IFB_ANN_Marble-Terrazzo_Restoration (Treasury & HOD) V2.docx (1).pdf
PDF 531 KB Posted
- Solicitation number
- BPM043203
- Issued by
- Anne Arundel County, Annapolis City, Maryland
About this file
This document is an Invitation for Bids (IFB) issued by the Maryland Department of General Services (DGS) to procure marble and terrazzo floor restoration services for the Goldstein Treasury Building and House of Delegates Building in Annapolis, Maryland. The IFB seeks bids to strip, clean, grind, hone, polish, harden, and seal approximately 6,000-6,500 square feet of marble and terrazzo flooring in the specified buildings. The work also includes repairing cracks in some marble tiles and restoring the floors to their original high-gloss finish. The IFB has a pre-bid conference scheduled for April 22, 2024, with bids due by April 29, 2024. The contract will be awarded to the responsible bidder submitting the lowest total bid price, and the work is to be completed per an agreed-upon schedule with the Building Managers. The contract will continue through completion of the project.
The IFB specifies a fixed-fee contract with all time and materials to be included in the bid price. There is no Small Business Reserve (SBR) designation, and the project is not federally funded. Bidders must meet minimum qualifications of 3 consecutive years of experience providing similar marble floor restoration services within the past 5 years. The IFB includes detailed pricing instructions and a required Bid Price Excel sheet for bidders to complete.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF MARYLAND
DEPARTMENT OF GENERAL SERVICES (DGS)
INVITATION FOR BIDS (IFB)
MARBLE/TERRAZZO FLOORS RESTORATION
GOLDSTEIN TREASURY BUILDING &
HOUSE OF DELEGATES BUILDING
SOLICITATION NUMBER: BPM043203
APRIL 12, 2024
VERSION 2 - APRIL 25, 2024
NOTICE
A Prospective Bidder that has received this document from a source other than eMarylandMarketplace
(eMMA) https://procurement.maryland.gov should register on eMMA. See Section 4.2.
MINORITY BUSINESS ENTERPRISES ARE ENCOURAGED TO RESPOND TO THIS
SOLICITATION.
MARBLE/TERRAZZO FLOORS RESTORATION – GOLDSTEIN
TREASURY AND HOUSE OF DELEGATES BUILDINGS
SOLICITATION NUMBER: BPM043203
IFB Document
NO BID NOTICE/VENDOR FEEDBACK FORM
To help us improve the quality of State solicitations, and to make our procurement process more responsive and business friendly, please provide comments and suggestions regarding this solicitation.
Please return your comments with your response. If you have chosen not to respond to this solicitation, please email or fax this completed form to the attention of the Procurement Officer (see Key Information Summary Sheet below for contact information).
Title:MARBLE/TERRAZZO FLOORS RESTORATION –
GOLDSTEIN TREASURY AND HOUSE OF DELEGATES BUILDINGS
SOLICITATION NUMBER: BPM043203
1. If you have chosen not to respond to this solicitation, please indicate the reason(s) below:
• Other commitments preclude our participation at this time
• The subject of the solicitation is not something we ordinarily provide
• We are inexperienced in the work/commodities required
• Specifications are unclear, too restrictive, etc. (Explain in REMARKS section)
• The scope of work is beyond our present capacity
• Doing business with the State is simply too complicated. (Explain in REMARKS section)
• We cannot be competitive. (Explain in REMARKS section)
• Time allotted for completion of the Bid is insufficient
• Start-up time is insufficient
• Bonding/Insurance requirements are restrictive (Explain in REMARKS section)
• Bid requirements (other than specifications) are unreasonable or too risky (Explain in REMARKS section)
• MBE or VSBE requirements (Explain in REMARKS section)
• Prior State of Maryland contract experience was unprofitable or otherwise unsatisfactory.
(Explain in REMARKS section)
• Payment schedule too slow
IFB for Department of General Services
SOLICITATION NUMBER: BPM043203
IFB Document
• Other: __________________________________________________________________
2. If you have submitted a response to this solicitation, but wish to offer suggestions or express concerns, please use the REMARKS section below. (Attach additional pages as needed.)
REMARKS:
Vendor Name: ________________________________ Date: _______________________
Contact Person: _________________________________ Phone (____) _____ - _________________
Address: ______________________________________________________________________
E-mail Address: ________________________________________________________________
STATE OF MARYLAND
DEPARTMENT OF GENERAL SERVICES (DGS)
KEY INFORMATION SUMMARY SHEET
Invitation for Bids Services, MARBLE/TERRAZZO FLOORS RESTORATION, Goldstein Treasury and House of Delegates Building
Solicitation Number: BPM043203
IFB Issue Date: April 12, 2024
IFB Issuing Office: Department of General Services
Procurement Officer: Suzanne Vaaler 100 Community Place Crownsville, MD 21032 e-mail:
Office Phone:
suzanne.vaaler@maryland.gov 410-260-3920
Bids are to be sent to: submit via eMMA
Pre-bid Conference: Monday, April 22 , 2024 from 1:00pm - 2:00pm See Attachment A for instructions.
Questions Due Date and Time Wednesday, April 24, 2024 5:00pm EST
Bid Due (Closing) Date and Time:
Monday, April 29, 2024 11:55pm EST Bidders are reminded that a completed Feedback Form is requested if a no-bid decision is made (see page iv).
Public Bid Opening Date, Time and Location
Wednesday, May 1, 2024 via eMMA
Contract Type: Fixed Fee – all time and materials shall be included in bid price
SOLICITATION NUMBER: BPM043203
IFB Document
Contract Duration: Through completion of project based upon quoted completion timeframe.
Schedule with Building Managers for each building.
Primary Place of Performance: Treasury Building House of Delegates 80 Calvert Street 6 Bladen Street Annapolis, MD 21401 Annapolis, MD 21401
SBR Designation: NO
Federal Funding: NO
SOLICITATION NUMBER: BPM043203
IFB Document
TABLE OF CONTENTS – IFB
1 Minimum Qualifications
1.1 Bidder Minimum Qualifications
2 Contractor Requirements: Scope of Work
2.1 Summary Statement
2.2 Background and Purpose
2.3 Responsibilities and Tasks
3 Contractor Requirements: General
3.1 Contract Initiation Requirements
3.2 End of Contract Transition
3.3 Invoicing
3.4 Insurance Requirements
3.5 Security Requirements
3.6 Work Orders
3.7 Additional Clauses
4 Procurement Instructions
4.1 Pre-Bid Conference
4.2 eMaryland Marketplace Advantage (eMMA)
4.3 Questions
4.4 Procurement Method
4.5 Bid Due (Closing) Date and Time
4.6 Multiple or Alternate Bids
4.7 Receipt, Opening and Recording of Bids
4.8 Confidentiality of Bids / Public Information Act Notice
4.9 Award Basis
4.10 Tie Bids
4.11 Duration of Bids
4.12 Revisions to the IFB
4.13 Cancellations
4.14 Incurred Expenses
SOLICITATION NUMBER: BPM043203
IFB Document
4.15 Protest/Disputes
4.16 Bidder Responsibilities
4.17 Acceptance of Terms and Conditions
4.18 Bid/Proposal Affidavit
4.19 Contract Affidavit
4.20 Compliance with Laws/Arrearages
4.21 Verification of Registration and Tax Payment
4.22 False Statements
4.23 Payments by Electronic Funds Transfer
4.24 Prompt Payment Policy
4.25 Electronic Procurements Authorized
4.26 Small Business Reserve (SBR) Procurement
5 Bid Format
5.1 One Part Submission
5.2 Labeling
5.3 Bid Price Form
5.4 Required Bid Submission
5.5 Delivery
5.6 Documents Required upon Notice of Recommendation for Contract Award
6 Bid Evaluation and Award
6.1 Bid Evaluation Criteria
6.2 Reciprocal Preference
6.3 Award Determination
6.4 Documents Required upon Notice of Recommendation for Contract Award
7 IFB ATTACHMENTS AND APPENDICES
Attachment B. Bid Instructions & Form
Attachment C. Bid/Proposal Affidavit
Attachment M. Contract
Attachment N. Contract Affidavit
SOLICITATION NUMBER: BPM043203
IFB Document
Appendix 1. – Abbreviations and Definitions
Appendix 2. – Bidder Information Sheet
SOLICITATION NUMBER: BPM043203
IFB Document
1 Minimum Qualifications
1.1 Bidder Minimum Qualifications
As part of the determination to be considered responsive, the Bidder must document in its Bid that it satisfies the following Minimum Qualifications:
1.1.1 The Bidder shall have a minimum of three (3) consecutive years of experience providing Marble Floor Restorations of similar scope and size within the past five (5) years of being in business.
Required Documentation: As proof of meeting this requirement, the Bidder shall provide with its Bid at least three (3) references from the past five (5) years that collectively are able to attest to the Bidders required years of experience in providing Marble Floor restorations.
THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK.
SOLICITATION NUMBER: BPM043203
IFB Document
2 Contractor Requirements: Scope of Work
2.1 Summary Statement
2.1.1 The Department of General Services (DGS) is issuing this Invitation for Bids (IFB) in order to procure the services defined in this Section 2, as specified in this IFB, from a contract between the successful bidder(s) and the Department of General Services for the purpose of providing marble restoration services in the Goldstein Treasury Building located at 80 Calvert Street, Annapolis, MD 21401, on the lobby and hallway floors as well as the second (2nd) floor elevator lobby and North & South hallways and the House of Delegates building located 6 Bladen Street, Annapolis, MD 21401, a small area on the first floor, on the second (2nd) floor, third (3rd) floor and all staircases and landings between the first (1st) and third (3rd) floor.
2.1.2 This Invitation for Bid (IFB) is also soliciting Add-Alternate pricing for annual cleaning and sealing of all of the restored floors specified in this bid. The Add-Alternate items may or may not be awarded with the award of the restoration work specified in Summary Statement 2.1.1, however all items, including Add-Alternates are required to be priced and submitted.
2.1.3 It is the State’s intention to obtain goods and services, as specified in this IFB, from a Contract between the selected Bidder and the State. This contract is to include all the expected time and materials to successfully complete this project. Department of General Services shall not be charged any additional time or materials the Contractor did not account for in their bid.
2.1.4 The Department of General Services intends to make a single award for the marble restoration work under this IFB. See IFB Section 4.9 Award Basis for more Contract award information.
2.1.5 A Bidder, either directly or through its subcontractor(s), must be able to provide all goods and services and meet all the requirements requested in this solicitation and the successful Bidder (the Contractor) shall remain responsible for Contract performance regardless of subcontractor participation in the work.
2.2 Background and Purpose
The Department of General Services (DGS) is issuing this Invitation for Bid (IFB) in order to procure the services defined in this section 2, as specified in this IFB, from a contract between the successful bidder and the Department of General Services for the purpose of providing marble restoration services in the aforementioned buildings and specific locations.
2.2.1 Project Goals
a) Goldstein Treasury Building specs (APPROXIMATELY 6,000-6,500 Square Feet in total):
a) First Floor Courtyard and Front Lobby Floors are Marble (approx. 2300 SF) – strip, clean, grind, hone, polish, harden, and seal marble surface. Repair cracks (with filler) in 2 black marble tiles per images. Restore marble clarity and quality and return to high gloss finish.
b) First Floor Hallway Floors (2) are Terrazzo to include hallway returns at end of hallway, washroom floor and closet floor - strip, clean, polish and seal. Restore floors to their original look and finish.
SOLICITATION NUMBER: BPM043203
IFB Document
c) Second Floor Lobby Floor is Terrazzo - strip, clean, polish and seal. Restore floors to their original look and finish.
d) Second Floor Hallway Floors (2) are Terrazzo to include hallway returns at end of hallway and washroom floor - strip, clean, polish and seal. Restore floors to their original look and finish.
House of Delegates Building specs (APPROXIMATELY 5,500-6,000 Square Feet in total):
e) First Floor Restoration - approx. 200 SF area on College Avenue side of building – clean, hone, polish, harden and seal marble surface. Restore Marble clarity and return to a high gloss finish.
f) Second Floor Marble – clean, hone, polish, harden and seal marble surface. Restore Marble clarity and return to a high gloss finish.
g) Third Floor Marble – clean, hone, polish, harden, and seal marble surface. Restore marble clarity and return to a high gloss finish.
h) Marble Staircases – clean, hone, polish, harden and seal all steps, to include risers, between the first (1st) and third (3rd) floors. (there are 52 steps total) Steps should retain their honed/matte finish.
i) Restoration of the Marble Landings between the stairs (there are 2 landings)
Requirements for all buildings:
j) Contractor shall obtain a signature approving completion and satisfaction of tasks outlined in this Invitation for Bid from the Annapolis Superintendent or his/her designee prior to removing equipment and leaving the each building location.
2.2.2 State Staff and Roles
Building Manager and staff will be responsible for moving and replacing furniture in impacted areas
2.2.3 Other State Responsibilities
N/A
2.3 Responsibilities and Tasks
The exact schedule for this work is to be developed in collaboration with the Building Manager for each building to minimize the impact of the building occupants and still complete the work during normal business hours. If the work needs to be completed after hours, that is to be approved by the Superintendent or the Assistant Superintendent prior to performing.
Normal business hours are between 8:00am and 5:00pm, Monday through Friday. After hours would be considered Monday through Friday between 5:00pm and 5:00am as well as Saturday and/or Sunday from 7:30am to 4:00pm.
SOLICITATION NUMBER: BPM043203
IFB Document
3 Contractor Requirements: General
3.1 Contract Initiation Requirements
THIS SECTION IS INAPPLICABLE TO THIS IFB.
3.2 End of Contract Transition
THIS SECTION IS INAPPLICABLE TO THIS IFB
3.3 Invoicing
3.3.1 General
a) All invoices for services shall be signed by the Contractor and uploaded into eMaryland Marketplace Advantage (eMMA).
All invoices for services shall be verified by the Contractor as accurate at the time of submission.
An invoice not satisfying the requirements of a Proper Invoice (as defined in COMAR 21.06.09) cannot be processed for payment. To be considered a Proper Invoice, invoices must include the following information, without error:
1) Contractor name and address;
2) Remittance address;
3) Federal taxpayer identification (FEIN) number, social security number, as appropriate;
4) Invoice period (i.e. time period during which services covered by invoice were performed);
5) Invoice date;
6) Invoice number;
7) State assigned Contract number;
8) State assigned Purchase Order number(s);
9) Goods or services provided;
10) Building/Location where services were performed;
11) Amount due; and
12) Any additional documentation required by regulation or the Contract.
Invoices that contain both fixed price and time and material items shall clearly identify each item as either fixed price or time and material billing.
The Department of General Services reserves the right to reduce or withhold Contract payment in the event the Contractor does not provide DGS with all required deliverables within the time frame specified in the Contract or otherwise breaches the terms and conditions of the Contract until such time as the Contractor brings itself into full compliance with the Contract.
SOLICITATION NUMBER: BPM043203
IFB Document
Any action on the part of DGS or a dispute of action by the Contractor, shall be in accordance with the provisions of Md. Code Ann., State Finance and Procurement Article §§ 15-215 through 15-223 and with
COMAR 21.10.04.
The State is generally exempt from federal excise taxes, Maryland sales and use taxes, District of Columbia sales taxes and transportation taxes. The Contractor, however, is not exempt from such sales and use taxes and may be liable for the same.
Invoices for final payment shall be clearly marked as “FINAL” and submitted when all work requirements have been completed and no further charges are to be incurred under the Contract. In no event shall any invoice be submitted later than 60 calendar days from the Contract termination date.
3.3.2 Invoice Submission Schedule
The Contractor shall submit invoices in accordance with the following schedule:
a) For items of work for which there is one-time pricing (see Attachment B –Bid Form) those items shall be billed in the month following the acceptance of the work by the Department of General Services.
b) For items of work for which there is annual pricing, see Attachment B–Bid Form, those items shall be billed in equal monthly installments for the applicable Contract year in the month following the performance of the services.
3.3.3 For the purposes of the Contract an amount will not be deemed due and payable if:
a) The amount invoiced is inconsistent with the Contract;
b) The proper invoice has not been received by the party or office specified in the Contract;
c) The invoice or performance is in dispute or the Contractor has failed to otherwise comply with the provisions of the Contract;
d) The item or services have not been accepted;
e) The quantity of items delivered is less than the quantity ordered;
f) The items or services do not meet the quality requirements of the Contract;
g) If the Contract provides for progress payments, the proper invoice for the progress payment has not been submitted pursuant to the schedule;
h) If the Contract provides for withholding a retainage and the invoice is for the retainage, all stipulated conditions for release of the retainage have not been met; or
i) The Contractor has not submitted satisfactory documentation or other evidence reasonably required by the Procurement Officer or by the Contract concerning performance under the Contract and compliance with its provisions.
3.3.4 Travel Reimbursement
Travel will not be reimbursed under this IFB.
SOLICITATION NUMBER: BPM043203
IFB Document
3.4 Insurance Requirements
The Contractor shall maintain, at a minimum, the insurance coverages outlined below, or any minimum requirements established by law if higher, for the duration of the Contract, including option periods, if exercised:
3.4.1 The following type(s) of insurance and minimum amount(s) of coverage are required:
a) Commercial General Liability - of $1,000,000 combined single limit per occurrence for bodily injury, property damage, and personal and advertising injury and $3,000,000 annual aggregate.
The minimum limits required herein may be satisfied through any combination of primary and umbrella/excess liability policies.
b) Crime Insurance/Employee Theft Insurance - to cover employee theft with a minimum single loss limit of $1,000,000 per loss, and a minimum single loss retention not to exceed $10,000.
The State of Maryland and the Department of General Services should be added as a “loss payee.”
c) Worker’s Compensation - The Contractor shall maintain such insurance as necessary or as required under Workers’ Compensation Acts, the Longshore and Harbor Workers’ Compensation Act, and the Federal Employers’ Liability Act, to not be less than. one million dollars ($1,000,000) per occurrence (unless a state’s law requires a greater amount of coverage). Coverage must be valid in all states where work is performed.
d) Automobile or Commercial Truck Insurance - The Contractor shall maintain Automobile or Commercial Truck Insurance (including owned, leased, hired, and non-owned vehicles) as appropriate with Liability, Collision, and PIP limits no less than those required by the State where the vehicle(s) is registered, but in no case less than those required by the State of Maryland.
3.4.2 The State shall be listed as an additional insured on the faces of the certificates associated with the coverages listed above, including umbrella policies, excluding Workers’ Compensation Insurance and professional liability.
3.4.3 All insurance policies shall be endorsed to include a clause requiring the insurance carrier to provide the Procurement Officer, by certified mail, not less than 30 days’ advance notice of any non-renewal, cancellation, or expiration. The Contractor shall notify the Procurement Officer in writing if policies are canceled or not renewed within five (5) days of learning of such cancellation or nonrenewal. The Contractor shall provide evidence of replacement insurance coverage to the Procurement Officer at least 15 days prior to the expiration of the insurance policy then in effect.
3.4.4 Any insurance furnished as a condition of the Contract shall be issued by a company authorized to do business in the State.
3.4.5 The recommended awardee must provide current certificate(s) of insurance with the prescribed coverages, limits and requirements set forth in this section within five (5) Business Days from notice of recommended award. During the period of performance for multi-year contracts, the Contractor shall provide certificates of insurance annually, or as otherwise directed by the Contract Monitor.
SOLICITATION NUMBER: BPM043203
IFB Document
3.4.6 The Contractor shall require any subcontractors to obtain and maintain comparable levels of coverage and shall provide the Contract Monitor with the same documentation as is required of the Contractor.
3.5 Security Requirements
The following requirements are applicable to the Contract:
3.5.1 Employee Identification
a) Contractor Personnel shall display his or her company ID badge in a visible location at all times while on State premises. Upon request of authorized State personnel, each Contractor Personnel shall provide additional photo identification.
b) Contractor Personnel shall cooperate with State site requirements, including but not limited to, being prepared to be escorted at all times, and providing information for State badge issuance.
c) Contractor shall remove any Contractor Personnel from working on the Contract where the State determines, in its sole discretion, that Contractor Personnel has not adhered to the Security requirements specified herein.
d) The State reserves the right to request that the Contractor submit proof of employment authorization of non-United States Citizens, prior to commencement of work under the Contract.
3.5.2 Security Clearance / Criminal Background Check
a) The Contractor shall obtain criminal background checks on candidates it sends for employment at DGS. At a minimum, these checks must contain convictions and probation before judgment (PBJ) pleadings within the State of Maryland. This check may be performed by a public or private entity.
b) The Contractor shall provide certification to DGS that the Contractor has completed the required criminal background check described in this IFB for each required Contractor Personnel prior to assignment, and that the Contractor Personnel have successfully passed this check.
c) Persons with a criminal record may not perform services under the Contract unless prior written approval is obtained from the Contract Monitor. The Contract Monitor reserves the right to reject any individual based upon the results of the background check. Decisions of the Contract Monitor as to acceptability of a candidate are final. The State reserves the right to refuse any individual Contractor Personnel to work on State premises, based upon certain specified criminal convictions, as specified by the State.
d) The CJIS criminal record check of each Contractor Personnel who will work on State premises shall be reviewed by the Contractor for convictions of any of the following crimes described in the Annotated Code of Maryland, Criminal Law Article:
1) §§ 6-101 through 6-104, 6-201 through 6-205, 6-409 (various crimes against property);
2) any crime within Title 7, Subtitle 1 (various crimes involving theft);
3) §§ 7-301 through 7-303, 7-313 through 7-317 (various crimes involving telecommunications and electronics);
SOLICITATION NUMBER: BPM043203
IFB Document
4) §§ 8-201 through 8-302, 8-501 through 8-523 (various crimes involving fraud);
5) §§9-101 through 9-417, 9-601 through 9-604, 9-701 through 9-706.1 (various crimes against public administration); or
6) a crime of violence as defined in CL § 14-101(a).
e) Contractor Personnel with access to systems supporting the State or to State data who have been convicted of a felony or of a crime involving telecommunications and electronics from the above list of crimes shall not be permitted to work on State premises under the Contract;
Contractor Personnel who have been convicted within the past five (5) years of a misdemeanor from the above list of crimes shall not be permitted to work on State premises.
f) A particular on-site location covered by the Contract may require more restrictive conditions regarding the nature of prior criminal convictions that would result in Contractor Personnel not being permitted to work on those premises. Upon receipt of a location’s more restrictive conditions regarding criminal convictions, the Contractor shall provide an updated certification regarding the Contractor Personnel working at or assigned to those premises.
3.5.3 On-Site Security Requirement(s)
b) For the conditions noted below, Contractor Personnel may be barred from entrance or leaving any site until such time that the State’s conditions and queries are satisfied.
1) Contractor Personnel may be subject to random security checks when entering and leaving State secured areas. The State reserves the right to require Contractor Personnel to be accompanied while on secured premises.
2) Some State sites, especially those premises of the Department of Public Safety and Correctional Services, require each person entering the premises to document and inventory items (such as tools and equipment) brought onto the site, and to submit to a physical search of his or her person. Therefore, Contractor Personnel shall always have available an inventory list of tools being brought onto a site and be prepared to present the inventory list to the State staff or an officer upon arrival for review, as well as present the tools or equipment for inspection. Before leaving the site, the Contractor Personnel will again present the inventory list and the tools or equipment for inspection. Upon both entering the site and leaving the site, State staff or a correctional or police officer may search Contractor Personnel. Depending upon facility rules, specific tools or personal items may be prohibited from being brought into the facility.
c) Any Contractor Personnel who enter the premises of a facility under the jurisdiction of the Department of General Services may be searched, fingerprinted (for the purpose of a criminal history background check), photographed and required to wear an identification card issued by the Department of General Services.
d) Further, Contractor Personnel shall not violate Md. Code Ann., Criminal Law Art. Section 9-410 through 9-417 and such other security policies of the agency that control the facility to which the Contractor Personnel seeks access. The failure of any of the Contractor Personnel to comply with any provision of the Contract is sufficient grounds for the State to immediately terminate the Contract for default.
SOLICITATION NUMBER: BPM043203
IFB Document
1) Perform regular vulnerability testing of operating system, application, and network devices. Such testing is expected to identify outdated software versions; missing software patches; device or software misconfigurations; and to validate compliance with or deviations from the security policies applicable to the Contract. Contractor shall evaluate all identified vulnerabilities for potential adverse effect on security and integrity and remediate the vulnerability no later than 30 days following the earlier of vulnerability’s identification or public disclosure, or document because remediation action is unnecessary or unsuitable. The Department of General Services shall have the right to inspect the Contractor’s policies and procedures and the results of vulnerability testing to confirm the effectiveness of these measures for the services being provided under the Contract.
2) Enforce strong user authentication and password control measures to minimize the opportunity for unauthorized access through compromise of the user access controls. At a minimum, the implemented measures should be consistent with the most current Maryland Department of Information Technology’s Information Security Policy (https://doit.maryland.gov/policies/Pages/default.aspx), including specific requirements for password length, complexity, history, and account lockout.
3) Ensure State data is not processed, transferred, or stored outside of the United States (“U.S.”). The Contractor shall provide its services to the State and the State’s end users solely from data centers in the U.S. Unless granted an exception in writing by the State, the Contractor shall not allow Contractor Personnel to store State data on portable devices, including personal computers, except for devices that are used and kept only at its U.S. data centers. The Contractor shall permit its Contractor Personnel to access State data remotely only as required to provide technical support.
4) Ensure Contractor’s Personnel shall not connect any of its own equipment to a State LAN/WAN without prior written approval by the State, which may be revoked at any time for any reason. The Contractor shall complete any necessary paperwork as directed and coordinated with the Contract Monitor to obtain approval by the State to connect Contractor -owned equipment to a State LAN/WAN.
5) Ensure that anti-virus and anti-malware software is installed and maintained on all systems supporting the services provided under the Contract; that the anti-virus and anti-malware software is automatically updated; and that the software is configured to actively scan and detect threats to the system for remediation. The Contractor shall perform routine vulnerability scans and take corrective actions for any findings.
6) Conduct regular external vulnerability testing designed to examine the service provider’s security profile from the Internet without benefit of access to internal systems and networks behind the external security perimeter. Evaluate all identified vulnerabilities on Internet-facing devices for potential adverse effects on the service’s security and integrity and remediate the vulnerability promptly or document because remediation action is unnecessary or unsuitable. The Department of General Services shall have the right to inspect these policies and procedures and the performance of vulnerability testing to confirm the effectiveness of these measures for the services being provided under the Contract.
https://doit.maryland.gov/policies/Pages/default.aspx
SOLICITATION NUMBER: BPM043203
IFB Document
3.6 Work Orders
a) Additional services will be provided via a Work Order process. Work shall not begin in advance of a fully executed Work Order. A Work Order may be issued for either a fixed price or time and materials (T&M) pricing. Work Order Requests (See sample at http://doit.maryland.gov/contracts/Documents/_procurementForms/WorkOrderSample.pdf) for the provision of services or resources that are within the scope of this IFB will be issued to the Contractor. The Work Order Request will include:
1) Technical requirements and description of the service or resources needed;
2) Performance objectives and/or deliverables, as applicable;
3) Due date and time for submitting a response to the request; and
4) Required place(s) where work must be performed.
b) The Contractor shall e-mail a response to the Contract Monitor within the specified time and include at a minimum:
1) A response that details the Contractor’s understanding of the work;
2) A price to complete the Work Order Request using the format provided using the format provided (see online sample).
3) A description of proposed resources required to perform the requested tasks, with labor categories listed in accordance with Attachment B.
4) An explanation of how tasks shall be completed. This description shall include proposed subcontractors and related tasks.
5) Contractor’s expectations for State-furnished information, work site, and/or access to equipment, facilities, or personnel
6) The proposed personnel resources, including any subcontractor personnel, to complete the task.
c) For a T&M Work Order, the Contract Monitor will review the response and will confirm the proposed labor rates are consistent with this IFB. For a fixed price Work Order, the Contract Monitor will review the response and will confirm the proposed prices are acceptable.
d) The Contract Monitor may contact the Contractor to obtain additional information, clarification, or revision to the Work Order, and will provide the Work Order to the Procurement Officer for a determination of compliance with the Contract and a determination whether a change order is appropriate. Written Procurement Officer approval is required before Work Order execution by the State.
e) Proposed personnel on any type of Work Order shall be subject to The Department of General Services approval. The Contractor shall furnish resumes of proposed personnel specifying the labor category(ies) proposed. The Contract Monitor shall have the option to interview the proposed personnel and, in the event of an interview or not, shall notify the Contractor of acceptance or denial of the personnel.
f) Performance of services under a Work Order shall commence consistent with an NTP issued by the Contract Monitor for such Work Order.
http://doit.maryland.gov/contracts/Documents/_procurementForms/WorkOrderSample.pdf
SOLICITATION NUMBER: BPM043203
IFB Document
g) The Blanket Purchase Order (BPO) issued as a result of the solicitation, and any subsequent amendments, modifications or options issued relevant to the solicitation or BPO, complies with all the terms, conditions and specifications issued with the solicitation and is incorporated in and made part of the Contract – Attachment M.
3.7 Additional Clauses
3.7.1 The State of Maryland’s Commitment to Purchasing Environmentally Preferred
Products and Services (EPPs)
Maryland’s State Finance & Procurement Article §14-410 defines environmentally preferable purchasing as “the procurement or acquisition of goods and services that have a lesser or reduced effect on human health and the environment when compared with competing goods or services that serve the same purpose.” Accordingly, Bidders are strongly encouraged to offer EPPs to fulfill this contract, to the greatest extent practicable.
3.7.2 No-Cost Extensions
In accordance with BPW Advisory 1995-1 item 7.b, in the event there are unspent funds remaining on the Contract, prior to the Contract's expiration date the Procurement Officer may modify the Contract to extend the Contract beyond its expiration date for a period up to, but not exceeding, one-third of the base term of the Contract (e.g., eight-month extension on a two-year contract) for the performance of work within the Contract's scope of work. Notwithstanding anything to the contrary, no funds may be added to the Contract in connection with any such extension.
THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK.
https://trackbill.com/bill/maryland-house-bill-629-environmentally-preferable-procurement-maryland-green-purchasing-committee/647077/
SOLICITATION NUMBER: BPM043203
IFB Document
4 Procurement Instructions
4.1 Pre-Bid Conference – Monday, April 22 , 2024 from 1:00pm - 2:00pm (See Attachment A for instructions)
4.2 eMaryland Marketplace Advantage (eMMA)
4.2.1 eMMA is the electronic commerce system for the State of Maryland. The IFB, Conference summary and attendance sheet, Bidders’ questions and the Procurement Officer’s responses, addenda, and other solicitation-related information will be made available via eMMA.
4.2.2 In order to receive a contract award, a vendor must be registered on eMMA. Registration is free. Go to emma.maryland.gov, click on “New Vendor? Register Now” to begin the process, and then follow the prompts.
4.3 Questions
4.3.1 All questions, including concerns regarding any applicable MBE or VSBE participation goals, shall identify in the subject line the Solicitation Number and Title, MARBLE/TERRAZZO
FLOORS RESTORATION – GOLDSTEIN TREASURY AND HOUSE OF DELEGATES
BUILDINGS SOLICITATION NUMBER: BPM043203, and shall be submitted in writing via e-mail to the Procurement Officer no later than the date and time specified the Key Information Summary Sheet. The Procurement Officer, based on the availability of time to research and communicate an answer, shall decide whether an answer can be given before the Bid due date.
4.3.2 Answers to all questions that are not clearly specific only to the requestor will be distributed via the same mechanism as for IFB amendments and posted on eMMA.
4.3.3 The statements and interpretations contained in responses to any questions, whether responded to verbally or in writing, are not binding on the Department of General Services unless it issues an amendment in writing.
4.4 Procurement Method
A Contract will be awarded in accordance with the Competitive Sealed Bidding method under COMAR 21.05.02.
4.5 Bid Due (Closing) Date and Time
4.5.1 Bids, in the number and form set forth in Section 5 Bid Format, must be received by the
Procurement Officer no later than the Bid due date and time indicated on the Key Information Summary Sheet in order to be considered.
4.5.2 Bidders submitting Bids should allow sufficient delivery time to ensure timely receipt by the Procurement Officer. Except as provided in COMAR 21.05.02.10, Bids received after the due date and time listed in the Key Information Summary Sheet will not be considered.
4.5.3 The date and time of an e-mail submission is determined by the date and time of arrival in the e-mail address indicated on the Key Information Summary Sheet.
4.5.4 Bids may be modified or withdrawn by written notice received by the Procurement Officer before the time and date set forth in the Key Information Summary Sheet for receipt of Bids.
https://emma.maryland.gov/page.aspx/en/usr/login?ReturnUrl=%2fpage.aspx%2fen%2fbuy%2fhomepage
SOLICITATION NUMBER: BPM043203
IFB Document
4.5.5 Bids may not be submitted by e-mail or facsimile. Bids will be opened publicly at the date and time indicated on the Key Information Summary Sheet.
4.5.6 Potential Bidders not responding to this solicitation are requested to submit the “No Bid Notice/Vendor Feedback” form, which includes company information and the reason for not responding (e.g., too busy, cannot meet mandatory requirements).
4.6 Multiple or Alternate Bids
Multiple or alternate Bids will not be accepted.
4.7 Receipt, Opening and Recording of Bids
4.7.1 Upon receipt, each Bid and any timely modification(s) to a Bid shall be stored in a secure place until the time and date set for bid opening. Before a Bid opening, the State may not disclose the identity of any Bidder.
4.7.2 Bids shall be opened publicly, at the time, date and place designated in the IFB Key Information Summary Sheet (near the beginning of the solicitation, after the Title Page and Notice to Vendors). The name of each Bidder, the Total Bid Price, and such other information as is deemed appropriate shall be read aloud or otherwise made available and recorded at the time of bid opening.
4.8 Confidentiality of Bids / Public Information Act Notice
4.8.1 The Bidder should give specific attention to the clear identification of those portions of its Bid that it considers confidential and/or proprietary commercial information or trade secrets, and provide justification why such materials, upon request, should not be disclosed by the State under the Public Information Act, Md. Code Ann., General Provisions Article, Title 4. This information should be identified by page number and placed in the Transmittal Letter with the Bid.
4.8.2 The Bids shall be tabulated, or a Bid abstract made. The opened Bids shall be available for public inspection at a reasonable time after Bid opening, but in any case, before contract award, except to the extent the Bidder designates trade secrets or other proprietary data to be confidential as set forth in this solicitation. Material so designated as confidential shall accompany the Bid and shall be readily separable from the Bid in order to facilitate public inspection of the non-confidential portion of the Bid, including the Total Bid Price.
4.8.3 For requests for information made under the PIA, the Procurement Officer shall examine the Bids to determine the validity of any requests for nondisclosure of trade secrets and other proprietary data identified in writing. Nondisclosure is permissible only if approved by the Office of the Attorney General.
4.9 Award Basis
4.9.1 A Contract shall be awarded to the responsible Bidder(s) submitting a responsive Bid with the most favorable bid price or most favorable evaluated bid price (as referenced in COMAR 21.05.02.13) for providing the goods and services as specified in this IFB. Bidders must bid on all line items. Partial or incomplete bids will be rejected unless otherwise stated in the solicitation. See IFB Section 6 for Bid evaluation and award information.
SOLICITATION NUMBER: BPM043203
IFB Document
4.9.2 Award of this contract will not be final and complete until after: (1) the Contractor submits complete and satisfactory documentation required under the Contract and/or documentation required by the Procurement Officer; and (2) the Contract is signed by the Department following any required approvals of the Contract, including approval by the Board of Public Works if such approval is required.
4.10 Tie Bids
Tie Bids will be decided pursuant to COMAR 21.05.02.14.
4.11 Duration of Bids
Bids submitted in response to this IFB are irrevocable for the latest of the following: 120 days following the Bid due date and time or the date any protest concerning this IFB is finally resolved. This period may be extended at the Procurement Officer’s request only with the Bidder’s written agreement.
4.12 Revisions to the IFB
4.12.1 If the IFB is revised before the due date for Bids, the Department of General Services shall post any addenda to the IFB on eMMA and shall endeavor to provide such addenda to all prospective Bidders that were sent this IFB or are otherwise known by the Procurement Officer to have obtained this IFB. It remains the responsibility of all prospective Bidders to check eMMA for any addenda issued prior to the submission of Bids.
4.12.2 Bidders shall acknowledge the receipt of all addenda to this IFB issued before the Bid due date.
4.12.3 Failure to acknowledge receipt of an addendum does not relieve the Bidder from complying with the terms, additions, deletions, or corrections set forth in the addendum, and may cause the Bid to be deemed not responsive.
4.13 Cancellations
4.13.1 The State reserves the right to cancel this IFB, accept or reject any and all Bids, in whole or in part, received in response to this IFB and to waive or permit the cure of minor irregularities.
4.13.2 In the event a government entity proposes and receives the recommendation for award, the procurement may be cancelled and the award processed in accordance with COMAR 21.01.03.01.A(4).
4.13.3 If the services that are the subject of the IFB are currently being provided under an interagency agreement with a public institution of higher education and the State determines that the services can be provided more cost effectively by the public institution of higher education, then the IFB may be cancelled in accordance with Md. Code Ann., State Finance and Procurement Art., § 3-207(b)(2).
4.14 Incurred Expenses
The State will not be responsible for any costs incurred by any Bidder in preparing and submitting a Bid or performing any other activities related to submitting a Bid in response to this solicitation.
SOLICITATION NUMBER: BPM043203
IFB Document
4.15 Protest/Disputes
Any protest or dispute related to this solicitation or the Contract award shall be subject to the provisions of COMAR 21.10 (Administrative and Civil Remedies).
4.16 Bidder Responsibilities
4.16.1 Bidders must be able to provide all goods and services and meet all of the requirements requested in this solicitation and the successful Bidder shall be responsible for Contract performance including any subcontractor participation.
4.16.2 If applicable, subcontractors utilized in meeting the established MBE or VSBE participation goal(s) for this solicitation shall be identified as provided in the appropriate Attachment(s) to this IFB (see Section 4.26 “MBE Participation Goal” and Section 4.27 “VSBE Goal”).
4.16.3 If the Bidder is the subsidiary of another entity, all information submitted by the Bidder, including but not limited to references, financial reports, or experience and documentation (e.g.
insurance policies, bonds, letters of credit) used to meet minimum qualifications, if any, shall pertain exclusively to the Bidder, unless the parent organization will guarantee the performance of the subsidiary. If applicable, the Bidder’s Bid shall contain an explicit statement, signed by an authorized representative of the parent organization, stating that the parent organization will guarantee the performance of the subsidiary.
4.16.4 A parental guarantee of the performance of the Bidder under this Section will not automatically result in crediting the Bidder with the experience or qualifications of the parent under any evaluation criteria pertaining to the actual Bidder’s experience and qualifications. Instead, the Bidder’s responsibility will be assessed to the extent to which the State determines that the experience and qualifications of the parent are applicable to and shared with the Bidder, any stated intent by the parent to be directly involved in the performance of the Contract, and the value of the parent’s participation as determined by the State.
4.17 Acceptance of Terms and Conditions
By submitting a Bid in response to this IFB, the Bidder, if selected for award, shall be deemed to have accepted the terms and conditions of this IFB and the Contract, attached hereto as Attachment M.
Any exceptions to this IFB or the Contract must be raised prior to Bid submission. Changes to the solicitation, including the Bid Form or Contract, made by the Bidder may result in Bid rejection.
4.18 Bid/Proposal Affidavit
A Bid submitted by the Bidder must be accompanied by a completed Bid/Proposal Affidavit. A copy of this Affidavit is included as Attachment C of this IFB.
4.19 Contract Affidavit
All Bidders are advised that if a Contract is awarded as a result of this solicitation, the successful Bidder will be required to complete a Contract Affidavit. A copy of this Affidavit is included for informational purposes as Attachment N of this IFB. This Affidavit must be provided within five (5) Business Days of notification of recommended award. For purposes of completing Section “B” of this Affidavit (Certification of Registration or Qualification with the State Department of Assessments and Taxation), a business entity that is organized outside of the State of Maryland is considered a “foreign” business.
SOLICITATION NUMBER: BPM043203
IFB Document
4.20 Compliance with Laws/Arrearages
By submitting a Bid in response to this IFB, the Bidder, if selected for award, agrees that it will comply with all federal, State, and local laws applicable to its activities and obligations under the Contract.
By submitting a response to this solicitation, each Bidder represents that it is not in arrears in the payment of any obligations due and owing the State, including the payment of taxes and employee benefits, and shall not become so in arrears during the term of the Contract if selected for Contract award.
4.21 Verification of Registration and Tax Payment
Before a business entity can do business in the State, it must be registered with the State Department of Assessments and Taxation (SDAT). SDAT is located at State Office Building, Room 803, 301 West Preston Street, Baltimore, Maryland 21201. For registration information, visit https://www.egov.maryland.gov/businessexpress.
It is strongly recommended that any potential Bidder complete registration prior to the Bid due date and time. The Bidder’s failure to complete registration with SDAT may disqualify an otherwise successful Bidder from final consideration and recommendation for Contract award.
4.22 False Statements
Bidders are advised that Md. Code Ann., State Finance and Procurement Article, § 11-205.1 provides as follows:
4.22.1 In connection with a procurement contract a person may not willfully:
a) Falsify, conceal, or suppress a material fact by any scheme or device.
b) Make a false or fraudulent statement or representation of a material fact.
c) Use a false writing or document that contains a false or fraudulent statement or entry of a material fact.
4.22.2 A person may not aid or conspire with another person to commit an act under Section 4.22.1.
4.22.3 A person who violates any provision of this section is guilty of a felony and on conviction is subject to a fine not exceeding $20,000 or imprisonment not exceeding five (5) years or both.
4.23 Payments by Electronic Funds Transfer
By submitting a Bid in response to this solicitation, the Bidder, if selected for award:
4.23.1 Agrees to accept payments by electronic funds transfer (EFT) unless the State Comptroller’s Office grants an exemption. Payment by EFT is mandatory for contracts exceeding $200,000.
The successful Bidder shall register using the COT/GAD X-10 Vendor Electronic Funds (EFT) Registration Request Form.
4.23.2 Any request for exemption must be submitted to the State Comptroller’s Office for approval at the address specified on the COT/GAD X-10 form, must include the business identification information as stated on the form, and must include the reason for the exemption. The COT/GAD X-10 form may be downloaded from the Comptroller’s website at:
http://comptroller.marylandtaxes.com/Vendor_Services/Accounting_Information/Static_Files/G ADX10Form20150615.pdf.
SOLICITATION NUMBER: BPM043203
IFB Document
4.24 Prompt Payment Policy
This procurement and the Contract(s) to be awarded pursuant to this solicitation are subject to the Prompt Payment Policy Directive issued by the Governor’s Office of Small, Minority & Women Business Affairs (GOSBA) and dated August 1, 2008. Promulgated pursuant to Md. Code Ann., State Finance and Procurement Article, §§ 11-201, 13-205(a), and Title 14, Subtitle 3, and COMAR
21.01.01.03 and 21.11.03.01, the Directive seeks to ensure the prompt payment of all subcontractors on non-construction procurement contracts. The Contractor shall comply with the prompt payment requirements outlined in the Contract, Section 31 “Prompt Pay Requirements” (see Attachment M).
Additional information is available on GOSBA’s website at:
http://www.gomdsmallbiz.maryland.gov/documents/legislation/promptpaymentfaqs.pdf.
4.25 Electronic Procurements Authorized
4.25.1 Under COMAR 21.03.05, unless otherwise prohibited by law, the Department of General
Services may conduct procurement transactions by electronic means, including the solicitation, proposing, award, execution, and administration of a contract, as provided in Md. Code Ann., Maryland Uniform Electronic Transactions Act, Commercial Law Article, Title 21.
4.25.2 Participation in the solicitation…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .