IFB Lump Sum Division Spreadsheet.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Y1PZ--806-NRM2425-006 Repair Pole Barn (trusses) at Camp Butler NC
Solicitation number
36C78625B0014
Issued by

About this file

The file is an Invitation for Bid (IFB) Lump Sum Division Spreadsheet for a Department of Veterans Affairs project to repair pole barn trusses at Camp Butler National Cemetery in Springfield, IL. The solicitation (36C78625B0014) requires bidders to provide a comprehensive lump sum breakdown across 25 construction divisions, including General Requirements, Concrete, Metals, Wood, Electrical, Plumbing, and other critical construction categories. Contractors must complete the spreadsheet by entering lump sum amounts for each division, with the option to mark divisions not applicable as "N/A", ultimately calculating a grand total that represents the complete project cost. The spreadsheet serves as a detailed pricing template for the project, allowing precise cost allocation across various construction disciplines.

View the file

Other files

File Type Posted
36C78625B0014 0003.docx DOCX document
36C78625B0014 0002.docx DOCX document
36C78625B0014 0001.docx DOCX document
36C78625B0014_1.docx DOCX document
Specification 806-NRM2425-006 Repair Pole Barn Trusses at CBNC.zip ZIP file
VAAR 852.219-75 VA Notice of Limitations On Subcontracting Certificate.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

IFB Lump Sum Division Spreadsheet
Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number.

If a Division is not being used put N/A in that field.

You can Add additional items you feel are appropriate.

Solicitation Number36C78625B0014
Project Nunber806-NRM2425-006
Project NameRepair Pole Barn (trusses) at Camp Butler NC
DivisionUnitCLIN 001Total
Division 0
Special Sections
Division 01
General Requirements
Division 02
Existing Conditions
Division 03
Concrete
Division 04
Masonry
Division 05
Metals
Division 06
Wood, Plastic, and Composites
Division 07
Thermal and Moisture Protection
Division 08
Openings (Doors, Windows, etc...)
Division 09
Finishes
Division 10
Specialties
Division 11
Equipment
Division 12
Furnishings
Division 13
Special Construction
Division 14
Fire Suppression
Division 22
Plumbing
Division 23
Heat, Ventilating, and Air Conditioning
Division 25
Integrated Automation
Division 26
Electrical
Division 27
Communications
Division 28
Electronic Safety and Security
Division 31
Earthwork
Division 32
Exterior Improvements
Division 33
Utilities
Bonds

Overhead

Profit

GRAND TOTALS $ $

File details come from the government source that posted it. Updated .