IFB DWGS-751-19193.SMD_2026-10-12.pdf
PDF 11 MB Posted
- Solicitation number
- RFQ 171 270000000021 1
- Issued by
- Michigan
About this file
This Invitation for Bid (IFB) document pertains to a new storage building project at Belle Isle State Park in Detroit, Michigan, managed by the Michigan Department of Technology, Management & Budget (DTMB) and the Department of Natural Resources (DNR). The project involves the construction of a new stand-alone cold storage pole building (3,246 square feet total: 3,000 square feet first floor, 246 square feet mezzanine) designed to serve as equipment and material storage for the DNR headquarters facility. The structure will be a non-occupied utility building constructed to Michigan Building Code standards (2021 MBC) with construction type V-B classification and does not require sprinkler systems or fire alarms. The project scope includes excavation work, engineered fill installation, coarse stone fill, chain link fencing installation, fuel storage tank relocation and replacement, trash compactor relocation with infrastructure construction, and all necessary site work and utilities. The IFB was issued October 9, 2026, and includes detailed architectural, structural, civil, and electrical drawings prepared by WTA Architects (Saginaw), MacMillan Associates (structural/civil engineers), and Peter Basso Associates (electrical).
Compensation is based on unit price bidding for major work items including excavation (cubic yard), engineered fill (cubic yard), coarse stone fill (cubic yard), and chain link fencing (10-foot sections), with contract amounts adjusted based on actual work performed. The project requires contractors to engage a soils engineer for foundation monitoring and to comply with all applicable Michigan Building Code provisions, NFPA 101 Life Safety Code, and NFPA 70 National Electrical Code standards. No sprinkler system or fire alarm system is required. Special inspections are mandated for prepared fill, drilled pier foundations, and concrete construction per Michigan Building Code Section 1700. Funding is provided through the State of Michigan, DTMB, with project oversight by Adam P. Lach, RA, Director of the Design and Construction Division. The contractor is responsible for all site access maintenance, dewatering as required, soil condition verification, and compliance with environmental and safety regulations throughout construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100 S. JEFFERSON AVENUE, SUITE 601
SAGINAW, MICHIGAN 48607
PHONE: (989) 752-8107
EMAIL: DESIGN@WTAARCH.COM
OFFICE OF THE ARCHITECT:
ARCHITECTS
PROJECT
SITE
BELLE ISLE
PARK
WINDSOR
LAKE
ST. CLAIR
GROSSE
POINTE
DEARBORN
GRAND RIVER AVE
W O
O D
W A
R D
A V
E
G R
A T
IO
T A
V E
E. J
EFFERSON AVE.
E . G
R A
N D
B
LV
D
DETROIT R
IVER
SOUTHFIELD WARREN
EASTPOINTE
DETROIT
ROWE PROFESSIONAL SERVICES COMPANY
27280 HAGGERTY ROAD, SUITE C-2
FARMINGTON HILLS, MICHIGAN 48331
PHONE: (248) 675-1096
FAX: (800) 974-1704
CIVIL ENGINEER:
MACMILLAN ASSOCIATES, INC.
714 E. MIDLAND STREET
BAY CITY, MICHIGAN 48706
PHONE: (989) 894-4300
FAX: (989) 864-9930
STRUCTURAL ENGINEER:
DEPARTMENT OF NATURAL RESOURCES (DNR)
PARKS & RECREATION DIVISION
99 PLEASURE DRIVE
BELLE ISLE PARK
DETROIT, MICHIGAN 48207
AGENCY:
ELECTRICAL ENGINEER:
PETER BASSO ASSOCIATES
5145 LIVERNOIS, SUITE 100
TROY, MICHIGAN 48098
PHONE: (866) 950-9760
FAX: (248) 879-0007
11 PLEASURE DRIVE
BELLE ISLE PARK
DETROIT, MICHIGAN 48207
PROJECT LOCATION:
CODE INFORMATION:
• 2021 MICHIGAN BUILDING CODE (MBC)
• 2012 NFPA 101 LIFE SAFETY CODE
• NFPA 70 NATIONAL ELECTRICAL CODE WITH PART 8
RULES (2023)
1. PROPOSED USE: UTILITY (U) - BARN (312)
2. CONSTRUCTION TYPE: V-B (601)
3. ALLOWABLE BUILDING HEIGHT: 40 FT (504.3)
4. ALLOWABLE BUILDING AREA: 5,500 SQ.FT. (506.2)
A. PROPOSED:
FIRST FLOOR: 3,000 SQ.FT.
MEZZANINE FLOOR: 246 SQ.FT.
TOTAL: 3,246 SQ.FT.
5. NO SPRINKLER SYSTEM REQUIRED (903)
A. NOT PROVIDED
6. NO FIRE ALARM REQUIRED (907)
A. NOT PROVIDED
7 . SPACE HEATING SYSTEMS (MMC 309.1)
A. NO HEATING FACILITIES AS PRIMARY PURPOSE IS
NOT ASSOCIATED WITH HUMAN COMFORT.
8. TOILET FACILITIES (MPC TABLE 403.1)
A. STAFF WILL HAVE ACCESS TO TOILET FACILITIES
AT ADJACENT DNR HEADQUARTERS BUILDING.
PROJECT DESCRIPTION
THIS PROJECT INCLUDES CONSTRUCTION OF A NEW
STAND-ALONE COLD STORAGE POLE BUILDING FOR
THE DNR HEADQUARTERS BUILDING ON BELLE ISLE.
THE NEW STRUCTURE WILL NOT BE REGULARLY
OCCUPIED OR STAFFED AND WILL BE USED FOR
EQUIPMENT AND MATERIAL STORAGE AND WILL NOT
INCLUDE ANY REPAIR, OFFICE, OR PLUMBING
FACILITIES.
MICHIGAN DEPARTMENT OF TECHNOLOGY,
MANAGEMENT & BUDGET (DTMB)
3111 W. ST. JOSEPH ST.
BUILDING 100
LANSING, MI 48917
OWNER:
SCHEDULE OF UNIT PRICES:
UNIT PRICE NO. 1: EXCAVATION
1. DESCRIPTION: PROVIDE EXCAVATION WORK
TO REMOVE UNSUITABLE SOILS IN
ACCORDANCE WITH SOILS INVESTIGATION
REPORT.
2. UNIT MEASUREMENTS: CUBIC YARD
UNIT PRICE NO. 2: ENGINEERED FILL
1. DESCRIPTION: PROVIDE ENGINEERED FILL TO
SUPPORT FOUNDATIONS IN ACCORDANCE
WITH SOILS INVESTIGATION REPORT.
2. UNIT MEASUREMENTS: CUBIC YARD
UNIT PRICE NO. 3: COURSE STONE FILL
1. DESCRIPTION: PROVIDE COARSE STONE FILL
AT BOTTOM OF FOUNDATION EXCAVATIONS
FOR STABILIZATIONS IN ACCORDANCE WITH
SOILS INVESTIGATION REPORT.
2. UNIT MEASUREMENTS: CUBIC YARD
UNIT PRICE NO. 4: CHAIN LINK FENCE
1. DESCRIPTION: PROVIDE CHAIN LINK FENCING
AS INDICATED IN CIVIL ENGINEERING
DRAWINGS.
2. UNIT MEASUREMENTS: 10-FOOT SECTION
PROJECT TITLE
989 752 8107 COPYRIGHT ©
WTAARCH.COM
A
Saginaw, Michigan 48607
100 S Jefferson Ave, Suite 601
RCHITECTS
PROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET NUMBER
SHEET TITLE
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
ADAM P. LACH, RA, DIRECTOR
FILE NO.
INDEX NO. CONTRACT NO.
INDEX OF DRAWINGS:CONTACTS:
DEPARTMENT OF NATURAL RESOURCES
/1
/2
:4
:0
A
M C
U s e rs
\r s o v a \D o c u m e n ts
\C E
N T
R A
L -2
-B e lle
Is le
H d q tr s M a in t& S to ra g e V rs o v a W
T A
.r v t
W T
A
2019131
OCTOBER 9, 2026
J.R.G.
BELLE ISLE STATE PARK
TS
DETROIT, MICHIGAN
NEW STORAGE BUILDING FOR:
BELLE ISLE STATE PARK
NEW STORAGE BUILDING FOR:
TITLE SHEET
DETROIT, MICHIGAN
751/19193.SMD
5603 Y22166
STRUCTURAL
S2.01 FOUNDATION PLAN, ROOF FRAMING
PLAN AND DETAILS
S3.01 NOTES AND SCHEDULES
ELECTRICAL
E0.01 ELECTRICAL STANDARDS AND DRAWING
INDEX
E0.02 ELECTRICAL STANDARD SCHEDULES
E0.04 ELECTRICAL SITE PLAN
E1.01 ELECTRICAL NEW WORK PLAN
E5.01 ONE LINE DIAGRAM
TS TITLE SHEET
NORTH SCALE: N.T.S.
LOCATION MAP
CIVIL
C1 COVER SHEET
C2 LEGEND SHEET
C3 NOTE SHEET
C4 DETAIL SHEET
C5 EXISTING CONDITIONS SHEET
C6 EXISTING CONDITIONS SHEET CONT.
C7 SITE PLAN SHEET
C8 SESC KEY SHEET
ARCHITECTURAL
A1.01 ARCHITECTURAL SITE PLAN
A2.21 FIRST FLOOR & PARTIAL MEZZANINE
FLOOR PLANS
A5.11 EXTERIOR ELEVATIONS & BUILDING
SECTIONS
A5.21 WALL SECTIONS, DETAILS & SCHEDULES
A6.21 ROOF PLAN, CEILING PLANS & DETAILS NO. REVISION DATE
ISSUED FOR BIDS 10/09/26
Th e
R ow e Bu ild in g
S.
S ag in aw
S t., S ui te
Fl in t, M I 4
O
0)
-7 w w w
.ro w ep sc
.c om
R
PR
SE
CO
OW
E
OF
ES
SIO
NA
L
RV
ICE
S
MP
AN
Y
CO
VE
R
SH
EE
T
1 8
GPR FO GPR FO GPR FO
GPR STM GPR STM GPR STM
GPR SAN GPR SAN GPR SAN
GPR CATV GPR CATV GPR CATV
GPR WTR GPR WTR GPR WTR
GPR ELEC GPR ELEC GPR ELEC
GPR TELE GPR TELE GPR TELE
GPR GAS GPR GAS GPR GAS
GPR MISC GPR MISC GPR MISC
GPR UNK GPR UNK GPR UNK
Th e
R ow e Bu ild in g
S.
S ag in aw
S t., S ui te
Fl in t, M I 4
O
0)
-7 w w w
.ro w ep sc
.c om
R
PR
SE
CO
OW
E
OF
ES
SIO
NA
L
RV
ICE
S
MP
AN
Y
LE
G
EN
D
SH
EE
2 8
Th e
R ow e Bu ild in g
S.
S ag in aw
S t., S ui te
Fl in t, M I 4
O
0)
-7 w w w
.ro w ep sc
.c om
R
PR
SE
CO
OW
E
OF
ES
SIO
NA
L
RV
ICE
S
MP
AN
Y
NO
TE
S
HE
ET
3 8
R ow e Bu ild in g
S.
S ag in aw
S t., S ui te
Fl in t, M I 4
O
0)
-7 w w w
.ro w ep sc
.c om
R
PR
SE
CO
OW
E
OF
ES
SIO
NA
L
RV
ICE
S
MP
AN
Y
DE
TA
IL
S
HE
4 8
R ow e Bu ild in g
S.
S ag in aw
S t., S ui te
Fl in t, M I 4
O
0)
-7 w w w
.ro w ep sc
.c om
R
PR
SE
CO
OW
E
OF
ES
SIO
NA
L
RV
ICE
S
MP
AN
Y
EX
IS
TI
NG
C O
ND
IT
IO
NS
S
HE
5 8
R ow e Bu ild in g
S.
S ag in aw
S t., S ui te
Fl in t, M I 4
O
0)
-7 w w w
.ro w ep sc
.c om
R
PR
SE
CO
OW
E
OF
ES
SIO
NA
L
RV
ICE
S
MP
AN
Y
TR
AS
H
CO
M
PA
CT
O
R
RE
LO
CA
TI
O
N
EX
IS
TI
NG
C
O
ND
IT
IO
NS
S
HE
ET
C O
NT
6 8
BAY 1
BAY 2
BAY 3
BAY 4
BAY 5
Th e
R ow e Bu ild in g
S.
S ag in aw
S t., S ui te
Fl in t, M I 4
O
0)
-7 w w w
.ro w ep sc
.c om
R
PR
SE
CO
OW
E
OF
ES
SIO
NA
L
RV
ICE
S
MP
AN
Y
SI
TE
P
LA
N
SH
EE
7 8
R ow e Bu ild in g
S.
S ag in aw
S t., S ui te
Fl in t, M I 4
O
0)
-7 w w w
.ro w ep sc
.c om
R
PR
SE
CO
OW
E
OF
ES
SIO
NA
L
RV
ICE
S
MP
AN
Y
SE
SC
K
EY
S
HE
8 8
PROJECT WORK LIMITS
EXISTING DNR PARK
HEADQUARTERS BUILDING CONTRACTOR SHALL KEEP ACCESS DRIVE
OPEN THROUGHOUT CONSTRUCTION FOR
OWNER USE AND ACCESS
EXISTING FUEL STORAGE
TANKS TO BE RELOCATED
PLEASURE DRIVE
P
LE
A S
U R
E D
R
IV
E
SUNSET DRIVE
S U
N S
E T
D R
IV
E
LOITER W
AYIN
S E
L R
U H
E A
V E
EXISTING
STABLES
FACILITY
EXISTING TRASH COMPACTOR
TO BE RELOCATED
REMOVE EXISTING RAMP AND
WALL FOR TRASH COMPACTOR
FUEL DISPENSING SYSTEM SCOPE OF WORK:
THE DESIGN INTENT IS TO RELOCATE TWO EXISTING
DOUBLE-WALLED FUEL STORAGE TANKS TO NEW
CONCRETE FUELING PAD. A THIRD EXISTING SINGLE-
WALLED FUEL STORAGE TANK IS TO BE REPLACED
WITH A NEW DOUBLE-WALLED TANK OF MATCHING
SIZE AND CAPACITY. PROVIDE NEW AST PUMPS WITH
CLOCK GAUGE ALARM FOR EACH TANK AND ALL
NECESSARY ACCESSORIES FOR A FULLY
OPERATIONAL AND COMPLIANT SYSTEM.
CONTRACTOR SHALL BE RESPONSIBLE FOR
PROVIDING DESIGN AND INSTALLATION OF A
COMPLETE FUEL DISPENSING SYSTEM IN COMPLIANCE
WITH ALL APPLICABLE CODES AND REGULATIONS.
SCOPE SHALL INCLUDE INSTALLATION OF
UNDERGROUND ELECTRICAL POWER AND ALL
CONNECTIONS FROM NEW POLE BUILDING TO FUEL
TANKS.
TRASH COMPACTOR SCOPE OF WORK:
THE DESIGN INTENT IS TO RELOCATE AN EXISTING
TRASH COMPACTOR FROM ITS CURRENT LOCATION TO
A NEW PAD ADJACENT TO THE NEW POLE BUILDING.
CONTRACTOR SHALL BE RESPONSIBLE FOR
CONSTRUCTION OF THE NEW PAD LOCATION AND
INFRASTRUCTURE INDICATED ON THE DRAWINGS.
MOVING THE EXISTING UNIT, INCLUDING
DISCONNECTING AND RECONNECTION OF POWER TO
BE PERFORMED BY:
REACTION DISTRIBUTING
19 BROCK STREET
AJAX, ONTARIO, L1S 1S9
(905) 426-6442 EXT 1001
www.reactiondistributing.com
CONTRACTOR SHALL REMOVE EXISTING
INFRASTRUCTURE AT CURRENT COMPACTOR
LOCATION AFTER RELOCATION, INCLUDING REMOVAL
OF RAMP, WALL, AND CUTTING AND CAPPING
ELECTRICAL POWER. PROVIDE LAWN RESTORATION AT
AREA OF RAMP REMOVAL AS REQUIRED.
GENERAL SITE PLAN NOTES:
1. ARCHITECTURAL SITE PLAN INDICATED ON THIS
SHEET IS FOR DIAGRAMMATIC PURPOSES ONLY.
2. REFER TO CIVIL DOCUMENTS FOR BENCHMARKS,
BOUNDARIES, EASEMENTS, ETC.
1 1/2" DIA. STEEL GUARDRAIL,
PAINTED 'SAFETY YELLOW'
1 1/2" DIA. STEEL GUARDRAIL,
PAINTED 'SAFETY YELLOW'
10' -
11' -
" V .I.
F.
10' -
CONCRETE DRIVE PER CIVIL DWGS.
FOOTING BELOW PER STRUCTURAL DWGS.
A1.01
A1.01
CONCRETE PAD PER CIVIL DWGS.
M
IN
1 1/2" DIA. SCH. 80 STEEL PIPE
GUARDRAIL,
PAINTED 'SAFETY YELLOW'
3/8" X 4" X 8" BASE PLATE AT
POSTS W/ (2) 1/2" DIA. S.S.
ANCHORS USING HILTI HIT-RE 500
V3 EPOXY @ 5" GA. (6 1/2" EMBED)
1 1/2" DIA. SCH. 80 STEEL PIPE
MID RAIL,
PAINTED 'SAFETY YELLOW'
1 1/2" DIA. SCH. 80 STEEL PIPE GUARDRAIL,
PAINTED 'SAFETY YELLOW'
M
IN
ROUNDED, TYP. EACH END
CONCRETE RETAINING WALL
PER STRUCTURAL AND CIVIL
DWGS.
1 1/2" DIA. SCH. 80 STEEL PIPE
MID RAIL,
PAINTED 'SAFETY YELLOW'
PROJECT TITLE
989 752 8107 COPYRIGHT ©
WTAARCH.COM
A
Saginaw, Michigan 48607
100 S Jefferson Ave, Suite 601
RCHITECTS
PROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET NUMBER
SHEET TITLE
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
ADAM P. LACH, RA, DIRECTOR
FILE NO.
INDEX NO. CONTRACT NO.
DEPARTMENT OF NATURAL RESOURCES
/1
/2
:4
:0
A
M C
U s e rs
\r s o v a \D o c u m e n ts
\C E
N T
R A
L -2
-B e lle
Is le
H d q tr s M a in t& S to ra g e V rs o v a W
T A
.r v t
W T
A
2019131
OCTOBER 9, 2026
J.R.G.
BELLE ISLE STATE PARK
A1.01
DETROIT, MICHIGAN
NEW STORAGE BUILDING FOR:
ARCHITECTURAL SITE
PLAN
751/19193.SMD
5603 Y22166
NO. REVISION DATE
ISSUED FOR BIDS 10/09/26
NORTH
SCALE: 1/8" = 1'-0"A1.01
RETAINING WALL GUARDRAIL PLAN1
SCALE: 1 1/2" = 1'-0"A1.01
RETAINING WALL GUARDRAIL DETAIL2
SCALE: 3/4" = 1'-0"A1.01
PARTIAL RETAINING WALL GUARDRAIL ELEVATION3
GENERAL PLAN NOTES:
1. COLUMN LINES ARE DIMENSIONED FROM INSIDE
FACE OF HORIZONTAL 2X WALL GIRTS TO THE
CENTER OF THE COLUMN, EXCEPT FOR CORNER
COLUMNS, UNLESS NOTED OTHERWISE.
2. REFER TO ALL ARCHITECTURAL, CIVIL,
STRUCTURAL AND ELECTRICAL FOR RELATED
WORK.
3. CONTRACTOR IS RESPONSIBLE TO ENSURE ALL
WORK CONFORMS WITH APPLICABLE NATIONAL,
STATE AND LOCAL CODES, LAWS AND
REGULATIONS.
1/A5.11
/A
.1
2/A5.11
/A
.1
A A
B B
E E
F F
80' - 0" OVERALL
O
V E
R A
L L
/4
/2
/4
8' - 0" 4' - 0" 4' - 0" 14' - 5 1/2" 6' - 4" 6' - 5" 6' - 4" 14' - 5 1/2" 8' - 0" 8' - 0"
6' - 4" 1' - 8" 4' - 0" 4' - 0" 14' - 5 1/2" 6' - 4" 6' - 5" 6' - 4" 14' - 5 1/2" 8' - 0" 8' - 0"
/4
/2
/4
O
V E
R A
L L
80' - 0" OVERALL
A
A5.11
B
A5.11
C
A5.11
C C
D D
4" 2 3/4" 14' - 0" OHD 2 3/4" 4"
4" 2 3/4" 14' - 0" OHD 2 3/4" 4"
4" 2 3/4" 14' - 0" OHD 2 3/4" 4" 4" 2 3/4" 14' - 0" OHD 2 3/4" 4"
/4
/4
/4
/4
BAY 1 BAY 2 BAY 3 BAY 4 BAY 5
1 1 1 1
4 4
001.1 005.1
1' - 0"
1' - 0"
1' - 0"
1' - 0"
002.1 004.1
004.2002.2
A2.21
UP
100' - 0"
A2.21
5' - 0"
5' - 0"
1' - 0"
4' - 6" 7 T @ 12" = 7' - 0"
1' - 0"
E.3 E.3
1.7
1.7
1' - 0"
A2.21
1' - 0"
/A
.1
A A
B B
E E
F F
A
A5.11
B
A5.11
C C
D D
MEZZANINE
/4
/2
/4
A2.21
DN
DN
OPEN TO
BELOW
109' - 0"
A2.21
1' - 0" 4' - 6"
8' - 0" 4' - 0"
A2.21
E.3 E.3
6' - 1 1/4" 6' - 1 1/2"
/4
/4
1.7
1.7
C L
E A
R W
ID
T
H
A2.21
4' - 0"
T
12' - 2 3/4"
1' - 0"
FIRST FLR
100' - 0"
MEZZ. FLR
109' - 0"
FD
R
/4
/4
R
/4
/4
/4
/4
A2.21
WOOD STAIR TREADS
W/ OPEN RISERS
WOOD STRINGER SUPPORTS
BOTH SIDES AND MIDDLE
BAY 1
MEZZANINE
WOOD GUARDRAIL,
UNPAINTED
E.3
9 T @ 12" = 9' - 0"
LANDING
5' - 6" 1' - 0"
A2.21
A2.21
DOUBLE 2x HEADER
MAX. 21" DIA. OPENING,
TYP.
1 1/2" DIA. STEEL PIPE
HANDRAIL, UNPAINTED
FIRST FLR
100' - 0"
MEZZ. FLR
109' - 0"
1 3
A2.21
R
/4
/4
R
/4
/4
WOOD STAIR TREADS W/
OPEN RISERS
WOOD STRINGER SUPPORTS
BOTH SIDES AND MIDDLE
2x P.T. THRUST BLOCK, 3/8" HILTI KWIK BOLT TZ2, EMBED 1-1/2", (1) BOLT AT
EA. STRINGER MIN.
BAY 1
MEZZANINE WOOD GUARDRAIL,
PAINTED
A2.21
7 T @ 12" = 7' - 0"
LANDING
4' - 6"1' - 0"
A2.21
MAX. 21" DIA. OPENING,
TYP.
2x4 KNEE WALL
1.7
1 1/2" DIA.
STEEL PIPE
HANDRAIL,
UNPAINTED
1' - 0"
/2
/2
2x4 TOP RAIL
2x4 RAIL
2x4 MID RAIL
2x4 POST
ROUNDED EDGES
3/4" APA RATED
SHEATHING
2x6 BOTTOM RAIL
2x6 BETWEEN
POSTS
1/2" DIA. THRU-
BOLTS W/ NUT &
WASHER PER
STRUCT. DWGS.
2x4 TOP RAIL
2x4 RAIL
2x4 MID RAIL
2x4 POST
STAIR STRINGER
STAIR STRINGER
BEYOND
ROUNDED EDGES
/2
1 1/2" DIA. STEEL
PIPE HANDRAIL,
UNPAINTED
STAINLESS
STEEL BRACKET
1/2" DIA. THRU-
BOLTS W/ NUT &
WASHER PER
STRUCT. DWGS.
FIRST FLR
100' - 0"
EXTR. MTL. WALL
PANELS
2x6 WALL GIRTS
3/4" PLYWD. BACKER
BOARD
CONC. SLAB
NOTE:
PROVIDE AND INSTALL ALL EQUIPMENT
BACKING BOARDS IN STRICT
ACCORDANCE WITH THE ELECTRICAL
SPECIFICATIONS, LOCAL BUILDING
CODES, AND THE LATEST EDITION OF
THE NATIONAL ELECTRICAL CODE (NEC).
GRADE BEAM
1/2" APA RATED
SHEATHING
FOUNDATION DESIGN INTENT
THE DESIGN INTENT IS TO CONSTRUCT THIS BUILDING
USING CONVENTIONAL PIERS AND FOOTINGS RESTING
ON NATIVE, NON-ORGANIC SOILS, AS DESCRIBED IN
THE SOILS INVESTIGATION REPORT PREPARED BY
MCDOWELL & ASSOCIATES. ALL NON-ENGINEERED FILL
SOILS, ORGANIC SUBSTANCES, OR EXCESSIVELY
WEAK SOILS SHOULD BE REMOVED IN ACCORDANCE
WITH THEIR REPORT AND REPLACED WITH
ENGINEERED FILL. CONTRACTOR SHALL BE
RESPONSIBLE FOR ENGAGING THE SOILS ENGINEER
DURING EXCAVATION AND CONSTRUCTION TO
MONITOR OPERATIONS AND VERIFY SOIL SUITABILITY
AND BEARING CAPACITY.
FOR BIDDING PURPOSES, THE CONTRACTOR SHALL
INCLUDE THE FOLLOWING IN BASE BID AMOUNT:
• EXCAVATE FOR ALL FOOTINGS AND
FOUNDATIONS TO A DEPTH OF 9’-6” BELOW
GRADE
• PROVIDE ENGINEERED FILL PER SOILS
INVESTIGATION RECOMMENDATIONS TO
BOTTOM OF FOUNDATION BEARING ELEVATION
• BACKFILL FOUNDATIONS USING NATIVE SOILS;
SPOILS WILL BE SPREAD ON SITE AT THE
DIRECTION OF THE OWNER
• PROVIDE DEWATERING FOR EXCAVATIONS AS
REQUIRED
CONTRACT AMOUNTS WILL BE ADJUSTED BASED ON
THE ACTUAL WORK PERFORMED USING UNIT COST
PRICING. REFER TO UNIT COSTS FOR ADDITIONAL
INFORMATION.
PROJECT TITLE
989 752 8107 COPYRIGHT ©
WTAARCH.COM
A
Saginaw, Michigan 48607
100 S Jefferson Ave, Suite 601
RCHITECTS
PROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET NUMBER
SHEET TITLE
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
ADAM P. LACH, RA, DIRECTOR
FILE NO.
INDEX NO. CONTRACT NO.
DEPARTMENT OF NATURAL RESOURCES
/1
/2
:4
:0
A
M C
U s e rs
\r s o v a \D o c u m e n ts
\C E
N T
R A
L -2
-B e lle
Is le
H d q tr s M a in t& S to ra g e V rs o v a W
T A
.r v t
W T
A
2019131
OCTOBER 9, 2026
J.R.G.
BELLE ISLE STATE PARK
A2.21
DETROIT, MICHIGAN
NEW STORAGE BUILDING FOR:
FIRST FLOOR & PARTIAL
MEZZANINE FLOOR
PLANS
751/19193.SMD
5603 Y22166
NORTH
SCALE: 1/4" = 1'-0"A2.21
FIRST FLOOR CONSTRUCTION PLAN1
NORTH
SCALE: 1/4" = 1'-0"A2.21
PARTIAL MEZZANINE CONSTRUCTION PLAN2
SCALE: 3/8" = 1'-0"A2.21
STAIR SECTION4
SCALE: 3/8" = 1'-0"A2.21
STAIR SECTION3
SCALE: 3/4" = 1'-0"A2.21
WOOD GUARDRAIL @ MEZZ.5
SCALE: 3/4" = 1'-0"A2.21
WOOD GUARDRAIL @ STAIR6
PLAN KEYNOTES
1 CONCRETE FLOOR SLAB ON VAPOR BARRIER
PER STRUCT. DWGS.
2 PRE-FINISHED FORMED METAL WALL PANELS
(RE: SPEC.), ON 2x6 WALL GIRTS PER STRUCT.
DWGS.
3 PRE-FINISHED FORMED METAL WALL PANELS
(RE: SPEC.), ON 1/2" APA RATED SHEATHING ON
2x6 WALL GIRTS PER STRUCT. DWGS.
4 CONCRETE APRON PER CIVIL DWGS.
5 LINE OF CONTINUOUS REINFORCED CONCRETE
GRADE BEAM PER STRUCT. DWGS.
6 PRESSURE TREATED TIMBER WOOD COLUMN
PER STRUCT. DWGS.
7 6" DIA. BOLLARD, TYP. PER CIVIL DWGS.
8 CONCRETE SUPPORTED ENTRY SLAB PER
STRUCT. DWGS.
9 24" WIDE STORAGE SHELVING UNITS, BY OWNER.
10 FENCING & GATE ENCLOSURE SYSTEM. PROVIDE
LATCH AND HOLD SWING IN FOR GATE DOOR.
11 WOOD GUARDRAIL SYSTEM, UNPAINTED.
12 1 1/2" DIAMETER STEEL PIPE HANDRAIL,
UNPAINTED.
13 LINE OF MEZZANINE ABOVE.
14 SAFETY SWING GATE SYSTEM WITH SIDE RAILS.
SPEC: FABENCO MZ CH-SERIES, MODEL
#CH15-64PC.
15 ELECTRICAL EQUIPMENT PER ELEC. DWGS.
16 PROVIDE 3/4" X 4' X 8' PLYWOOD BACKER BOARD
FOR ELECTRICAL EQUIPMENT (RE: DETAIL THIS
SHEET).
SCALE: 1/2" = 1'-0"A2.21
WALL BACKING SECTION7
NO. REVISION DATE
FIRST FLR
100' - 0"
RE: STRUCT
B.O. FTG
B.O. TRUSS
116' - 0"
MEZZ. FLR
109' - 0"
A B E F
A
A5.11
C D
001.1
E.3
4"
12"
4"
12" 31
1' - 0"
1' - 0"
FIRST FLR
100' - 0"
RE: STRUCT
B.O. FTG
B.O. TRUSS
116' - 0"
MEZZ. FLR
109' - 0"
ABEF
A
A5.11
CD
005.1
E.3
4"
12"
4"
12" 31
1' - 0" 1' - 0"
FIRST FLR
100' - 0"
RE: STRUCT
B.O. FTG
B.O. TRUSS
116' - 0"
MEZZ. FLR
109' - 0"
134691011
B
A5.11
C
A5.11
004.1 002.1
31 31
32 32
1.77 2
FIRST FLR
100' - 0"
RE: STRUCT
B.O. FTG
B.O. TRUSS
116' - 0"
MEZZ. FLR
109' - 0"
1 3 4 6 9 10 11
B
A5.11
C
A5.11
5 8
002.2 004.2
1.7 72
FIRST FLR
100' - 0"
RE: STRUCT
B.O. FTG
B.O. TRUSS
116' - 0"
MEZZ. FLR
109' - 0"
1 3 4 6 9 10 11
B
A5.11
C
A5.11
5 8
BAY 1 BAY 2 BAY 3
MEZZANINE
BAY 4 BAY 5
A5.21
1.7 72
FIRST FLR
100' - 0"
RE: STRUCT
B.O. FTG
B.O. TRUSS
116' - 0"
MEZZ. FLR
109' - 0"
ABEF
A
A5.11
CD
BAY 1
A5.21
001.1
E.3
4"
12"
4"
12"
FIRST FLR
100' - 0"
RE: STRUCT
B.O. FTG
B.O. TRUSS
116' - 0"
ABEF
A
A5.11
CD
BAY 4
E.3
4"
12"
4"
12"
PROJECT TITLE
989 752 8107 COPYRIGHT ©
WTAARCH.COM
A
Saginaw, Michigan 48607
100 S Jefferson Ave, Suite 601
RCHITECTS
PROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET NUMBER
SHEET TITLE
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
ADAM P. LACH, RA, DIRECTOR
FILE NO.
INDEX NO. CONTRACT NO.
DEPARTMENT OF NATURAL RESOURCES
/1
/2
:4
:0
A
M C
U s e rs
\r s o v a \D o c u m e n ts
\C E
N T
R A
L -2
-B e lle
Is le
H d q tr s M a in t& S to ra g e V rs o v a W
T A
.r v t
W T
A
2019131
OCTOBER 9, 2026
J.R.G.
BELLE ISLE STATE PARK
A5.11
DETROIT, MICHIGAN
NEW STORAGE BUILDING FOR:
EXTERIOR ELEVATIONS &
BUILDING SECTIONS
751/19193.SMD
5603 Y22166
SCALE: 1/8" = 1'-0"
WEST ELEVATION
4/A5.11
SCALE: 1/8" = 1'-0"
EAST ELEVATION
3/A5.11SCALE: 1/8" = 1'-0"
NORTH ELEVATION
1/A5.11
SCALE: 1/8" = 1'-0"
SOUTH ELEVATION
2/A5.11
SCALE: 1/8" = 1'-0"A5.11
BUILDING SECTIONA
SCALE: 1/8" = 1'-0"A5.11
BUILDING SECTIONB
SCALE: 1/8" = 1'-0"A5.11
BUILDING SECTIONC
MATERIAL KEYNOTE
1 POURED CONCRETE FOOTING PER STRUCT.
DWGS.
2 COMPACTED GRANULAR FILL PER CIVIL DWGS.
3 FINISH GRADE. SLOPE AWAY FROM BUILDING
PER CIVIL DWGS.
4 CONCRETE FLOOR SLAB ON VAPOR BARRIER
PER STRUCT. DWGS.
5 SUPPORTED CONCRETE ENTRY SLAB PER
STRUCT. DWGS.
6 PRESSURED TREATED 2x8 SKIRT BOARD.
7 PRESSURE TREATED TIMBER WOOD COLUMN
PER STRUCT. DWGS.
8 CONCRETE FILLED PIPE BOLLARD PER CIVIL
DWGS.
9 PRE-FINISHED FORMED METAL WALL PANELS
(RE: SPEC.).
10 1/2" APA RATED WALL SHEATHING.
11 2x6 WOOD WALL GIRTS LAID FLAT @ 24" O.C.
12 HEADER PER STRUCT. DWGS.
13 VENTED ALUMIMUM SOFFIT SYSTEM.
14 PRE-ENGINEERED GABLE END TRUSS.
15 PRE-ENGINEERED WOOD TRUSSES @ 48" O.C.
16 1/2" APA RATED ROOF SHEATHING.
17 ASPHALT ROOF SHINGLES ON 15# FELT
UNDERLAYMENT (RE: SPEC.).
18 CONTINUOUS RIDGE VENT.
19 METAL WRAPPED FASCIA TRIM ON 2x6
CONTINUOUS FASCIA BOARD.
20 METAL WRAPPED RAKE TRIM ON 2x6
CONTINUOUS RAKE BOARD.
21 HOLLOW METAL DOOR AND FRAME, PAINT.
22 SECTIONAL OVERHEAD DOOR.
23 OFFSET MOTOR OPERATOR AND DRAW ARMS
ATTACHED TO SECTIONAL DOOR PANEL. INSTALL
HORIZONTAL TRACKS AS REQUIRED TO CLEAR
EACH OTHER AT 14 FEET AT OHD LOCATIONS.
24 2x4 WOOD ROOF PURLINS @ 24" O.C.
PERPENDICULAR TO TRUSSES PER STRUCT.
DWGS.
25 SIMPSON TIE DOWN PER STRUCT. DWGS.
26 WOOD STAIR TREADS WITH OPEN RISERS AND
STRINGER SUPPORTS ON BOTH SIDES AND
MIDDLE.
27 WOOD GUARDRAIL SYSTEM, UNPAINTED.
28 1 1/2" DIAMETER HANDRAIL, UNPAINTED.
29 3/4" UNPAINTED APA RATED FLOOR SHEATHING
ON 2x12 FLOOR JOISTS PER STRUCT. DWGS.
30 SAFETY SWING GATE SYSTEM WITH SIDE RAILS.
31 RAIN GUARD DIVERTER SYSTEM.
32 LIGHT FIXTURE PER ELEC. DWGS.
33 ELECTRICAL EQUIPMENT PER ELEC. DWGS.
S E
E S
C H
E D
SCHED.
SEE
D1
S E
E S
C H
E D
U L E
SEE SCHEDULE
D2
GLAZING
2"
SEE SCHEDULE
2"
S E
E S
C H
E D
U L E
F1
FIRST FLR
100' - 0"
B.O. TRUSS
116' - 0"
MEZZ. FLR
109' - 0"
A6.21
A5.21
OHD OPENING
RE: SCHED.
METAL WALL PANELS
HEAD FLASHING
WEATHER SEAL
PRE-FINISHED ALUM.
SHEET MTL. TRIM AT
JAMB & HEAD
LVL HEADER
PER STRUCT. DWGS.
2x8 CRIPPLE @ 24" O.C.
OVER OPENING
2x6 TORSION SPRING
MOUNTING BOARD
(2) 2x8 FRAMING
PER STRUCT. DWGS.
M
IN
H
E A
D R
O O
M
/2
SECTIONAL DOOR
TIMBER COLUMN
BEYOND
OPENING
RE: SCHED.
METAL WALL PANELS
2x6 GIRTS
HEAD FLASHING
2x8 CRIPPLE @ 24" O.C.
OVER OPENING
(2) 2x8 HEADER
PER STRUCT. DWGS.
HM DOOR AND
FRAME, PAINT
SEALANT &
BACKER ROD
TIMBER COLUMN
BEYOND
E .O
G
R A
D E
B E
A M
ALL OPENINGS BACKED W/
VERT. 2x4 BETWEEN GIRTS
PRE-FINISHED ALUM. SHEET
MTL. TRIM AT JAMB & HEAD
SECTIONAL OVERHEAD DOOR
TRACK MOUNTED TO TIMBER
COLUMN
WEATHER SEAL
TIMBER COLUMN
METAL WALL PANELS
E .O
G
R A
D E
B E
A M
ALL OPENINGS BACKED W/
VERT. 2x4 BETWEEN GIRTS
PRE-FINISHED ALUM. SHEET
MTL. TRIM AT JAMB & HEAD
(3) ANCHORS PER JAMB INTO
TIMBER COLUMNS, UNIVERSAL
OR WOOD STUD ANCHORS
HM DOOR, PAINT
HM FRAME, PAINT
THRESHOLD
/4
SEALANT & BACKER ROD
TIMBER COLUMN
METAL WALL PANELS
FIRST FLR
100' - 0"
B.O. TRUSS
116' - 0"
MEZZ. FLR
109' - 0"
F
M
IN
A5.21
A6.21
4"
12"
5 3/4"
HM FRAME, PAINT
THRESHOLD
CONC. FLOOR SLAB
PER STRUCT. DWGS.
BOND BREAK
CONC. FLOOR SLAB
PER STRUCT. DWGS.
PRE-FINISHED ALUM. SHEET
MTL. TRIM AT JAMB & HEAD
SECTIONAL OVERHEAD DOOR
BOND BREAK
BOTTOM WEATHER SEAL
TRACK BEYOND
FIRST FLR
100' - 0"
GRADE PER
CIVIL DWGS.
P.T. 2x8 SKIRT BD.
METAL WALL PANELS
BASE FLASHING
REINF. CONC.
GRADE BEAM
PER STRUCT. DWGS.
CONC. SLAB
PER STRUCT. DWGS.
BENT PLATE
PER STRUCT. DWGS.
TIMBER COLUMN BEYOND
BOND BREAK
PROJECT TITLE
989 752 8107 COPYRIGHT ©
WTAARCH.COM
A
Saginaw, Michigan 48607
100 S Jefferson Ave, Suite 601
RCHITECTS
PROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET NUMBER
SHEET TITLE
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
ADAM P. LACH, RA, DIRECTOR
FILE NO.
INDEX NO. CONTRACT NO.
DEPARTMENT OF NATURAL RESOURCES
/1
/2
:4
:0
A
M C
U s e rs
\r s o v a \D o c u m e n ts
\C E
N T
R A
L -2
-B e lle
Is le
H d q tr s M a in t& S to ra g e V rs o v a W
T A
.r v t
W T
A
2019131
OCTOBER 9, 2026
J.R.G.
BELLE ISLE STATE PARK
A5.21
DETROIT, MICHIGAN
NEW STORAGE BUILDING FOR:
WALL SECTIONS,
DETAILS & SCHEDULES
751/19193.SMD
5603 Y22166
DOOR SCHEDULE
DOOR
HEIGHT THK.
DOOR PANEL DOOR FRAME DETAILS *=SIM. FIRE RATING
REMARKS
HW
SETNUMBER WIDTH TYPE MAT. FINISH TYPE MAT. FINISH HEAD JAMB SILL LABEL MIN.
FIRST FLR
001.1 3' - 0" 7' - 0" 1 3/4" D1 H.M. PT-1 F1 H.M. PT-1 6/A5.21 8/A5.21 10/A5.21 PAINT DOOR & FRAME, PUNCH CODE KEY LOCK 01
002.1 14' - 0" 14' - 0" 3" D2 - 5/A5.21 7/A5.21 9/A5.21 SECTIONAL OVERHEAD DOOR 02
002.2 14' - 0" 14' - 0" 3" D2 - 5/A5.21 7/A5.21 9/A5.21 SECTIONAL OVERHEAD DOOR 02
004.1 14' - 0" 14' - 0" 3" D2 - 5/A5.21 7/A5.21 9/A5.21 SECTIONAL OVERHEAD DOOR 02
004.2 14' - 0" 14' - 0" 3" D2 - 5/A5.21 7/A5.21 9/A5.21 SECTIONAL OVERHEAD DOOR 02
005.1 3' - 0" 7' - 0" 1 3/4" D1 H.M. PT-1 F1 H.M. PT-1 6/A5.21 8/A5.21 10/A5.21 PAINT DOOR & FRAME, PUNCH CODE KEY LOCK 01
1/4" = 1'-0"
DOOR TYPES
1/4" = 1'-0"
FRAME TYPES
SCALE: 3/4" = 1'-0"A5.21
WALL SECTION4
SCALE: 1 1/2" = 1'-0"A5.21
HEAD DETAIL5
SCALE: 1 1/2" = 1'-0"A5.21
HEAD DETAIL6
SCALE: 1 1/2" = 1'-0"A5.21
JAMB DETAIL7
SCALE: 1 1/2" = 1'-0"A5.21
JAMB DETAIL8
SCALE: 3/4" = 1'-0"A5.21
WALL SECTION3
SCALE: 1 1/2" = 1'-0"A5.21
SILL DETAIL10
SCALE: 1 1/2" = 1'-0"A5.21
SILL DETAIL9
MATERIAL KEYNOTE
1 POURED CONCRETE FOOTING PER STRUCT.
DWGS.
2 COMPACTED GRANULAR FILL PER CIVIL DWGS.
3 FINISH GRADE. SLOPE AWAY FROM BUILDING
PER CIVIL DWGS.
4 CONCRETE FLOOR SLAB ON VAPOR BARRIER
PER STRUCT. DWGS.
5 SUPPORTED CONCRETE ENTRY SLAB PER
STRUCT. DWGS.
6 PRESSURED TREATED 2x8 SKIRT BOARD.
7 PRESSURE TREATED TIMBER WOOD COLUMN
PER STRUCT. DWGS.
8 CONCRETE FILLED PIPE BOLLARD PER CIVIL
DWGS.
9 PRE-FINISHED FORMED METAL WALL PANELS
(RE: SPEC.).
10 1/2" APA RATED WALL SHEATHING.
11 2x6 WOOD WALL GIRTS LAID FLAT @ 24" O.C.
12 HEADER PER STRUCT. DWGS.
13 VENTED ALUMIMUM SOFFIT SYSTEM.
14 PRE-ENGINEERED GABLE END TRUSS.
15 PRE-ENGINEERED WOOD TRUSSES @ 48" O.C.
16 1/2" APA RATED ROOF SHEATHING.
17 ASPHALT ROOF SHINGLES ON 15# FELT
UNDERLAYMENT (RE: SPEC.).
18 CONTINUOUS RIDGE VENT.
19 METAL WRAPPED FASCIA TRIM ON 2x6
CONTINUOUS FASCIA BOARD.
20 METAL WRAPPED RAKE TRIM ON 2x6
CONTINUOUS RAKE BOARD.
21 HOLLOW METAL DOOR AND FRAME, PAINT.
22 SECTIONAL OVERHEAD DOOR.
23 OFFSET MOTOR OPERATOR AND DRAW ARMS
ATTACHED TO SECTIONAL DOOR PANEL. INSTALL
HORIZONTAL TRACKS AS REQUIRED TO CLEAR
EACH OTHER AT 14 FEET AT OHD LOCATIONS.
24 2x4 WOOD ROOF PURLINS @ 24" O.C.
PERPENDICULAR TO TRUSSES PER STRUCT.
DWGS.
25 SIMPSON TIE DOWN PER STRUCT. DWGS.
26 WOOD STAIR TREADS WITH OPEN RISERS AND
STRINGER SUPPORTS ON BOTH SIDES AND
MIDDLE.
27 WOOD GUARDRAIL SYSTEM, UNPAINTED.
28 1 1/2" DIAMETER HANDRAIL, UNPAINTED.
29 3/4" UNPAINTED APA RATED FLOOR SHEATHING
ON 2x12 FLOOR JOISTS PER STRUCT. DWGS.
30 SAFETY SWING GATE SYSTEM WITH SIDE RAILS.
31 RAIN GUARD DIVERTER SYSTEM.
32 LIGHT FIXTURE PER ELEC. DWGS.
33 ELECTRICAL EQUIPMENT PER ELEC. DWGS.
SCALE: 1 1/2" = 1'-0"A5.21
TYP. BASE DETAIL12
GENERAL ROOF PLAN NOTES:
1. PROVIDE FLASHING IN ACCORDANCE WITH ROOF
MANUFACTURER'S RECOMMENDATIONS AT ALL
ROOF EDGES.
1/A5.11
/A
.1
2/A5.11
/A
.1
A A
B B
E E
F F
A
A5.11
B
A5.11
C
A5.11
C C
D D
RIDGE LINE RIDGE LINE
R1R1 R1
R3R3R3
R4
R4
R4
R4
R4
R4
R5R5
R7R7
R6
R6
R2
R2
R5 R5
R7 R7
1' - 0"1' - 0"
E.3 E.3
A6.21
A6.21
A6.21
A6.21
A6.21
A6.21
A6.21
1.7
1.7
R8R8
R8R8
C1C2 TYP.C2
C2C2
C2 TYP.
C4C4
C5 TYP.
C5 TYP.
108' - 11 1/4"
C3TYP.
C2
C2TYP.
B.O. TRUSS
116' - 0"
H E
E L H
E
IG
H T
PRE-ENGINEERED WOOD
TRUSSES @ 48" O.C.
2x4 WOOD ROOF PURLINS @ 24" O.C.
1/2" APA RATED ROOF
SHEATHING
15# FELT UNDERLAYMENT
SIMPSON TIE DOWN
PER STRUCT. DWGS.
HEADER
PER STRUCT. DWGS.
P.T. TIMBER WOOD COLUMN
PER STRUCT. DWGS.
METAL WALL PANEL
J-CHANNEL FLASHING
DRIP EDGE FLASHING
VENTED ALUM. SOFFIT
2x4 LOOKOUT
2x6 FASCIA BOARD
METAL FASCIA TRIM
ASPHALT SHINGLES
1"
1' - 0"
4"
12"
B.O. TRUSS
116' - 0"
11 1/2"
METAL RAKE TRIM
2x6 RAKE BOARD
VENTED SLUM. SOFFIT
2x4 OUTRIGGER
PER STRUCT. DWGS.
DRIP EDGE FLASHING
ASPHALT SHINGLES
METAL WALL PANELS
PRE-ENGINEERED GABLE END TRUSS
J-CHANNEL FLASHING
1/2" APA RATED ROOF SHEATHING
1"
P.T. TIMBER WOOD COLUMN
PER STRUCT. DWGS.
2x BLOCKING
SIMPSON TIE DOWN
PER STRUCT. DWGS.
PRE-ENGINEERED WOOD
TRUSSES @ 48" O.C.
2x BRACE AT END WALL POSTS
PER STRUCT. DWGS.
1/2" APA RATED SHEATHING
PER STRUCT, DWGS.
RIDGE VENT
ASPHALT SHINGLES
PRE-ENGINEERED
WOOD TRUSS
1/2" APA RATED ROOF
SHEATHING
2x4 WOOD ROOF
PURLINS
15# FELT UNDERLAYMENT
ATTIC VENTILATION REQUIREMENTS:
ATTIC FLOOR AREA: 80 FEET X 30 FEET = 2,400 SQ.FT.
TOTAL NET FREE AREA: 2,304 SQ.IN. (16.0 SQ.FT.)
MINIMUM INTAKE (SOFFIT): 1,152 SQ.IN.
REQUIRED INTAKE (SOFFIT): 1,152 SQ.IN. / 50 SQ.IN. PER VENT = 23 QTY
PROVIDED INTAKE (SOFFIT): 24 QTY
MINIMUM EXHAUST (RIDGE/ROOF): 1,152 SQ.IN.
REQUIRED EXHAUST (RIDGE/ROOF): 1,152 SQ.IN / 18 IN./FT. = 64 FEET REQUIRED
PROVIDED EXHAUST (RIDGE/ROOF): 80 FEET
PROJECT TITLE
989 752 8107 COPYRIGHT ©
WTAARCH.COM
A
Saginaw, Michigan 48607
100 S Jefferson Ave, Suite 601
RCHITECTS
PROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET NUMBER
SHEET TITLE
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
ADAM P. LACH, RA, DIRECTOR
FILE NO.
INDEX NO. CONTRACT NO.
DEPARTMENT OF NATURAL RESOURCES
/1
/2
:4
:0
A
M C
U s e rs
\r s o v a \D o c u m e n ts
\C E
N T
R A
L -2
-B e lle
Is le
H d q tr s M a in t& S to ra g e V rs o v a W
T A
.r v t
W T
A
2019131
OCTOBER 9, 2026
J.R.G.
BELLE ISLE STATE PARK
A6.21
DETROIT, MICHIGAN
NEW STORAGE BUILDING FOR:
ROOF PLAN, CEILING
PLANS & DETAILS
751/19193.SMD
5603 Y22166
NORTH
SCALE: 1/4" = 1'-0"A6.21
ROOF PLAN1
NORTH
SCALE: 1/8" = 1'-0"A6.21
FIRST FLOOR CEILING PLAN2
NORTH
SCALE: 1/8" = 1'-0"A6.21
PARTIAL MEZZANINE CEILING PLAN3
SCALE: 1 1/2" = 1'-0"A6.21
EAVE DETAIL4
SCALE: 1 1/2" = 1'-0"A6.21
RAKE DETAIL5
SCALE: 1 1/2" = 1'-0"A6.21
RIDGE VENT DETAIL6
ROOF PLAN KEYNOTES
1 ASPHALT ROOF SHINGLES ON 15# FELT
UNDERLAYMENT ON 1/2" APA RATED ROOF
SHEATHING (RE: SPECS.).
2 SELF-ADHERED PEEL AND STICK ICE AND WATER
SHIELD UNDERLAYMENT OVER SHEATHING.
3 CONTINUOUS RIDGE VENT.
4 VENTED ALUMIMUM SOFFIT SYSTEM (RE:
SECTIONS).
5 RUN ICE AND WATER SHIELD AND FELT
UNDERLAYMENT OVER RAKE TRIM MIN. 1/2".
INSTALL DRIP EDGE ON TOP OF UNDERLAYMENT
AT RAKE EDGE.
6 PRE-FINISHED METAL DRIP EDGE BELOW
UNDERLAYMENT AT EAVE EDGE.
7 PRE-FINISHED ALUMINUM TRIM OVER FASCIA
AND RAKE BOARDS.
8 RAIN GUARD DIVERTER SYSTEM.
CEILING KEYNOTES
1 EXPOSED PRE-ENGINEERED WOOD TRUSSES.
2 LIGHT FIXTURE PER ELEC. DWGS.
3 EXPOSED WOOD FLOOR JOISTS PER STRUCT.
DWGS.
4 CORD REEL RECEPTACLE MOUNTED TO B.O.
TRUSS PER ELEC. DWGS.
5 VENTED ALUMINUM SOFFIT PANEL.
BAY 1
BAY 1 BAY 2 BAY 3 BAY 4 BAY 5
WC1
WC1
WC1
S2.01
S2.01
S2.01
S2.01
S2.01
BAY 1 BAY 2 BAY 3 BAY 4 BAY 5
NORTH
1/8"=1'-0"
ROOF FRAMING PLAN
LEGEND
H1 - (2) 2X8 FLAT WOOD HEADER, (2) SIMPSON L50
EACH END
WC1 - WOOD COLUMN - SEE SCHEDULE SHEET S3.01
SEE SHEET S3.01 FOR NOTES
RIDGEH
S2.01
S2.01
S2.01
S2.01
2x4 ENDBOARD, TYP
GABLE ENDWALL
TRUSS
GABLE
ENDWALL
TRUSS
2x4 ENDBOARD, TYP
WOOD TRUSSES AT
4'-0" O.C. WITH 2x4
PURLINS AT 2'-0" O.C.
PERPENDICULAR TO
TRUSS. NOT SHOWN
FOR CLARITY.TRUSS BEARING ELEV = 116'-0"
1/2" APA RATED WALL
SHEATHING, FULL HEIGHT
1/2" APA RATED WALL
SHEATHING, FULL HEIGHT
2X6 OUTLOOKERS
AT 2'-0" O.C., TYP
2x12 EACH SIDE OF
COLUMNS, TWO SPAN
MIN, TYP UNO
WC3
WC1 WC1
WC1
WC1
WC1
WC1
WC1
WC1
WC3
WC1
WC1
WC1
WC1
1 3/4" x14" LVL EACH
SIDE OF COLUMN AT
OVERHEAD DOORS
WC1
WC1
H1
H
NORTH
1/8"=1'-0"
FOUNDATION PLAN
B.O. FOOTING = 96'-0" UNO
LEGEND
F1 - FOOTING - SEE SCHEDULE SHEET S3.01
WC1 - WOOD COLUMN - SEE SCHEDULE SHEET S3.01
P1 - CONCRETE PIER - SEE SCHEDULE SHEET S3.01
SEE SHEET S3.01 FOR NOTES
A
B
C
E
F
1 3 4
P1 F2
P1 F2
P1 F1
P1 F1
P1 F1
WC1
WC1
P1 F1
WC1
WC3 WC1
P1 F2
P1 F2
T.O. GRADE BEAM
= 100'-0" UNO
S2.01
S2.01 2P1
F1
W C1
D
6 8
WC1
1'-0"x1'-6" CONCRETE
GRADE BEAM WITH (2)#5
CONT TOP AND BOTT, TYP
9 10
WC1
TIMBER POST, SEE PLAN
(4) 16d NAILS EACH 2x AT POST TYP
GABLE END TRUSS FASTEN
TO POSTS W/(8) 16d NAILS AT
TOP AND BOTTOM CHORDS
WALL SECTION
1/2"=1'-0"
WOOD TRUSS,
2x6 GIRT AT 2'-0" O.C.
2x6 AT 2'-0" O.C.
SEE ARCH
2x4 PURLIN
2x6 BLOCKING BETWEEN
OUTLOOKERS
METAL WALL PANEL
SEE ARCH
APA RATED SHEATHING,
SEE PLAN
2x8 TREATED BAND, FASTEN
TO GRADE BEAM WITH 1/2"
DIAMETER HILTI TZ-2 AT 2'-0"
O.C., 3 1/4" EMBED
1/2" APA RATED SHEATHING
SEE PLAN
2x6 BLOCKING AT BRACES
WITH (10)#10 SCREWS TO
TOP OF SHEATHING
2x6 BRACE BOTH
SIDES OF POST AT
TRUSS BEARING
ELEV
(12)#10 SCREWS
EACH END, TYP
SIMPSON H3 TIE DOWNS
AT OUTLOOKER, TYP
T.O. SLAB
100'-0"
GRADE
COMPACTED
GRANULAR FILL
CONCRETE FOOTING,
SEE PLAN
POST BASE, SEE DETAIL 3/S2.01 FOR
COLUMNS A1, A11, F1, AND F11
EXTEND GRADE BEAM
REINFORCING THROUGH
PIER
B.O. FOOTING
SEE PLAN
(3) TIES IN TOP 5"
3" C
LR
#3 TIES AT 12" O.C.
2"
CLR
VERTICAL REINFORCING, SEE
SCHEDULE SHEET S3.01
1'-0"
2"
CLRDOWEL VERT PIER REINF
TO FOOTING
CONCRETE PIER, SEE PLAN
COMPACTED
GRANULAR FILL
CONC SLAB, SEE PLAN
BOND BREAK
1' -0
SIMPSON LUS26
JOIST HANGER AT
OUTLOOKERS
26GA 'CLASSIC RIB' METAL
PANEL, FASTEN PER
MANUFACTURER'S
RECOMMENDATIONS FOR
DIAPHRAGM UTILIZATION
COMPACTED
ENGINEERED FILL
HEADER CONNECTION
3/4"=1'-0"
WOOD COLUMN
(10) 5/16"x4" "GRK"
LAG SCREWS EACH
ADD PC 2x6 EACH SIDE
WITH (10)"GRK" SCREWS AT
HEADERS
HEADER
SEE PLAN SIDE OF POST
SEE PLAN
1/
4"
1/ 2"
TY
P
M
IN
HEADER CONNECTION
WOOD COLUMN
(10)5/16"x4" "GRK"
LAG SCREWS EACH
ADD PC 2x6 EACH SIDE
WITH (10) "GRK" SCREWS AT
SIDE OF POST.
HEADERS.
HEADER
SEE PLAN
SEE PLAN
1/
4"
1/ 2"
TY
P
M
IN
WOOD COLUMN BASE
3/4"=1'-0"
8"
2 3/4"2 3/4" 2 1/2"
1"
1/ 2"1
1/ 4"
4 1/2"7 1/2"
A-A
1 1/4" 1 1/4"
5 1/2" FOR C1
7 1/2 FOR C3
A
A
4"
C WPL
(4)5/8" DIAMETER
A36 THREADED
RODS WITH HEAVY
HEX NUTS, GALV
(4)5/8" DIAMETER
A36 THREADED
RODS WITH HEAVY
HEX NUTS, GALV
1/2" BENT PLATE
COLUMN BASE,
GALV
CONCRETE GRADE
BEAM, SEE PLAN
(2)3/4" DIAMETER
ASTM F1554 GR 55
ANCHOR RODS,
HEAVY HEX NUT
EMBED TACK
WELDED TO THE
THREADS
9"
WOOD
COLUMN,
SEE PLAN
3/16
ONLY FOR USE AT: A1, A11, F1, F11
PIER REINFORCING,
SEE PLAN
WC1
WC1
WC1
H1
H1 H1
WC1
NORTH
1/8"=1'-0"
MEZZANINE FRAMING PLAN
T.O. JOIST ELEVATION = 108'-11 1/4" UNO
WC2
(2) LVL 1 3/4" x 11 7/8"
(2) LVL 1 3/4" x 11 7/8" WITH
HUCQ412-SDS AT NORTH END
A
B
F
1 3
WC2
3/4" APA RATED
SHEATHING
F3
WC2
WC1
WC1P1WC1
P1 F2
F3 WC2
WC3
WC1
P1 F1
W C1
P1 F1
WC1
P1 F1
A
B
C
F
D
WC1
WC1
C
D
E.3
E
E.3
E
E.3
PITCH
COMPACTED BACKFILL
CONCRETE FOOTING, SEE PLAN
#3 AT 8"
#3 AT 8" EW
T.O. SLAB
SEE PLAN
4" CONCRETE SLAB
#3 CONT
SEE PLAN
B.O. FOOTING
12" 16"
3" C
LR
1/2"=1'-0"
1/
2" C
LR
CONCRETE WALL, SEE PLAN
THERM BREAK, SEE ARCH
CONCRETE FOOTING,
SEE PLAN
CONCRETE WALL,
SEE PLAN
COMPACTED
BACKFILL
SEE ARCH PLAN
FOR ENTRY SLAB
DIMENSIONS
S2.01
ENTRY SLAB,
SEE DETAIL 6/S2.01
ENTRY SLAB,
SEE DETAIL 6/S2.01
WC1
8"
8"
8"
8" 8"
WC1
8"
1 1/2" x 14" VERSA-LAM
2400 1.7E STRINGER,
SEE DETAIL 3/S3.01, 2
PLY AT INTERIOR SPANS
2x10 AT 16" OC
(2) LVL 1 3/4" x 11 7/8" WITH
HHUS410 EACH END
WC1WC3
1 1/2" x 14" VERSA-LAM 2400 1.7E
STRINGER, SEE DETAIL 4/S3.01
(2) 2x12
U P
UP
3/4" APA RATED SHEATHING
LVL 1 3/4" x 11 7/8" WITH
HUS1.81/10 EACH END
WC1
WC1
WC1
WC1
WC3
WC1
HU7 AT EACH END OF LVL
JOIST, TYP
LU28 AT EACH END OF 2x
JOIST, TYP
LVL 1 3/4" x 11 7/8" WITH
HUS1.81/10 EACH END
LVL 1 3/4" x 11 7/8" WITH
HUS1.81/10 EACH END
(2) LVL 1 3/4" x 11 7/8" WITH
HHUS48 AT NORTH END
2x4 AT 16" OC TO B.O. STRINGERS, CENTER STUDS UNDER
JOIST/STRINGER BEARING
LVL 1 3/4" x 9 1/4"
WITH HUS1.81/10
EACH END
(2) LVL 1 3/4" x 11 7/8"
100'-0" T.O. SLAB98'-2"
98'-2"
F2 P1 F2
P1 F1
P1 F2
P1 F2
2x FULL DEPTH BLOCKING
AT 2'-0" OC
2x FULL DEPTH
BLOCKING AT 2'-0" OC
2x FULL DEPTH
BLOCKING AT
STRINGERS
2x FULL DEPTH BLOCKING
AT 2'-0" OC, EACH SIDE OF
LANDING
P1
P1 F3 P1
3/4"=1'-0"
INTERIOR FOOTING
BOND BREAK
T.O. SLAB
SEE PLAN
B.O. FOOTING
3" C
LR
SEE PLAN
COMPACTED
BACKFILL
CONCRETE FOOTING,
SEE PLAN
CONCRETE SLAB,
SEE PLAN
CONCRETE PIER,
SEE PLAN
HILTI ABA66Z POST
BASE, (1) 5/8" HEAVY
HEX HEAD ANCHOR
WITH HIT- HY-200
EPOXY, 4" EMBEDMENT
WOOD COLUMN,
SEE PLAN
2"
CLR
2"
CLR
(3) TIES IN TOP 5" OF PIER
DOWEL VERTICAL
INTO FOOTING
COMPACTED
ENGINEERED FILL
S2.01
S2.01
NOTE:
ALL JOIST HANGERS (HHUS, HUS,
ETC) AS MANUFACTURED BY
SIMPSON STRONG TIE UNO
JOIST BEARING ELEV = 103'-2"
WC1
P1 F1
WC1
P1 F1
P1 F1
P1 F1
WC1
WC1
P1 F2
WC1WC1P1
F2WC1P1
F2 WC1
P1 F2
WC1P1
F2 WC1P1
F2
3 4 6 8 9 10 115 72
WC1
WC1
THICKENED SLAB AT KNEE
WALL, SEE DETAIL 8/S2.1
C
LR
T.O. SLAB
SEE PLAN
(2) #4 CONT
THICKENED SLAB
3/4"=1'-0"
KNEE WALL, SEE PLAN
COMPACTED BACKFILL
CONCRETE SLAB,
SEE PLAN
4" 4"
T T
3"1/2" HILTI KWIK BOLT
TZ2 AT 2'-0" OC, 2 1/2"
EMBEDMENT
1/2" APA RATED
SHEATHING
1/2" APA RATED
SHEATHING
S2.01
WC2
F4
F4F4
F4
F4 F4
8" CONCRETE SLAB WITH 6x6 D7.5xD7.5 WWF OVER VAPOR
BARRIER ON 6" COMPACTED
GRANULAR FILL
WC1
1.7
1'-0"x1'-6" CONCRETE
GRADE BEAM WITH (2)#5
CONT TOP AND BOTT, TYP
WC1
WC1
1.7 2
WC1
WC1
2x FULL DEPTH BLOCKING
WC1
WC2
2x
A T
" O
C
(4) 5/16"x4" "GRK" LAG
SCREWS THROUGH
JOIST INTO COLUMN
S3.01
LV
L
3/
4" x
/4
AT
6" O
C
TYP
CONCRETE
APRON,
SEE CIVIL
CONCRETE
APRON,
SEE CIVIL
CONCRETE APRON, SEE CIVIL.
DOWEL APRON TO GRADE BEAM SIM
TO DETAIL 6/S2.01, TYP OF 4
CONCRETE APRON,
SEE CIVIL
T.O. GRADE BEAM = 99'-0" AT
CONCRETE APRON, TYP OF 4
PROJECT TITLE
989 752 8107 COPYRIGHT ©
NOT FOR CONSTRUCTION
PRELIMINARY
WTAARCH.COM
A Saginaw, Michigan 48607 100 S Jefferson Ave, Suite 601
RCHITECTS
PROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET NUMBER
SHEET TITLE
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
ADAM P. LACH, RA, DIRECTOR
FILE NO.
INDEX NO. CONTRACT NO.
DEPARTMENT OF NATURAL RESOURCES
/5
/2
5:
:0
PM
C :\U se rs
\rs ov a\ D oc um en ts
\C
EN
TR
AL
-2
-B el le Is le H dq trs
M ai nt &S to ra ge _V
_r so va
W
TA
.rv t
W
TA
2019131
10/7/2026
BELLE ISLE STATE PARK
DETROIT, MICHIGAN
NEW STORAGE BUILDING FOR:
751/19193.SMD
5603 Y22166
NO. REVISION DATE
ISSUED FOR BIDS 10/09/26
(989) 894-4300 www.macmillanassociates.com
714 EAST MIDLAND STREET BAY CITY, MICHIGAN 48706
MacMILLAN ASSOCIATES
CONSULTING ENGINEERS
Since 1963
S2.01
FOUNDATION PLAN,
JAG
FRAMING PLAN, AND
DETAILS
8" SLAB4" SLAB
100'-0" T.O. SLAB
4" CONCRETE SLAB WITH 6x6 W1.4xW1.4 WWF OVER VAPOR
BARRIER ON 6" COMPACTED
GRANULAR FILL
DOWEL FOOTING
REINFORCEMENT INTO
DRILLED PIER, 6" MIN
EMBED, TYP OF 4
P1 F1
HEADER, SEE PLAN
TIMBER POST,
SEE PLAN
2x6 GIRT AT 2'-0" O.C. TYP
(4) 16d NAILS EACH 2x AT POST TYP
2x6 CONTWOOD TRUSSES
AT 4'-0" O.C., SEE PLAN
WALL SECTION
1/2"=1'-0"
(2) SIMPSON H2.5A TIE
DOWNS PER TRUSS
SEE DETAILS 4/S2.01 AND 5/S2.01
FOR HEADER CONNECTION
2x4 PURLINS
AT 2'-0" O.C.
2x BLOCKING CONTINUOUS
BETWEEN TRUSSES
26GA 'CLASSIC RIB'
METAL PANEL, FASTEN
PER MANUFACTURER'S
RECOMMENDATIONS FOR
DIAPHRAGM UTILIZATION
BOTTOM
OF TRUSS
SEE PLAN
APA RATED
SHEATHING, SEE PLAN
POST BASE, SEE DETAIL 3/S2.01 FOR
COLUMNS A1, A11, F1, AND F11
EXTEND GRADE BEAM
REINFORCING THROUGH
PIER
2x8 TREATED BAND, FASTEN
TO GRADE BEAM WITH 1/2"
DIAMETER HILTI TZ-2 AT 2'-0"
O.C., 3 1/4" EMBED
CONC PIER, SEE PLAN
T.O. SLAB
100'-0"
GRADE
CONC SLAB, SEE PLAN
BOND BREAK
COMPACTED
GRANULAR FILL
CONCRETE FOOTING,
SEE PLAN
B.O. FOOTING
SEE PLAN
(3) TIES IN TOP 5"
3" C
LR
#3 TIES AT 12" O.C.
VERTICAL REINFORCING, SEE
SCHEDULE SHEET S3.01
1'-0"
2"
CLRDOWEL VERT PIER REINF
TO FOOTING
COMPACTED
GRANULAR FILL
1' -0
2"
CLR
COMPACTED
ENGINEERED FILL
UNBALANCED SNOW LOAD DIAGRAM
NOTE:
DISTRIBUTION SHALL BE
LC RIDGE
0 PSF
27 PSF
5'-0"
17 PSF
APPLIED ON EITHER SIDE
OF THE RIDGE.
UNBALANCED LOAD
(4)#4 EACH WAY1'-0"2'-6"x2'-6"
F1
DEPTH REMARKS
FOOTING SCHEDULE
REINFORCINGSIZEMARK
F2
SEE PLAN2'-0" DIAMETER
Fy=60 KSI f'c=3000 PSI
(6)#6 VERT, #3 TIES AT 12" O.C.
F3
SEE DETAIL 2/S2.01
SEE DETAIL 1/S2.01
AND 7/S2.01
F4 1'-6" CONT 1'-0" (2) #5 CONT
SEE PLAN3'-0" DIAMETER (12)#6 VERT, #3 TIES AT 12" O.C. SEE DETAIL 2/S2.01
MARK
PIER SCHEDULE
TIESSIZE VERT REINF REMARKS
Fy = 60 ksi f'c = 3000 psi
P1 12"x12" (4)#4 #3 AT 12" O.C.
T.O. PIER = 100'-0" TYP UNO
MARK SIZE
WC1 6x8
REMARKS
WC2 6x6 SIMPSON ECCLL464 AT CORNER COLUMNS
SIMPSON BC46 AT INTERIOR COLUMN
WC3 8x8 SEE DETAIL 3/S2.01
SIMPSON APA66Z WITH (1) 5/8"
HEAVY HEX HEAD ANCHOR WITH
HIT-HY-200 EPOXY, 4" EMBED UNO
T.O. SLAB VARIES
CONCRETE SLAB BY CIVIL CONCRETE RETAINING WALL
LEGEND
F1 - FOOTING - SEE SCHEDULE THIS SHEET
100'-0" - B.O. FOOTING ELEVATION
F5
F5
F6
DECREASE FOOTING SIZE
WHERE GRADE IS 2 FT BELOW
TOP OF WALL, SEE CIVIL
DECREASE FOOTING WHERE
GRADE IS 2 FT BELOW TOP OF
WALL, SEE CIVIL
578.17
B.O. FOOTING
SEE PLAN
3/4"=1'-0"
RETAINING WALL
C
LR3"
2"
CLR
1'-0"
2" C
LR
SEE PLAN
T.O. WALL
1' -0
VARIES
2"
CLR
LAP
2x4 SHEAR KEY
#4 AT 12" O.C.
VERTICAL
EACH FACE
#4 AT 12" O.C.
HORIZONTAL
EACH FACE
#4 AT 12" O.C. DOWEL INTO
FOOTING EACH FACE, LAP
SPLICE PER STRUCTURAL
NOTES
#4 AT 12" O.C. TOP
AND BOTTOM
#4 AT 12" O.C. TOP
AND BOTTOM
VARIES
T.O. CONCRETE
CONCRETE PAVEMENT,
SEE CIVIL
BOND BREAK
SEE PLAN
T.O. CONCRETE
CONCRETE PAVEMENT,
SEE CIVIL, GRADE AT SIM
#4 AT 12" O.C.
BOND BREAK
2'-0"
12"12"
COMPACTED
GRANULAR FILL
3/4" CHAMFER
SEE PLAN
4' -8
" M
AX
S3.01
NORTH
1/8"=1'-0"
RETAINING WALL FOUNDATION PLAN
GUARDRAIL CONNECTION
3/4"=1'-0"
LVL BEAM, SEE PLAN
2" 2"
WOOD JOIST,
SEE PLAN
PLYWOOD SHEATHING,
SEE PLAN
SIMPSON STRONGTIE DTT2Z
TIE, FASTEN TO JOIST WITH
(8) 1 1/2" SDS SCREWS
1/2" DIA A307 THRUBOLT
WITH HEX HEAD NUT AND
WASHER BOTH ENDS
4X4 GUARDRAIL
POST, SEE ARCH
S3.01
STAIR DETAIL
3/4"=1'-0"
LVL BEAM, SEE PLAN
SEE ARCH FOR RISE
AND RUN DIMENSIONS
3/4" APA RATED FLOOR
SHEATHING
SIMPSON HANGER LRU26Z
AT 1 PLY STRINGER,
U26-2X SLD25 AT 2 PLY
STRINGER
STAIR STRINGER,
SEE PLAN
2x FULL DEPTH BLOCKING
AT EACH STRINGER
WOOD STAIR TREAD,
SEE ARCH
STAIR DETAIL
SEE ARCH FOR RISE
AND RUN DIMENSIONS
3/4" APA RATED FLOOR
SHEATHING
KNEE WALL, SEE PLAN
STAIR STRINGER,
SEE PLAN
WOOD JOIST, SEE PLAN
WOOD STAIR TREAD,
SEE ARCH
NOTCH STRINGER AS
REQUIRED, BEAR FULL
LENGTH OF KNEE WALL
FULL DEPTH BLOCKING
BETWEEN STRINGERS, TYP
S3.01
S3.01
PROJECT TITLE
989 752 8107 COPYRIGHT ©
NOT FOR CONSTRUCTION
PRELIMINARY
WTAARCH.COM
A Saginaw, Michigan 48607 100 S Jefferson Ave, Suite 601
RCHITECTS
PROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET NUMBER
SHEET TITLE
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
ADAM P. LACH, RA, DIRECTOR
FILE NO.
INDEX NO. CONTRACT NO.
DEPARTMENT OF NATURAL RESOURCES
/5
/2
5:
:0
PM
C :\U se rs
\rs ov a\ D oc um en ts
\C
EN
TR
AL
-2
-B el le Is le H dq trs
M ai nt &S to ra ge _V
_r so va
W
TA
.rv t
W
TA
2019131
10/7/2026
BELLE ISLE STATE PARK
DETROIT, MICHIGAN
NEW STORAGE BUILDING FOR:
751/19193.SMD
5603 Y22166
NO. REVISION DATE
ISSUED FOR BIDS 10/09/26
(989) 894-4300 www.macmillanassociates.com
714 EAST MIDLAND STREET BAY CITY, MICHIGAN 48706
MacMILLAN ASSOCIATES
CONSULTING ENGINEERS
Since 1963
S3.01
NOTES, SCHEDULES
JAG
AND DETAILS
586.34 T.O. WALL
CONTRACTOR TO
VERIFY T.O. WALL
ELEVATION
T.O. SLAB VARIES
CONCRETE SLAB BY CIVIL
GENERAL
1. VERIFY DIMENSIONS BEFORE COMMENCING WORK. REPORT DISCREPANCIES TO THE ARCHITECT.
2. VERIFY OPENINGS IN THE FRAMING PLANS WITH THE ARCHITECTURAL AND ELECTRICAL DRAWINGS.
3. ALL WORK SHALL CONFORM TO MICHIGAN BUILDING CODE 2021.
4. DESIGN LOADS
a. DESIGNED IN ACCORDANCE WITH MICHIGAN BUILDING CODE 2021.
b. ROOF SNOW LOAD:
GROUND SNOW LOAD PG = 20 PSF
FLAT ROOF SNOW LOAD, PF = 17 PSF
SNOW EXPOSURE FACTOR, CE = 1.0
SNOW LOAD IMPORTANCE FACTOR, I = 1.0
THERMAL FACTOR, CT = 1.2
c. LIVE LOAD:
DESIGN ROOF LIVE LOAD = 30 PSF UNIFORM
MEZZANINE STORAGE = 125 PSF
d. WIND LOADS:
BASIC WIND SPEED VULT = 108 MPH
VASD = 84 MPH
WIND EXPOSURE D
INTERNAL PRESSURE COEFFICIENT, GC PI = +/-0.18
WALL COMPONENTS & CLADDING:
EFFECTIVE POSITIVE NEGATIVE
WIND AREA (FT2) PRESSURE (PSF) PRESSURE (PSF)
-END ZONE
10 32 -43 20 31 -40 50 29 -36 100 28 -34
-INTERIOR ZONE 10 32 -35
20 31 -34
50 29 -32 100 28 -30
e. EARTHQUAKE DESIGN DATA:
SEISMIC USE GROUP, II
SEISMIC IMPORTANCE FACTOR, I = 1.0
SPECTRAL RESPONSE COEFFICIENTS: SDS = .11, SD1 = .073, SS = .103, S1 = .046
SITE CLASS D
BASIC SEISMIC - FORCE - RESISTING SYSTEM:
SEISMIC DESIGN CATEGORY, B
ANALYSIS PROCEEDURE: EQUIVALENT LATERAL FORCE METHOD
SEISMIC RESPONSE MODIFICATION FACTOR, R=7, CS = .068
DESIGN BASE SHEAR = 5.2 KIPS TOTAL UNFACTORED
5. SPECIAL INSPECTIONS:
a. SPECIAL INSPECTIONS SHALL BE IN ACCORDANCE WITH THE MICHIGAN BUILDING CODE 2021
SECTION 1700.
b. THE FOLLOWING TYPES OF WORK REQUIRE SPECIAL INSPECTIONS: (REFER TO THE BUILDING CODE
AND SPECIFICATIONS FOR DETAILED INSPECTION REQUIREMENTS).
1. PREPARED FILL.
2. DRILLED PIER FOUNDATIONS.
3. CONCRETE CONSTRUCTION.
FOUNDATION NOTES
1. FOUNDATIONS ARE DESIGNED BASED ON SOIL BEARING OF 2000 PSF FOLLOWING INSTALLATION OF
ENGINEERED FILL BELOW FOOTING BEARING ELEVATION AS RECOMMENDED BY GEOTECHNICAL
ENGINEER. IF SOIL OF THIS CAPACITY IS NOT FOUND AT THE ELEVATION NOTED, ENLARGE OR LOWER
FOOTINGS AT THE DIRECTION OF THE ARCHITECT/ENGINEER.
2. PLACE STRUCTURAL BACKFILL MEETING OR EXCEEDING MDOT CLASS II IN LAYERS NOT EXCEEDING 9”
LOOSE THICKNESS. COMPACT EACH LAYER TO AT LEAST 95% OF THE MAXIMUM DENSITY PER ASTM
D-1557. COMPACTING BY FLOODING IS NOT PERMITTED.
3. CENTER FOOTINGS UNDER WALL LOCATION AND COLUMNS UNLESS NOTED.
4. EARTH FORMS ARE NOT PERMITTED UNLESS SPECIFICALLY NOTED.
5. FOLLOWING DEMOLITION OF STRUCTURES AND STRIPPING OF TOPSOIL, PREPARE SOILS AND INSTALL
ENGINEERED FILL UNDER FOUNDATION BEARING LOCATIONS IN ACCORDANCE WITH SOILS REPORT BY
MCDOWELL AND ASSOCIATES, DATED APRIL 1, 2022.
6. DISTURBANCE OF THE FOUNDATION BEARING SOILS SHALL BE AVOIDED.
7. EXISTING FOUNDATIONS OR FLOOR SLAB ENCOUNTERED DURING SITE GRADINGS AND EXCAVATION
SHALL BE REMOVED TO A DEPTH OF TWO (2) FEET BELOW NEW CONSTRUCTION. REPLACE WITH
STRUCTURAL BACKFILL.
8. BACKFILL AND EXCAVATION PER SPECIFICATIONS.
9. CASINGS WILL BE REQUIRED FOR INSTALLATION OF DRILLED PIERS.
CONCRETE NOTES
1. ACI BUILDING CODE 318; MANUAL OF STANDARD PRACTICE FOR DETAILING 315 FOR THE MIXING, FABRICATION AND PLACEMENT OF CONCRETE, REINFORCING STEEL, AND ACCESSORIES.
2. CONCRETE STRENGTH - STANDARD WEIGHT CONCRETE:
FOOTINGS, WALLS, PIERS: F'C = 3000 MINIMUM PSI
CONCRETE SLABS ON GRADE: F'C = 3500 MINIMUM PSI
EXTERIOR CONCRETE SLABS EXPOSED TO DE-ICING: F'C = 5000 PSI
3. REINFORCING - BARS: ASTM A-615 GRADE 60
WELDED WIRE FABRIC: ASTM A-1064
4. PROVIDE SAWCUT CONTROL JOINTS AT APPROXIMATELY 15' MAXIMUM ON CENTER EACH WAY IN SLABS
ON GRADE, SEE DETAILS. LOCATE JOINTS UNDER PARTITIONS WHENEVER POSSIBLE. CONSTRUCTION JOINTS AT CONTRACTOR'S OPTION. CONTRACTOR TO SUBMIT PROPOSED CONTROL JOINT PLAN FOR
REVIEW AND APPROVAL.
5. FORM ALL CONCRETE.
6. EXPOSED EDGES OF CONCRETE BEAMS, COLUMNS, ETC. SHALL BE CHAMFERED ¾”.
7. PROVIDE CORNER BARS FOR ALL CONTIGUOUS CORNERS.
8. WATER/CEMENT RATIO LIMITS:
F'C = 3000 PSI 0.68 NON-AIR ENTRAINED, 0.50 AIR-ENTRAINED
F'C = 3500 PSI 0.62 NON-AIR ENTRAINED, 0.50 AIR-ENTRAINED
F'C = 5000 PSI 0.4 AIR-ENTRAINED
9. SLUMP LIMITS:
3” FOR FOUNDATIONS, 4” FOR SLABS AND WALLS
10. PROVIDE AIR ENTRAINED CONCRETE FOR EXTERIOR EXPOSURES.
11. REINFORCING LAP LENGTH: 45 BAR DIAMETERS (36 IF STAGGERED) FOR BARS UP TO #5, 60 BAR
DIAMETERS (48 IF STAGGERED) FOR BARS LARGER THAN #5.
WOOD FRAMING
1. DIMENSIONAL FRAMING MATERIAL SHALL BEAR THE GRADE MARK OF AN ALSC APPROVED AGENCY, KILN
DRIED, AND HAVE THE FOLLOWING MINIMUM STRESS GRADE:
2x4 STUD WALLS: SPRUCE-PINE-FIR, CONSTRUCTION GRADE OR BETTER.
2x6 AND LARGER: HEM-FIR #2 OR BETTER.
TIMBER POSTS: SOUTHERN YELLOW PINE #1 OR BETTER, TREATED FOR BELOW GRADE USE.
2. ROOF RAFTERS ANCHORED TO CONTINUOUS PLATES WITH ONE SIMPSON H3 ANCHOR UNLESS NOTED
OTHERWISE.
3. WOOD TO BE IN CONTACT WITH CONCRETE, MASONRY, OR GRADE SHALL BE PRESSURE TREATED.
PLYWOOD SHEATHING
1. PLYWOOD FOR ROOF DECK SHALL BE 1/2” THICK APA RATED SHEATHING, (24/16).
2. PLYWOOD FOR WALLS SHALL BE 1/2" THICK APA RATED SHEATHING, (24/16).
3. PLYWOOD FOR FLOORS SHALL BE 3/4" THICK APA RATED SHEATHING, (24/16).
4. ROOF SHEATHING FASTENED WITH 8D COMMON NAILS AT 4” O.C. AT PANEL EDGES AND INTERMEDIATE
SUPPORTS UNLESS NOTED OTHERWISE.
5. PANELS SHALL BE LAID IN A STAGGERED PATTERN, CONTINUOUS OVER TWO SPANS.
WOOD TRUSSES
1. WOOD TRUSSES SHALL BE DESIGNED AND FABRICATED PER TRUSS PLATE INSTITUTE, INC.
SPECIFICATIONS.
2. DESIGN LOADS FOR TRUSSES SHALL BE:
TOP CHORD SNOW LOAD - 30 PSF (SEE DIAGRAM THIS SHEET FOR UNBALANCED SNOW LOAD)
TOP CHORD DEAD LOAD - 15 PSF
BOTTOM CHORD DEAD LOAD - 5 PSF
BOTTOM CHORD LIVE LOAD - 2,000 LB PANEL POINT (LOCATE ALONG TRUSS BOTTOM CHORD TO PRODUCE
THE GREATEST LOAD EFFECT)
TOP CHORD WIND UPLIFT - DESIGN IN ACCORDANCE WITH MICHIGAN BUILDING CODE 108 MPH, EXPOSURE D. DEPENDENT ON EFFECTIVE WIND AREA AND ZONE.
LOADS SHALL BE COMBINED PER MICHIGAN BUILDING CODE LOAD COMBINATIONS.
3. SHOP DRAWINGS FOR TRUSSES SHALL BE PREPARED BY THE SUPPLIER AND SUBMITTED TO THE
ARCHITECT/ENGINEER FOR APPROVAL. SHOP DRAWINGS SHALL BE PREPARED UNDER THE SUPERVISION AND SHALL BE CERTIFIED BY A REGISTERED PROFESSIONAL ENGINEER IN THE STATE WHERE THE
PROJECT IS LOCATED.
4. TRUSSES SHALL BE ANCHORED TO SUPPORTS WITH (2) SIMPSON H2.5A ANCHOR UNLESS NOTED
OTHERWISE.
5. LIMIT OVERHANG MEMBER DEFLECTION TO L/180.
6. PIGGY-BACK TRUSS TO TRUSS CONNECTION DESIGN AND SPECIFICATION BY TRUSS MANUFACTURER.
MINIMUM CONNECTION (2) SIMPSON TP47 PLATES EACH SIDE, @ 2'-0” ON CENTER.
7. PROVIDE MATCHING DEPTH TRUSS MEMBERS AT 2X FRAMING CONNECTIONS.
8. LATERAL WEB BRACING DESIGN AND CONNECTIONS BY TRUSS MANUFACTURER.
9. TRUSSES SHALL BE DESIGNED FOR MAXIMUM BEARING PRESSURE OF 405 PSI.
10. TEMPORARY BRACING PER BCSI TO BE CONTRACTORS RESPONSIBILITY. CONFORM TO ALL APPLICABLE
CODES AND STANDARDS.
STRUCTURAL COMPOSITE LUMBER
1. LAMINATED VENEER LUMBER (LVL):
FB = 2,600 PSI (BOTH TENSION & COMPRESSION)
FC (PERPENDICULAR) = 750 PSI
FC (PARALLEL) = 2,310 PSI
FV = 285 PSI
E = 1.9x106 PSI
S3.01
586.34 T.O. WALL
8"
COPYRIGHT 2026C
Saginaw, Michigan 48607 989 752 8107
100 S Jefferson Ave, Suite 601
WTAARCH.COM
A RCHITE SCT
CHECKED BY
PROJECT DATE
SHEET NUMBERPROJECT NUMBER
SHEET TITLE
DATENO.
PROJECT TITLE
REVISION
NEW STORAGE BUILDING FOR:
DETROIT, MICHIGAN
2019131
05/13/26
09/15/2695% CD REVIEW
P L U R I B U E
S U N U M
C I R C U M S P I C E
SI QU EREI S PE NI N SUL AM AMOE NA M
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
DEPARTMENT OF NATURAL RESOURCES
5145 Livernois, Suite 100 Troy, Michigan 48098-3276
Tel: 248-879-5666 www.PeterBassoAssociates.com
PBA Project No.: 2026.0047 Peter Basso Associates
10/09/26ISSUED FOR BIDS
ELECTRICAL STANDARDS AND
DRAWING INDEX
E0.01
EMG
Saginaw, Michigan 48607 989 752 8107
100 S Jefferson Ave, Suite 601
WTAARCH.COM
A RCHITE SCT
CHECKED BY
PROJECT DATE
SHEET NUMBERPROJECT NUMBER
SHEET TITLE
DATENO.
PROJECT TITLE
REVISION
NEW STORAGE BUILDING FOR:
DETROIT, MICHIGAN
2019131
05/13/26
09/15/2695% CD REVIEW
P L U R I B U E
S U N U M
C I R C U M S P I C E
SI QU EREI S PE NI N SUL AM AMOE NA M
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
DEPARTMENT OF NATURAL RESOURCES
5145 Livernois, Suite 100 Troy, Michigan 48098-3276
Tel: 248-879-5666 www.PeterBassoAssociates.com
PBA Project No.: 2026.0047 Peter Basso Associates
10/09/26ISSUED FOR BIDS
ELECTRICAL STANDARD
SCHEDULES
E0.02
Know what's below .
Call before you dig.
COPYRIGHT 2026C
Saginaw, Michigan 48607 989 752 8107
100 S Jefferson Ave, Suite 601
WTAARCH.COM
A RCHITE SCT
CHECKED BY
PROJECT DATE
SHEET NUMBERPROJECT NUMBER
SHEET TITLE
DATENO.
PROJECT TITLE
REVISION
NEW STORAGE BUILDING FOR:
DETROIT, MICHIGAN
2019131
05/13/26
09/15/2695% CD REVIEW
P L U R I B U E
S U N U M
C I R C U M S P I C E
SI QU EREI S P ENI N SUL AM AMOE NA M
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
DEPARTMENT OF NATURAL RESOURCES
5145 Livernois, Suite 100 Troy, Michigan 48098-3276
Tel: 248-879-5666 www.PeterBassoAssociates.com
PBA Project No.: 2026.0047 Peter Basso Associates
10/09/26ISSUED FOR BIDS
ELECTRICAL SITE PLAN
E0.04
BAY 1 BAY 2
BAY 3
BAY 4 BAY 5
1 3 4 6 9 10 115 81.7 72
A
B
E
F
C
D
E.3
A
B
E
F
C
D
E.3
A
B
E
F
C
D
E.3
COPYRIGHT 2026C
Saginaw, Michigan 48607 989 752 8107
100 S Jefferson Ave, Suite 601
WTAARCH.COM
A RCHITE SCT
CHECKED BY
PROJECT DATE
SHEET NUMBERPROJECT NUMBER
SHEET TITLE
DATENO.
PROJECT TITLE
REVISION
NEW STORAGE BUILDING FOR:
DETROIT, MICHIGAN
2019131
05/13/26
09/15/2695% CD REVIEW
P L U R I B U E
S U N U M
C I R C U M S P I C E
SI QU EREI S PE NI N SUL AM AMOE NA M
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
DEPARTMENT OF NATURAL RESOURCES
5145 Livernois, Suite 100 Troy, Michigan 48098-3276
Tel: 248-879-5666 www.PeterBassoAssociates.com
PBA Project No.: 2026.0047 Peter Basso Associates
10/09/26ISSUED FOR BIDS
ELECTRICAL NEW WORK PLAN
E1.01
Saginaw, Michigan 48607 989 752 8107
100 S Jefferson Ave, Suite 601
WTAARCH.COM
A RCHITE SCT
CHECKED BY
PROJECT DATE
SHEET NUMBERPROJECT NUMBER
SHEET TITLE
DATENO.
PROJECT TITLE
REVISION
NEW STORAGE BUILDING FOR:
DETROIT, MICHIGAN
2019131
05/13/26
09/15/2695% CD REVIEW
P L U R I B U E
S U N U M
C I R C U M S P I C E
SI QU EREI S PE NI N SUL AM AMOE NA M
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
DEPARTMENT OF NATURAL RESOURCES
5145 Livernois, Suite 100 Troy, Michigan 48098-3276
Tel: 248-879-5666 www.PeterBassoAssociates.com
PBA Project No.: 2026.0047 Peter Basso Associates
10/09/26ISSUED FOR BIDS
ONE LINE DIAGRAM & DETAILS
E5.01
File details come from the government source that posted it. Updated .