IFB_CR_24-241953.FMD.SwingStageServices.Addendum_1.docx
DOCX document 69 KB Posted
- Attached to
- 24-241953. FMD. SwingStageServices
- Solicitation number
- 0000034735
- Issued by
- California
About this file
I apologize, but no file content was actually provided for me to analyze and summarize. While you referenced a filename (IFB_CR_24-241953.FMD.SwingStageServices.Addendum_1.docx), the actual file contents or text are missing from the message. Without seeing the specific document details, I cannot generate an accurate summary. To proceed, please upload or paste the full text of the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_CR_24-241953.FMD.SwingStageServices.docx | DOCX document | |
| IFB_CR_24-241953.FMD.SwingStageServices.Addendum_1_Changes.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #1 - IFB Swing Stage Services Northern Region
Date: March 21, 2025
To: All Bidders for IFB FMD Swing Stage Services Northern Region
| From: | Department of General Services |
| Office of Business and Acquisition Services (OBAS) |
Subject: Addendum #1 - IFB FMD Swing Stage Services Northern Region CR 24-241953
This addendum is to make deletions and changes to the solicitation referenced above.
Change 1 – IFB Instructions service locations, Section A (3) has been changed as follows:
3) Services will be performed at the following facilities:
Building #
Building Name
Location
| 018 |
| Resources |
| 1416 9th Street |
Sacramento, CA 95814
| 0B28 |
| CDTFA |
| 450 N Street |
Sacramento, CA 95814
| 041 |
| Allenby |
| 1215 O Street |
Sacramento, CA 95814
| 058 |
| May Lee Office Complex |
| 650 Bannon Street |
Sacramento, CA 95811
| 059 |
| May Lee Office Complex Garage |
| 650 Richards Blvd. |
Sacramento, CA 95811
| 402 |
| Ronald M. George |
| 455 Golden Gate Avenue |
San Francisco, CA 94102
| 602 |
| Elihu Harris |
| 1515 Clay Street |
Oakland, CA 94612
Change 2 – IFB Key Action Dates, Section C (1) has been changed as follows:
1) Key Action Dates:
Listed below are the important action dates and times by which actions must be taken or completed. If OBAS finds it necessary to change any of these dates, it will be accomplished by addendum to this IFB.
| Event |
| Date |
| Time (PT) |
| IFB available to prospective bidders |
| March 19, 2025 |
Non-Mandatory Walk-Through
CDTFA Building #OB28 450 N Street Sacramento, CA 95814
Resources Building #018 1416 9th Street Sacramento, CA 95814
Allenby Building #041 1215 O Street Sacramento, CA 95814
May Lee Office Complex/Garage Building #058/059 650 Bannon Street Sacramento, CA 95811
Elihu Harris Building #602 1515 Clay Street Oakland, CA 94612
Ronald M. George Building #402 455 Golden Gate Avenue San Francisco, CA 94102
March 26, 2025
March 27, 2025
March 27, 2025
9:00 a.m.
10:00 a.m.
11:00 a.m.
1:30 p.m.
9:00 a.m.
Change 3 – IFB Attachment 8, Cost Sheet has been changed as follows:
9. PREVENTIVE MAINTENANCE: BUILDING #041
| Description |
| A |
| B |
| C |
Service Rate
| Frequency per Year |
| Annual Total |
Calculated Amount (A x B)
| Annual Inspection |
| $ |
| 1 |
| $ |
| Monthly Pre-Use Inspection |
| $ |
| 12 |
| $ |
ANNUAL TOTAL
(Sum of Column C)
CALCULATED PREVENTIVE MAINTENANCE TOTAL
(Annual Total x 3)
10. FORESEEABLE REPAIR SERVICES1 : BUILDING #041
| Description |
| A |
| B |
| C |
| D |
| E |
| F |
| G |
| Number of Labor Hours |
| Normal Business Hourly Rate2 |
| Calculated Labor Amount |
(A x B)
| Part Replacement Amount3 |
| Total Combined Replacement Amount |
(C+D) Est Qty
Calculated Total Amount (ExF)
Replace Wire/Ropes
| $ |
| $ |
| $ |
| 1 |
| $ |
Replace Overspeed Switches
| $ |
| $ |
| $ |
| 1 |
| $ |
Replace Shaft Bearings
| $ |
| $ |
| $ |
| 1 |
| $ |
Replace Wire Window Shims
| $ |
| $ |
| $ |
| 1 |
| $ |
Replace Detent Pins
| $ |
| $ |
| $ |
| 1 |
| $ |
Replace Detent Pin Lanyards
| $ |
| $ |
| $ |
| 1 |
| $ |
FORESEEABLE REPAIR SERVICES TOTAL
(Sum of Column G)
1 Table 10: Foreseeable Repair Services amounts are used for evaluation purposes. Cost Sheet amounts are not a guarantee of service but shall be used should these services become necessary during the term of the Agreement.
2 Table 10: The State will pay the Foreseeable Repair Services at the fixed price specified as the Total Combined Replacement Amount (Column E) based on the calculations with the Normal Business Hourly rate. Should FMD require the repairs be performed outside of normal business hours, the Foreseeable Repairs Normal Business Hourly Rate (Column B) shall be replaced by the applicable Per Hourly Rate from Table 11: Unforeseeable Repair Services to calculate the Total Calculated Labor Cost (Column C) and Total Combined Replacement Amount (Column E). The State will not pay a separate hourly rate and/or parts replacement amount.
3 Table 10: Foreseeable Repair Services: The Parts Replacement Amount (Column D) are all inclusive, including tax, markup, etc. The Part Replacement Amount is included in the Total Combined Replacement Amount and will not be paid separately.
11. UNFORESEEABLE REPAIR SERVICES1 : BUILDING #041
| Type of Service |
| A |
| B |
| C |
| Rate2 |
| Estimated Number of Hours |
Annual Calculated Amount (A x B)
| Normal Business Hours as identified in Exhibit A, Scope of Work Section 5.A.1. |
| $ |
Per Hour
| 4 |
| $ |
| Outside of Normal Business Hours as identified in Exhibit A, Scope of Work, Section 5.A.1. |
| $ |
Per Hour
| 4 |
| $ |
Emergency –Within Normal Business Hours (Requires response as identified in Exhibit A, Scope of Work Section 8.F) Per Hour
| 4 |
| $ |
Emergency –Outside Normal Business Hours (Requires response as identified in Exhibit A, Scope of Work Section 8.F) Per Hour
| 4 |
| $ |
| Parts Allowance |
| $ 500 |
| Parts Mark-Up3 |
| __________% |
| $ 500 |
| $ |
ANNUAL TOTAL
(Sum of Column C)
CALCULATED UNFORESEEABLE REPAIR SERVICES TOTAL
1 Table 11: Unforeseeable Repair Services amounts are used for evaluation purposes. Cost Sheet amounts are not a guarantee of service but shall be used should these services become necessary during the term of the Agreement.
2 Table 11: Unforeseeable Repair Services rate is for one (1) Service Technician. Should the Contractor require more than one (1) Service Technician to perform services, approval must be obtained by the Facilities Management Division (FMD) Contract Administrator or FMD Designated Representative prior to commencement of service.
3 Table 11: Unforeseeable Repair Services. Any Unforeseeable Repair Service requiring an unforeseeable repair part shall require actual receipt for the part when invoicing FMD. A Purchase Order or Purchase Estimate is not to be used in place of a receipt.
12. TOTAL AMOUNT: BUILDING 041
| A |
| B |
| Table |
| Bid Amount |
| 9 |
| Preventive Maintenance |
CALCULATED PREVENTIVE MAINTENANCE TOTAL
| 10 |
| Foreseeable Repair Services |
FORESEEABLE REPAIR SERVICES TOTAL
(Sum of Column G)
| 11 |
| Unforeseeable Repair Services |
CALCULATED UNFORESEEABLE REPAIR SERVICES TOTAL
Total Bid Amount (Sum of Column B)
COST SHEET SUMMARY
| A |
| B |
| Table |
| Bid Amount |
| 4 |
| TOTAL AMOUNT - BUILDING #018 |
| 8 |
| TOTAL AMOUNT - BUILDING #OB28 |
| 12 |
| TOTAL AMOUNT - BUILDING #041 |
| 16 |
| TOTAL AMOUNT - BUILDING #058 |
| 20 |
| TOTAL AMOUNT - BUILDING #059 |
| 24 |
| TOTAL AMOUNT - BUILDING #402 |
| 28 |
| TOTAL AMOUNT - BUILDING #602 |
Total Bid Amount (Sum of Column B)
Change 4 – IFB Attachment 9 Sample Agreement, Exhibit A Scope of Work, Section 1(B) has been changed as follows:
B. The services will be performed at the following locations:
#018 Resources 1416 9th Street Sacramento, CA 95814
#OB28 CDTFA
450 N Street Sacramento, CA 95814 #041 Allenby 1215 O Street Sacramento, CA 95814 #058 May Lee Office Complex 650 Bannon Street Sacramento, CA 95811
#059 May Lee Office Complex Garage 650 Richards Blvd.
Sacramento, CA 95811 #402 Ronald M. George 455 Golden Gate Avenue San Francisco, CA 94102 #602 Elihu Harris 1515 Clay Street Oakland, CA 94612
Change 5 – IFB Attachment 9 Sample Agreement, Exhibit A Scope of Work, Section 6(D) has been changed as follows:
D. Preventive Maintenance shall be paid be the State at the Contractor's rates specified in Exhibit B, Attachment 1, Cost Sheet, Table 1,5, 9, 13, 17, 21, 25, Preventative Maintenance Services.
Change 6 – IFB Attachment 9 Sample Agreement, Exhibit A Scope of Work, Section 7(B) has been changed as follows:
B. Foreseeable Repairs shall be paid by the State at the Contractor’s Repair Service-Hourly Rates, specified in Exhibit B, Attachment 1, Cost Sheet, Table 2, 6, 10, 14, 18, 22, 26, Foreseeable Repair Services.
Change 7 – IFB Attachment 9 Sample Agreement, Exhibit A Scope of Work, Section 7(C) has been changed as follows:
C. Unforeseeable Repairs shall be paid by the State at the Contractor’s Repair Service-Hourly Rates, specified in Exhibit B, Attachment 1, Cost Sheet, Table 3, 7, 11, 15, 19, 23, 27, Unforeseeable Repair Services.
Change 8 – IFB Attachment 9 Sample Agreement, Exhibit A Scope of Work, Section 8(E) has been changed as follows:
E. Emergency services provided by the Contractor, shall be charged at the Contractor’s Emergency Repair Service-Hourly Rates, specified in Exhibit B, Attachment 1, Cost Sheet, Table 3, 7, 11, 15, 19, 23, 27, Unforeseeable Repair Services.
Change 9 – IFB Attachment 9 Sample Agreement, Exhibit A Scope of Work, Section 8(F) has been changed as follows:
F. When calculating Emergency Repair costs relative to Foreseeable Repairs, the hourly rate shall be as identified in Exhibit B, Attachment 1, Table 3, 7, 11, 15, 19, 23, 27, Unforeseeable Repair Services. All other costs shall be billed consistent with Table 2, 6, 10, 14, 18, 22, 26, Foreseeable Repair Services.
Change 10 – IFB Attachment 9 Sample Agreement, Exhibit A Attachment 1, Equipment List has been changed as follows:
BUILDING #041:
| QTY |
| EQUIPMENT DESCRIPTION |
| MANUFACTURER |
| MODEL # |
| SERIAL # |
| 1 |
| Modular Scaffolding Platform System |
| Tirak |
| XE700P |
| 2 |
| 450” Power Cord |
| 2 |
| Handrail Push Button Kits |
| 2 |
| Wire/ Ropes |
| 2 |
| Rollers |
| 2 |
| Overspeed Switches |
| 2 |
| Brake Plugs |
| 2 |
| Torque Limiter |
| 2 |
| Wind Wire Shaft |
| 2 |
| Shaft Bearings |
| 2 |
| Wire Winder Shims |
| 2 |
| Detent Pins |
| 2 |
| Detent Pin Lanyards |
Administration Division, Office of Business and Acquisition Services | State of California | Government Operations Agency Contracts Services Section | 707 Third Street, MS 508 |West Sacramento, CA 95605 | t 916-376-1768 image1.png
File details come from the government source that posted it. Updated .