IFB Lump Sum Division Spreadsheet.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 36C78623B0016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78623B0016 0002.docx | DOCX document | |
| 36C78623B0016 0001.docx | DOCX document | |
| Drawings-Rock Island.pdf | ||
| Limitations on Subcontracting Certificate for 823MM23004 Replace Committal Shelter.docx | DOCX document | |
| FAR 52.219-28 Post-Award Small Business Program Rerepresentation (MAR 2023).docx | DOCX document | |
| Past Performance.pdf | ||
| 36C78623B0016_1.docx | DOCX document | |
| Combined Specs.pdf | ||
| RFI Form.docx | DOCX document | |
| Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| Solicitation Number | 36C78623B0014 |
| Project Number | 823MM23004 |
| Project Name | Replace Committal Shelter at Wood National Cemetery |
| Division | CLIN1 | CLIN 2 | TOTAL CLIN 0001 & 0002 | BID OPTION 1 | BID OPTION 2 | BID OPTION 3 | BID OPTION 4 | BID OPTION 5 | BID OPTION 6 | BID OPTION 7 | BID OPTION 8 | GRAND TOTAL CLIN 0001, 0002, and BID OPTIONS 1-8 |
| Division 0 | ||||||||||||
| Special Sections | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 1 | ||||||||||||
| General Requirements | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 2 | ||||||||||||
| Existing Conditions | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 3 | ||||||||||||
| Concrete | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 4 | ||||||||||||
| Masonry | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 5 | ||||||||||||
| Metals | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 6 | ||||||||||||
| Wood and Plastic | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 7 | ||||||||||||
| Thermal and Moisture | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 8 | ||||||||||||
| Doors and Windows | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 9 | ||||||||||||
| Finishes | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 10 | ||||||||||||
| Specialties | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 11 | ||||||||||||
| Equipment | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 12 | ||||||||||||
| Furnishings | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 13 | ||||||||||||
| Special Construction | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 22 | ||||||||||||
| Plumbing | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 23 | ||||||||||||
| Heat, Ventilating, and Air Conditioning | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 25 | ||||||||||||
| Integrated Automation | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 26 | ||||||||||||
| Electrical | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 27 | ||||||||||||
| Communications | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 28 | ||||||||||||
| Electronic Safety and Security | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 31 | ||||||||||||
| Earthwork | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 32 | ||||||||||||
| Exterior Improvements | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Division 33 | ||||||||||||
| Utilities | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
| Bonds | ||||||||||||
| $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| TOTAL PRICE | CLIN1 | CLIN 2 | TOTAL CLIN 0001 & 0002 | BID OPTION 1 | BID OPTION 2 | BID OPTION 3 | BID OPTION 4 | BID OPTION 5 | BID OPTION 6 | BID OPTION 7 | BID OPTION 8 | |
| $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
TOTAL CONTRACT PRICE (CLINS 0001 & 0002 PLUS ADD ALTERNATE OPTIONS 0001 THROUGH 0008): $