IFB J27219 EQUIPMENT LIST SERVICE SCHEDULE.pdf
PDF 270 KB Posted
- Solicitation number
- B27000550
- Issued by
- Hawaii
About this file
This is an Equipment List Service Schedule document for IFB J27219, a maintenance contract for the Judiciary, Second Circuit (Hoapili Hale) located in Hawaii. The contractor shall provide complete maintenance, inspections, and diagnostics for the facility's air conditioning and ventilation systems in accordance with attached specifications and general conditions. The schedule outlines mechanical equipment requiring service across multiple building levels (designated A through L), including storm sumps and pumps, sewage sumps, exhaust fans, chillers, cooling towers, air handling units (AHUs), variable frequency drives (VFDs), water coolers, and rooftop equipment. Service requirements are categorized by frequency—monthly, quarterly, tri-annual, semi-annual, and annual—with specific filter and belt replacement intervals noted. The document provides detailed unit descriptions, room locations, area descriptions, and manufacturer/model information for approximately 200+ individual pieces of equipment distributed throughout the five-story facility and roof areas.
The service schedule is presented as a monthly template repeating throughout a twelve-month period, with dedicated sections for each month (January through December) and columns for recording service dates, technician information, and maintenance comments. Equipment ranges from small utility items such as water coolers to major systems including multiple Carrier air handlers, Trane helical chillers, Evapco cooling towers, and associated pump and drive systems. Critical chiller room equipment (designated Level E/P-5) requires the most frequent service intervals including monthly, quarterly, and tri-annual maintenance. The schedule reflects a comprehensive preventive maintenance program designed to ensure optimal operation of a complex mechanical infrastructure serving judicial facilities, with service documentation and compliance tracking integrated into the monthly reporting structure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hoapili Hale - Mechanical Equipment/Service Schedule X=Services Due
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Filter Belts Unit Model # Motor Model # A Level P-1
A-1 Storm Sump #3, Pump #1 P-1 X X N/A N/A Paco Pump 5K215DL3143B- 5hp.
A-2 Storm Sump #3, Pump #2 P-1 X X N/A N/A Paco Pump TPE5R12C1C215TC- 5hp A-3 Skimmer Sump #2, Pump #1 P-1, Controller on P-2 X X N/A N/A Paco Pump Baldor-VM3117- 3/4hp A-4 Skimmer Sump #2, Pump #2 P-1, Controller on P-2 X X N/A N/A Paco Pump 5K43MG6509- 3/4hp A-5 Exhaust Fan 1A-01 Utility Room X X N/A N/A SE1-14-440-C-X 48A8011005A -1/8hp B Level P-2
B-1 Sewage Sump #1, Pump #1 P-2 X X N/A N/A Tramco-2902-4A2 VEM3558T-2hp B-2 Sewage Sump #1,Pump #2 P-2 X X N/A N/A Tramco-2902-4A3 VEM3558T-2hp B-3 Carrier Air Handler P-2, Cell Block X X 2-22 X 29 56 42BHE16LG4R92013 5K46KN4085X C Level P-3
C-1 Carnes Exhaust Fan 2A-01 Generator Room. X X N/A AP38 BSQ-180-5-X C-2 Carnes Exhaust Fan 2A-01 Generator Room. X X N/A 4L550R BSQ-100-5-X C-3 Exhaust Fan 2A-01 Utility Room X X N/A SE1-14-440C-X 48A8011005A -1/8hp D Level P-4
D-1 Daikin Condenser P-4 X X N/A N/A RK36NMVJUA E Level P-5
E-1 Storm Sump #4, Pump #1 P-5A X X N/A N/A Tramco-2501-2A2 F2106173332- 1.5hp E-2 Storm Sump #4, Pump #2 P-5A X X N/A N/A Tramco-2501-2A2 F2106173047- 1.5hp E-3 CH-1, Trane Helical Chiller 3A-03 Chiller Room X X X N/A N/A RTWD090 N/A E-4 CH-2, Trane Helical Chiller 3A-03 Chiller Room X X X N/A N/A RTWD090 N/A E-5 CH-3 Carrier Air Cooled Chiller CT Cooling Tower X X X N/A N/A 30RAP0256DA52010 E-6 CWP-1, Baldor 254T 3A-03 Chiller Room X X X N/A N/A Paco pump 3095-7/8 KP E-7 CWP-2, Baldor 254T 3A-03 Chiller Room X X X N/A N/A Paco pump 3095-7/8 KP E-8 CHWP-1, Baldor 254T 3A-03 Chiller Room X X X N/A N/A Paco pump 2013-5/6 KP E-9 CHWP-2, Baldor EM2333t 3A-03 Chiller Room X X X N/A N/A Paco pump 2333t
E-10 ABB VFD, CHWP-1 3A-03 Chiller Room X N/A N/A ACH 550 BDR N/A E-11 ABB VFD, CHWP-2 3A-03 Chiller Room X N/A N/A ACH 550 UO N/A
E-12 Water Treatment System 3A-03 Chiller Room X N/A N/A Aquatrac-Slimflex N/A E-13 Gas Extraction System-Trane 3A-03 Chiller Room X N/A RMWE-IOM-3 N/A E-14 Exhaust Fan-Gas Extraction 3A-03 Chiller Room X N/A A39 BSQ-120-5-X JQL48S17D1299BK E-15 Exhaust Fan 3A-01 Utility Room X X N/A SE1-14-440-C-X 48A8011005A-1/8hp
F Cooling Tower F-1 CT-1 Evapco CT Cooling Tower X X X X N/A 3-BX93 LSTB 5112 Baldor-Reliance -20hp F-2 CT-2 Evapco CT Cooling Tower X X X X N/A 3-BX93 LSTB 5112 Baldor-Reliance -20hp F-3 CT-1, VFD - ABB CT Cooling Tower X N/A N/A ACH550-UO N/A F-4 CT-2, VFD - ABB CT Cooling Tower X N/A N/A ACH550-UO N/A G 1st Floor
G-1 1-1, Carrier AHU-TVB 148 Mechanical Rm. X X M-13,24-16x25x2 2-B56 39ED26 2333T, 15HP G-2 1-1, VFD - ABB 148 Mechanical Rm. X N/A N/A ACH550-UO N/A G-3 1-1, UV Light 148 Mechanical Rm. X N/A N/A N/A G-4 1-2, Carrier AHU-Legal Dcs. 148 Mechanical Rm. X X M-13,24-16x25x2 2-B56 39ED26 2333T, 15HP G-5 1-2, VFD - ABB 148 Mechanical Rm. X N/A N/A ACH550-UO N/A G-6 1-2, UV Light 148 Mechanical Rm. X N/A N/A N/A G-7 Daikin split system 125 Video Equip.Rm. X X Washable Type FTX36NVJU G-8 1-3, Carrier AHU 120 Video Conference Rm. X X A28 M3108 G-9 Carnes Exhaust Fan 105 Electrical Rm. X X N/A 3L380 VlOBF2
G-10 Carnes Exhaust Fan 149 Utility Rm. X X N/A N/A VlOBF2 G-11 Elkay Water Cooler Lobby X N/A VRCTL8-1D N/A G-12 Daikin Split system Kiosk Kiosk ceiling X Washable Type N/A R410A N/A G-13 Daikin compressor Left Planter main ent. X N/A N/A RX12RMVJU9 N/A
H 2nd Floor H-1 2-1, Carrier AHU-JCFS 234 Mechanical Rm. X X 15-16x25x2" 2-3V530 39ED15 EM3710T H-2 2-1, VFD - ABB 234 Mechanical Rm. X N/A N/A ACH550-UO N/A H-3 2-2, Carrier AHU-Library 234 Mechanical Rm. X X 10-16x25x2" 2-A32 39ED12 EM3615T H-4 2-2, VFD - ABB 234 Mechanical Rm. X N/A N/A ACH550-UO N/A H-5 2-2, UV Light 234 Mechanical Rm. X N/A N/A Bulb # H-6 2-3, Carrier AHU-SSB 203 Restroom Women/Men X X 8-20x25x2" 2-A32 39ED12 EM3710T H-7 2-3, VFD - ABB 203 Restroom Women/Men X N/A N/A ACH550-UO N/A H-8 Carnes Exhaust Fan 205 Electrical Rm. X X N/A N/A V10BF2 H-9 Carnes Exhaust Fan 235 Utility Rm. X X N/A N/A SQ95-VG-6
H-10 Sunroc Corp Water Cooler Lobby X N/A N/A NWCASFBL-004 N/A
I 3rd Floor I-1 3-1, Carrier Air Handler 364 Mechanical Rm. X X 10-16x25x2" 2-2UX335 39ED12 EM3710T I-2 3-1, VFD, ABB 364 Mechanical Rm. X N/A N/A ACH550-UO N/A I-3 3-1, UV Light 364 Mechanical Rm. X N/A N/A Bulb # I-4 3-2, Carrier AHU, CR-3B 314 Locker Room-Men X X 2-2"x22"x29" A33 42BHE30LG4R93022 EM3157T-2HP I-5 3-3, Carrier AHU, CR-3A 314 Locker Room-Men X X 2-2"x22"x29" A33 42BHE30LG4L93022 EM3157T-2HP I-6 3-4, Carrier AHU, CR-3D 356 Staff R/R-Women X X 2-2"x22"x29" A33 42BHE30LG4L93022 EM3157T-2HP I-7 3-5, Carrier AHU, CR-3C 358 Staff Rest Room-Men X X 2-2"x22"x29" A33 42BHE30LG4R92821 EM3157T-2HP I-8 3-6, Carrier AHU, JC-3D 345 Judge's Chambers X X 2-20x25x1" 1-A39 42BH4A-R4U RM3116 I-9 3-7, Carrier AHU, JC-3C 341 Judge's Chambers X X 2-16x25x1" 1-4L420 42BH4A-R4U RM5112
I-10 3-8, Carrier AHU 333 Per Dium Judge X X 1-16x25x1" 1-A38 42BH1A-RSU RM3108 I-11 3-9 Carrier AHU, Bailiff 332 Bailiff's Office X X 1-16x33x1" 1-A38 42BH2A-R2U RM3108 I-12 3-10 Carrier AHU, JC-3B 325 Judge's Chambers X X 1-16x33x1" 1-A40 42BH3A-R2U RM5112 I-13 3-11 Carrier AHU, JC-3A 322 Judge's Chambers X X 2-16x25x1" 1-A40 42BH3A-R2U RM5112 I-14 3-12 Carrier AHU, Training 309 Conference Room X X 1-16x33x1" 1-A38 42BH2A-R2U RM3108 I-15 3-13, Carrier AHU AUX. CR-3B 364 Mechanical Rm. X X 1-16x25x1" 1-A32 42BH1A-RSU I-16 Carnes Exhaust Fan 305 Electrical Rm. X X N/A N/A VlOBF2 I-17 Carnes Exhaust Fan 347 Utility Rm. X X N/A N/A VlOBF2 I-18 Elkay Water Cooler Lobby X N/A LZS8WSSP N/A
J 4th Floor J-1 4-1 Carrier Air Handler 466 Mechanical Rm. X X 10-16x25x2" 1-AP42 39ED12 EM3710T J-2 4-1, VFD - ABB 466 Mechanical Rm. X N/A N/A ACH550-UO N/A J-3 4-2 Carrier AHU, CR-4B 416 Multi-Purpose Rm. X X 2-2"x22"x29" A33 42BHE30LG4L93022 EM3157T-2HP J-4 4-3 Carrier AHU, CR-4A 416 Multi-Purpose Rm. X X 2-2"x22"x29" A33 42BHE30LG4R93022 EM3157T-2HP J-5 4-4 Carrier AHU, CR-4D 458 Rest Room-Women X X 2-2"x22"x29" A33 42BHE30LG4L93022 EM3157T-2HP J-6 4-5 Carrier AHU, CR-4C 460 Rest Room-Men X X 2-2"x22"x29" A33 42BHE30LG4R93022 EM3157T-2HP J-7 4-6 Carrier AHU, JC-4D 447 Judge's Chambers X X 2-20x25x1" 1-A39 42BH4A-R4U RM3116 J-8 4-7 Carrier AHU, JC-4C 443 Judge's Chambers X X 2-16x25x1" 1-4L420 42BH3A-R4U RM3112 J-9 4-8 Carrier AHU, JR-4C 438 Jury Room 4C X X 1-16x33x1" 1-A38 42BH2A-R4U RM3108
J-10 4-9 Carrier AHU, JR-4B 431 Jury Room 4B X X 1-16x33x1" 1-A38 42BH2A-R4U WEG12630184 J-11 4-10 Carrier AHU, JC-4B 424 Judge's Chambers X X 2-16x25x1" 1-A40 42BH3A-R4U RM3112 J-12 4-11 Carrier AHU, JC-4A 421 Judge's Chambers X X 2-16x25x1" 1-A38 42BH3A-R3U J-13 4-12 Carrier AHU, JR-4A 409 Jury Room 4A X X 1-16x33x1" 1-A38 42BH2A-R4U RM3108 J-14 4-13 Carrier AHU, JR-4D 455 Jury Room 4D X X 1-16x33x1" 1-A38 42BH2A-R4U 5K45HN061
J-15 4-14 Carrier AHU AUX. CR-4B 466 Mechanical Room X X 1-16x25x1" 1-A35 42BH1A-RSU S018ES3E56-S J-16 4-15 Carrier AHU AUX. CR-4A 403 Rest Room-Women X X 2-20x25x2" 1-A38 42BH2A-RSU J-17 Carnes Exhaust Fan 405 Electrical Rm. X X N/A N/A D0824B3756 E62788 J-18 Carnes Exhaust Fan 449 Utility Rm. X X N/A N/A V1OBF2 J-19 TCF Exhaust Fan, #10A 449 Utility Rm. X X N/A N/A TCVX 04018ET3E324T-W22 J-20 VFD-Exh.Fan, #10A 449 Utility Rm. X N/A N/A CXD-060A-4V CERUS X-DRIVE J-21 TCF Exhaust Fan, #10B 449 Utility Rm. X X N/A N/A TCVX 04018ET3E324T-W22 J-22 VFD-Exh.Fan, #10B 449 Utility Rm. X N/A N/A CXD-060A-4V CERUS X-DRIVE J-23 Sunroc Corp Water Cooler Lobby X N/A N/A NWCASFBL-004 N/A
K 5th Floor K-1 Exhaust Fan #8, Public R/R 501 Machine Room X X N/A 1-AX78 CAT-75933 N/A K-2 Exh.Fan #9, CO-Parking 501 Machine Room X X N/A 3-CX112 PM2AA22A01C N/A K-3 VFD-Exh.Fan #9 501 Machine Room X N/A N/A DANFOSS N/A K-4 Exhaust Fan #7, Staff R/R 503 Machine Room X X N/A 1-A43 18-CSWX-10CW-TH-0-A7 N/A K-5 Mitsubishi, FCU-2A 502 Elevator Room X X Washable Type N/A PKA-A24FA N/A K-6 Mitsubishi, FCU-2B 502 Elevator Room X X Washable Type N/A PKA-A24FA N/A K-7 Mitsubishi, FCU-1A 504 Elevator Room X X Washable Type N/A PKA-A18GA N/A K-8 Mitsubishi, FCU-1B 504 Elevator Room X X Washable Type N/A PKA-A18HA7 N/A
L Roof L-1 Mitsubishi, ACU 2A Roof-S/W for R-502 X X N/A N/A PUY-A24NHAU N/A L-2 Mitsubishi, ACU 2B Roof-S/W for R-502 X X N/A N/A PUY-A24NHAU N/A L-3 Mitsubishi, ACU 1A Roof-S/E for R-504 X X N/A N/A PUY-A19NHAU N/A L-4 Mitsubishi, ACU 1B Roof-S/E for R-504 X X N/A N/A PUY-A18NKA7 N/A L-5 Exh. Louver Actuator, #1 Roof Pit X X N/A N/A AFBUP-S L-6 Exh. Louver Actuator, #2 Roof Pit X X N/A N/A AFBUP-S L-7 Fresh Air Intake Grill, North Roof-North X N/A N/A L-8 Fresh Air Intake Grill, South Roof-South X N/A N/A
Hoapili Hale January Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
A Level P-1
A-1 Storm Sump #3, Pump #1 P-1 A-2 Storm Sump #3, Pump #2 P-1 A-3 Skimmer Sump #2, Pump #1 P-1, Controller on P-2 A-4 Skimmer Sump #2, Pump #2 P-1, Controller on P-2 B Level P-2
B-1 Sewage Sump #1, Pump #1 P-2 B-2 Sewage Sump #1,Pump #2 P-2 B-3 Carrier Air Handler P-2, Cell Block D Level P-4
D-1 Daikin Condenser P-4 E Level P-5
E-1 Storm Sump #4, Pump #1 P-5A E-2 Storm Sump #4, Pump #2 P-5A E-3 CH-1, Trane Helical Chiller 3A-03 Chiller Room E-4 CH-2, Trane Helical Chiller 3A-03 Chiller Room E-5 CH-3 Air Cooled Chiller CT Cooling Tower
E-12 Water Treatment System 3A-03 Chiller Room F Cooling Tower
F-1 CT-1 Evapco CT Cooling Tower F-2 CT-2 Evapco CT Cooling Tower G 1st Floor
G-1 1-1, Carrier AHU-TVB 148 Mechanical Rm.
G-4 1-2, Carrier AHU-Legal Dcs. 148 Mechanical Rm.
G-7 Daikin split system 125 Video Equip.Rm.
G-8 1-3, Carrier AHU 120 Video Conference Rm.
G-12 Daikin Split system Kiosk Kiosk ceiling
G-13 Daikin compressor Left Planter main ent.
H 2nd Floor
H-1 2-1, Carrier AHU-JCFS 234 Mechanical Rm.
H-3 2-2, Carrier AHU-Library 234 Mechanical Rm.
H-6 2-3, Carrier AHU-SSB 203 Restroom Women/Men
Hoapili Hale January Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
I 3rd Floor
I-1 3-1, Carrier Air Handler 364 Mechanical Rm.
I-4 3-2, Carrier AHU, CR-3B 314 Locker Room-Men I-5 3-3, Carrier AHU, CR-3A 314 Locker Room-Men I-6 3-4, Carrier AHU, CR-3D 356 Staff R/R-Women I-7 3-5, Carrier AHU, CR-3C 358 Staff Rest Room-Men I-8 3-6, Carrier AHU, JC-3D 345 Judge's Chambers I-9 3-7, Carrier AHU, JC-3C 341 Judge's Chambers
I-10 3-8, Carrier AHU, Kawano 333 Per Dium Judge I-11 3-9 Carrier AHU, Bailiff 332 Bailiff's Office I-12 3-10 Carrier AHU, JC-3B 325 Judge's Chambers I-13 3-11 Carrier AHU, JC-3A 322 Judge's Chambers I-14 3-12 Carrier AHU, Training 309 Conference Room I-15 3-13, Carrier AHU AUX. CR-3B 364 Mechanical Rm.
J 4th Floor J-1 4-1 Carrier Air Handler 466 Mechanical Rm.
J-3 4-2 Carrier AHU, CR-4B 416 Multi-Purpose Rm.
J-4 4-3 Carrier AHU, CR-4A 416 Multi-Purpose Rm.
J-5 4-4 Carrier AHU, CR-4D 458 Rest Room-Women J-6 4-5 Carrier AHU, CR-4C 460 Rest Room-Men J-7 4-6 Carrier AHU, JC-4D 447 Judge's Chambers
J-8 4-7 Carrier AHU, JC-4C 443 Judge's Chambers J-9 4-8 Carrier AHU, JR-4C 438 Jury Room 4C
J-10 4-9 Carrier AHU, JR-4B 431 Jury Room 4B J-11 4-10 Carrier AHU, JC-4B 424 Judge's Chambers J-12 4-11 Carrier AHU, JC-4A 421 Judge's Chambers J-13 4-12 Carrier AHU, JR-4A 409 Jury Room 4A J-14 4-13 Carrier AHU, JR-4D 455 Jury Room 4D Hoapili Hale January Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
J-15 4-14 Carrier AHU AUX. CR-4B 466 Mechanical Room J-16 4-15 Carrier AHU AUX. CR-4A 403 Rest Room-Women
K 5th Floor K-5 Mitsubishi, FCU-2A 502 Elevator Room K-6 Mitsubishi, FCU-2B 502 Elevator Room K-7 Mitsubishi, FCU-1A 504 Elevator Room K-8 Mitsubishi, FCU-1B 504 Elevator Room
L Roof L-1 Mitsubishi, ACU 2A Roof-S/W for R-502 L-2 Mitsubishi, ACU 2B Roof-S/W for R-502 L-3 Mitsubishi, ACU 1A Roof-S/E for R-504 L-4 Mitsubishi, ACU 1B Roof-S/E for R-504
February Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
A Level P-1
A-1 Storm Sump #3, Pump #1 P-1 A-2 Storm Sump #3, Pump #2 P-1 A-3 Skimmer Sump #2, Pump #1 P-1, Controller on P-2 A-4 Skimmer Sump #2, Pump #2 P-1, Controller on P-2 B Level P-2
B-1 Sewage Sump #1, Pump #1 P-2 B-2 Sewage Sump #1,Pump #2 P-2 B-3 Carrier Air Handler P-2, Cell Block D Level P-4
D-1 Daikin Condenser P-4 E Level P-5
E-1 Storm Sump #4, Pump #1 P-5A E-2 Storm Sump #4, Pump #2 P-5A E-3 CH-1, Trane Helical Chiller 3A-03 Chiller Room E-4 CH-2, Trane Helical Chiller 3A-03 Chiller Room E-5 CH-3 Air Cooled Chiller CT Cooling Tower
E-12 Water Treatment System 3A-03 Chiller Room F Cooling Tower
F-1 CT-1 Evapco CT Cooling Tower F-2 CT-2 Evapco CT Cooling Tower G 1st Floor
G-1 1-1, Carrier AHU-TVB 148 Mechanical Rm.
G-4 1-2, Carrier AHU-Legal Dcs. 148 Mechanical Rm.
G-7 Daikin split system 125 Video Equip.Rm.
H-1 2-1, Carrier AHU-JCFS 234 Mechanical Rm.
H-3 2-2, Carrier AHU-Library 234 Mechanical Rm.
H-6 2-3, Carrier AHU-SSB 203 Restroom Women/Men
Hoapili Hale February Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
I 3rd Floor
I-1 3-1, Carrier Air Handler 364 Mechanical Rm.
I-4 3-2, Carrier AHU, CR-3B 314 Locker Room-Men I-5 3-3, Carrier AHU, CR-3A 314 Locker Room-Men I-6 3-4, Carrier AHU, CR-3D 356 Staff R/R-Women I-7 3-5, Carrier AHU, CR-3C 358 Staff Rest Room-Men I-8 3-6, Carrier AHU, JC-3D 345 Judge's Chambers I-9 3-7, Carrier AHU, JC-3C 341 Judge's Chambers
I-10 3-8, Carrier AHU, Kawano 333 Per Dium Judge I-11 3-9 Carrier AHU, Bailiff 332 Bailiff's Office I-12 3-10 Carrier AHU, JC-3B 325 Judge's Chambers I-13 3-11 Carrier AHU, JC-3A 322 Judge's Chambers I-14 3-12 Carrier AHU, Training 309 Conference Room I-15 3-13, Carrier AHU AUX. CR-3B 364 Mechanical Rm.
J 4th Floor J-1 4-1 Carrier Air Handler 466 Mechanical Rm.
J-3 4-2 Carrier AHU, CR-4B 416 Multi-Purpose Rm.
J-4 4-3 Carrier AHU, CR-4A 416 Multi-Purpose Rm.
J-5 4-4 Carrier AHU, CR-4D 458 Rest Room-Women
J-10 4-9 Carrier AHU, JR-4B 431 Jury Room 4B J-11 4-10 Carrier AHU, JC-4B 424 Judge's Chambers J-12 4-11 Carrier AHU, JC-4A 421 Judge's Chambers J-13 4-12 Carrier AHU, JR-4A 409 Jury Room 4A J-14 4-13 Carrier AHU, JR-4D 455 Jury Room 4D Hoapili Hale February Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
J-15 4-14 Carrier AHU AUX. CR-4B 466 Mechanical Room J-16 4-15 Carrier AHU AUX. CR-4A 403 Rest Room-Women
K 5th Floor K-5 Mitsubishi, FCU-2A 502 Elevator Room K-6 Mitsubishi, FCU-2B 502 Elevator Room K-7 Mitsubishi, FCU-1A 504 Elevator Room K-8 Mitsubishi, FCU-1B 504 Elevator Room
L Roof L-1 Mitsubishi, ACU 2A Roof-S/W for R-502 L-2 Mitsubishi, ACU 2B Roof-S/W for R-502
March Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
A Level P-1
A-1 Storm Sump #3, Pump #1 P-1 A-2 Storm Sump #3, Pump #2 P-1 A-3 Skimmer Sump #2, Pump #1 P-1, Controller on P-2 A-4 Skimmer Sump #2, Pump #2 P-1, Controller on P-2 A-5 Exhaust Fan 1A-01 Utility Room B Level P-2
B-1 Sewage Sump #1, Pump #1 P-2 B-2 Sewage Sump #1,Pump #2 P-2 B-3 Carrier Air Handler P-2, Cell Block C Level P-3
C-1 Carnes Exhaust Fan 2A-01 Generator Room.
C-2 Carnes Exhaust Fan 2A-01 Generator Room.
C-3 Exhaust Fan 2A-01 Utility Room D Level P-4
D-1 Daikin Condenser P-4 E Level P-5
E-1 Storm Sump #4, Pump #1 P-5A E-2 Storm Sump #4, Pump #2 P-5A E-3 CH-1, Trane Helical Chiller 3A-03 Chiller Room E-4 CH-2, Trane Helical Chiller 3A-03 Chiller Room E-5 CH-3 Carrier Air Cooled Chiller CT Cooling Tower E-6 CWP-1, Baldor 254T 3A-03 Chiller Room E-7 CWP-2, Baldor 254T 3A-03 Chiller Room E-8 CHWP-1, Baldor 254T 3A-03 Chiller Room E-9 CHWP-2, Baldor EM2333t 3A-03 Chiller Room
E-10 ABB VFD, CHWP-1 3A-03 Chiller Room
E-11 ABB VFD, CHWP-2 3A-03 Chiller Room E-12 Water Treatment System 3A-03 Chiller Room E-14 Exhaust Fan-Gas Extraction 3A-03 Chiller Room E-15 Exhaust Fan 3A-01 Utility Room
F Cooling Tower F-1 CT-1 Evapco CT Cooling Tower F-2 CT-2 Evapco CT Cooling Tower F-3 CT-1, VFD - ABB CT Cooling Tower F-4 CT-2, VFD - ABB CT Cooling Tower G 1st Floor
G-1 1-1, Carrier AHU-TVB 148 Mechanical Rm.
G-2 1-1, VFD - ABB 148 Mechanical Rm.
G-4 1-2, Carrier AHU-Legal Dcs. 148 Mechanical Rm.
G-5 1-2, VFD - ABB 148 Mechanical Rm.
G-7 Daikin split system 125 Video Equip.Rm.
G-8 1-3, Carrier AHU 120 Video Conference Rm.
G-9 Carnes Exhaust Fan 105 Electrical Rm.
G-10 Carnes Exhaust Fan 149 Utility Rm.
G-11 Elkay Water Cooler Lobby G-12 Daikin Split system Kiosk Kiosk ceiling G-13 Daikin compressor Left Planter main ent.
H 2nd Floor H-1 2-1, Carrier AHU-JCFS 234 Mechanical Rm.
H-2 2-1, VFD - ABB 234 Mechanical Rm.
H-3 2-2, Carrier AHU-Library 234 Mechanical Rm.
H-4 2-2, VFD - ABB 234 Mechanical Rm.
H-6 2-3, Carrier AHU-SSB 203 Restroom Women/Men H-7 2-3, VFD - ABB 203 Restroom Women/Men H-8 Carnes Exhaust Fan 205 Electrical Rm.
H-9 Carnes Exhaust Fan 235 Utility Rm.
H-10 Sunroc Corp Water Cooler Lobby
March Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
I 3rd Floor
I-1 3-1, Carrier Air Handler 364 Mechanical Rm.
I-2 3-1, VFD, ABB 364 Mechanical Rm.
I-4 3-2, Carrier AHU, CR-3B 314 Locker Room-Men I-5 3-3, Carrier AHU, CR-3A 314 Locker Room-Men I-6 3-4, Carrier AHU, CR-3D 356 Staff R/R-Women I-7 3-5, Carrier AHU, CR-3C 358 Staff Rest Room-Men I-8 3-6, Carrier AHU, JC-3D 345 Judge's Chambers I-9 3-7, Carrier AHU, JC-3C 341 Judge's Chambers
I-10 3-8, Carrier AHU, Kawano 333 Per Dium Judge I-11 3-9 Carrier AHU, Bailiff 332 Bailiff's Office I-12 3-10 Carrier AHU, JC-3B 325 Judge's Chambers I-13 3-11 Carrier AHU, JC-3A 322 Judge's Chambers I-14 3-12 Carrier AHU, Training 309 Conference Room I-15 3-13, Carrier AHU AUX. CR-3B 364 Mechanical Rm.
I-16 Carnes Exhaust Fan 305 Electrical Rm.
I-17 Carnes Exhaust Fan 347 Utility Rm.
I-18 Elkay Water Cooler Lobby
J 4th Floor J-1 4-1 Carrier Air Handler 466 Mechanical Rm.
J-2 4-1, VFD - ABB 466 Mechanical Rm.
J-3 4-2 Carrier AHU, CR-4B 416 Multi-Purpose Rm.
J-4 4-3 Carrier AHU, CR-4A 416 Multi-Purpose Rm.
J-5 4-4 Carrier AHU, CR-4D 458 Rest Room-Women J-6 4-5 Carrier AHU, CR-4C 460 Rest Room-Men J-7 4-6 Carrier AHU, JC-4D 447 Judge's Chambers J-8 4-7 Carrier AHU, JC-4C 443 Judge's Chambers J-9 4-8 Carrier AHU, JR-4C 438 Jury Room 4C
J-10 4-9 Carrier AHU, JR-4B 431 Jury Room 4B J-11 4-10 Carrier AHU, JC-4B 424 Judge's Chambers
J-12 4-11 Carrier AHU, JC-4A 421 Judge's Chambers J-13 4-12 Carrier AHU, JR-4A 409 Jury Room 4A J-14 4-13 Carrier AHU, JR-4D 455 Jury Room 4D J-15 4-14 Carrier AHU AUX. CR-4B 466 Mechanical Room J-16 4-15 Carrier AHU AUX. CR-4A 403 Rest Room-Women J-17 Carnes Exhaust Fan 405 Electrical Rm.
J-18 Carnes Exhaust Fan 449 Utility Rm.
J-19 TCF Exhaust Fan, #10A 449 Utility Rm.
J-20 VFD-Exh.Fan, #10A 449 Utility Rm.
J-21 TCF Exhaust Fan, #10B 449 Utility Rm.
J-22 VFD-Exh.Fan, #10B 449 Utility Rm.
J-23 Sunroc Corp Water Cooler Lobby Hoapili Hale March Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
K 5th Floor
K-1 Exhaust Fan #8, Public R/R 501 Machine Room K-2 Exh.Fan #9, CO-Parking 501 Machine Room K-3 VFD-Exh.Fan #9 501 Machine Room K-4 Exhaust Fan #7, Staff R/R 503 Machine Room K-5 Mitsubishi, FCU-2A 502 Elevator Room K-6 Mitsubishi, FCU-2B 502 Elevator Room K-7 Mitsubishi, FCU-1A 504 Elevator Room K-8 Mitsubishi, FCU-1B 504 Elevator Room
L Roof L-1 Mitsubishi, ACU 2A Roof-S/W for R-502 L-2 Mitsubishi, ACU 2B Roof-S/W for R-502 L-3 Mitsubishi, ACU 1A Roof-S/E for R-504
L-5 Exh. Louver Actuator, #1 Roof Pit
L-6 Exh. Louver Actuator, #2 Roof Pit
April Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
A Level P-1
A-1 Storm Sump #3, Pump #1 P-1 A-2 Storm Sump #3, Pump #2 P-1 A-3 Skimmer Sump #2, Pump #1 P-1, Controller on P-2 A-4 Skimmer Sump #2, Pump #2 P-1, Controller on P-2 B Level P-2
B-1 Sewage Sump #1, Pump #1 P-2 B-2 Sewage Sump #1,Pump #2 P-2 B-3 Carrier Air Handler P-2, Cell Block D Level P-4
D-1 Daikin Condenser P-4 E Level P-5
E-1 Storm Sump #4, Pump #1 P-5A E-2 Storm Sump #4, Pump #2 P-5A E-3 CH-1, Trane Helical Chiller 3A-03 Chiller Room E-4 CH-2, Trane Helical Chiller 3A-03 Chiller Room E-5 CH-3 Air Cooled Chiller CT Cooling Tower
E-12 Water Treatment System 3A-03 Chiller Room F Cooling Tower
F-1 CT-1 Evapco CT Cooling Tower F-2 CT-2 Evapco CT Cooling Tower G 1st Floor
G-1 1-1, Carrier AHU-TVB 148 Mechanical Rm.
G-4 1-2, Carrier AHU-Legal Dcs. 148 Mechanical Rm.
G-7 Daikin split system 125 Video Equip.Rm.
H-1 2-1, Carrier AHU-JCFS 234 Mechanical Rm.
H-3 2-2, Carrier AHU-Library 234 Mechanical Rm.
H-6 2-3, Carrier AHU-SSB 203 Restroom Women/Men
Hoapili Hale April Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
I 3rd Floor
I-1 3-1, Carrier Air Handler 364 Mechanical Rm.
I-4 3-2, Carrier AHU, CR-3B 314 Locker Room-Men I-5 3-3, Carrier AHU, CR-3A 314 Locker Room-Men I-6 3-4, Carrier AHU, CR-3D 356 Staff R/R-Women I-7 3-5, Carrier AHU, CR-3C 358 Staff Rest Room-Men I-8 3-6, Carrier AHU, JC-3D 345 Judge's Chambers I-9 3-7, Carrier AHU, JC-3C 341 Judge's Chambers
I-10 3-8, Carrier AHU, Kawano 333 Per Dium Judge I-11 3-9 Carrier AHU, Bailiff 332 Bailiff's Office I-12 3-10 Carrier AHU, JC-3B 325 Judge's Chambers I-13 3-11 Carrier AHU, JC-3A 322 Judge's Chambers I-14 3-12 Carrier AHU, Training 309 Conference Room I-15 3-13, Carrier AHU AUX. CR-3B 364 Mechanical Rm.
J 4th Floor J-1 4-1 Carrier Air Handler 466 Mechanical Rm.
J-3 4-2 Carrier AHU, CR-4B 416 Multi-Purpose Rm.
J-4 4-3 Carrier AHU, CR-4A 416 Multi-Purpose Rm.
J-5 4-4 Carrier AHU, CR-4D 458 Rest Room-Women
J-10 4-9 Carrier AHU, JR-4B 431 Jury Room 4B J-11 4-10 Carrier AHU, JC-4B 424 Judge's Chambers J-12 4-11 Carrier AHU, JC-4A 421 Judge's Chambers J-13 4-12 Carrier AHU, JR-4A 409 Jury Room 4A J-14 4-13 Carrier AHU, JR-4D 455 Jury Room 4D Hoapili Hale April Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
J-15 4-14 Carrier AHU AUX. CR-4B 466 Mechanical Room J-16 4-15 Carrier AHU AUX. CR-4A 403 Rest Room-Women
K 5th Floor K-5 Mitsubishi, FCU-2A 502 Elevator Room K-6 Mitsubishi, FCU-2B 502 Elevator Room K-7 Mitsubishi, FCU-1A 504 Elevator Room K-8 Mitsubishi, FCU-1B 504 Elevator Room
L Roof L-1 Mitsubishi, ACU 2A Roof-S/W for R-502 L-2 Mitsubishi, ACU 2B Roof-S/W for R-502
May Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
A Level P-1
A-1 Storm Sump #3, Pump #1 P-1 A-2 Storm Sump #3, Pump #2 P-1 A-3 Skimmer Sump #2, Pump #1 P-1, Controller on P-2 A-4 Skimmer Sump #2, Pump #2 P-1, Controller on P-2 B Level P-2
B-1 Sewage Sump #1, Pump #1 P-2 B-2 Sewage Sump #1,Pump #2 P-2 B-3 Carrier Air Handler P-2, Cell Block D Level P-4
D-1 Daikin Condenser P-4 E Level P-5
E-1 Storm Sump #4, Pump #1 P-5A E-2 Storm Sump #4, Pump #2 P-5A E-3 CH-1, Trane Helical Chiller 3A-03 Chiller Room E-4 CH-2, Trane Helical Chiller 3A-03 Chiller Room E-5 CH-3 Air Cooled Chiller CT Cooling Tower
E-12 Water Treatment System 3A-03 Chiller Room F Cooling Tower
F-1 CT-1 Evapco CT Cooling Tower F-2 CT-2 Evapco CT Cooling Tower G 1st Floor
G-1 1-1, Carrier AHU-TVB 148 Mechanical Rm.
G-4 1-2, Carrier AHU-Legal Dcs. 148 Mechanical Rm.
G-7 Daikin split system 125 Video Equip.Rm.
H-1 2-1, Carrier AHU-JCFS 234 Mechanical Rm.
H-3 2-2, Carrier AHU-Library 234 Mechanical Rm.
H-6 2-3, Carrier AHU-SSB 203 Restroom Women/Men
Hoapili Hale May Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
I 3rd Floor
I-1 3-1, Carrier Air Handler 364 Mechanical Rm.
I-4 3-2, Carrier AHU, CR-3B 314 Locker Room-Men I-5 3-3, Carrier AHU, CR-3A 314 Locker Room-Men I-6 3-4, Carrier AHU, CR-3D 356 Staff R/R-Women I-7 3-5, Carrier AHU, CR-3C 358 Staff Rest Room-Men I-8 3-6, Carrier AHU, JC-3D 345 Judge's Chambers I-9 3-7, Carrier AHU, JC-3C 341 Judge's Chambers
I-10 3-8, Carrier AHU, Kawano 333 Per Dium Judge I-11 3-9 Carrier AHU, Bailiff 332 Bailiff's Office I-12 3-10 Carrier AHU, JC-3B 325 Judge's Chambers I-13 3-11 Carrier AHU, JC-3A 322 Judge's Chambers I-14 3-12 Carrier AHU, Training 309 Conference Room I-15 3-13, Carrier AHU AUX. CR-3B 364 Mechanical Rm.
J 4th Floor J-1 4-1 Carrier Air Handler 466 Mechanical Rm.
J-3 4-2 Carrier AHU, CR-4B 416 Multi-Purpose Rm.
J-4 4-3 Carrier AHU, CR-4A 416 Multi-Purpose Rm.
J-5 4-4 Carrier AHU, CR-4D 458 Rest Room-Women
J-10 4-9 Carrier AHU, JR-4B 431 Jury Room 4B J-11 4-10 Carrier AHU, JC-4B 424 Judge's Chambers J-12 4-11 Carrier AHU, JC-4A 421 Judge's Chambers J-13 4-12 Carrier AHU, JR-4A 409 Jury Room 4A J-14 4-13 Carrier AHU, JR-4D 455 Jury Room 4D Hoapili Hale May Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
J-15 4-14 Carrier AHU AUX. CR-4B 466 Mechanical Room J-16 4-15 Carrier AHU AUX. CR-4A 403 Rest Room-Women
K 5th Floor K-5 Mitsubishi, FCU-2A 502 Elevator Room K-6 Mitsubishi, FCU-2B 502 Elevator Room K-7 Mitsubishi, FCU-1A 504 Elevator Room K-8 Mitsubishi, FCU-1B 504 Elevator Room
L Roof L-1 Mitsubishi, ACU 2A Roof-S/W for R-502 L-2 Mitsubishi, ACU 2B Roof-S/W for R-502
June Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
A Level P-1
A-1 Storm Sump #3, Pump #1 P-1 A-2 Storm Sump #3, Pump #2 P-1 A-3 Skimmer Sump #2, Pump #1 P-1, Controller on P-2 A-4 Skimmer Sump #2, Pump #2 P-1, Controller on P-2 A-5 Exhaust Fan 1A-01 Utility Room B Level P-2
B-1 Sewage Sump #1, Pump #1 P-2 B-2 Sewage Sump #1,Pump #2 P-2 B-3 Carrier Air Handler P-2, Cell Block C Level P-3
C-1 Carnes Exhaust Fan 2A-01 Generator Room.
C-2 Carnes Exhaust Fan 2A-01 Generator Room.
C-3 Exhaust Fan 2A-01 Utility Room D Level P-4
D-1 Daikin Condenser P-4 E Level P-5
E-1 Storm Sump #4, Pump #1 P-5A E-2 Storm Sump #4, Pump #2 P-5A E-3 CH-1, Trane Helical Chiller 3A-03 Chiller Room E-4 CH-2, Trane Helical Chiller 3A-03 Chiller Room E-5 CH-3 Carrier Air Cooled Chiller CT Cooling Tower E-6 CWP-1, Baldor 254T 3A-03 Chiller Room E-7 CWP-2, Baldor 254T 3A-03 Chiller Room E-8 CHWP-1, Baldor 254T 3A-03 Chiller Room
E-14 Exhaust Fan-Gas Extraction 3A-03 Chiller Room E-15 Exhaust Fan 3A-01 Utility Room
F Cooling Tower F-1 CT-1 Evapco CT Cooling Tower F-2 CT-2 Evapco CT Cooling Tower F-3 CT-1, VFD - ABB CT Cooling Tower F-4 CT-2, VFD - ABB CT Cooling Tower G 1st Floor
G-1 1-1, Carrier AHU-TVB 148 Mechanical Rm.
G-2 1-1, VFD - ABB 148 Mechanical Rm.
G-4 1-2, Carrier AHU-Legal Dcs. 148 Mechanical Rm.
G-5 1-2, VFD - ABB 148 Mechanical Rm.
G-7 Daikin split system 125 Video Equip.Rm.
G-8 1-3, Carrier AHU 120 Video Conference Rm.
G-9 Carnes Exhaust Fan 105 Electrical Rm.
G-10 Carnes Exhaust Fan 149 Utility Rm.
G-11 Elkay Water Cooler Lobby G-12 Daikin Split system Kiosk Kiosk ceiling G-13 Daikin compressor Left Planter main ent.
H 2nd Floor H-1 2-1, Carrier AHU-JCFS 234 Mechanical Rm.
H-2 2-1, VFD - ABB 234 Mechanical Rm.
H-3 2-2, Carrier AHU-Library 234 Mechanical Rm.
H-4 2-2, VFD - ABB 234 Mechanical Rm.
H-6 2-3, Carrier AHU-SSB 203 Restroom Women/Men H-7 2-3, VFD - ABB 203 Restroom Women/Men H-8 Carnes Exhaust Fan 205 Electrical Rm.
H-9 Carnes Exhaust Fan 235 Utility Rm.
H-10 Sunroc Corp Water Cooler Lobby
June Service Schedule
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
I 3rd Floor
I-1 3-1, Carrier Air Handler 364 Mechanical Rm.
I-2 3-1, VFD, ABB 364 Mechanical Rm.
I-4 3-2, Carrier AHU, CR-3B 314 Locker Room-Men I-5 3-3, Carrier AHU, CR-3A 314 Locker Room-Men I-6 3-4, Carrier AHU, CR-3D 356 Staff R/R-Women I-7 3-5, Carrier AHU, CR-3C 358 Staff Rest Room-Men I-8 3-6, Carrier AHU, JC-3D 345 Judge's Chambers I-9 3-7, Carrier AHU, JC-3C 341 Judge's Chambers
I-10 3-8, Carrier AHU, Kawano 333 Per Dium Judge I-11 3-9 Carrier AHU, Bailiff 332 Bailiff's Office I-12 3-10 Carrier AHU, JC-3B 325 Judge's Chambers I-13 3-11 Carrier AHU, JC-3A 322 Judge's Chambers I-14 3-12 Carrier AHU, Training 309 Conference Room I-15 3-13, Carrier AHU AUX. CR-3B 364 Mechanical Rm.
I-16 Carnes Exhaust Fan 305 Electrical Rm.
I-17 Carnes Exhaust Fan 347 Utility Rm.
I-18 Elkay Water Cooler Lobby
J 4th Floor J-1 4-1 Carrier Air Handler 466 Mechanical Rm.
J-2 4-1, VFD - ABB 466 Mechanical Rm.
J-3 4-2 Carrier AHU, CR-4B 416 Multi-Purpose Rm.
J-4 4-3 Carrier AHU, CR-4A 416 Multi-Purpose Rm.
J-5 4-4 Carrier AHU, CR-4D 458 Rest Room-Women J-6 4-5 Carrier AHU, CR-4C 460 Rest Room-Men J-7 4-6 Carrier AHU, JC-4D 447 Judge's Chambers J-8 4-7 Carrier AHU, JC-4C 443 Judge's Chambers J-9 4-8 Carrier AHU, JR-4C 438 Jury Room 4C
J-14 4-13 Carrier AHU, JR-4D 455 Jury Room 4D J-15 4-14 Carrier AHU AUX. CR-4B 466 Mechanical Room J-16 4-15 Carrier AHU AUX. CR-4A 403 Rest Room-Women J-17 Carnes Exhaust Fan 405 Electrical Rm.
J-18 Carnes Exhaust Fan 449 Utility Rm.
J-19 TCF Exhaust Fan, #10A 449 Utility Rm.
J-20 VFD-Exh.Fan, #10A 449 Utility Rm.
J-21 TCF Exhaust Fan, #10B 449 Utility Rm.
J-22 VFD-Exh.Fan, #10B 449 Utility Rm.
J-23 Sunroc Corp Water Cooler Lobby Hoapili Hale June Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
K 5th Floor
K-1 Exhaust Fan #8, Public R/R 501 Machine Room K-2 Exh.Fan #9, CO-Parking 501 Machine Room K-3 VFD-Exh.Fan #9 501 Machine Room K-4 Exhaust Fan #7, Staff R/R 503 Machine Room K-5 Mitsubishi, FCU-2A 502 Elevator Room K-6 Mitsubishi, FCU-2B 502 Elevator Room K-7 Mitsubishi, FCU-1A 504 Elevator Room K-8 Mitsubishi, FCU-1B 504 Elevator Room
L Roof L-1 Mitsubishi, ACU 2A Roof-S/W for R-502 L-2 Mitsubishi, ACU 2B Roof-S/W for R-502 L-3 Mitsubishi, ACU 1A Roof-S/E for R-504
July Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
A Level P-1
A-1 Storm Sump #3, Pump #1 P-1 A-2 Storm Sump #3, Pump #2 P-1 A-3 Skimmer Sump #2, Pump #1 P-1, Controller on P-2 A-4 Skimmer Sump #2, Pump #2 P-1, Controller on P-2 B Level P-2
B-1 Sewage Sump #1, Pump #1 P-2 B-2 Sewage Sump #1,Pump #2 P-2 B-3 Carrier Air Handler P-2, Cell Block D Level P-4
D-1 Daikin Condenser P-4 E Level P-5
E-1 Storm Sump #4, Pump #1 P-5A E-2 Storm Sump #4, Pump #2 P-5A E-3 CH-1, Trane Helical Chiller 3A-03 Chiller Room E-4 CH-2, Trane Helical Chiller 3A-03 Chiller Room E-5 CH-3 Air Cooled Chiller CT Cooling Tower
E-12 Water Treatment System 3A-03 Chiller Room F Cooling Tower
F-1 CT-1 Evapco CT Cooling Tower F-2 CT-2 Evapco CT Cooling Tower G 1st Floor
G-1 1-1, Carrier AHU-TVB 148 Mechanical Rm.
G-4 1-2, Carrier AHU-Legal Dcs. 148 Mechanical Rm.
G-7 Daikin split system 125 Video Equip.Rm.
H-1 2-1, Carrier AHU-JCFS 234 Mechanical Rm.
H-3 2-2, Carrier AHU-Library 234 Mechanical Rm.
H-6 2-3, Carrier AHU-SSB 203 Restroom Women/Men
Hoapili Hale July Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
I 3rd Floor
I-1 3-1, Carrier Air Handler 364 Mechanical Rm.
I-4 3-2, Carrier AHU, CR-3B 314 Locker Room-Men I-5 3-3, Carrier AHU, CR-3A 314 Locker Room-Men I-6 3-4, Carrier AHU, CR-3D 356 Staff R/R-Women I-7 3-5, Carrier AHU, CR-3C 358 Staff Rest Room-Men I-8 3-6, Carrier AHU, JC-3D 345 Judge's Chambers I-9 3-7, Carrier AHU, JC-3C 341 Judge's Chambers
I-10 3-8, Carrier AHU, Kawano 333 Per Dium Judge I-11 3-9 Carrier AHU, Bailiff 332 Bailiff's Office I-12 3-10 Carrier AHU, JC-3B 325 Judge's Chambers I-13 3-11 Carrier AHU, JC-3A 322 Judge's Chambers I-14 3-12 Carrier AHU, Training 309 Conference Room I-15 3-13, Carrier AHU AUX. CR-3B 364 Mechanical Rm.
J 4th Floor J-1 4-1 Carrier Air Handler 466 Mechanical Rm.
J-3 4-2 Carrier AHU, CR-4B 416 Multi-Purpose Rm.
J-4 4-3 Carrier AHU, CR-4A 416 Multi-Purpose Rm.
J-5 4-4 Carrier AHU, CR-4D 458 Rest Room-Women
J-10 4-9 Carrier AHU, JR-4B 431 Jury Room 4B J-11 4-10 Carrier AHU, JC-4B 424 Judge's Chambers J-12 4-11 Carrier AHU, JC-4A 421 Judge's Chambers J-13 4-12 Carrier AHU, JR-4A 409 Jury Room 4A J-14 4-13 Carrier AHU, JR-4D 455 Jury Room 4D Hoapili Hale July Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
J-15 4-14 Carrier AHU AUX. CR-4B 466 Mechanical Room J-16 4-15 Carrier AHU AUX. CR-4A 403 Rest Room-Women
K 5th Floor K-5 Mitsubishi, FCU-2A 502 Elevator Room K-6 Mitsubishi, FCU-2B 502 Elevator Room K-7 Mitsubishi, FCU-1A 504 Elevator Room K-8 Mitsubishi, FCU-1B 504 Elevator Room
L Roof L-1 Mitsubishi, ACU 2A Roof-S/W for R-502 L-2 Mitsubishi, ACU 2B Roof-S/W for R-502
August Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
A Level P-1
A-1 Storm Sump #3, Pump #1 P-1 A-2 Storm Sump #3, Pump #2 P-1 A-3 Skimmer Sump #2, Pump #1 P-1, Controller on P-2 A-4 Skimmer Sump #2, Pump #2 P-1, Controller on P-2 B Level P-2
B-1 Sewage Sump #1, Pump #1 P-2 B-2 Sewage Sump #1,Pump #2 P-2 B-3 Carrier Air Handler P-2, Cell Block D Level P-4
D-1 Daikin Condenser P-4 E Level P-5
E-1 Storm Sump #4, Pump #1 P-5A E-2 Storm Sump #4, Pump #2 P-5A E-3 CH-1, Trane Helical Chiller 3A-03 Chiller Room E-4 CH-2, Trane Helical Chiller 3A-03 Chiller Room E-5 CH-3 Air Cooled Chiller CT Cooling Tower
E-12 Water Treatment System 3A-03 Chiller Room F Cooling Tower
F-1 CT-1 Evapco CT Cooling Tower F-2 CT-2 Evapco CT Cooling Tower G 1st Floor
G-1 1-1, Carrier AHU-TVB 148 Mechanical Rm.
G-4 1-2, Carrier AHU-Legal Dcs. 148 Mechanical Rm.
G-7 Daikin split system 125 Video Equip.Rm.
H-1 2-1, Carrier AHU-JCFS 234 Mechanical Rm.
H-3 2-2, Carrier AHU-Library 234 Mechanical Rm.
H-6 2-3, Carrier AHU-SSB 203 Restroom Women/Men
Hoapili Hale August Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
I 3rd Floor
I-1 3-1, Carrier Air Handler 364 Mechanical Rm.
I-4 3-2, Carrier AHU, CR-3B 314 Locker Room-Men I-5 3-3, Carrier AHU, CR-3A 314 Locker Room-Men I-6 3-4, Carrier AHU, CR-3D 356 Staff R/R-Women I-7 3-5, Carrier AHU, CR-3C 358 Staff Rest Room-Men I-8 3-6, Carrier AHU, JC-3D 345 Judge's Chambers I-9 3-7, Carrier AHU, JC-3C 341 Judge's Chambers
I-10 3-8, Carrier AHU, Kawano 333 Per Dium Judge I-11 3-9 Carrier AHU, Bailiff 332 Bailiff's Office I-12 3-10 Carrier AHU, JC-3B 325 Judge's Chambers I-13 3-11 Carrier AHU, JC-3A 322 Judge's Chambers I-14 3-12 Carrier AHU, Training 309 Conference Room I-15 3-13, Carrier AHU AUX. CR-3B 364 Mechanical Rm.
J 4th Floor J-1 4-1 Carrier Air Handler 466 Mechanical Rm.
J-3 4-2 Carrier AHU, CR-4B 416 Multi-Purpose Rm.
J-4 4-3 Carrier AHU, CR-4A 416 Multi-Purpose Rm.
J-5 4-4 Carrier AHU, CR-4D 458 Rest Room-Women
J-10 4-9 Carrier AHU, JR-4B 431 Jury Room 4B J-11 4-10 Carrier AHU, JC-4B 424 Judge's Chambers J-12 4-11 Carrier AHU, JC-4A 421 Judge's Chambers J-13 4-12 Carrier AHU, JR-4A 409 Jury Room 4A J-14 4-13 Carrier AHU, JR-4D 455 Jury Room 4D Hoapili Hale August Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
J-15 4-14 Carrier AHU AUX. CR-4B 466 Mechanical Room J-16 4-15 Carrier AHU AUX. CR-4A 403 Rest Room-Women
K 5th Floor K-5 Mitsubishi, FCU-2A 502 Elevator Room K-6 Mitsubishi, FCU-2B 502 Elevator Room K-7 Mitsubishi, FCU-1A 504 Elevator Room K-8 Mitsubishi, FCU-1B 504 Elevator Room
L Roof L-1 Mitsubishi, ACU 2A Roof-S/W for R-502 L-2 Mitsubishi, ACU 2B Roof-S/W for R-502
September Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
A Level P-1
A-1 Storm Sump #3, Pump #1 P-1 A-2 Storm Sump #3, Pump #2 P-1 A-3 Skimmer Sump #2, Pump #1 P-1, Controller on P-2 A-4 Skimmer Sump #2, Pump #2 P-1, Controller on P-2 A-5 Exhaust Fan 1A-01 Utility Room B Level P-2
B-1 Sewage Sump #1, Pump #1 P-2 B-2 Sewage Sump #1,Pump #2 P-2 B-3 Carrier Air Handler P-2, Cell Block C Level P-3
C-1 Carnes Exhaust Fan 2A-01 Generator Room.
C-2 Carnes Exhaust Fan 2A-01 Generator Room.
C-3 Exhaust Fan 2A-01 Utility Room D Level P-4
D-1 Daikin Condenser P-4 E Level P-5
E-1 Storm Sump #4, Pump #1 P-5A E-2 Storm Sump #4, Pump #2 P-5A E-3 CH-1, Trane Helical Chiller 3A-03 Chiller Room E-4 CH-2, Trane Helical Chiller 3A-03 Chiller Room E-5 CH-3 Carrier Air Cooled Chiller CT Cooling Tower E-6 CWP-1, Baldor 254T 3A-03 Chiller Room E-7 CWP-2, Baldor 254T 3A-03 Chiller Room E-8 CHWP-1, Baldor 254T 3A-03 Chiller Room
E-14 Exhaust Fan-Gas Extraction 3A-03 Chiller Room E-15 Exhaust Fan 3A-01 Utility Room
F Cooling Tower F-1 CT-1 Evapco CT Cooling Tower F-2 CT-2 Evapco CT Cooling Tower F-3 CT-1, VFD - ABB CT Cooling Tower F-4 CT-2, VFD - ABB CT Cooling Tower G 1st Floor
G-1 1-1, Carrier AHU-TVB 148 Mechanical Rm.
G-2 1-1, VFD - ABB 148 Mechanical Rm.
G-4 1-2, Carrier AHU-Legal Dcs. 148 Mechanical Rm.
G-5 1-2, VFD - ABB 148 Mechanical Rm.
G-7 Daikin split system 125 Video Equip.Rm.
G-8 1-3, Carrier AHU 120 Video Conference Rm.
G-9 Carnes Exhaust Fan 105 Electrical Rm.
G-10 Carnes Exhaust Fan 149 Utility Rm.
G-11 Elkay Water Cooler Lobby G-12 Daikin Split system Kiosk Kiosk ceiling G-13 Daikin compressor Left Planter main ent.
H 2nd Floor H-1 2-1, Carrier AHU-JCFS 234 Mechanical Rm.
H-2 2-1, VFD - ABB 234 Mechanical Rm.
H-3 2-2, Carrier AHU-Library 234 Mechanical Rm.
H-4 2-2, VFD - ABB 234 Mechanical Rm.
H-6 2-3, Carrier AHU-SSB 203 Restroom Women/Men H-7 2-3, VFD - ABB 203 Restroom Women/Men H-8 Carnes Exhaust Fan 205 Electrical Rm.
H-9 Carnes Exhaust Fan 235 Utility Rm.
H-10 Sunroc Corp Water Cooler Lobby
September Service Schedule
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
I 3rd Floor
I-1 3-1, Carrier Air Handler 364 Mechanical Rm.
I-2 3-1, VFD, ABB 364 Mechanical Rm.
I-4 3-2, Carrier AHU, CR-3B 314 Locker Room-Men I-5 3-3, Carrier AHU, CR-3A 314 Locker Room-Men I-6 3-4, Carrier AHU, CR-3D 356 Staff R/R-Women I-7 3-5, Carrier AHU, CR-3C 358 Staff Rest Room-Men I-8 3-6, Carrier AHU, JC-3D 345 Judge's Chambers I-9 3-7, Carrier AHU, JC-3C 341 Judge's Chambers
I-10 3-8, Carrier AHU, Kawano 333 Per Dium Judge I-11 3-9 Carrier AHU, Bailiff 332 Bailiff's Office I-12 3-10 Carrier AHU, JC-3B 325 Judge's Chambers I-13 3-11 Carrier AHU, JC-3A 322 Judge's Chambers I-14 3-12 Carrier AHU, Training 309 Conference Room I-15 3-13, Carrier AHU AUX. CR-3B 364 Mechanical Rm.
I-16 Carnes Exhaust Fan 305 Electrical Rm.
I-17 Carnes Exhaust Fan 347 Utility Rm.
I-18 Elkay Water Cooler Lobby
J 4th Floor J-1 4-1 Carrier Air Handler 466 Mechanical Rm.
J-2 4-1, VFD - ABB 466 Mechanical Rm.
J-3 4-2 Carrier AHU, CR-4B 416 Multi-Purpose Rm.
J-4 4-3 Carrier AHU, CR-4A 416 Multi-Purpose Rm.
J-5 4-4 Carrier AHU, CR-4D 458 Rest Room-Women J-6 4-5 Carrier AHU, CR-4C 460 Rest Room-Men J-7 4-6 Carrier AHU, JC-4D 447 Judge's Chambers J-8 4-7 Carrier AHU, JC-4C 443 Judge's Chambers J-9 4-8 Carrier AHU, JR-4C 438 Jury Room 4C
J-14 4-13 Carrier AHU, JR-4D 455 Jury Room 4D J-15 4-14 Carrier AHU AUX. CR-4B 466 Mechanical Room J-16 4-15 Carrier AHU AUX. CR-4A 403 Rest Room-Women J-17 Carnes Exhaust Fan 405 Electrical Rm.
J-18 Carnes Exhaust Fan 449 Utility Rm.
J-19 TCF Exhaust Fan, #10A 449 Utility Rm.
J-20 VFD-Exh.Fan, #10A 449 Utility Rm.
J-21 TCF Exhaust Fan, #10B 449 Utility Rm.
J-22 VFD-Exh.Fan, #10B 449 Utility Rm.
J-23 Sunroc Corp Water Cooler Lobby Hoapili Hale September Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
K 5th Floor
K-1 Exhaust Fan #8, Public R/R 501 Machine Room K-2 Exh.Fan #9, CO-Parking 501 Machine Room K-3 VFD-Exh.Fan #9 501 Machine Room K-4 Exhaust Fan #7, Staff R/R 503 Machine Room K-5 Mitsubishi, FCU-2A 502 Elevator Room K-6 Mitsubishi, FCU-2B 502 Elevator Room K-7 Mitsubishi, FCU-1A 504 Elevator Room K-8 Mitsubishi, FCU-1B 504 Elevator Room
L Roof L-1 Mitsubishi, ACU 2A Roof-S/W for R-502 L-2 Mitsubishi, ACU 2B Roof-S/W for R-502 L-3 Mitsubishi, ACU 1A Roof-S/E for R-504
October Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
A Level P-1
A-1 Storm Sump #3, Pump #1 P-1 A-2 Storm Sump #3, Pump #2 P-1 A-3 Skimmer Sump #2, Pump #1 P-1, Controller on P-2 A-4 Skimmer Sump #2, Pump #2 P-1, Controller on P-2 B Level P-2
B-1 Sewage Sump #1, Pump #1 P-2 B-2 Sewage Sump #1,Pump #2 P-2 B-3 Carrier Air Handler P-2, Cell Block D Level P-4
D-1 Daikin Condenser P-4 E Level P-5
E-1 Storm Sump #4, Pump #1 P-5A E-2 Storm Sump #4, Pump #2 P-5A E-3 CH-1, Trane Helical Chiller 3A-03 Chiller Room E-4 CH-2, Trane Helical Chiller 3A-03 Chiller Room E-5 CH-3 Air Cooled Chiller CT Cooling Tower
E-12 Water Treatment System 3A-03 Chiller Room F Cooling Tower
F-1 CT-1 Evapco CT Cooling Tower F-2 CT-2 Evapco CT Cooling Tower G 1st Floor
G-1 1-1, Carrier AHU-TVB 148 Mechanical Rm.
G-4 1-2, Carrier AHU-Legal Dcs. 148 Mechanical Rm.
G-7 Daikin split system 125 Video Equip.Rm.
H-1 2-1, Carrier AHU-JCFS 234 Mechanical Rm.
H-3 2-2, Carrier AHU-Library 234 Mechanical Rm.
H-6 2-3, Carrier AHU-SSB 203 Restroom Women/Men
Hoapili Hale October Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
I 3rd Floor
I-1 3-1, Carrier Air Handler 364 Mechanical Rm.
I-4 3-2, Carrier AHU, CR-3B 314 Locker Room-Men I-5 3-3, Carrier AHU, CR-3A 314 Locker Room-Men I-6 3-4, Carrier AHU, CR-3D 356 Staff R/R-Women I-7 3-5, Carrier AHU, CR-3C 358 Staff Rest Room-Men I-8 3-6, Carrier AHU, JC-3D 345 Judge's Chambers I-9 3-7, Carrier AHU, JC-3C 341 Judge's Chambers
I-10 3-8, Carrier AHU, Kawano 333 Per Dium Judge I-11 3-9 Carrier AHU, Bailiff 332 Bailiff's Office I-12 3-10 Carrier AHU, JC-3B 325 Judge's Chambers I-13 3-11 Carrier AHU, JC-3A 322 Judge's Chambers I-14 3-12 Carrier AHU, Training 309 Conference Room I-15 3-13, Carrier AHU AUX. CR-3B 364 Mechanical Rm.
J 4th Floor J-1 4-1 Carrier Air Handler 466 Mechanical Rm.
J-3 4-2 Carrier AHU, CR-4B 416 Multi-Purpose Rm.
J-4 4-3 Carrier AHU, CR-4A 416 Multi-Purpose Rm.
J-5 4-4 Carrier AHU, CR-4D 458 Rest Room-Women
J-10 4-9 Carrier AHU, JR-4B 431 Jury Room 4B J-11 4-10 Carrier AHU, JC-4B 424 Judge's Chambers J-12 4-11 Carrier AHU, JC-4A 421 Judge's Chambers J-13 4-12 Carrier AHU, JR-4A 409 Jury Room 4A J-14 4-13 Carrier AHU, JR-4D 455 Jury Room 4D Hoapili Hale October Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
J-15 4-14 Carrier AHU AUX. CR-4B 466 Mechanical Room J-16 4-15 Carrier AHU AUX. CR-4A 403 Rest Room-Women
K 5th Floor K-5 Mitsubishi, FCU-2A 502 Elevator Room K-6 Mitsubishi, FCU-2B 502 Elevator Room K-7 Mitsubishi, FCU-1A 504 Elevator Room K-8 Mitsubishi, FCU-1B 504 Elevator Room
L Roof L-1 Mitsubishi, ACU 2A Roof-S/W for R-502 L-2 Mitsubishi, ACU 2B Roof-S/W for R-502
November Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
A Level P-1
A-1 Storm Sump #3, Pump #1 P-1 A-2 Storm Sump #3, Pump #2 P-1 A-3 Skimmer Sump #2, Pump #1 P-1, Controller on P-2 A-4 Skimmer Sump #2, Pump #2 P-1, Controller on P-2 B Level P-2
B-1 Sewage Sump #1, Pump #1 P-2 B-2 Sewage Sump #1,Pump #2 P-2 B-3 Carrier Air Handler P-2, Cell Block D Level P-4
D-1 Daikin Condenser P-4 E Level P-5
E-1 Storm Sump #4, Pump #1 P-5A E-2 Storm Sump #4, Pump #2 P-5A E-3 CH-1, Trane Helical Chiller 3A-03 Chiller Room E-4 CH-2, Trane Helical Chiller 3A-03 Chiller Room E-5 CH-3 Air Cooled Chiller CT Cooling Tower
E-12 Water Treatment System 3A-03 Chiller Room F Cooling Tower
F-1 CT-1 Evapco CT Cooling Tower F-2 CT-2 Evapco CT Cooling Tower G 1st Floor
G-1 1-1, Carrier AHU-TVB 148 Mechanical Rm.
G-4 1-2, Carrier AHU-Legal Dcs. 148 Mechanical Rm.
G-7 Daikin split system 125 Video Equip.Rm.
H-1 2-1, Carrier AHU-JCFS 234 Mechanical Rm.
H-3 2-2, Carrier AHU-Library 234 Mechanical Rm.
H-6 2-3, Carrier AHU-SSB 203 Restroom Women/Men
Hoapili Hale November Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
I 3rd Floor
I-1 3-1, Carrier Air Handler 364 Mechanical Rm.
I-4 3-2, Carrier AHU, CR-3B 314 Locker Room-Men I-5 3-3, Carrier AHU, CR-3A 314 Locker Room-Men I-6 3-4, Carrier AHU, CR-3D 356 Staff R/R-Women I-7 3-5, Carrier AHU, CR-3C 358 Staff Rest Room-Men I-8 3-6, Carrier AHU, JC-3D 345 Judge's Chambers I-9 3-7, Carrier AHU, JC-3C 341 Judge's Chambers
I-10 3-8, Carrier AHU, Kawano 333 Per Dium Judge I-11 3-9 Carrier AHU, Bailiff 332 Bailiff's Office I-12 3-10 Carrier AHU, JC-3B 325 Judge's Chambers I-13 3-11 Carrier AHU, JC-3A 322 Judge's Chambers I-14 3-12 Carrier AHU, Training 309 Conference Room I-15 3-13, Carrier AHU AUX. CR-3B 364 Mechanical Rm.
J 4th Floor J-1 4-1 Carrier Air Handler 466 Mechanical Rm.
J-3 4-2 Carrier AHU, CR-4B 416 Multi-Purpose Rm.
J-4 4-3 Carrier AHU, CR-4A 416 Multi-Purpose Rm.
J-5 4-4 Carrier AHU, CR-4D 458 Rest Room-Women
J-10 4-9 Carrier AHU, JR-4B 431 Jury Room 4B J-11 4-10 Carrier AHU, JC-4B 424 Judge's Chambers J-12 4-11 Carrier AHU, JC-4A 421 Judge's Chambers J-13 4-12 Carrier AHU, JR-4A 409 Jury Room 4A J-14 4-13 Carrier AHU, JR-4D 455 Jury Room 4D Hoapili Hale November Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
J-15 4-14 Carrier AHU AUX. CR-4B 466 Mechanical Room J-16 4-15 Carrier AHU AUX. CR-4A 403 Rest Room-Women
K 5th Floor K-5 Mitsubishi, FCU-2A 502 Elevator Room K-6 Mitsubishi, FCU-2B 502 Elevator Room K-7 Mitsubishi, FCU-1A 504 Elevator Room K-8 Mitsubishi, FCU-1B 504 Elevator Room
L Roof L-1 Mitsubishi, ACU 2A Roof-S/W for R-502 L-2 Mitsubishi, ACU 2B Roof-S/W for R-502
December Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr i-A nn ua l Se m i-A nn ua l An nu al
Fi lte r R ep la ce
Be lt
R ep la ce
Date Tech. Comments:
A Level P-1
A-1 Storm Sump #3, Pump #1 P-1 A-2 Storm Sump #3, Pump #2 P-1 A-3 Skimmer Sump #2, Pump #1 P-1, Controller on P-2 A-4 Skimmer Sump #2, Pump #2 P-1, Controller on P-2 A-5 Exhaust Fan 1A-01 Utility Room B Level P-2
B-1 Sewage Sump #1, Pump #1 P-2 B-2 Sewage Sump #1,Pump #2 P-2 B-3 Carrier Air Handler P-2, Cell Block C Level P-3
C-1 Carnes Exhaust Fan 2A-01 Generator Room.
C-2 Carnes Exhaust Fan 2A-01 Generator Room.
C-3 Exhaust Fan 2A-01 Utility Room D Level P-4
D-1 Daikin Condenser P-4 E Level P-5
E-1 Storm Sump #4, Pump #1 P-5A E-2 Storm Sump #4, Pump #2 P-5A E-3 CH-1, Trane Helical Chiller 3A-03 Chiller Room E-4 CH-2, Trane Helical Chiller 3A-03 Chiller Room E-5 CH-3 Carrier Air Cooled Chiller CT Cooling Tower E-6 CWP-1, Baldor 254T 3A-03 Chiller Room E-7 CWP-2, Baldor 254T 3A-03 Chiller Room E-8 CHWP-1, Baldor 254T 3A-03 Chiller Room
E-13 Gas Extraction System-Trane 3A-03 Chiller Room E-14 Exhaust Fan-Gas Extraction 3A-03 Chiller Room E-15 Exhaust Fan 3A-01 Utility Room
F Cooling Tower F-1 CT-1 Evapco CT Cooling Tower F-2 CT-2 Evapco CT Cooling Tower F-3 CT-1, VFD - ABB CT Cooling Tower F-4 CT-2, VFD - ABB CT Cooling Tower G 1st Floor
G-1 1-1, Carrier AHU-TVB 148 Mechanical Rm.
G-2 1-1, VFD - ABB 148 Mechanical Rm.
G-3 1-1, UV Light 148 Mechanical Rm.
G-4 1-2, Carrier AHU-Legal Dcs. 148 Mechanical Rm.
G-5 1-2, VFD - ABB 148 Mechanical Rm.
G-6 1-2, UV Light 148 Mechanical Rm.
G-7 Daikin split system 125 Video Equip.Rm.
G-8 1-3, Carrier AHU 120 Video Conference Rm.
G-9 Carnes Exhaust Fan 105 Electrical Rm.
G-10 Carnes Exhaust Fan 149 Utility Rm.
G-11 Elkay Water Cooler Lobby G-12 Daikin Split system Kiosk Kiosk ceiling G-13 Daikin compressor Left Planter main ent.
H 2nd Floor H-1 2-1, Carrier AHU-JCFS 234 Mechanical Rm.
H-2 2-1, VFD - ABB 234 Mechanical Rm.
H-3 2-2, Carrier AHU-Library 234 Mechanical Rm.
H-4 2-2, VFD - ABB 234 Mechanical Rm.
H-5 2-2, UV Light 234 Mechanical Rm.
H-6 2-3, Carrier AHU-SSB 203 Restroom Women/Men H-7 2-3, VFD - ABB 203 Restroom Women/Men H-8 Carnes Exhaust Fan 205 Electrical Rm.
H-9 Carnes Exhaust Fan 235 Utility Rm.
H-10 Sunroc Corp Water Cooler Lobby
December Service Schedule
Unit # Unit Description
Room # Area Description M on th ly Q ua rt er ly
Tr…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .