IFB_Solicitation_08A3789_Final.pdf

PDF 701 KB Posted

Attached to
IFPQ Roofing Services, San Bernardino County
Solicitation number
08A3789
Issued by
San Bernardino County, San Bernardino City, California

About this file

This is an Invitation for Price Quote (IFPQ #08A3789) issued by the California Department of Transportation (Caltrans) for roofing services in San Bernardino County. The scope includes roofing replacement services at the Cajon Maintenance Station, specifically replacing roofs at the Repair Shop (7,285 sq ft) and Salt and Cinder Storage building (3,726 sq ft) with 80 mil thermoplastic polyolefin (TPO) roof systems and Securock installation. An optional pre-bid site inspection is scheduled for December 12, 2024 at 10:00 a.m. in West Cajon, CA. Written questions are due by December 12, 2024 at 5:00 p.m., with quotes due by December 19, 2024 at 5:00 p.m. The contract term is estimated to run from January 1, 2025 through December 31, 2025.

This solicitation is set aside for Small Business (SB), including Micro Business (MB), SB for Public Works (SB-PW), or Disabled Veteran Business Enterprise (DVBE) contractors, with a maximum contract value of $461,000. Prevailing wages apply if the total bid exceeds $15,000. Contractors must possess either a valid Class A General Engineer Contractor license, Class B General Building Contractor license, or C-39 Roofing Contractor license. A payment bond of 100% is required for bids exceeding $25,000. The contractor must also maintain specified insurance coverage including $1,000,000 per occurrence general liability and automobile liability.

View the file

Other files

File Type Posted
Addendum_1_Questions_and_Answers_08A3789.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation for Price Quote IFPQ Number 08A3789

ADMINISTRATION

DIVISION OF PROCUREMENT AND CONTRACTS

1727 30TH STREET, MS 65

SACRAMENTO, CA 95816-7006

PHONE (916) 227-6000

TTY 711

https://dot.ca.gov/programs/procurement-and-contracts/

December 5, 2024

Invitation for Price Quote (IFPQ)

IFPQ # 08A3789

Notice to Prospective Contractors

You are invited to review and respond to this Small Business (SB) Invitation for Price Quote (IFPQ), IFPQ 08A3789 titled Roofing Services in San Bernardino County. In submitting your quote, you must comply with the instructions found herein.

“This solicitation is authorized pursuant to Government Code Section 14838.7, which provides for the award of contracts for the acquisition of construction, including the erection, construction, alteration, repair, or improvement of any State structure, building, road, or other State improvement of any kind, that has an estimated value of greater than $5,000.00, but not more than $461,000.00, to a certified SB, including a micro business (MB), SB for the purpose of public works (SB-PW), or a disabled veteran business enterprise (DVBE). A bid over $461,000.00 will result in rejection of your bid due to non-responsiveness.”

This contract requires Prevailing Wages if the total bid amount exceeds $15,000. If the total bid amount is under $15,000, then Prevailing Wage language will be removed prior to award. Refer to Attachment 4, Proposed Form of Agreement, for requirement details.

In the opinion of the Caltrans, this IFPQ is complete and without need of explanation; however, if you have questions, or should you need any clarifying information, the contact person for this IFPQ is:

Tim Murphy California Department of Transportation (Caltrans) Email address: timothy.murphy@dot.ca.gov Phone: (279) 234-2662

Please note that no verbal information given will be binding upon Caltrans unless such information is issued in writing as an official addendum.

*Technical questions regarding this solicitation will be addressed, in writing and at an Optional Site Inspection to be held on December 12, 2024, in West Cajon, CA. See Section C1, Time Schedule, for more details.

ALL REQUIRED DOCUMENTS ARE EITHER ATTACHED (ATTACHMENTS 1 & 2) OR THE

DOCUMENT LINK IS PROVIDED ON ATTACHMENT 3, REQUIRED DOCUMENTS.

Sincerely, Tim Murphy Contract Analyst https://dot.ca.gov/programs/procurement-and-contracts/ mailto:timothy.murphy@dot.ca.gov

A) Purpose and Description of Services

1. Contractor shall furnish all labor, tools, equipment, materials, parts, travel, and incidentals necessary to provide roofing replacement services to the California Department of Transportation (Caltrans) Banning Maintenance Station and employee housing.

2. Refer to the Proposed Form of Agreement, Exhibit A, for a more complete description of services.

B) Bidder’s Minimum Qualifications

1. By submitting its bid, Bidder certifies, under penalty of perjury, that its Contractors State License

Board (CSLB) license is in a classification appropriate to the work to be undertaken as identified in the Proposed Form of Agreement, Exhibit A. This requirement has also been added in the Proposed Form of Agreement, Exhibit E. Refer to Section C, Price Quotation Requirements and Information, Contractor’s License, for submittal requirements. Caltrans will verify bidder’s Contractor License, and any Subcontractor Licenses, thus it is not necessary for bidders to provide a copy.

2. Bidder shall possess at the time of quote submittal, and for the duration of the Agreement, a valid and current registration with the Department of Industrial Relations (DIR). Caltrans will verify bidder’s DIR registration; it is not necessary to provide a copy.

3. Failure of Bidder to sufficiently provide any or all the minimum qualifications, in the opinion of Caltrans, will result in the Bidder’s bid deemed non-responsive.

C) Price Quotation Requirements and Information

1. Time Schedule

It is recognized that time is of the essence. All bidders are hereby advised of the following schedule and will be expected to adhere to the required dates and times.

Event Date Time (Pacific Time)

IFPQ available to prospective bidders 12/05/2024 Optional Pre-Bid Site Inspection 12/12/2024 10:00 a.m.

Written Question Submittal 12/12/2024 5:00 p.m.

Final Date for Quote Submission 12/19/2024 5:00 p.m.

Proposed Award Date (estimate) 12/23/2024

2. Optional Pre-Bid Site Inspection A. An optional pre-bid site inspection is scheduled at 10:00 a.m., December 12, 2024, at Cajon

Maintenance Station 14757 State Highway 138 West Cajon Valley, CA 92371 for the purpose of discussing concerns regarding this IFPQ.

B. In the event a potential prime contractor is unable to attend the optional pre-bid site inspection, an authorized representative may attend on its behalf. The representative may only sign in for one (1) company. Subcontractors may not represent a potential prime contractor at a pre-bid site inspection.

C. All prospective contractors are to be assembled at Caltrans, Cajon Maintenance Station 14757 State Highway 138 West Cajon Valley, CA 92371, at 10:00 a.m. Bidders must sign in (on the sheet provided) upon arrival and sign out upon completion of the walk-through activities.

Caltrans will conduct the site inspection of the facilities and disseminate any additional information to participants, if necessary.

3. Reasonable Accommodation

For bidders who have and need assistance due to a physical impairment, a reasonable accommodation will be provided upon request for the pre-bid site inspection. The bidder must call the designated Contract Analyst contact no later than the fifth (5th) working day prior to the scheduled date and time of the pre-bid site inspection to arrange for a reasonable accommodation.

4. Questions and Answers A. For bidders attending the site inspection, bring written questions to the inspection.

B. Questions regarding this IFPQ must be submitted in writing. Bidders are encouraged to submit their written questions by December 12, 2024.

C. Written questions must include the individual's name, firm name, complete address, and must reference IFPQ No. 08A3789. Questions must be sent to the following email:

Email: timothy.murphy@dot.ca.gov

D. Written responses to all questions will be collectively compiled and posted as an Addendum to the Cal eProcure website (https://caleprocure.com/pages/index.aspx). It is the responsibility of the Bidder to access the website for any changes or addenda that may be posted. Refer to Section C1, Time Schedule, for the schedule of events and dates/times. Bidder can contact the Contract Analyst named above.

5. ADM-1412 – Price Quote Proposal The total price quote proposal for this Agreement must not exceed $461,000.00. A price quote amount more than $461,000.00 will be deemed non-responsive and will be rejected.

6. Costs Included in Bid Rates Quotation prices/rates shall include the cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, contract bond premiums, and any other taxes or assessments, including, but not limited to, sales and use taxes required by law or otherwise and no additional allowance will be made thereof unless separate payment provisions in the Agreement should specifically so provide.

7. Employment of Undocumented Workers No State agency or department, as defined in Public Contract Code Section 10335.7, that is subject to this code, shall award a public works contract to a bidder or contractor, nor shall a bidder or contractor be eligible to bid for or receive a public works contract, who has, in the preceding five (5) years, been convicted of violating a State or Federal law regarding the employment of undocumented workers (Pub. Cont. Code Section 6101).

8. State Prevailing Wages State General Prevailing Wage Rates will apply for the County of Riverside as described in the attached Proposed Form of Agreement. The predetermined general prevailing wage rates published by the Director of Industrial Relations (DIR) may be obtained via the Internet at https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm or by contacting the Contract Analyst listed on the first page of this solicitation. It is the bidder's responsibility to use the correct classification determination published by the DIR. By signing the attached Bid/Bidder Certification Sheet, the Bidder acknowledges this is a public works contract subject to Labor Code Sections 1720-1861, and that if awarded this Agreement, it will be the Bidder’s responsibility to ensure that all prevailing requirements are met, including but not limited to the payment of appropriate prevailing wages rates to all employees who participate and perform services under this Agreement, Department of Industrial Relations registration, submittal of weekly certified payroll records, and employment of apprentices throughout the duration of the Agreement.

https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm

9. Mandatory Organic Waste Recycling

Contractor generating organic waste or commercial solid waste shall comply with SB 1383; also Contractor will arrange for recycling services required by this section in a manner that is consistent with State and local laws and requirements, including a local ordinance or local jurisdiction’s franchise agreement, applicable to the collection, handling, or recycling of organic waste and commercial solid waste. This requirement does not modify, limit, or abrogate the Contractor’s right to sell or donate its recyclable organic waste materials consistent with the requirements of Public Resources Code Section 42649.8 et seq. When applicable, Contractor must comply with these provisions.

10. Motor Carrier Permit Requirements A. Contractor is responsible for determining whether California Vehicle Code Sections 34601 and

34620 require Contractor to have a valid Motor Carrier Permit (MCP) issued by the Department of Motor Vehicles (DMV) in order for Contractor to lawfully perform any part or aspect of the work described in Exhibit A, Scope of Work, and, if California Vehicle Code Sections 34601 and 34620 do require same for any part or aspect of such work, Contractor must have a valid MCP(s) issued from the DMV for its services as a Motor Carrier of Property under this Agreement. Contractor shall pay any required fees necessary to obtain and maintain in good standing during the entire term of this Agreement any such required MCP(s).

B. MCP(s), if any, required for Contractor’s Motor Carriers of Property under California Vehicle Code Sections 34601 and 34620 shall be on file with Contractor for the duration of this Agreement. Upon request of Caltrans Contract Manager or their designee, Contractor must immediately provide to Caltrans a copy of the required MCP(s), if any.

11. Contractor Registration Program A. No Contractor or Subcontractor may be listed on a bid proposal for a contract with prevailing wages unless registered with the DIR, pursuant to Labor Code Section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a)).

B. No Contractor or Subcontractor may be awarded a contract with prevailing wages unless registered with DIR pursuant to Labor Code Section 1725.5.

C. Caltrans will verify each of the registration numbers provided by the bidder prior to Agreement award. Bidders that do not possess the required DIR registration will be deemed non-responsive and rejected from further consideration in the solicitation process.

12. Contractor’s License Bidder must have, at time of quote submittal and for the duration of the contract, either a valid, current Class A General Engineer Contractor license or a Class B General Building Contractor license or a C-39 Roofing Contractor license issued by the CSLB, for the type of work to be performed. Bidder shall obtain, pay for, and maintain, in good standing, all necessary licenses and permits to accomplish the work. Bidders will be considered non-responsive unless proper licensing requirements are met. An invalid license will result in rejection of the bid. Positive verification of a valid license issued by the CSLB will be performed by Caltrans (Bus. and Prof. Code Section 7028.15).

13. Subcontractors Bidder may subcontract portions of the work as defined in the attached Proposed Form of Agreement. If a Subcontractor(s) is used, complete the Bidder Declaration (GSPD–05-105).

Bidder must ensure Subcontractor(s) shall have all necessary licenses, permits, and/or certifications to accomplish its portion of the work. Failure of a Subcontractor(s) to have the proper licenses, permits, and/or certifications, shall be cause for rejection of price quote. Contractor may only subcontract portions of the work to a qualified Department of General Services (DGS) Certified

Small Business (SB)/Micro Business (MB)/SB for the purpose of Public Works (SB-PW), or Disabled Veteran Business Enterprise (DVBE), with the same status of Contractor. No work may be subcontracted to any business not certified as a SB/MB/SB-PW or DVBE by DGS. Contractor must ensure the Subcontractor(s) is DGS Certified SB/MB/SB-PW or DVBE and has all necessary licenses, permits, and/or certifications to accomplish its portion of the work.

14. Standard Title VI/Nondiscrimination Assurances (DOT Order No. 1050.2A) Caltrans, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Statute 252, 42 USC Sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any Agreement entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

15. Non-Collusion Declaration for Public Works The winning bidder must submit a non-collusion declaration for public works during the Agreement award process. Failure to submit a complete declaration shall be grounds for rejection of bid.

16. Bonds Payment Bond Requirement: If the successful bidder’s bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have. Inadequate or lack of a Payment Bond does not negate the Contractor’s obligations under this Agreement.

17. Insurance A. The bidder who receives the Agreement award must provide a Certificate of Insurance providing proof of insurance to the Division of Procurement and Contracts within 10 working days from the date of notification of award. The State’s Office of Risk and Insurance Management will review insurance certificates and/or proof of self-insurance documentation before execution of the Agreement. Refer to the Proposed Form of Agreement, Exhibit E, for the applicable and specific Insurance requirements and coverage limits.

B. The insurance carrier shall provide an endorsement for the additional insured statement as follows:

Caltrans, State of California, its officers, agents, and employees shall be included as additional insured, but only with respect to work performed for the State of California under this Agreement.

C. The additional insured endorsement must accompany the certificate of insurance.

D. Satisfying a Self-Insured Retention (SIR)

All insurance required by this Agreement must allow, but not require, the State to pay any SIR and/or act as Contractor’s agent in satisfying any SIR. The choice to pay any SIR and/or act as Contractor’s agent in satisfying any SIR is at the State’s discretion. If the State chooses to pay any SIR and/or act as Contractor’s agent in satisfying any SIR, Contractor shall reimburse the State for the same.

E. Available Coverages/Limits

In the event the insurance coverages obtained by Contractor is broader in scope than, and/or the limits are higher than, those required under the Agreement, all such broader coverage and/or higher limits available to Contractor shall also be available and applicable to the State.

18. California Civil Rights Laws Any person that submits a bid with a state agency, with respect to any Agreement in the amount of one hundred thousand dollars ($100,000) or more, shall certify, under penalty of perjury, at the time the bid is submitted, that they satisfy all of the conditions set forth in California Public Contract Code Section 2010 and they shall execute the California Civil Rights Law Certification (ADM- 0076), completed, signed, and returned with its bid or proposal.

19. Darfur Contracting Act A. The Darfur Contracting Act, Public Contract Code Sections 10475-10481, applies to any company that currently or within the previous three (3) years has had business activities or other operations outside of the United States. The Act was passed by the California Legislature and signed into law by the Governor to preclude State agencies generally from contracting with “scrutinized” companies that do business in the African nation of Sudan (of which the Darfur region is a part), for the reasons described in Public Contract Code Section 10475. All bidders shall complete the Darfur Contracting Act Certification (ADM-0077) and submit with the proposal.

B. If your company has not, within the previous three (3) years, had any business activities or other operations outside of the United States, complete Option 1 on the ADM-0077.

C. A scrutinized company is a company doing business in Sudan as defined in Public Contract Code Section 10476. Scrutinized companies are ineligible to, and cannot, bid on or submit a proposal for an Agreement with a State agency for goods or services (Pub. Cont. Code Section 10477(a)).

D. Therefore, Public Contract Code Section 10478(a) requires a company that currently has (or within the previous three (3) years has had) business activities or other operations outside of the United States to certify that it is not a “scrutinized” company, during the Agreement award process with a State agency.

E. A scrutinized company may still, however, submit a bid or proposal for a Contract with a State agency for goods or services if the company first obtains permission from the Department of General Services (DGS) according to the criteria set forth in Public Contract Code Section 10477(b).

20. Price Quote Submittal A. The price quote should be emailed as described below. The price quote must be received by the Caltrans, Division of Procurement and Contracts (DPAC), by dates and times shown in Section C, Price Quotation Requirements and Information.

B. The price quote email should be clearly marked with the IFPQ number, title, and ‘PRICE QUOTATION SUBMITTAL’, as shown in the following example:

IFPQ Number: 08A3789

PRICE QUOTATION SUBMITTAL–DO NOT OPEN

C. All quotes shall include the documents identified in the IFPQ; see Attachment 3, Required Documents. Quotes not including the required documents may be deemed non-responsive. A non-responsive price quote is one that does not meet the basic quote requirements.

D. Only an individual who is legally authorized to bind the proposing firm contractually shall sign all documents requiring a signature, and each document must bear a signature.

E. Email to: timothy.murphy@dot.ca.gov

F. Pursuant to Government Code Section 14838.7, Caltrans must receive at least two (2) price quotes from certified SB/MBs or at least two (2) price quotes from DVBEs before it can make an Agreement award. Therefore, at Caltrans’ discretion, if only one price quote is received, the timeframe for receipt of price quotes may be extended in order to receive the minimum number of quotes required by the Government Code. All prospective bidders will be notified via email or telephone of any extensions.

G. Price quotes must include the performance of all the services described herein. Any attempt to modify the Price Quote Proposal document to deviate from the work specifications will not be considered and will cause a price quote to be rejected.

H. A price quote may be rejected if it is conditional, incomplete, or if it contains any alterations of form or other irregularities of any kind. Caltrans may reject any price quote on the basis that it is not responsive or from responsible bidder and may waive any immaterial deviation in a quote.

Caltrans’ waiver of an immaterial defect shall in no way modify the IFPQ document or excuse the bidder from full compliance with all requirements if awarded the Agreement.

I. Costs for developing price quotes and in anticipation of award of the Agreement are entirely the responsibility of the bidder and shall not be charged to Caltrans.

J. A bidder may modify a price quote after its submission by first withdrawing the original price quote and then by resubmitting a new price quote prior to the price quote submittal deadline.

Bidder modifications offered in any other manner, oral or written, will not be considered.

K. A bidder may withdraw a price quote by, prior to price quote submission deadline, submitting a written withdrawal request to Caltrans, at timothy.murphy@dot.ca.gov, signed by the bidder or an agent authorized in accordance with Section L, below. A bidder may thereafter submit a new price quote prior to the price quote submittal deadline. Price quotes may not be withdrawn without cause subsequent to the price quote submittal deadline.

L. Only an individual who is authorized to bind the bidding firm contractually shall sign the attached Bid/Bidder Certification Sheet. The signature must also indicate the title or position that the individual holds in the firm. An unsigned price quote may be cause for bid rejection.

M. Caltrans may modify the IFPQ prior to the date fixed for submission of price quotations by the issuance of an addendum sent to all parties who received an IFPQ package.

N. Caltrans reserves the right to reject all price quotes for reasonable cause.

O. Bidders are cautioned not to rely on Caltrans during its evaluation process to discover and report to the bidder any defects and errors in the submitted documents. Before submitting their documents, bidders should carefully proof them for errors and full adherence to the IFPQ requirements.

P. Where applicable, bidder should carefully examine work sites and specifications. Bidder shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the Agreement amount will be made due to a lack of careful examination of work sites and specifications.

Q. Caltrans does not accept alternate Agreement language from a bidder. A price quote with such language will be considered a counter proposal and will be rejected. The State’s General Terms and Conditions (GTC 04/2017) are not negotiable. The GTC 04/2017 may be viewed at Internet site https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services- Resources-List-Folder/Standard-Contract-Language.

21. Evaluation and Selection A. At the time of quote opening, each price quote will be checked for the presence or absence of required information in conformance with the submission requirements of this IFPQ.

mailto:timothy.murphy@dot.ca.gov https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language

B. Caltrans will evaluate each price quote to determine its responsiveness to Caltrans’ needs.

C. Price quotes that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, shall be rejected.

D. The Agreement, if awarded, shall be awarded to the responsible bidder who submits the lowest price quote and meets all the specifications. A price quote meets the specifications if it complies with all the requirements in this solicitation. In the event of a tie quote, Caltrans will draw lots to determine the successful bidder. Only one (1) price quote may be submitted by an entity:

individual, firm, partnership, corporation, joint venture, or combination thereof. Receipt of more than one (1) price quote from an entity will result in all quotes from that entity being rejected and returned to the bidder.

22. Standard Conditions of Service A. Service shall not begin before the start date set forth in the Agreement. After all approvals have been obtained, and the Agreement is executed should Contractor fail to commence work at the agreed upon time, Caltrans, upon five (5) days written notice to contractor, reserves the right to terminate the Agreement. In addition, contractor shall be liable to Caltrans for the difference between contractor’s quote price and the actual cost of performing the work by the second low bidder or by another contractor.

B. All performance under the Agreement shall be completed on or before the expiration date of the Agreement.

C. Antitrust Provisions

1) Bidder offers and agrees, and will require all of his other Subcontractors and suppliers to agree, that if the bid is accepted to assign to the awarding body all rights, title, and interest in and to all causes of action they may have under Section 4 of the Clayton Act (15 USC Section 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works Agreement or subcontract. The assignment made by Contractor and all additional assignments made by Subcontractors and suppliers shall be deemed to have been made and will become effective at the time the awarding body tenders final payment to Contractor without further acknowledgment or the necessity of tendering to the awarding body any written assignments.

2) If an awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under Government Code Sections 4550-4554, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, and attributable overcharges that were paid by the assignor but were not paid by the public body as a part of the price quote, less the expenses incurred in obtaining that portion of the recovery.

3) Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under Government Code Sections 4550- 4554 if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action (See Government Code Section 4554).

D. If bidder is awarded Agreement and refuses to sign Agreement presented for signature within time and manner required, bidder will be liable to Caltrans for actual damages resulting to Caltrans therefrom or 10 percent (10%) of the amount quoted, whichever is less.

E. Loss Leader usage is prohibited in this Solicitation: It is unlawful for any person engaged in business within this State to sell or use any article or product as a "loss leader" as defined in Business and Professions Code Section 17030. "Loss Leader" means any article or product sold at less than cost: a) where the purpose is to induce, promote, or encourage the purchase of other merchandise; or b) where the effect is a tendency or capacity to mislead or deceive purchasers of prospective purchasers; or c) where the effect is to divert trade from or otherwise injure competitors.

F. No oral understanding or agreement shall be binding on either party.

23. Executive Order N-6-22 – Russia Sanctions

On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law unless the contract has been Federalized (i.e. there is federal participation in any phase). By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.

24. Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting

A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.

B. Bidder/Offeror/Contractor must notify the State in writing if their solution or service includes, or makes available, any GenAI including GenAI from third parties or subcontractors.

C. The State has developed a GenAI Reporting and Factsheet (STD 1000) to be completed by the Bidder/Offeror/Contractor.

D. Failure to submit the GenAI Reporting and Factsheet (STD 1000) will result in disqualification of the Bidder/Offeror/Contractor.

E. Failure to report GenAI to the State may void any resulting contract. The State reserves its right to seek any and all relief it may be entitled to as a result of such non-disclosure.

F. Upon receipt of a Bidder/Offeror/Contractor GenAI Reporting and Factsheet (STD 1000), the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.

https://www.gov.ca.gov/wp-content/uploads/2022/03/3.4.22-Russia-Ukraine-Executive-Order.pdf https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std1000.pdf

STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION

Agreement Number 08A3789

PRICE QUOTE PROPOSAL

ADM-1412 (REV. 10/2024) Attachment 1

Contractor’s Name (Please Print):

Item Number

Estimated Quantity

Unit of Measure Item

Unit Price (Price Per Unit of Measure)

Total (Estimated Quantity X

Unit Price)

1 1 Lump Sum

All labor, tools, equipment, materials, parts, travel, and incidentals to remove existing roof and replace the roof at the Cajon Maintenance Station (MS) Repair Shop and the Cajon MS Cinder Storage, with 80 Mil PTO and ½ inch Securock per STD 213, Exhibit A, Scope of Work

2 100 Hours All non-routine labor for Roofing Repair at the Riverside Maintenance Station per Exhibit A, Scope of Work $ $

Maximum allowable expenditure for all materials, supplies, parts, fees, and permits per Exhibit A. Actual costs will be reimbursed based on submitted original receipts. Enter 2 percent (2%) of the Total amount in Item Number 1 (0.02 x Total) here.

1) The above quantities are estimates only and are given as a basis for comparison of quotes. No guarantee is made or implied as to the exact quantity that will be needed.

2) In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail.

3) Please do not alter, modify, or change this quote proposal sheet. Any alterations, modifications, or changes to this quote proposal sheet will be grounds to reject the quote.

4) Each line item must be quoted. Please do not leave any unit price column blank or this quote proposal sheet will be deemed non-responsive.

Total Proposal $

Attachment 2

Bid/Bidder Certification Sheet

Only an individual who is authorized to bind the bidding firm contractually shall sign the Bid/Bidder Certification Sheet. The signature must indicate the title or position that the individual holds in the firm.

This Bid/Bidder Certification Sheet must be signed and returned along with all "required attachments" as an entire package. The bid must be transmitted in a sealed envelope in accordance with IFPQ instructions.

G. Our all-inclusive proposal is submitted in a sealed envelope marked “Price Quote Proposal–Do Not

Open”.

H. All required attachments are included with this certification sheet.

I. The signature affixed hereon and dated certifies compliance with all the requirements of this proposal document. The signature below authorizes the verification of this certification.

J. The signature and date affixed hereon certifies that this proposal is a firm offer for a 90-day period.

An Unsigned Bid/Bidder Certification Sheet May Be Cause for Bid Rejection

1. Company Name 2. Telephone Number 2a. Fax Number

2b. Email Address

3. Address

Indicate your organization type:

4. Sole Proprietorship 5. Partnership 6. Corporation Indicate the applicable employee and/or corporation number:

7. Federal Employee ID No. (FEIN) 8. California Corporation No.

Indicate the Department of Industrial Relations information:

9. Contractor Registration Number Indicate applicable license and/or certification information:

10. Contractors State License Board

Number

11. PUC License Number

CAL-T-

12. Required

Licenses/Certifications

13.Proposer’s Name (Print) 14. Title

15. Signature 16. Date

17. Are you certified with the Department of General Services, Office of Small Business and Disabled Veteran Business Enterprise Services (OSDS) as:

a. Small Business Enterprise Yes No If yes, enter certification number:

b. Disabled Veteran Business Enterprise Yes No If yes, enter your service code below:

Note: A copy of your Certification is required to be included if either of the above items is checked “Yes”.

Date application was submitted to OSDS, if an application is pending: _________________

Attachment 2

Bid/Bidder Certification Sheet

Completion Instructions for Bid/Bidder Certification Sheet

Complete the numbered items on the Bid/Bidder Certification Sheet by following the instructions below.

Item Numbers Instructions

1, 2, 2a, 2b, 3 Must be completed. These items are self-explanatory.

Check if your firm is a sole proprietorship. A sole proprietorship is a form of business in which one person owns all the assets of the business in contrast to a partnership and corporation. The sole proprietor is solely liable for all the debts of the business.

Check if your firm is a partnership. A partnership is a voluntary agreement between two or more competent persons to place their money, effects, labor, and skill, or some or all of them in lawful commerce or business, with the understanding that there shall be a proportional sharing of the profits and losses between them. An association of two or more persons to carry on, as co-owners, a business for profit.

Check if your firm is a corporation. A corporation is an artificial person or legal entity created by or under the authority of the laws of a state or nation, composed, in some rare instances, of a single person and his successors, being the incumbents of a particular office, but ordinarily consisting of an association of numerous individuals.

7 Enter your Federal employee tax identification number.

Enter your corporation number assigned by the California Secretary of State. This information is used to verify if a corporation is in good standing and qualified to conduct business in California.

Enter your Contractor Registration Number assigned by the Department of Industrial Relations (DIR). This Information will be used to determine if you are registered with DIR.

Complete if your firm holds a California contractor’s license. This information will be used to verify possession of a contractor’s license for public works agreements.

11 Complete if your firm holds a PUC license. This information will be used to verify possession of a PUC license for public works agreements.

12 Complete, if applicable, by indicating the type of license and/or certification that your firm possesses and that is required for the type of services being procured.

13, 14, 15, 16 Must be completed. These items are self-explanatory.

If certified as a Small Business Enterprise, place a check in the “Yes” box, and enter your certification number on the line. If certified as a Disabled Veteran Business Enterprise, place a check in the “Yes” box and enter your service code on the line. If you are not certified to one or both, place a check in the “No” box. If your certification is pending, enter the date your application was submitted to the Department of General Services, Office Small Business and DVBE Services. To get certified, go to https://www.dgs.ca.gov/PD/About/Page-Content/PD-Branch- Intro-Accordion-List/Office-of-Small-Business-and-Disabled-Veteran-Business- Enterprise/Certification-Program.

https://www.dgs.ca.gov/PD/About/Page-Content/PD-Branch-Intro-Accordion-List/Office-of-Small-Business-and-Disabled-Veteran-Business-Enterprise/Certification-Program https://www.dgs.ca.gov/PD/About/Page-Content/PD-Branch-Intro-Accordion-List/Office-of-Small-Business-and-Disabled-Veteran-Business-Enterprise/Certification-Program https://www.dgs.ca.gov/PD/About/Page-Content/PD-Branch-Intro-Accordion-List/Office-of-Small-Business-and-Disabled-Veteran-Business-Enterprise/Certification-Program

Attachment 3

Required Documents

The following documents should be submitted, or your bid may be considered non-responsive.

Do not submit this checklist, the Proposed Form of Agreement, company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFPQ Requirements and/or as listed below.

☐ Attachment 1 – Price Quote Proposal (ADM-1412)

☐ Attachment 2 – Bid/Bidder Certification Sheet

☐ Bidder Declaration (GSPD 05-105) Bidder Declaration

☐ Quotes from Subcontractors (on SB/DVBE letterhead)

☐ California Civil Rights Laws Certification (ADM-0076) California Civil Rights Laws Certification

☐ Darfur Contracting Act Certification (ADM-0077) Darfur Contracting Act Certification

☐ STD 1000 GenAI Reporting and Factsheet

The following documents will be requested of the WINNING BIDDER at time of contract award;

they are NOT required at time of bid submittal:

☐ Contractor Certification Clauses (CCC 04/2017) Contractor Certification Clauses

☐ Payment Bond Payment Bond ☐ Non-Collusion Declaration Non-Collusion Declaration

☐ Insurance (Requirements outlined in Proposed Form of Agreement, Exhibit E, Items 1 & 2)

☐ Payee Data Record (STD 204) Payee Data Record https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077 https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std1000.pdf https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM2009 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1418 https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf

Attachment 4

Proposed Form of Agreement

Note to Bidders: The following pages represent a sample of the Agreement that will be awarded, if any, from this IFPQ. Please review it carefully and present any questions in writing to the contact identified for this IFPQ.

2. The term of this Agreement is:

Contractor’s Name TBD

Exhibit A

Public Works (State)

Scope of Work

1. Contractor shall furnish all labor, tools, equipment, materials, parts, travel, and incidentals necessary to provide roofing removal and replacement services to the California Department of Transportation (Caltrans) Cajon Maintenance Station.

2. The services shall be performed at the following location:

Cajon Maintenance Station 14757 State Highway 138 West Cajon Valley, CA 92371

3. Any reference to Caltrans Contract Manager shall also include designee.

4. This Agreement will commence on January 1, 2025 (estimate), or upon approval by

Caltrans, whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by Caltrans. Contractor shall not receive payment for work performed prior to approval of the Agreement and before receipt of notice to proceed by Caltrans Contract Manager. This Agreement will expire on December 31, 2025 (estimate).

The services shall be provided during normal business hours Monday through Friday 7:00 a.m. to 3:30 p.m., excluding State holidays. The parties may amend this Agreement as permitted by law.

5. This Agreement cites specific portions of the most current version of the Caltrans 2023 Standard Specifications and the revised 2023 Standard Specifications (herein collectively referred to as the “Standard Specifications”). The Standard Specifications can be accessed via the Internet at: https://dot.ca.gov/programs/design/july-2023-ccs-standard-plans-and-standard-specifications. Only the sections of the Standard Specifications cited in this Agreement are requirements and are hereby incorporated by this reference as if attached to this Agreement. All other portions of the Standards Specification are not applicable to this Agreement.

6. All inquiries during the term of this Agreement will be directed to the project representatives listed below:

California Department of Transportation (Caltrans):

Contractor TBD

Section/Unit: District 08/Maintenance Project Manager:

Caltrans Contract Manager: TBD

Address: 464 West 4th Street San Bernardino, CA 92401

Address (Street Address, City, State, Zip Code):

Business Phone Number: Business Phone Number:

Email: Email:

7. Detailed Description of Work A. Contractor shall expose, remove, and dispose of the existing damaged roofing material and sheathing and any damaged insulation and wood. Rain gutters, downspouts, and roof extrusions, if necessary, shall be removed and protected on site (see Section F below). Contractor shall prepare the substrate, furnish, and install roofing material, rain https://dot.ca.gov/programs/design/july-2023-ccs-standard-plans-and-standard-specifications https://dot.ca.gov/programs/design/july-2023-ccs-standard-plans-and-standard-specifications gutters, downspouts, fasteners, roof ventilation, and other materials which are required to prepare work area, to replace roof with a complete waterproof assembly, meeting the performance requirements specified herein.

B. Contractor shall carefully remove the existing roofing material so that no damage occurs to the supporting roof deck, joists, fascia, or any other part of the building. Damage caused by Contractor during the roof removal shall be replaced with like material of equal or better quality at Contractor's expense, which shall include the same section depth, lip width, and gauge thickness of the member damaged.

C. Contractor shall replace existing rot or water-damaged sheeting or decking with equivalent or similar materials, ensuring the replacement matches the same section depth, lip width, and gauge thickness of the damaged member. Materials must be pre-approved by Caltrans Contract Manager.

D. The new roof system shall be subject to Caltrans Contract Manager's approval and shall match the existing color. No work shall begin without prior written approval from Caltrans Contract Manager.

E. If any turbines, attic vents, aluminum rain gutters, rigid insulation, flashing metal, fascia board and down spouts are damaged during removal, Contractor shall replace to equal or better quality at no cost to Caltrans.

F. Contractor shall apply temporary protection, such as tarp or plastic covering, and anchoring such material with wood lath nails, staples and/or fastening devices to ensure the structure will be watertight until roof repairs can be made. Plastic sheathing shall not be less than six millimeters (6 mm) thick.

G. Caltrans Contract Manager will approve replacement materials and any work that may be required to repair hidden defects below roofing layer, including but not limited to, sheathing or roof supports prior to installation of the replacement materials.

H. The Cajon Maintenance Station Repair Shop, 7,285 square (sq) feet (ft) remove current roof material and dispose to an approved disposal site. Install 80 mil thermoplastic polyolefin (TPO) roof system fully to all walls and base flashings, one layer of Securock or like material that is up to two inches (2") with screws and plates, replace any damage material with likewise material. Install new roof accessories, molded pipes boots, T-tops, corners, T-Joints, sealant pockets, drip edge metal, termination bar, and counter flash.

I. Cajon Maintenance Station Salt and Cinder Storage, 3726 square (sq) feet (ft) remove current roof material and dispose to an approve disposal site. Install 80 mil TPO roof system fully to all walls and base flashings, one layer of Securock or like material that is up to two inches (2") with screws and plates, replace any damage material with likewise material. Install new roof accessories, molded pipes boots, T- tops, corners, T-Joints, sealant pockets, drip edge metal, termination bar, and counter flash.

8. Safety A. Contractor shall have at least two (2) employees at the work site when working on the roof.

B. Contractor shall be responsible for inspecting and identifying any mold presence in the materials and shall treat or replace any mold-contaminated material as necessary. The cost of addressing and resolving any mold issues shall be at Contractor’s sole expense.

9. Materials A. Contractor shall furnish all new materials required to complete the roofing work. Only materials conforming to the Uniform Building Code shall be incorporated in the work.

B. Materials shall be manufactured, handled, and used in a workmanlike manner to ensure completed work. Materials will be subject to inspection by Caltrans Contract Manager.

Contractor shall furnish samples without charge to Caltrans Contract Manager upon request.

C. Contractor shall assure Caltrans Contract Manager has free access, at all times, to materials being installed.

D. Any manufacturer's warranties, guarantees, instruction sheets, and parts lists shall be turned over to Caltrans Contract Manager prior to the start of work.

E. Materials to be disposed of shall be in a legal manner at no cost to Caltrans. Costs involved with disposing of material shall be included in the bid rate.

F. Products used for roofing projects shall be fully compatible with existing substrates.

Contractor shall install roofing materials that are compatible with one another under conditions of service and application required, as directed by roofing system manufacturer based on whose testing and field experience.

10. Defective Materials All materials, supplied by Contractor, which Caltrans Contract Manager has determined to not conform to the requirements of this Agreement, will be rejected whether in place or not.

The rejected material(s) shall be removed immediately from the site of work, unless otherwise directed by Caltrans Contract Manager. No rejected material, the defects of which have been subsequently corrected, shall be used in the work, unless advance approval in writing has been given by Caltrans Contract Manager. Upon failure of Contractor to comply promptly with any order of Caltrans Contract Manager regarding defective materials, Caltrans Contract Manager will have authority to cause the removal and replacement of rejected material and to deduct the cost thereof from any money due or to become due to Contractor.

11. Quality Assurance or References Contractor shall ensure that all Codes, Standards, State and local laws, rules and regulations are followed, including but not limited to:

A. National Roofing Contractors Association (NRCA), Roofing and Waterproofing Manual.

B. Factory Mutual (FM) 4450: Approval Standard for Class 1 Insulated Steel Deck Roofs.

C. FM 4470: Approval Standard Class 1 Roof Covers, Approval Guide.

D. Single-Ply Roofing Institute (SPRI): "Wind Load Design Guide for Low Sloped Flexible

Membrane Roofing Systems"; "Fastener Selection Guide".

E. American National Standards Institute/Single Ply Roofing Industry (ANSI/SPRI) FX-1

"Standard Field Test Procedure for Determining the Withdrawal Resistance of Roofing https://www.nrca.net/ https://standards.globalspec.com/std/20782/FMAPPROVAL%204450 https://store.accuristech.com/standards/fm-approvals-4470?product_id=1945360 https://www.spri.org/download/ansi-spri_standards_2020_restructure/es-1/ANSI_SPRI_FM-4435-ES-1_2011_08042020.pdf https://www.spri.org/download/ansi-spri_standards_2020_restructure/es-1/ANSI_SPRI_FM-4435-ES-1_2011_08042020.pdf https://docs.rs-online.com/bfaf/0900766b81533e36.pdf https://www.ansi.org/

Fasteners"; and ANSI/SPRI ES-1 "Wind Design Guide for Edge Systems Used with Low Slope Roofing Systems".

F. The publications listed below form a part of this Agreement to the extent referenced. The publications are referred to in the text by the basic designation only.

1) American Society for Testing and Materials (ASTM) E108 Fire Tests of Roof

Coverings.

2) FM A/S4470 Class I Roof Covers.

3) FM DS/1-28 Wind Loads to Roof Systems and Roof Deck.

4) FM DS/1-29 Above-Deck Roof Components FM P7825 Approval Guide.

5) Underwriters Laboratories (UL) Solutions Roofing Materials and Systems Directory

(RMSD), which can be accessed at: http://www.ul.com.

6) UL 790 Standard Test Methods for Fire Tests of Roof Coverings.

7) UL Solutions Fire Resistance of Roof Covering Materials, which can be accessed at http://www.ul.com.

8) California Building Code (CBC), Section 1609, Wind Loads to Roof…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .