This is a set of construction plans for the Pino Lane Wastewater Improvements project (CIP#6943.071), a capital improvement project by the City of Austin, Texas, involving Austin Water Utility. The project encompasses wastewater infrastructure improvements along Pino Lane and adjacent streets (Dove Springs Drive, Dovehill Drive, Dovewood Drive, Dovemeadow Drive, Dove Drive, and Natural Channel) in Austin, Travis County. The scope includes installation of approximately 1,263 linear feet of 8-inch wastewater mains and 245 linear feet of 15-inch wastewater mains, along with 11 wastewater service connections totaling 136 linear feet of 18-inch pipe. The work involves removing and replacing existing deteriorated wastewater infrastructure, abandoning obsolete lines, and performing necessary pavement repairs. The project location spans from 5903 to 6205 Pino Lane, Austin, Texas 78744, in the Williamson Creek Watershed (suburban classification). The plans were prepared by MWM DesignGroup with professional engineer Anthony D. Buonodono (License #103439) and submitted to Austin Water for 90% review status as of May 27, 2026, with an approval date of July 1, 2026.
The plans include detailed erosion and sedimentation control measures, traffic control requirements, tree protection specifications, and pavement repair details across 45 sheets. Construction activities must comply with City of Austin environmental criteria, Chapter 25 of the City Code, and standard specifications. The project is not located within the 100-year floodplain, Edwards Aquifer recharge zones, or on parkland. Contractor responsibilities include utility location verification through One Call 811 notification 48 hours prior to work, installation of temporary erosion controls before site preparation, pre-construction conference coordination, and daily inspection and maintenance of erosion controls. Water pressure zones for the project are identified at two locations with minimum, typical, and maximum pressure readings. All materials must be listed on the Austin Water Standard Products List, and testing and sterilization of waterlines shall follow City Standard Specification Items 510.3(27)-(29).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_9000_ACA1011REBID_PAC1_v1.pdf | ||
| IFB_7800_MLJ1045_BID_DOC_v1.pdf | ||
| IFB_9000_ACA1011REBID_0600_v1.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
17.5' DRAINAGE & P.U.E.
PUBLIC GREENBELT & DRAINAGE EASEMENT
' P
.U .E
D
RA
IN
AG
E
EA
SE
ME
NT
70' D.E.
.5
DR
AI
NA
GE
E
AS
EM
EN
T
P.
U.
E.
' D
RA
IN
AG
E
EA
SE
ME
NT
A
ND
P .U .E
' E
.E.
' E .E.
7.5'/10'/15' P.U.E.
P.
U.
E.
E.
T.E
P.U.E.
D.E.
D.
E.
10' SANITARY SEW
ER EASEMENT
'/1
5' P .U .E
5'/10'/15' P.U.E.
10'
DRAI
NAG
E EA
SEME
NT
' D
RA
IN
AG
E
EA
SE
ME
NT
P .U .E
ACCESS & P.U.E.
7.5 ' P
.U .E.
5'/7.
5'/10
' P.U .E.
' E
.E.
P.U.E.
' S
AN
ITA
RY
S
EW
ER
E
AS
EM
EN
T
7.
5' P .U .E
' D .E.
10'/15' P.U.E.
' E
.E.
7.5 '/1 0' P.U
.E.
7.
5' P .U .E
7.
5' /1 0' P
.U .E
'/1
5' P .U .E
DRAINAGE AND PUBLIC UTILITY EASEMENT
' E
.E.
10' S.E.
7.5' P.U.E.
7.5' P.U.E.
5' /7 .5 ' P
.U .E
15' P.U.E.
' P
.U.
E.
7.
5' P .U .E
' S
AN
ITA
RY
S
EW
ER
E
AS
EM
EN
T
7.
5' /1 0' /1 5' P .U .E
' E
LE
CT
RIC
E
AS
EM
EN
T
7.5'/10' P.U.E.
15' P.U.E.
7.5' P.U.E.
7.5'/10'/15' P.U.E.
5'/10'/15' P.U.E.
7.5'/10' P.U.E.
3' P .U .E
7.5' P.U.E.
'/1 5'
P.U .E.
7.5 ' P
.U .E.
7.
5' /1 0' P .U .E
3' /5 ' P
.U .E
' E
.E.
7.5'/10'/15' P.U.E.
' E .E.
7.5'/10' P.U.E.
10' E.E.
7.5'/10' P.U.E.
7.
5' /1 0' P .U .E
5'/10' P.U.E.
10' W.W.E & P.U.E.
7.5' P.U.E.
' S
AN
ITA
RY
S
EW
ER
E
AS
EM
EN
T
3' /5 ' P
.U .E.
TURNSTONE DR
PI
NO
L N
TU
RT
LE
D
OV
E
DR
DOVE DR
DOVEWOOD DR
DOVEHILL DR
DOVE SPRINGS DR
DOVE SPRINGS DR
DOVEMEADOW
DR
CR
EE
K
BE
ND
D
R
TU
RN
ST
ON
E
DR
DO
VE
C
RE
EK
D
R
WILLIAMSON CREEK
PI
NO
L N
NA
TU
RA
L
CH
AN
NE
L
NATURAL CHANNEL
NOTES:
NOTES:
GENERAL PERMIT PROGRAM APPROVAL DOES NOT CONSTITUTE UTILITY ALIGNMENT/ASSIGNMENT APPROVAL.
RELEASE OF THIS APPLICATION DOES NOT CONSTITUTE A VERIFICATION OF ALL DATA, INFORMATION AND CALCULATIONS SUPPLIED BY THE APPLICANT. THE ENGINEER OF RECORD IS SOLELY RESPONSIBLE FOR THE COMPLETENESS, ACCURACY, AND ADEQUACY OF HIS/HER SUBMITTAL, WHETHER OR NOT THE APPLICATION IS REVIEWED FOR CODE COMPLIANCE BY CITY ENGINEERS.
PINO LANE
WW IMPROVEMENTS
SUBPROJECT ID: CIP#6943.071
WASTEWATER ID NO. S-2026-0005
CITY OF AUSTIN, TEXAS
LOCATION MAP
N.T.S.MAPSCO: MAP 674D
COA GRID: H15
GENERAL PERMIT PROGRAM CORRECTIONS RECORD
FOR USE BY GENERAL PERMIT OFFICE ONLY
NO DESCRIPTION BY
CORRECT (C)
ADD (D)
VOID (V)
SHEET NO.'s
TOTAL #
SHEETS IN
CORRECTION
PLAN SET
GENERAL
PERMIT
PROGRAM
APPROVAL
APPROVAL DATE
1. CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS DEPARTMENT 24 HOURS PRIOR TO STARTING CONSTRUCTION OR CLEARING
OPERATIONS.
2. CONTRACTOR SHALL CALL "ONE CALL" AT 811 FOR UTILITY LOCATIONS AT LEAST 48 HOURS PRIOR TO ANY WORK IN CITY EASEMENTS
OR STREET RIGHT OF WAYS.
3. THIS PROJECT IS LOCATED WITHIN THE WILLIAMSON CREEK WATERSHED (CLASSIFIED AS SUBURBAN) AND SHALL BE DEVELOPED, CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH CHAPTER 25 OF THE CODE OF THE CITY OF AUSTIN.
4. NO PORTION OF THIS SITE IS LOCATED WITHIN PARKLAND OR LAND USED FOR PARK PURPOSES. (IF SUCH LAND IS INCLUDED, DOCUMENTATION OF PARKS AND RECREATION DEPT APPROVAL IS REQUIRED AT THE TIME OF SUBMITTAL FOR GENERAL PERMIT
PROGRAM APPROVAL.)
5. NO PORTION OF THIS SITE IS LOCATED WITHIN THE 100-YEAR FLOODPLAIN, PER CITY OF AUSTIN AND FEDERAL EMERGENCY
MANAGEMENT AGENCY FLOOD INSURANCE RATE MAP(S) NO 48453CO585H, DATED 9/26/2008.
6. THIS PROJECT IS NOT WITHIN THE EDWARDS AQUIFER RECHARGE ZONE AS DEFINED BY THE CITY OF AUSTIN. THIS PROJECT IS NOT WITHIN THE EDWARDS AQUIFER RECHARGE ZONE AS REGULATED BY THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ).
7. THERE ARE NO CRITICAL ENVIRONMENTAL FEATURES WITHIN 150' OF ANY PORTION OF THIS PROJECT. A FIELD INVESTIGATION HAS NOT BEEN PERFORMED AS A PART OF THIS PROJECT. (A FIELD INVESTIGATION HAS NOT BEEN PERFORMED AS A PART OF THIS
PROJECT AND IS NOT REQUIRED.)
8. THE STANDARD SHEETS INCLUDED IN THIS PLAN SET WERE PROVIDED BY THE GENERAL PERMIT PROGRAM OFFICE FOR USE ON GENERAL PERMIT PROJECTS ONLY. IF ANY MODIFICATIONS TO THE SHEETS WERE MADE, THEY ARE CLEARLY INDICATED ON THE
SHEET ITSELF AND IN THE COVER SHEET INDEX.
9. ADDITIONAL TRENCH E/S CONTROL: TRIANGULAR SEDIMENT FILTER DIKE WILL BE INSTALLED ACROSS FULL WIDTH OF TRAFFIC CLOSURE AND DOWNSTREAM OF CONSTRUCTION AREA, PERPENDICULAR TO CURB. FILTER DIKE TO FOLLOW ACTIVE CONSTRUCTION.
REMOVING AND RE-SETTING FILTER DIKE IS CONSIDERED SUBSIDIARY TO BARRICADES AND TRAFFIC HANDLING.
10. PROJECT SCHEDULE MUST BE APPROVED BY THE GENERAL PERMIT PROGRAM (GPP) COORDINATOR. INSTALLATION AND REMOVAL OF TEMPORARY AND PERMANENT EROSION/SEDIMENTATION CONTROLS MUST BE REFLECTED IN THE SCHEDULE, BY STATION NUMBER.
GPP INSPECTOR MUST BE NOTIFIED A MINIMUM OF 48 HOURS IN ADVANCE OF TRANSITION BETWEEN PHASES.
11. APPROPRIATE EASEMENTS/APPROVALS MUST BE SECURED AND DOCUMENTED FOR PROJECT AREAS LOCATED OUTSIDE OF RIGHT OF WAYS. NO WORK SHALL BE PERFORMED WITHIN THESE AREAS UNTIL ASSOCIATED RIGHT OF ENTRY HAS BEEN SECURED.
ADDITIONALLY, THIS PROJECT WILL NOT BE CONSIDERED COMPLETE UNTIL ALL RECORDED EASEMENT DOCUMENT NUMBERS HAVE
BEEN OBTAINED AND SHOWN ON PLANS.
12. CONTRACTOR SHALL STAKE ALL PROPOSED SERVICE CONNECTIONS LOCATED WITHIN THE CRITICAL ROOT ZONE OF TREES 8" IN CALIPER AND LARGER AT LEAST 21 CALENDAR DAYS PRIOR TO CONSTRUCTION OF SUCH SERVICES. STAKING SHALL CONSIST OF A LATH WITH NAIL AND PAINT MARKINGS. IN CASES WHERE A STAKE CANNOT BE PLACED WITHOUT DAMAGING PROPERTY, CONTRACTOR MAY USE PAINT ONLY. ONCE STAKING IS COMPLETED, IT IS THE CONTRACTOR'S RESPONSIBILITY TO INFORM THE CITY OF AUSTIN'S CONSTRUCTION INSPECTOR WITHIN TWENTY-FOUR HOURS. THE CITY OF AUSTIN'S CONSTRUCTION INSPECTOR WILL THEN COORDINATE A FIELD REVIEW OF THE SERVICE LOCATIONS WITH THE GENERAL PERMIT PROGRAM COORDINATOR AND PROPERTY OWNERS. SERVICE LINE LOCATIONS MAY BE ADJUSTED BASED ON THE REVIEW AND WILL BE RESTAKED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE CONTRACT. ALL SERVICE LINE STAKING SHALL BE MAINTAINED UNTIL THE SERVICE IS INSTALLED.
G
EN
ER
AL
P
ER
M
IT
P R
O G
R
AM
5/
/2
:2
AM
Y:
\0
-0
A-
PI
N O
_W W
\W
PD
_P
IN
O _W
W
TR
\C
AD
\P R
O D
U C
TI
O
N _F
IL
ES
\D W
G \P
IN
O
-G -G
N -C
O
VR
.D W
G , C
O A_
PD
F_
X3
4, C
O A_
PL
O
T_
ST
YL
ES
.S
TB
D W
AY
N
E H
O
LL
IN
S
PROJECT INFORMATION:
STREET ADDRESS:
5903 - 6205 PINO LN
AUSTIN, TX 78744
PROJECT MANAGEMENT:
CITY OF AUSTIN
PROFESSIONAL SERVICES DIVISION
CAPITAL CONTRACTING OFFICE
CITY OF AUSTIN
PO BOX 1088
AUSTIN, TEXAS 78767
CLIENT/SPONSOR:
CITY OF AUSTIN
AUSTIN WATER UTILITY
CONTACT:
JAVIER RAMIREZ
PHONE: (512) 924-0024
EMAIL: javier.ramirez@austintexas.gov
CONTACT:
DANIEL KANKEL
PHONE:(512) 974-7730
EMAIL: Daniel.Kankel@austintexas.gov
CONTACT:
TONY BUONODONO, P.E.
PHONE: 512.576.1080
EMAIL: tony.buonodono@mwmdg.com
G-001 1 OF 45
PROJECT LOCATION
WATER PRESSURE ZONE: CENTRAL SOUTH
LOCATION MIN. TYP. MAX.
PINO LN/DOVE SPRINGS DR 58.01 66.67 71.00
PINO LN/DOVE DR 54.55 63.20 67.53
AULCC NUMBER
UCC-231207-02-01
SUBMITTAL PREPARED BY:
5/27/26
PI
N
O L
AN
E
W W
IM
PR
O
VE
M
EN
TS
THIS DOCUMENT IS RELEASED FOR
THE PURPOSE OF INTERIM REVIEW
UNDER
THE AUTHORITY OF
IT IS NOT TO BE USED FOR
CONSTRUCTION, BIDDING OR
PERMIT PURPOSES.
DRAFT
5/27/2026.
LIC. # 103439
ANTHONY D. BUONODONO, P.E.
90%
9001 N. IH35
Suite 102 Austin, Texas 78753 p: 512.453.0767 f: 512.453.1734
TBAE FIRM REGISTRATION NO.: 1452
TBPE FIRM REGISTRATION NO.: F-1416
TBPLS FIRM REGISTRATION NO.: 10065600
AUSTIN WATER UTILITY DEPARTMENT
05/28/2026
AUSTIN WATER
PIPELINE ENGINEERING DEPARTMENT
DATE
07/01/2026
FO/OM
OF
R
EV
N
O
SURVEY BY
DRAWN BY
CHECKED BY
DESIGNED BY
REVIEWED BY
NOTES NAME DATE
BY
D
AT
E
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N C
IT
Y
O F
AU
ST
IN
, T
EX
AS
PI
N
O L
AN
E
W W
IM
PR
O
VE
M
EN
TS
IN
D
EX
SH
EE
T
SH
EE
T
IN
D
EX
CIP#6943.071
G-002 2 45
MWM 08/08/2023
JCS 9/29/2023
JCS 9/29/2023
AW 9/29/2023
ESD
4/
/2
9:
A
M Y:
\0
-0
A-
PI
N O
_W W
\W
PD
_P
IN
O _W
W
TR
\C
AD
\P R
O D
U C
TI
O
N _F
IL
ES
\D W
G \P
IN
O
-G -G
N
-IN
D X.
D W
G , C
O A_
PD
F_
X3
4, C
O A_
PL
O
T_
ST
YL
ES
.S
TB
D W
AY
N
E H
O
LL
IN
S
AU
ST
IN
W
AT
ER
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
ES
D
IV
IS
IO
N
9001 N. IH35
Suite 102 Austin, Texas 78753 p: 512.453.0767 f: 512.453.1734
TBAE FIRM REGISTRATION NO.: 1452
TBPE FIRM REGISTRATION NO.: F-1416
TBPLS FIRM REGISTRATION NO.: 10065600
1/
/2
SHEET INDEX
PAGE NUMBER SHEET NUMBER SHEET TITLE
1 G-001 COVER SHEET
2 G-002 SHEET INDEX
3 G-003 LEGEND SHEET
4 G-004 ABBREVIATIONS SHEET
5 G-005 CIP GEN NOTES SHEET
6 CE-001 EROSION AND SEDIMENTATION CONTROL NOTES 1 OF 2
7 CE-002 EROSION AND SEDIMENTATION CONTROL NOTES 2 OF 2
8 CE-003 CONTROL POINT TABLE AND TREE LIST
9 CE-101 PROPOSED EROSION AND SEDIMENTATION CONTROL PLAN
10 CW-101 WASTEWATER OVERVIEW PLAN
11 CD-101 PROPOSED WASTEWATER DEMOLITION PLAN
12 CW-201 PROPOSED WWL-A STA 1+00 - END - DOVE SPRINGS DRIVE
13 CW-202 PROPOSED WWL-B STA 1+00 - 4+50 - PINO LANE
14 CW-203 PROPOSED WWL-B STA 4+50 - 8+50 - PINO LANE
15 CW-204 PROPOSED WWL-B STA 8+50 - 11+15 - PINO LANE
16 CW-205 PROPOSED WWL-B STA 11+15 - END - PINO LANE
17 CW-206 PROPOSED WWL-C STA 1+00 - END - DOVEHILL DR
18 CW-207 PROPOSED WWL-D STA 1+00 - END - DOVEWOOD DR
19 CW-208 PROPOSED WWL-E STA 1+00 - END - DOVEMEADOW DR
20 CW-209 PROPOSED WWL-F STA 1+00 - END - DOVE DR
21 CW-210 PROPOSED WWL-G STA 1+00 - 8+00 - NATURAL CHANNEL
22 CW-211 PROPOSED WWL-G STA 8+00- END - NATURAL CHANNEL
23 CW-501 WASTEWATER DETAILS 1 OF 3
24 CW-502 WASTEWATER DETAILS 2 OF 3
25 CW-503 WASTEWATER DETAILS 3 OF 3
26 CP-101 PROPOSED PAVEMENT PLAN
27 CP-501 PAVEMENT REPAIR DETAILS 1 OF 3
28 CP-502 PAVEMENT REPAIR DETAILS 2 OF 3
29 CP-503 PAVEMENT REPAIR DETAILS 3 OF 3
30 CT-001 TRAFFIC CONTROL GENERAL NOTES
31 CT-002 TEMPORARY TRAFFIC CONTROL OVERALL LAYOUT
32 CT-101 TRAFFIC CONTROL PLAN 1 OF 10
33 CT-102 TRAFFIC CONTROL PLAN 2 OF 10
34 CT-103 TRAFFIC CONTROL PLAN 3 OF 10
35 CT-104 TRAFFIC CONTROL PLAN 4 OF 10
36 CT-105 TRAFFIC CONTROL PLAN 5 OF 10
37 CT-106 TRAFFIC CONTROL PLAN 6 OF 10
38 CT-107 TRAFFIC CONTROL PLAN 7 OF 10
39 CT-108 TRAFFIC CONTROL PLAN 8 OF 10
40 CT-109 TRAFFIC CONTROL PLAN 10 OF 10
41 CT-501 TCP DETAILS 1 OF 4
42 CT-502 TCP DETAILS 2 OF 4
43 CT-503 TCP DETAILS 3 OF 4
44 CT-504 TCP DETAILS 4 OF 4
45 CT-505 TCP SPECIAL DETAIL WWTR SERVICE
05/28/2026
AW-
AW-
AW-
AW-
AW-
AW-
AW-
AW-
AW-
AW-
AW-
AW-
AW-
AW-
AW-
AW-
AW-
AW-
AW-
AW-
AW-
July 01, 2026
Mary Ann C. Cramer
MULTICORELINK:PINO-G-GN-COVR-G001
MULTICORELINK:PINO-G-GN-COVR-G001
MULTICORELINK:PINO-G-GN-LGND-G003
MULTICORELINK:PINO-G-GN-LGND-G003
MULTICORELINK:PINO-G-GN-ABRV-G004
MULTICORELINK:PINO-G-GN-ABRV-G004
MULTICORELINK:PINO-G-GN-NOTE-G005
MULTICORELINK:PINO-G-GN-NOTE-G005
MULTICORELINK:PINO-C-EV-NOTE_GN-CE001
MULTICORELINK:PINO-C-EV-NOTE_GN-CE001
MULTICORELINK:PINO-C-EV-NOTE_GN-CE002
MULTICORELINK:PINO-C-EV-NOTE_GN-CE002
MULTICORELINK:PINO-C-EV-NOTE_GN-CE003
MULTICORELINK:PINO-C-EV-NOTE_GN-CE003
MULTICORELINK:PINO-C-CE-EROS - (1)-(1)
MULTICORELINK:PINO-C-CE-EROS - (1)-(1)
MULTICORELINK:PINO-G-WW-OVRV-G101
MULTICORELINK:PINO-G-WW-OVRV-G101
MULTICORELINK:PINO-G-WW-ABAN-G101
MULTICORELINK:PINO-G-WW-ABAN-G101
MULTICORELINK:PINO-C-WW-PLPR - (1)-(1)
MULTICORELINK:PINO-C-WW-PLPR - (1)-(1)
MULTICORELINK:PINO-C-WW-PLPR - (1)-(2)
MULTICORELINK:PINO-C-WW-PLPR - (1)-(2)
MULTICORELINK:PINO-C-WW-PLPR - (1)-(3)
MULTICORELINK:PINO-C-WW-PLPR - (1)-(3)
MULTICORELINK:PINO-C-WW-PLPR - (1)-(4)
MULTICORELINK:PINO-C-WW-PLPR - (1)-(4)
MULTICORELINK:PINO-C-WW-PLPR - (1)-(5)
MULTICORELINK:PINO-C-WW-PLPR - (1)-(5)
MULTICORELINK:PINO-C-WW-PLPR - (4)-1
MULTICORELINK:PINO-C-WW-PLPR - (4)-1
MULTICORELINK:PINO-C-WW-PLPR - (3)-(1)
MULTICORELINK:PINO-C-WW-PLPR - (3)-(1)
MULTICORELINK:PINO-C-WW-PLPR - (3)-(2)
MULTICORELINK:PINO-C-WW-PLPR - (3)-(2)
MULTICORELINK:PINO-C-WW-PLPR - (4)-2
MULTICORELINK:PINO-C-WW-PLPR - (4)-2
MULTICORELINK:PINO-C-WW-PLPR - (2)-(1)
MULTICORELINK:PINO-C-WW-PLPR - (2)-(1)
MULTICORELINK:PINO-C-WW-PLPR - (2)-(2)
MULTICORELINK:PINO-C-WW-PLPR - (2)-(2)
MULTICORELINK:PINO-C-WW-DETL-1
MULTICORELINK:PINO-C-WW-DETL-1
MULTICORELINK:PINO-C-WW-DETL-2
MULTICORELINK:PINO-C-WW-DETL-2
MULTICORELINK:PINO-C-WW-DETL-3
MULTICORELINK:PINO-C-WW-DETL-3
MULTICORELINK:PINO-G-WW-PAVE-G101
MULTICORELINK:PINO-G-WW-PAVE-G101
MULTICORELINK:PINO-C-CP-DETL-1
MULTICORELINK:PINO-C-CP-DETL-1
MULTICORELINK:PINO-C-CP-DETL-2
MULTICORELINK:PINO-C-CP-DETL-2
MULTICORELINK:PINO-C-CP-DETL-3
MULTICORELINK:PINO-C-CP-DETL-3
MULTICORELINK:PINO-C-TC-NOTE-CT001
MULTICORELINK:PINO-C-TC-NOTE-CT001
MULTICORELINK:PINO-C-TC-OVRV-CT101
MULTICORELINK:PINO-C-TC-OVRV-CT101
MULTICORELINK:PINO-C-TC-PLAN-1-CT101
MULTICORELINK:PINO-C-TC-PLAN-1-CT101
MULTICORELINK:PINO-C-TC-PLAN-2-CT102
MULTICORELINK:PINO-C-TC-PLAN-2-CT102
MULTICORELINK:PINO-C-TC-PLAN-3-CT103
MULTICORELINK:PINO-C-TC-PLAN-3-CT103
MULTICORELINK:PINO-C-TC-PLAN-4-CT104
MULTICORELINK:PINO-C-TC-PLAN-4-CT104
MULTICORELINK:PINO-C-TC-PLAN-5-CT105
MULTICORELINK:PINO-C-TC-PLAN-5-CT105
MULTICORELINK:PINO-C-TC-PLAN-6-CT106
MULTICORELINK:PINO-C-TC-PLAN-6-CT106
MULTICORELINK:PINO-C-TC-PLAN-7-CT107
MULTICORELINK:PINO-C-TC-PLAN-7-CT107
MULTICORELINK:PINO-C-TC-PLAN-8-CT108
MULTICORELINK:PINO-C-TC-PLAN-8-CT108
MULTICORELINK:PINO-C-TC-DETL-CT502
MULTICORELINK:PINO-C-TC-DETL-CT502
MULTICORELINK:PINO-C-TC-DETL-CT503
MULTICORELINK:PINO-C-TC-DETL-CT503
MULTICORELINK:PINO-C-TC-DETL-CT504
MULTICORELINK:PINO-C-TC-DETL-CT504
PROPOSED FEATURESEXISTING FEATURES
CENTERLINE
RIGHT OF WAY LINE
PROPERTY LINE
EASEMENT LINE
FLOOD HAZARD ZONE 25 YEAR
FLOOD HAZARD ZONE 100 YEAR
CRITICAL WATER QUALITY ZONE
TRANSITION WATER QUALITY ZONE
DRAINAGE EDGE
DRAINAGE CENTERLINE
DITCH EDGE
TIME OF CONCENTRATION
MAJOR CONTOURS
MINOR CONTOURS
PAVED ROADWAY EDGE
PAVED ROADWAY DEMOLITION
GRAVEL ROADWAY EDGE
PAVED PARKING / DRIVEWAY EDGE
PAVED PARKING / DRIV. EDGE DEMO
SIDEWALK EDGE
SIDEWALK EDGE DEMOLITION
PAVED SITE FEATURES
PAVED SITE FEATURES DEMOLITION
CURB LINE
CURB LINE DEMOLITION
BUILDING LINE
GUARDRAIL
GUARDRAIL DEMOLITION
HANDRAIL
HANDRAIL DEMOLITION
CHAINLINK FENCE
STEEL FENCE
FENCE DEMOLITION - GENERAL
STONE / ROCK WALL
BRICK WALL
TRANSVERSE JOINT
LONGITUDINAL JOINT
EROSION ROCK BERM
EROSION DIVERSION DIKE
EROSION MULCH SOCK
EROSION SILT FENCE
EROSION TRI-FILTER DIKE
EROSION TREE PROTECTION
LIMITS OF CONSTRUCTION
COMMUNICATION OVERHEAD
COMMUNICATION UNDERGROUND
COMMUNICATION DEMOLITION
CHILLED WATER LINE
CHILLED WATER TO ABANDON
CHILLED WATER DEMOLITION
ELECTRIC OVERHEAD
ELECTRIC UNDEGROUND
ELECTRIC DEMOLITION
FIBER OVERHEAD
FIBER UNDERGROUND
FIBER DEMOLITION
IRRIGATION LINE
IRRIGATION TO ABANDON
IRRIGATION DEMOLITION
NATURAL GAS LINE
NATURAL GAS TO ABANDON
NATURAL GAS DEMOLITION
RECLAIMED WATER LINE
RECLAIMED WATER TO ABANDON
RECLAIMED WATER DEMOLITION
CENTERLINE
RIGHT OF WAY LINE
PROPERTY LINE
EASEMENT LINE
FLOOD HAZARD ZONE 25 YEAR
FLOOD HAZARD ZONE 100 YEAR
CRITICAL WATER QUALITY ZONE
TRANSITION WATER QUALITY ZONE
DRAINAGE AREA EDGE
DRAINAGE CENTERLINE
DITCH EDGE
TIME OF CONCENTRATION
MAJOR CONTOURS
MINOR CONTOURS
PAVED ROADWAY EDGE
PAVED PARKING / DRIVEWAY EDGE
GRAVEL ROADWAY EDGE
SIDEWALK EDGE
PAVED SITE FEATURES
CURB LINE
BUILDING LINE
GUARDRAIL
HANDRAIL
CHAINLINK FENCE
BARBWIRE FENCE
WOOD FENCE
STEEL FENCE
FENCE LINE
STONE / ROCK WALL
BRICK WALL
TREE LINE
AUDIO - TV - GENERAL
COMMUNICATION OVERHEAD
COMMUNICATION UNDERGROUND
CHILLED WATER LINE
CHILLED WATER ABANDONED
ELECTRIC OVERHEAD
ELECTRIC UNDEGROUND
FIBER - GENERAL
IRRIGATION LINE
IRRIGATION ABANDONED
NATURAL GAS LINE
NATURAL GAS ABANDONED
RECLAIMED WATER LINE
RECLAIMED WATER ABANDONED
PETROLEUM - GENERAL
STORM LINE
STORM ABANDONED
TRAFFIC SIGNAL OVERHEAD
TRAFFIC SIGNAL UNDERGROUND
WATER LINE
WATER ABANDONED
WASTE WATER LINE
WASTE WATER ABANDONED
FORCE MAIN LINE
FORCE MAIN ABANDONED
BRASS DISK FOUND
BRASS DISK SET
BOLT FOUND
BOLT SET
BENCHMARK FOUND
BENCHMARK SET
CALCULATED POINT
CONTROL POINT FOUND
CONTROL POINT SET
COTTON SPINDLE FOUND
COTTON SPINDLE SET
DRILL HOLE FOUND
DRILL HOLE SET
HUB & TACK FOUND
HUB & TACK SET
IRON PIPE FOUND
IRON PIPE SET
IRON ROD FOUND
IRON ROD SET
MONUMENT FOUND
MONUMENT SET
MAGNAIL FOUND
MAGNAIL SET
NAIL FOUND
NAIL SET
PROPERTY PIN FOUND
PROPERTY PIN SET
TEMP BENCHMARK FOUND
TEMP BENCHMARK SET
TRAVERSE
CROSS FOUND
CROSS SET
BIKE RACK
BOLLARD
BENCH
BUS STOP
COLUMN CIRCULAR / RECTANG
FLAG POLE
GABION
GARBAGE CAN
GUARDRAIL POST
MAILBOX
PARKING METER
POST
SIGN
UTILITY MANHOLE UNKNOWN
UTILITY PED UNKNOWN
UTILITY JUNCTION BOX UNKN
UTILITY VAULT UNKNOWN
UTILITY VALVE UNKNOWN
UTILITY VENT UNKNOWN
SHRUB
TREE
RAILROAD SIGNAL
RAILROAD CONTROL / SWITCH
TEST PIT
BORE HOLE
STORM LINE
STORM TO ABANDON
STORM DEMOLITION
PERFORATED DRAIN
TRAFFIC SIGNAL OVERHEAD
TRAFFIC SIGNAL UNDERGROUND
TRAFFIC SIGNAL DEMOLITION
WATER LINE
WATER TO ABANDON
WATER DEMOLITION
WASTE WATER LINE
WASTE WATER TO ABANDON
WASTE WATER DEMOLITION
FORCE MAIN LINE
FORCE MAIN TO ABANDON
FORCE MAIN DEMOLITION
AUDIO - TV JUNCTION BOX
AUDIO - TV MANHOLE
AUDIO - TV VAULT
COMMUNICATION ANTENNA
COMM JUNCTION BOX
COMMUNICATION MANHOLE
COMMUNICATION PEDESTAL
COMMUNICATION POLE
COMMUNICATION RISER
COMMUNICATION VAULT
CHILLED WATER MANHOLE
CHILLED WATER VALVE
CHILLED WATER VAULT
ELECTRIC AC UNIT
ELECTRIC CABINET
ELECTRIC ANCHOR
ELECTRIC HANDHOLE
ELECTRIC JUNCTION BOX
ELEC LIGHT / FOUNDATION
ELECTRIC MANHOLE
ELECTRIC METER
ELECTRIC PULL BOX
ELECTRIC PED
ELECTRIC POWER POLE
ELECTRIC RISER
ELEC TRANSMISSION POLE
ELECTRIC TRANSFORMER
ELECTRIC VAULT
FIBER JUNCTION BOX
FIBER MANHOLE
FIBER VAULT
IRRIGATION CONTROL BOX
IRRIGATION CONTROL VALVE
IRRIGATION HOSE BIB
IRRIGATION METER
IRRG SPRINKLER CTRL VALVE
IRRIGATION SPRINKLER HEAD
NATURAL GAS LAMP
NATURAL GAS MANHOLE
NATURAL GAS METER
NATURAL GAS SRVC CONN
NATURAL GAS VAULT
NATURAL GAS VALVE
NATURAL GAS VENT
RECLAIMED WATER MAHOLE
RECLAIMED WATER METER
RECLAIMED WATER VAULT
RECLAIMED WATER VALVE
TRAFFIC CONTROL BOX / CABINET
TRAFFIC POLE FOUNDATION
TRAFFIC MANHOLE
TRAFFIC MAST
TRAFFIC PULL BOX
TRAF PEDESTRIAN SIGNAL
TRAFFIC PEDESTAL
TRAFFIC POLE
TRAFFIC VAULT
STORM AREA INLET
DRAINAGE ARROW
STORM CURB INLET
STORM INLET COVER
STORM CLEANOUT
STORM GRATE INLET
STORM HEADWALL
STORM JUNCTION BOX
STORM MANHOLE
STORM ROOF DRAIN
STORM WINGWALL
WASTE WATER AIR RLS VLV
WWTR BACKFLOW PRVN
WASTE WATER CLEANOUT
WASTE WATER FLOW METER
WASTE WATER LIFT STATION
WASTE WATER MANHOLE
WASTE WATER SRVC CONN
WASTE WATER VAULT
WASTE WATER VALVE
WASTE WATER VENT
WATER AIR FLUSH VALVE
WATER AIR RLS VALVE AUTO
WATER AIR RLS VALVE COMBO
WATER AIR RLS VLV MANUAL
WATER BACKFLOW PRVN
WATER BOUNDARY VALVE
WATER / WASTEWATER CAP
WATER CHECK VLV SINGLE
WATER CHECK VLV DOUBLE
WATER DRAINAGE MANHOLE
WATER DRAINAGE VALVE
WATER FAUCET
WATER FIRE CONNECTION
WATER FIRE HYDRANT
WATER FLOW METER
WATER FOUNTAIN
WATER HANDHOLE
WATER HYD PRSS RLS VLV
WATER MANHOLE
WATER / WWTR MAT CHANGE
WATER METER
WATER MONITOR WELL
WATER / WASTEWATER PLUG
WATER / WWTR PROJ. SEPR
WATER PRSS RLS VALVE
WATER PRSS SSTN VALVE
WATER / WWTR REDUCER
WATER RISER
WATER SRVC CONNECTION
WATER SHUTOFF VALVE
WATER VAULT
WATER VALVE
WATER VACM RELEASE VALVE
WATER VENT
WATER WELL
BIKE RACK
BOLLARD
BENCH
BUS STOP
COLUMN CIRCULAR / RECTANG
GABION
GARBAGE CAN
GUARDRAIL POST
MAILBOX
PARKING METER
POST
SIGN
SHRUB
TREE
RAILROAD SIGNAL
RAILROAD CONTROL / SWITCH
COMM JUNCTION BOX
COMMUNICATION MANHOLE
COMMUNICATION PEDESTAL
COMMUNICATION POLE
COMMUNICATION VAULT
CHILLED WATER MANHOLE
CHILLED WATER VALVE
ELECTRIC AC UNIT
ELECTRIC CABINET
ELECTRIC ANCHOR
ELECTRIC JUNCTION BOX
ELEC LIGHT / FOUNDATION
ELECTRIC MANHOLE
ELECTRIC METER
ELECTRIC PULL BOX
ELECTRIC PED
ELECTRIC POWER POLE
ELECTRIC RISER
ELECTRIC TRANSFORMER
ELECTRIC VAULT
FIBER JUNCTION BOX
FIBER MANHOLE
IRRIGATION CTRL BOX / VALVE
IRRIGATION HOSE BIB
IRRIGATION METER
IRRG SPRINKLER CTRL VALVE
IRRIGATION SPRINKLER HEAD
NATURAL GAS LAMP
NATURAL GAS MANHOLE
NATURAL GAS METER
NATURAL GAS SRVC CONN
NATURAL GAS VAULT
NATURAL GAS VALVE
NATURAL GAS VENT
RECLAIMED WATER MAHOLE
RECLAIMED WATER METER
RECLAIMED WATER VALVE
TRAFFIC CONTROL BOX / CABINET
TRAFFIC POLE FOUNDATION
TRAFFIC MANHOLE
TRAF MAST
TRAFFIC PULL BOX
TRAF PEDESTRIAN SIGNAL
TRAFFIC PEDESTAL
TRAFFIC POLE
TRAFFIC VAULT
STORM AREA INLET
DRAINAGE ARROW
STORM CURB INLET
STORM INLET COVER
STORM CLEANOUT
STORM GRATE INLET
STORM HEADWALL
STORM JUNCTION BOX
STORM MANHOLE
STORM ROOF DRAIN
STORM WINGWALL
WASTE WATER AIR RLS VLV
WWTR BACKFLOW PRVN
WASTE WATER CLEANOUT
WASTE WATER FLOW METER
WASTE WATER LIFT STATION
WASTE WATER MANHOLE
WASTE WATER SRVC CONN
WASTE WATER VALVE
WASTE WATER VENT
WATER AIR FLUSH VALVE
WATER AIR RLS VALVE AUTO
WATER AIR RLS VALVE COMBO
WATER AIR RLS VLV MANUAL
WATER BACKFLOW PRVN
WATER BOUNDARY VALVE
WATER / WASTEWATER CAP
WATER CHECK VLV SINGLE
WATER CHECK VLV DOUBLE
WATER DRAINAGE MANHOLE
WATER DRAINAGE VALVE
WATER FIRE CONNECTION
WATER FIRE HYDRANT
WATER FLOW METER
WATER HYD PRSS RLS VLV
WATER MANHOLE
WATER / WWTR MAT CHANGE
WATER METER
WATER MONITOR WELL
WATER / WASTEWATER PLUG
WATER / WWTR PROJ. SEPR
WATER PRSS RLS VALVE
WATER PRSS SSTN VALVE
WATER / WWTR REDUCER
WATER RISER
WATER SRVC CONNECTION
WATER VAULT
WATER VALVE
WATER VACM RELEASE VALVE
WATER VENT
CL
25Y 25Y
100Y 100Y
CWQZ CWQZ
WQTZ WQTZ
DR DR
TC TC
X X X
C OH C OH
C UG C UG
FO FO
TS OH TS OH
TS UG TS UG
E OH E OH
E UG E UG
CW CW
CW CW
G G G
G G G
R R R
R R R
W W
W W
BM
BM
U
TBM
TBM
BUS
PM
TP01
B01
CL
25Y 25Y
100Y 100Y
CWQZ CWQZ
WQTZ WQTZ
DR DR
TC TC
RB RB RB RB RB
DDK DDK DDK DDK
MS MS MS MS MS
SF SF SF SF SF
TFD TFD TFD TFD
LOC LOC
C OH C OH
C UG C UG
C C C
E OH E OH
E UG E UG
E E E
CW CW
CW CW
CW CW
DC
SD
WW
CP
CJ
C
C
C
EJ
E
E
E
E
CW
C W
GL
G
G
G
G
I C
S C
R
R R
TS
TSP
FO
FOJ
IR IR
IR IR
IR IR
WW
WW
CO
FW W
L
WW
W W
D
F
P
W
W
M
W W
W
EP
TRV
TV TV
IR IR
IR IR
PET PET
UJ
UP
U
U
U
RRCRRS
FO OH FO OH
FO UG FO UG
FO FO
G G G
G G G
G G G
R R R
R R R
R R R
TS OH TS OH
TS UG TS UG
TS TS
PD PD
W W
W W
C
CP
C
FO
FOJ
TS
TSP
EJ
E
E
E
E
TR
CW
C W
GL
G
G
G
G
I C
S C
R
R
R
CJ
EP
C
TVJ
TV
TV
ANT
C
CW
AC
EC
EH
EP
E
ET
FO
IRC
IR
G
G
R
TSP
TS
DC
SD
CO
WW
FW W
L
WW
WW
W W
SD
RD
W
W
S O
W
WL
D
F
WH
P
M
W
W
WW
WF
W
BUS
PM
RRC RRS
W
AC
EC
EP
E
ET
IR
G
G
TSP
TS
SD
RD
WW
W
W
IRC
TSCTSB
TSCTSB
GEOTECH BORE HOLE
SUE TEST HOLE
ASPHALTIC CONCRETE
TAN FLEX BASE
FAT CLAY (CH)
GEOTECH LEGEND
LEAN CLAY (CL)
CLAYEY GRAVEL (GC)
OF
R
EV
N
O
SURVEY BY
DRAWN BY
CHECKED BY
DESIGNED BY
REVIEWED BY
NOTES NAME DATE
BY
D
AT
E
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N C
IT
Y
O F
AU
ST
IN
, T
EX
AS
PI
N
O L
AN
E
W W
IM
PR
O
VE
M
EN
TS
LE
G
EN
D
SH
EE
T
LE
G
EN
D
S H
EE
T
CIP#6943.071
G-003 3 45
MWM 08/08/2023
JCS 9/27/2023
JCS 9/27/2023
AHW 9/27/2023
/2
9:
A
M Y:
\0
-0
A-
PI
N O
_W W
\W
PD
_P
IN
O _W
W
TR
\C
AD
\P R
O D
U C
TI
O
N _F
IL
ES
\D W
G \P
IN
O
-G -G
N -L
G N
D .D
W G
, C O
A_
PD
F_
X3 4, C O
A_
PL
O T_
ST
YL
ES
.S
TB
D
W
AY
N E
H O
LL
IN
S
AU
ST
IN
W
AT
ER
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
ES
D
IV
IS
IO
N
9001 N. IH35
Suite 102 Austin, Texas 78753 p: 512.453.0767 f: 512.453.1734
TBAE FIRM REGISTRATION NO.: 1452
TBPE FIRM REGISTRATION NO.: F-1416
TBPLS FIRM REGISTRATION NO.: 10065600
1/
/2
04/23/2026
1/
/2
05/28/2026
July 01, 2026
Mary Ann C. Cramer
1S SINGLE SERVICE
2S DOUBLE SERVICE
A
ABAN ABANDON
ABLT AS-BUILT
AATUR ABANDONED ACCORDING TO UTILITY RECORDS
AC ASBESTOS CEMENT
AC. ACRE
ACC ACCESSIBLE
AFV AIR FLUSH VALVE
AGGR AGGREGATE
ALGN ALIGNMENT
APPD APPROVED
APP. APPROXIMATE
APPX APPENDIX
AR AS REQUIRED
ARCH ARCHITECT
ASPH ASPHALT
ASSY ASSEMBLY
ATCH ATTACHMENT
ATTN ATTENTION
AUTO AUTOMATIC
AUX AUXILIARY
AV AIR VENT
ARV AIR RELEASE VALVE AUTO
ARVC AIR RELEASE VALVE COMBO
ARVM AIR RELEASE VALVE MANUAL
AW AUSTIN WATER UTILITY
B
BGN BEGIN (BEGINNING)
BC BACK OF CURB
BCV BUTTERFLY CHECK VALVE
BDNG BEDDING
BDRY BOUNDARY
BFV BUTTERFLY VALVE
BFP BACKFLOW PREVENTER
BLDG BUILDING
BLIN BASELINE
BLKT BLANKET
BLT BUILT
BLW BELOW
BMRK BENCHMARK
BOT BOTTOM
BRG BEARING
BTWN BETWEEN
BWIR BARBWIRE
C
C COMMUNICATION
CATV CABLE TELEVISION
C CONC CAST CONCRETE
C-C CENTER TO CENTER
CD CONSTRUCTION DOCUMENT
CG CURB & GUTTER
CF CUBIC FEET
CFS CUBIC FEET PER SECOND
CHK CHECK POINT
CI CAST IRON
CIP CAPITAL IMPROVEMENT PROJECT
CIPP CURED IN PLACE PIPE
C.I.P. CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLNK CHAINLINK
CLR CLEAR
CLS CLASSIFICATION
CMP CORRUGATED METAL PIPE
CNTR CENTER
CO CONDUIT
COCC CONCENTRIC
COJB COMMUNCATION JUNCTION BOX
COL COLUMN
COA CITY OF AUSTIN
CONC CONCRETE
COND CONDUIT
COMM COMMUNICATION
COMH COMMUNICATION MANHOLE
CONN CONNECT
CONT CONTINUED
COPD COMMUNCATION PED
COORD COORDINATE
COVR COVER
COVT COMMUNICATION VAULT
CPLG COUPLING
CPP CORRUGATED PLASTIC PIPE
CRZ CRITICAL ROOT ZONE
CS CARBON STEEL
CSC CONCRETE STEEL CYLINDER
CSG CASING
CTB CONCRETE TRAFFIC BARRIER
CTRL CONTROL
CUR CURRENT
CT CLAY TILE
CV CONTROL VALVE
CYL CYLINDER
CW CHILLED WATER
CWL CHILLED WATER LINE
CWMH CHILLED WATER MANHOLE
CWQZ CRITICAL WATER QUALITY ZONE
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
CWTR CHILLED WATER
CWV CHILLED WATER VALVE
CWVT CHILLED WATER VAULT
CY CUBIC YARD
D
D DEPTH
DB DUCT BANK
DD DISABLED
DA DRAINAGE AREA
DAT DATUM
DEFL DEFLECTION
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DESC. DESCRIPTION
DETL DETAIL
DETN DETENTION
DEV DEVELOPMENT
DI DUCTILE IRON PIPE
DIA DIAMETER
DIAG DIAGRAM
DIFF DIFFERENCE
DIMM DIMMENSION
DIR DIRECTION
DISC DISCONNECT
DISCH DISCHARGE
DIST DISTANCE
DIV DIVISION
DOC DOCUMENT
DR DRAIN
DRNG DRAINAGE
DRV DRIVEWAY
DSBL DISABLE
DOBL DOUBLE
DSGN DESIGN
DSPL DISPOSAL
DTCH DETACH
DUCT DUCT BANK
DUPL DUPLICATE
DWG DRAWING
E
E EAST / ELECTRIC
E/A ENGINEER/ARCHITECT
E/S EROSION /SEDIMENTATION
EA. EACH
EA EDGE OF ASPHALT
EC EDGE OF CONCRETE
ECC ECCENTRIC
EFF EFFECTIVE
EG EDGE OF GRAVEL
EJ EXPANSION JOINT
EL. ELEVATION
ELEC ELECTRIC
ELJB ELECTRIC JUNCTION BOX
ELMH ELECTRIC MANHOLE
ELMT ELECTRIC METER
ELVT ELECTRIC VAULT
ENC ENCASEMENT
ENGR ENGINEER
ENTR ENTRANCE
ENVIR ENVIRONMENT
EP EDGE OF PAVEMENT
EQ EQUAL
EQUIV EQUIVALENT
EROS EROSION
ES EDGE OF SHOULDER
ESC EROSION AND SEDIMENTATION CONTROL
ESD ENGINEERING SERVICES DIVISION
ESMT EASEMENT LINE
EST ESTIMATE
ETC ETCETERA
EX. EXISTING
EXC EXCAVATE
EXP EXPANSION
EXTN EXTENSION
F
F-F FACE TO FACE
FC FACE OF CONCRETE / CURB
FDBK FEEDBACK
FDC FIRE DEPARTMENT CONNECTION
FDU FUNDING DEPARTMENT UNIT
FENC FENCE
FEAT FEATURE
FF FINISHED FLOOR
FIBR FIBER OPTIC
FG FINISH GRADE
FH FIRE HYDRANT
FIGR FIGURE
FL. FLOWLINE
FLHA FLOOD HAZARD AREA
FLRD FLARED
FM FORCEMAIN
FN FENCE
FO FIBER OPTIC
FOMH FIBER OPTIC MANHOLE
FOVT FIBER OPTIC VAULT
FP FLOODPLAIN
FT FEET
FTNG FOOTING
FURN FURNISH
FUTR FUTURE
FW FIRE WATER LINE
G
G NATURAL GAS
GAL GALLON
GB GRADE BREAK
GEN GENERAL
GPM GALLONS PER MINUTE
GRAL GUARDRAIL
GRLN GRADE LINE
GRDN GARDEN
GRND GROUND
GS GALVANIZED STEEL
GSC NATURAL GAS SERVICE
GSL NATURAL GAS LINE
GSMH NATURAL GAS MANHOLE
GSMT NATURAL GAS METER
GSV NATURAL GAS VALVE
GSVT NATURAL GAS VAULT
GV GATE VALVE
H
HA. HECTARE
HAZD HAZARD
HCP HANDICAPPED
HDTY HEAVY DUTY
HDWL HEADWALL
HDPE HIGH DENSITY POLYETHYLENE
HGL HYDRAULIC GRADE LINE
HH HANDHOLE
HORZ HORIZONTAL
HP HIGH PRESSURE, HIGH POINT
HT HEIGHT
HYD HYDRANT
HYDR HYDRAULIC
I
ID / ID. IDENTIFICATION
IGCV IRRIGATION CONTROL VALVE
IGHB IRRIGATION HOSE BIB
IMPV IMPERVIOUS
IN INCHES
INPR INLET PROTECTION
IP IRON PIN
IR IRRIGATION
IRRG IRRIGATION
J
JNCT JUNCTION
JRST JOINT RESTRAINT
K
L
L LENGTH
LBS POUNDS
LDTY LIGHT-DUTY
LF LINEAR FEET
LOC LIMIT OF CONSTRUCTION
LG LIP OF GUTTER
LS LUMP SUM
LT LEFT
M
MANH MANHOLE
MAT MATERIAL
MAX. / MAX MAXIMUM
METR METER
MH MANHOLE
MIN. / MIN MINIMUM
MJ MECHANICAL JOINT
MM MILLIMETER
MPH MILES PER HOUR
MS MULCH SOCK
N
N NORTH
NO. / NO NUMBER
N/A NOT APPLICABLE
NE NORTH EAST
NG NATURAL GROUND
NGAS NATURAL GAS
NPWR RECLAIMED WATER
NTS NOT TO SCALE
O
OC ON CENTER
OH OVERHEAD
OVHD OVERHEAD
P
PC POINT OF CURVATURE
P.C. PRE-CAST
P.E. PROFESSIONAL ENGINEER
PI POINT OF INTERSECTION
PCC POINT COMPOUND CURVE
PE POLYETHYLENE
PET PETROLEUM
PERV PERVIOUS
NO. PAGE
PI. PLASTICITY INDEX
PL PROPERTY LINE
PR. PROPOSED
PROJ. PROJECT
PRV PRESSURE REDUCING VALVE
PRVN PREVENTER
PRSS PRESSURE
PSI POUNDS PER SQUARE INCH
PSV PRESSURE SUSTAINING VALVE
PT POINT OF TANGENCY
PUE PUBLIC UTILITY EASEMENT
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
PWD PUBLIC WORKS DEPARTMENT
Q
QNTY QUANTITY
R
R RECLAIMED WATER
RB ROCK BERM
RCP REINFORCED CONCRETE PIPE
RDC REDUCER
REF REFERENCE
RLS RELEASE
ROW RIGHT OF WAY
RR RAILROAD
RRAP RIP-RAP
RT RIGHT
RWL RECLAIMED WATER LINE
RWMH RECLAIMED WATER MANHOLE
RWV RECLAIMED WATER VALVE
RWVT RECLAIMED WATER VAULT
S
S SOUTH
SCE STABILIZED CONSTRUCTION ENTRANCE
SD STORM DRAIN
SDAI STORM DRAIN AREA INLET
SDCI STORM DRAIN CURB INLET
SDCO STORM DRAIN CLEANOUT
SDDI STORM DRAIN INLET
SDHW STORM DRAIN HEAD WALL
SDR STANDARD DIMENSION RATIO
SDL STORM DRAIN LINE
SDVT STORM DRAIN VAULT
SE SOUTH EAST
SEPR SEPARATOR
SF SQUARE FEET
SFN SILT FENCE
SH. SHEET
SHLN SHRUB LINE
SL SPRINKLER LINE
SP SITE PLAN
SRVC SERVICE
SSD STOPPING SIGHT DISTANCE
SSTN SUSTAIN
STBK STEBACK
STD STANDARD
STL STEEL
STRM STORM DRAIN
SW SOUTH WEST
SWK SIDEWALK
SWV SWIVEL
SY SQUARE YARD
T
TBA TO BE ABANDONED
TBR TO BE REMOVED
TC TOP OF CURB ELEVATION
TEMP TEMPORARY
TFD TRI-FILTER DIKE
T.O.C. TABLE OF CONTENTS
TOC TIME OF CONCENTRATION
TRAF TRAFFIC SIGNAL
TRLN TREE LINE
TRPR TREE PROTECTION
TS TRAFFIC SIGNAL
TSMH TRAFFIC SIGNAL MANHOLE
TSVT TRAFFIC SIGNAL VAULT
TV CATV
TVMH CATV MANHOLE
TVVT CATV VAULT
TXDOT TEXAS DEPARTMENT OF TRANSPORTATION
TYP TYPICAL
U
UG UNDERGROUND
UNDR UNDERGROUND
UNK UNKNOWN
V
VACM VACCUM
VCP VITRIFIED CLAY PIPE
VOL VOLUME
VPC VERTICAL POINT OF CURVATURE
VPI VERTICAL POINT OF INTERSECTION
VPT VERTICAL POINT OF TANGENCY
VLV VALVE
W
W WATER
WATR WATER
WAMH WATER MANHOLE
WAHH WATER HANDHOLE
WASC WATER SERVICE CONNECTION
WAVT WATER VAULT
WL WATER LINE
WQTZ WATER QUALITY TRANSITION ZONE
WW WASTEWATER
WWCO WASTEWATER CLEANOUT
WWTR WASTEWATER
WWL WASTEWATER LINE
WWLS WASTEWATER LIFT STATION
WWO WASTEWATER OVERFLOW
WWMH WASTEWATER MANHOLE
WWSC WASTEWATER SERVICE CONNECTION
WWVT WASTEWATER VAULT
COMMONLY USED ABBREVIATIONS
OF
R
EV
N
O
SURVEY BY
DRAWN BY
CHECKED BY
DESIGNED BY
REVIEWED BY
NOTES NAME DATE
BY
D
AT
E
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N C
IT
Y
O F
AU
ST
IN
, T
EX
AS
PI
N
O L
AN
E
W W
IM
PR
O
VE
M
EN
TS
AB
BR
EV
IA
TI
O
N S
SH
EE
T
AB
BR
EV
IA
TI
O
N S
SH
EE
T
CIP#6943.071
G-004 4 45
MWM 08/08/2023
JCS 9/27/2023
JCS 9/27/2023
/2
9:
A
M Y:
\0
-0
A-
PI
N O
_W W
\W
PD
_P
IN
O _W
W
TR
\C
AD
\P R
O D
U C
TI
O
N _F
IL
ES
\D W
G \P
IN
O
-G -G
N -A
BR
V.
D W
G , C
O A_
PD
F_
X3
4, C
O A_
PL
O
T_
ST
YL
ES
.S
TB
D W
AY
N
E H
O
LL
IN
S
AU
ST
IN
W
AT
ER
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
ES
D
IV
IS
IO
N
9001 N. IH35
Suite 102 Austin, Texas 78753 p: 512.453.0767 f: 512.453.1734
TBAE FIRM REGISTRATION NO.: 1452
TBPE FIRM REGISTRATION NO.: F-1416
TBPLS FIRM REGISTRATION NO.: 10065600
1/
/2
04/23/2026
1/
/2
05/28/2026
OF
EV
N
O
SURVEY BY
DRAWN BY
CHECKED BY
DESIGNED BY
REVIEWED BY
NOTES NAME DATE
BY
D
AT
E
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N C
IT
Y
O F
AU
ST
IN
, T
EX
AS
PI
N
O L
AN
E
W W
IM
PR
O
VE
M
EN
TS
G
EN
ER
AL
N O
TE
S
SH
EE
T C
IP
G
EN
N
O
TE
S
SH
EE
T
CIP#6943.071
G-005 5 45
MWM 08/08/2023
JCS 8/10/2023
JCS 8/10/2023
CHK 8/10/2023
6/
/2
2:
P
M Y:
\0
-0
A-
PI
N O
_W W
\W
PD
_P
IN
O _W
W
TR
\C
AD
\P R
O D
U C
TI
O
N _F
IL
ES
\D W
G \P
IN
O
-G -G
N -N
O
TE
.D W
G , C
O A_
PD
F_
X3
4, C
O A_
PL
O
T_
ST
YL
ES
.S
TB
D W
AY
N
E H
O
LL
IN
S
AU
ST
IN
W
AT
ER
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
ES
D
IV
IS
IO
N
9001 N. IH35
Suite 102 Austin, Texas 78753 p: 512.453.0767 f: 512.453.1734
TBAE FIRM REGISTRATION NO.: 1452
TBPE FIRM REGISTRATION NO.: F-1416
TBPLS FIRM REGISTRATION NO.: 10065600
1/
/2
AW INFRASTRUCTURE INFORMATION
PROPOSED PRODUCT TYPE (TO BE INSTALLED) LENGTH OF PIPE (L.F.) SIZE OF PIPE (INCH) NO. OF SERVICES
WATER MAIN NA
WASTEWATER MAIN NA
RECLAIMED WATER MAIN
NA
WATER SERVICE
136' 18"
WASTEWATER SERVICE
NA NA
RECLAIMED WATER SERVICE
NA NA UTILITY CRITERIA MANUAL WAIVER SUMMARY
1263'
245'
NA NA
8"
15"
NA
NA
NA
WASTEWATER MAIN
WASTEWATER MAIN
NA NA
NA NA
NA
C
IT
Y O
F
AU
ST
IN
AU
ST
IN
W
AT
ER
ST
AN
D
AR
D N
O
O
F
VE
R
SI
O
N
.0
AUSTIN WATER
REVIEW BLOCK
A U
ST
IN
W A
TE
R
G
EN
ER
A
L
IN
FO
R
M A
TI
O
N A
N D
C O
N
ST
R U
C
TI
O N
N O
TE
S
FO
R
C A
PI
TA
L
IM
PR
O
VE
M
EN
T
PR
O
JE
C
TS
FE
BR
U
AR
Y
7, AW EXPIRATION STAMP
THREE YEARS FROM THE
DATE OF SIGN-OFF
EXPAND OR REDUCE TABLE AS NEEDED*
THE INFORMATION INCLUDED IN THIS TABLE ARE APPROXIMATE VALUES ESTIMATED BASED ON GENERAL ENGINEERING GUIDELINES
GENERAL NOTES
ALL RESPONSIBILITY FOR THE ADEQUECY OF THESE PLANS REMAINS WITH THE ENGINEER. APPROVAL OF THESE
PLANS BY THE CITY OF AUSTIN DOES NOT REMOVE THESE RESPONSIBILITIES.
"REVIEWED BY AUSTIN WATER" APPLIES ONLY TO AW PUBLIC INFRASTRUCTURE, ALL OTHER WATER AND WASTEWATER INFRASTRUCTURE INSIDE PRIVATE PROPERTY ARE UNDER THE JURISDICATION OF BUILDING
INSPECTIONS.
USE OF ELECTRONIC FILES GENERAL DISCLAIMER: USE OF THE ATTACHED FILES IN ANY MANNER INDICATES YOUR ACCEPTANCE OF TERMS AND CONDITIONS AS SET FORTH BELOW. IF YOU DO NOT AGREE TO ALL OF THE TERMS AND CONDITIONS, PLEASE CONTACT AUSTIN WATER PIPELINE ENGINEERING, PROJECT COORDINATOR PRIOR TO USE OF THE REFERENCED INFORMATION. PLEASE BE ADVISED THAT THE ATTACHED FILES ARE IN A FORMAT THAT CAN BE ALTERED BY THE USER. DUE TO THIS FACT, ANY REUSE OF THE DATA WILL BE AT THE USER'S SOLE RISK WITHOUT LIABILITY OR LEGAL EXPOSURE TO THE CITY OF AUSTIN AND USER SHALL INDEMNIFY AND HOLD HARMLESS THE CITY OF AUSTIN FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES INCLUDING ATTORNEY'S FEES ARISING OUT OF OR RESULTING FROM USING THE DIGITAL FILE. IN ADDITION, IT IS THE RESPONSIBILITY OF THE USER TO COMPARE ALL DATA WITH THE PDF VERSION OF THIS DRAWING. IN THE EVENT THERE IS A CONFLICT BETWEEN THE PDF VERSION DRAWING AND THE ELECTRONIC FILE, THE PDF VERSION DRAWING SHALL PREVAIL.
AUTOMATED METERING INFRASTRUCTURE: EFFECTIVE MARCH 2022,
NEW WATER METERS INSTALLED SHALL BE IN CONFORMANCE WITH
AW’S AUTOMATED METERING INFRASTRUCTURE TECHNOLOGY, AND
WITH THE APPLICABLE STANDARD PRODUCT LIST. APPLICANTS FILING A
SITE PLAN OR SUBDIVISION PLAN WILL BE REQUIRED TO COORDINATE
WITH THE AUSTIN WATER PLAN REVIEWER FOR DETAILS ON APPROVAL
AND INSTALLATION.
PRIOR TO THE HANDLING AND DISPOSAL OF ASBESTOS PIPE, THE
CONTRACTOR'S WORK PLAN WILL BE REVIEWED AND COORDINATED
THROUGH COA BUILDING SERVICES DEPARTMENT - ASBESTOS, LEAD
AND MOLD MANAGEMENT GROUP MANAGER WHO CAN BE REACHED
AT 512-974-7137. IT IS THE CONTRACTOR'S RESPONSIBILITY TO USE A
TRAINED, CERTIFIED AND LICENSED ASBESTOS ABATEMENT
CONTRACTOR IN ACCORDANCE WITH THE FEDERAL, STATE AND LOCAL
REGULATIONS.
MODIFICATIONS TO AUSTIN WATER SIGNED AND STAMPED SHEETS ARE
NOT PERMITTED. ALL DESIGN MODIFICATIONS SHALL BE SUBMITTED VIA
THE ABC PORTAL FOR A PLAN CORRECTION OR REVISION. ALL
UNETHICAL ENGINEERING PRACTICES, INCLUDING MODIFYING CITY
STAMPED PLAN SHEETS, SHALL BE REPORTED TO THE TEXAS BOARD OF
PROFESSIONAL ENGINEERS AND LAND SURVEYORS (TBPELS).
REFERENCE: TEXAS ENGINEERING PRACTICE ACT AND RULES,
SUBCHAPTER C: PROFESSIONAL CONDUCT AND ETHICS
DOES THIS PROJECT NEED AULCC REVIEW?
□YES
□ NO
IF YES, PLEASE PROVIDE UCC # __________________
NOTE: IF THE PROJECT IS LOCATED WITHIN FULL
PURPOSE JURISDICTION, A RIGHT-OF-WAY REVIEW,
THROUGH THE AULCC PERMIT WILL BE REQUIRED.
1. THE CITY STANDARD CONSTRUCTION SPECIFICATIONS CURRENT AT THE TIME OF BIDDING SHALL COVER MATERIALS AND METHODS
USED TO DO THIS WORK.
2. CONTRACTOR MUST OBTAIN A ROW PERMIT FROM AUSTIN TRANSPORTATION AND PUBLIC WORKS DEPARTMENT, RIGHT OF WAY MANAGEMENT DIVISION BEFORE BEGINNING CONSTRUCTION WITHIN THE RIGHT-OF-WAY OF A PUBLIC STREET OR ALLEY. ACTIVITY
WITHIN RIGHT-OF-WAY SHALL COMPLY WITH APPROVED TRAFFIC CONTROL PLAN (TCP).
3. AT LEAST 48 HOURS PRIOR TO BEGINNING ANY UTILITY CONSTRUCTION ACTIVITY IN PUBLIC ROW OR PUBLIC EASEMENT, THE CONTRACTOR SHALL NOTIFY THE APPLICABLE CITY OF AUSTIN INSPECTION GROUP (AUSTIN TRANSPORTATION AND PUBLIC WORKS DEPARTMENT (TPW), OR DEVELOPMENT SERVICES). SEE CURRENT NOTIFICATION REQUIREMENTS AT WWW.AUSTINTEXAS.GOV.
4. THE CONTRACTOR SHALL CONTACT THE AUSTIN AREA “ONE CALL” SYSTEM AT 1-800-344-8377 FOR EXISTING UTILITY LOCATIONS PRIOR TO ANY EXCAVATION IN ADVANCE OF CONSTRUCTION. THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL UTILITIES TO BE EXTENDED, TIED TO, OR ALTERED, OR SUBJECT TO DAMAGE/INCONVENIENCE BY THE CONSTRUCTION OPERATIONS. THE CITY OF AUSTIN WATER AND WASTEWATER MAINTENANCE RESPONSIBILITY ENDS AT R.O.W./EASEMENT LINES.
5. NO OTHER UTILITY SERVICE/APPURTENANCES SHALL BE PLACED NEAR THE PROPERTY LINE, OR OTHER ASSIGNED LOCATION DESIGNATED FOR WATER AND WASTEWATER UTILITY SERVICE THAT WOULD INTERFERE WITH THE WATER AND WASTEWATER
SERVICES.
6. MINIMUM TRENCH SAFETY MEASURES SHALL BE PROVIDED, AS REQUIRED BY OSHA, CITY SPECIFICATION 509S, AND CITY/COUNTY
CONSTRUCTION INSPECTORS.
7. PRESSURE TAPS WILL ONLY BE ALLOWED ON A CASE BY CASE BASIS, AS DETERMINED BY THE DIRECTOR'S DESIGNEE. NORMALLY PRESSURE TAPS 4 INCHES AND LARGER SHALL BE ALLOWED IN THE FOLLOWING CASES: A) A TEST SHUT OUT INDICATES AN ADEQUATE SHUT OUT TO PERFORM THE WORK IS NOT FEASIBLE B) MORE THAN 30 CUSTOMERS OR A SINGLE CRITICAL CUSTOMER (AS DEFINED BY AUSTIN WATER) WOULD BE IMPACTED BY THE SHUT OUT OR C) THE EXISTING WATER LINE WARRANTS IT.
8. WATER LINE TESTING AND STERILIZATION SHALL BE PERFORMED IN ACCORDANCE WITH CITY STANDARD SPECIFICATION ITEMS 510.3 (27)-(29). FORCE MAIN PRESSURE TESTING SHALL BE CONDUCTED AND FALL UNDER THE SPECIFICATIONS AS WATER LINES
(PRESSURE PIPE) OR AS DIRECTED BY THE PROJECT SPECIFICATIONS.
9. ALL MATERIAL USED ON THIS PROJECT MUST BE LISTED ON THE STANDARD PRODUCTS LISTING. ANY MATERIAL NOT LISTED HAS TO GO THROUGH THE REVIEW OF THE STANDARDS COMMITTEE FOR REVIEW AND APPROVAL PRIOR TO START OF PROJECT. TESTING AND EVALUATION OF PRODUCTS ARE REQUIRED BEFORE APPROVAL WILL BE GIVEN ANY CONSIDERATION.
10. WHEN WATER SERVICES ARE DAMAGED AND THE SERVICE MATERIAL IS POLYETHYLENE (PE), THE LINE SHALL BE REPAIRED ONLY BY HEAT FUSION WELD, AT BRASS FITTINGS, OR THE FULL LENGTH SHALL BE REPLACED PER CURRENT STANDARD DETAIL(S). WHEN POLYBUTYLENE (PB) TUBING IS DAMAGED OR TAMPERED WITH IN ANY WAY, THE FULL LENGTH OF SERVICE LINE SHALL BE REPLACED. (NOTE: FULL LENGTH IS FROM THE CORPORATION STOP TO THE METER.) REPAIR COUPLINGS ARE NOT ALLOWED FOR ANY
WATER OR WASTEWATER SERVICE LINE REPAIR, RECONNECT, OR REPLACEMENT.
11. WHEN AN EXISTING WATERLINE SHUT OUT IS NECESSARY AND POSSIBLE, THE CONTRACTOR SHALL NOTIFY THE CONSTRUCTION INSPECTOR WHO WILL THEN NOTIFY AUSTIN WATER DISPATCH AND THE AFFECTED CUSTOMERS A MINIMUM OF FORTY-EIGHT (48)
HOURS IN ADVANCE.
12. THE INSPECTOR SHALL NOTIFY AUSTIN WATER AT 972-1000 AT A MINIMUM OF 72 HOURS PRIOR TO RELOCATING ANY DOMESTIC OR
FIRE DEMAND WATER METERS.
13. PROJECT-SPECIFIC SHOP DRAWINGS SHALL BE SUBMITTED FOR AW APPROVAL FOR PRE-CAST CIRCULAR VERTICAL MANHOLE SECTIONS LARGER THAN 48" DIAMETER. THE SHOP DRAWINGS SHALL INCLUDE THE FLOWLINE ELEVATION OF ALL CONNECTING PIPES; ELEVATIONS OF TRANSITIONS FROM LARGE DIAMETER SECTIONS TO 48" DIAMETER SECTIONS; TOP OF MANHOLE AND SURROUNDING GROUND ELEVATIONS; AND DETAILS OF SPECIAL CONSTRUCTION CONSIDERATIONS SPECIFIED IN THE CONTRACT
DOCUMENTS.
14. WHEN CONCRETE MANHOLES LARGER THAN 48 INCH DIAMETER ARE USED, DRAWINGS THAT ARE SEALED BY A PROFESSIONAL ENGINEER SHALL BE SUBMITTED FOR BASE SLABS, FLAT TOP LIDS (IF USED), AND FLAT TYPE CONCRETE PIECES USED TO
TRANSITION FROM LARGER TO SMALLER DIAMETER MANHOLE SECTIONS.
15. ALL FIRE HYDRANTS AND VALVES THAT ARE TO BE ABANDONED SHALL BE REMOVED, SALVAGED AND RETURNED TO AUSTIN WATER.
NOTICE SHOULD BE GIVEN 48 HOURS PRIOR, TO PIPELINE OPERATIONS DISTRIBUTION SYSTEM -VALVES AND HYDRANT SERVICES
SUPERVISOR AT AWDSM-ASSET-RECOVERY@CITYOFAUSTIN.ONMICROSOFT.COM.
16. ALL EXISTING WATER METERS IDENTIFIED TO BE RELOCATED OR ABANDONED AT THE DEVELOPMENT SHALL BE REMOVED FROM THE METER BOX PRIOR TO CONSTRUCTION AND GIVEN IMMEDIATELY TO THE CITY OF AUSTIN INSPECTOR.
17. THE ENGINEER SHALL CALL OUT THE SIZE, TYPE AND USE (DOMESTIC, IRRIGATION OR RECLAIM) OF ALL EXISTING WATER METERS TO BE RELOCATED OR REPURPOSED. WATER METER NUMBERS WILL NOT BE REQUIRED TO BE PLACED ON THE PLAN SHEET. A SEPARATE UTILITY PERMITTING OFFICE FORM CAN BE USED TO PROVIDE RELEVANT DATA FOR THE EXISTING INFORMATION ON EXISTING METERS TO RECEIVE APPROPRIATE CREDITS. THIS FORM SHALL BE DIRECTLY SUBMITTED TO UTILITY PERMITTING OFFICE
FOR REVIEW AND PROCESSING.
18. NO CONNECTION MAY BE MADE BETWEEN THE PRIVATE PLUMBING AND AUSTIN WATER INFRASTRUCTURE UNTIL A CITY APPROVED
WATER METER HAS BEEN INSTALLED.
19. METER BOXES AND CLEAN OUTS SHALL NOT BE LOCATED WITHIN PAVED AREAS SUCH AS DRIVEWAYS AND SIDEWALKS.
20. NO SOIL COMPACTION EQUIPMENT SHALL COME WITHIN 24-INCHES FROM THE TOP OF THE WATER OR WASTEWATER PIPE. BETWEEN
24-36 INCHES FROM TOP OF THE PIPE, ONLY LIGHT SOIL COMPACTION EQUIPMENT (E.G., RAMMERS OR "WHACKER PACKERS", VIBRATING PLATE COMPACTORS, WALK-BEHIND HAND-GUIDED ROLLERS) OR SMOOTH ROLLER COMPACTION EQUIPMENT WEIGHING LESS THAN 5,000 LBS. WILL BE ALLOWED. WHERE SOIL COMPACTION EQUIPMENT WILL BE 36-INCHES OR GREATER FROM THE TOP OF THE PIPE, HS20 LOADS SHALL NOT BE EXCEEDED. PIPE DEPTHS SHALL BE VERIFIED THROUGH POTHOLING, LEVEL A SUE OR BY MH
INVERT DATA.
21. THE DESIGN AND CONSTRUCTION OF RETAINING WALLS, BRIDGES, CULVERTS, HEADWALLS, JUNCTION STRUCTURES, SCREENING WALLS, AND STORMWATER DRAINAGE PIPE WITHIN THE VICINITY OF AW UTILITIES SHALL BE IN COMPLIANCE WITH SECTION 13 OF THE
COA'S TRANSPORTATION CRITERIA MANUAL.
22. THRUST RESTRAINT SHALL BE IN ACCORDANCE WITH CITY STANDARD SPECIFICATION ITEM 510.3(22) AND SPL WW-27A, WW-27A-01, WW-27A-02 AND WW-27F.
23. ALL WATERLINE BRANCH CONNECTIONS SHALL HAVE AN MJ GATE VALVE POSITIVELY RESTRAINED TO THE MJ TEE BY USING A SWIVEL TEE, FOSTER ADAPTOR, OR SWIVEL X SOLID HYDRANT ADAPTOR (WITH SWIVEL GLAND).
* ON CITY SPONSORED PROJECTS, WHERE CONFLICTS ARE IDENTIFIED BETWEEN THESE CONSTRUCTION NOTES AND THE PROJECT CONTRACT DOCUMENTS, THE
CONTRACT DOCUMENTS WILL TAKE PRECEDENCE.
STANDARD CONSTRUCTION NOTES REVISED FEBRUARY 7, 2025
WAIVERS APPROVED BY:
AUSTIN WATER DATE
231207-02-04
06/11/2026
06/30/2026
EXPIRATION DATE
July 01, 2028
CITY OF AUSTIN - STANDARD NOTES
EROSION AND SEDIMENTATION CONTROL
1. THE CONTRACTOR SHALL INSTALL EROSION/SEDIMENTATION CONTROLS AND
TREE/NATURAL AREA PROTECTIVE FENCING PRIOR TO ANY SITE PREPARATION WORK
(CLEARING, GRUBBING, OR EXCAVATION).
2. THE PLACEMENT OF EROSION/SEDIMENTATION CONTROLS SHALL BE IN ACCORDANCE
WITH THE ENVIRONMENTAL CRITERIA MANUAL AND THE APPROVED EROSION AND
SEDIMENTATION CONTROL PLAN.
3. THE PLACEMENT OF TREE/NATURAL AREA PROTECTIVE FENCING SHALL BE IN
ACCORDANCE WITH THE CITY OF AUSTIN STANDARD NOTES FOR TREE AND NATURAL
AREA PROTECTION AND THE APPROVED GRADING/TREE AND NATURAL AREA PLAN.
4. A PRE-CONSTRUCTION CONFERENCE SHALL BE HELD ON-SITE WITH THE CONTRACTOR,
DESIGN ENGINEER, PERMIT APPLICANT, AND GENERAL PERMIT PROGRAM
REPRESENTATIVE AFTER INSTALLATION OF THE EROSION/SEDIMENTATION CONTROLS
AND THE TREE/NATURAL AREA PROTECTION MEASURES AND PRIOR TO BEGINNING
ANY SITE PREPARATION WORK. THE CONTRACTOR SHALL NOTIFY THE GENERAL
PERMIT PROGRAM OFFICE AT 512/974-6330, AT LEAST 3 DAYS PRIOR TO THE MEETING
DATE.
5. ANY SIGNIFICANT VARIATION IN MATERIALS OR LOCATIONS OF CONTROLS OR FENCES
FROM THOSE SHOWN ON THE APPROVED PLANS MUST BE APPROVED BY THE
REVIEWING ENGINEER AND THE GENERAL PERMIT PROGRAM REPRESENTATIVE.
6. THE CONTRACTOR IS REQUIRED TO INSPECT THE CONTROLS AND FENCES AT DAILY
INTERVALS AND AFTER SIGNIFICANT RAINFALL EVENTS TO INSURE THAT THEY ARE
FUNCTIONING PROPERLY. THE PERSON(S) RESPONSIBLE FOR MAINTENANCE OF
CONTROLS AND FENCES SHALL IMMEDIATELY MAKE ANY NECESSARY REPAIRS TO
DAMAGED AREAS. SILT ACCUMULATION AT CONTROLS MUST BE REMOVED WHEN THE
DEPTH REACHES SIX (6) INCHES. SILT ACCUMULATION AT INLET DEVICES SHOULD BE
REMOVED WHEN THE DEPTH REACHES TWO (2) INCHES.
7. PRIOR TO FINAL ACCEPTANCE BY THE CITY, HAUL ROADS AND WATERWAY CROSSINGS
CONSTRUCTED FOR TEMPORARY CONTRACTOR ACCESS MUST BE REMOVED,
ACCUMULATED SEDIMENT REMOVED FROM THE WATERWAY AND THE AREA RESTORED
TO THE ORIGINAL GRADE AND REVEGETATED. ALL LAND CLEARING DEBRIS SHALL BE
DISPOSED OF IN APPROVED SPOIL DISPOSAL SITES.
8. ALL WORK MUST STOP IF A VOID IN THE ROCK SUBSTRATE IS DISCOVERED WHICH IS
ONE SQUARE FOOT OR LARGER IN TOTAL AREA, BLOWS AIR FROM WITHIN THE
SUBSTRATE, AND/OR CONSISTENTLY RECEIVES WATER DURING ANY RAIN EVENT. AT
THIS TIME, IT IS THE RESPONSIBILITY OF THE PROJECT MANAGER TO IMMEDIATELY
CONTACT THE GENERAL PERMIT PROGRAM REPRESENTATIVE FOR FURTHER
INVESTIGATION.
9. FIELD REVISIONS TO THE EROSION/SEDIMENTATION CONTROL PLAN MAY BE REQUIRED
BY THE GENERAL PERMIT PROGRAM REPRESENTATIVE DURING THE COURSE OF
CONSTRUCTION TO CORRECT CONTROL INADEQUACIES. ANY REVISIONS TO THE
PERMITTED PLAN MUST BE APPROVED BY THE GENERAL PERMIT PROGRAM OFFICE OF
THE PLANNING AND DEVELOPMENT REVIEW DEPARTMENT.
10. PERMANENT EROSION/SEDIMENTATION CONTROL: ALL DISTURBED AREAS SHALL BE
RESTORED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. WHERE THE CRITERIA
MANUAL AND CONTRACT DOCUMENTS DIFFER THE MOST ENVIRONMENTALLY
BENEFICIAL MATERIALS/METHOD SHALL BE REQUIRED UNLESS OTHERWISE APPROVED
BY THE GENERAL PERMIT PROGRAM REPRESENTATIVE.
11. DEVELOPER INFORMATION:
OWNER:
COMPANY: CITY OF AUSTIN
CONTACT: DANIEL KANKEL
PHONE: (512) 974-7730
E-MAIL: Daniel.Kankel@austintexas.gov
OWNER'S REPRESENTATIVE RESPONSIBLE FOR PLAN ALTERATIONS:
COMPANY: MWM DESIGNGROUP
CONTACT: TONY BUONODONO, P.E.
ADDRESS:
9001 N. IH35
Suite 102 Austin, Texas 78753
PHONE: 512.453.0767
E-MAIL: tony.buonodono@mwmdg.com
PARTY RESPONSIBLE FOR EROSION/SEDIMENTATION CONTROL MAINTENANCE:
COMPANY: CONTRACTOR
PARTY RESPONSIBLE FOR TREE/NATURAL AREA PROTECTION MAINTENANCE:
COMPANY: CONTRACTOR
12. THE CONTRACTOR SHALL NOT DISPOSE OF SURPLUS EXCAVATED MATERIAL FROM THE
SITE WITHOUT NOTIFYING THE GENERAL PERMIT PROGRAM REPRESENTATIVE, AT
974-6330, AT LEAST 48 HOURS PRIOR TO THE SPOILS REMOVAL. THIS NOTIFICATION
SHALL INCLUDE THE DISPOSAL LOCATION AND A COPY OF THE PERMIT ISSUED TO
RECEIVE THE MATERIAL.
13. INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY PRIOR TO STREET WORK, AND
WILL BE REMOVED AS SOON AS THE GENERAL PERMIT PROGRAM REPRESENTATIVE
AGREES THAT THERE IS NO POTENTIAL FOR SEDIMENTATION.
9001 N. IH35
Suite 102 Austin, Texas 78753 p: 512.453.0767 f: 512.453.1734
TBAE FIRM REGISTRATION NO.: 1452
TBPE FIRM REGISTRATION NO.: F-1416
TBPLS FIRM REGISTRATION NO.: 10065600
1/
/2
OF
R
EV
N
O
SURVEY BY
DRAWN BY
CHECKED BY
DESIGNED BY
REVIEWED BY
NOTES NAME DATE
BY
D
AT
E
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N C
IT
Y
O F
AU
ST
IN
, T
EX
AS
PI
N
O L
AN
E
W W
IM
PR
O
VE
M
EN
TS
ER
O
SI
O
N A
N D
S
ED
IM
EN
TA
TI
O N
C O
N
TR
O L
C O
A
ST
AN
D
AR
D
N O
TE
S
AN
D
D
ET
AI
LS
O
F
ER
O
SI
O
N A
N D
S
ED
IM
EN
TA
TI
O N
C O
N
TR
O L
N O
TE
S
O
F
CIP#6943.071
CE-001 6 45
MWM 08/08/2023
JCS 8/10/2023
JCS 8/10/2023
ADB 8/10/2023
ADB
/2
9:
A
M Y:
\0
-0
A-
PI
N O
_W W
\W
PD
_P
IN
O _W
W
TR
\C
AD
\P R
O D
U C
TI
O
N _F
IL
ES
\D W
G \P
IN
O
-C -E
V- N
O
TE
_G N
.D W
G , C
O A_
PD
F_
X3
4, C
O A_
PL
O
T_
ST
YL
ES
.S
TB
D W
AY
N
E H
O
LL
IN
S
AU
ST
IN
W
AT
ER
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
ES
D
IV
IS
IO
N
9001 N. IH35
Suite 102 Austin, Texas 78753 p: 512.453.0767 f: 512.453.1734
APPROVED
STANDARD NO.
FABRIC COVERED (SEVERE SERVICE) ROCK
BERM
N / A
THE ARCHITECT/ENGINEER ASSUMES
RESPONSIBILITY FOR APPROPRIATE
USE OF THIS STANDARD.
TRENCH IN
FABRIC (SEE
SILT FENCE
DETAIL, THIS
SHEET.)
4"-8" DIAMETER
OPEN GRADED ROCK
EXISTING
GRADE
2:1 SIDE
SLOPES
WOVEN WIRE
SHEATHING OR
CHAIN LINK
FENCE FABRIC
GEOTEXTILE FABRIC
SECURE TO WIRE
ON UPHILL END
2' HIGH 1
NOTES:
1. USE ONLY OPEN GRADED ROCK, 4-8 INCH DIAMETER, FOR STREAM FLOW CONDITION.
USE OPEN GRADED ROCK, 3-5 INCH DIAMETER, FOR OTHER CONDITIONS.
2. ROCK BERM SHALL BE SECURED WITH A WOVEN WIRE SHEATHING HAVING MAXIMUM 1 INCH
OPENING AND MINIMUM WIRE DIAMETER OF 20 GAUGE.
3. ROCK BERM SHALL BE INSPECTED WEEKLY OR AFTER EACH RAIN, AND THE STONE AND/OR
FABRIC CORE-WOVEN WIRE SHEATHING SHALL BE REPLACED WHEN THE STRUCTURE CEASES TO
FUNCTION AS INTENDED, DUE TO SILT ACCUMULATION AMONG THE ROCKS, WASHOUT,
CONSTRUCTION TRAFFIC DAMAGE, ETC.
4. WHEN SILT REACHES A DEPTH EQUAL TO ONE-THIRD THE HEIGHT OF THE BERM OR ONE FOOT, WHICHEVER IS LESS, THE SILT SHALL BE REMOVED AND DISPOSED OF IN AN APPROVED SITE AND IN
A MANNER AS TO NOT CREATE A SILTATION PROBLEM.
5. DAILY INSPECTION SHALL BE MADE ON SEVERE SERVICE ROCK BERMS; SILT SHALL BE REMOVED
WHEN ACCUMULATION REACHES 6 INCHES.
6. WHEN SITE IS COMPLETELY STABILIZED, THE BERM AND ACCUMULATED SILT SHALL BE REMOVED
AND DISPOSED OF IN AN APPROVED MANNER.
FLOW
ADDITIONAL EROSION/SEDIMENTATION CONTROL FOR WORK
IN PAVED AREAS FOR GENERAL PERMIT PROGRAM PROJECTS
NOTES:
1. THE TEMPORARY SPOILS/STOCKPILE STORAGE AREA AND STAGING AREA MAY BE LOCATED
DIRECTLY ADJACENT TO THE EXCAVATION AND ON THE PAVEMENT.
2. ANY SPOIL NOT INTENDED TO BE REUSED WILL BE HAULED TO AN APPROVED OR PERMITTED
DISPOSAL SITE DAILY.
3. INSTALL TRIANGULAR SEDIMENT FILTER DIKE (DETAIL 628S) ACROSS FULL WIDTH OF TRAFFIC
CLOSURE AND DOWNSTREAM OF CONSTRUCTION AREA, PERPENDICULAR TO CURB AND
PLACED TO EFFECTIVELY CATCH AND CONTAIN SEDIMENT LADEN RUNOFF FROM THE
EXCAVATED AREA. FILTER DIKE TO FOLLOW ACTIVE CONSTRUCTION. REMOVING AND
RE-SETTING FILTER DIKE IS CONSIDERED SUBSIDIARY TO BARRICADES AND TRAFFIC HANDLING.
EDGE OF
PROPOSED EXCAVATION
EXISTING PAVING
20 LB SANDBAGS
@ 2' O.C.
EXISTING CURB
AND GUTTER
TRIANGULAR
FILTER DIKE
(CoA STD. 628S)
TEMPORARY
SPOILS AND/OR
STOCKPILE
RUN-OFF FLOW
04/23/2026
1/
/2
05/28/2026
STANDARD ENVIRONMENTAL NOTES:
ADDITIONAL AREAS:
1. ANY ADDITIONAL AREAS REQUIRED FOR CONSTRUCTION OF THIS PROJECT SHALL BE
THE SOLE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR MUST SECURE CITY OF
AUSTIN APPROVAL OF PROPOSED ADDITIONAL AREAS PRIOR TO USE. APPROVAL OF
"CORRECTION REQUEST" MUST BE SECURED FROM THE GENERAL PERMIT PROGRAM
OFFICE OF THE PLANNING AND DEVELOPMENT REVIEW DEPARTMENT.
2. ALL ASSOCIATED PERMITS AND FEES SHALL BE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
3. IN ORDER TO SECURE APPROVAL FOR USE OF ADDITIONAL AREAS, CONTRACTOR MUST
PROVIDE COMPLETE "CORRECTION REQUEST" SUBMITTAL TO GENERAL PERMIT
PROGRAM OFFICE AND ALLOW A ONE WEEK COMMENT PERIOD FOR EACH REVIEW.
CONTRACTOR SHOULD REQUEST INFORMATION ON THE ELEMENTS REQUIRED TO BE
INCLUDED IN THE SUBMITTAL FROM THE OWNER'S REPRESENTATIVE OR THE GENERAL
PERMIT PROGRAM OFFICE.
4. CONTRACTOR MUST INSTALL AND MAINTAIN EROSION/SEDIMENTATION CONTROLS AND
TREE PROTECTION FOR ALL SUCH AREAS IN ACCORDANCE WITH THE CITY OF AUSTIN
ENVIRONMENTAL CRITERIA MANUAL AND AS INCLUDED IN THE APPROVED SUBMITTAL
OR DIRECTED IN THE FIELD BY THE GENERAL PERMIT PROGRAM REPRESENTATIVE.
5. A SIGNED COPY OF THE PLANS PERMITTED THROUGH THE GENERAL PERMIT PROGRAM
MUST BE KEPT ON SITE AND ACCESSIBLE AT ALL TIMES DURING PROJECT
CONSTRUCTION.
DEWATERING:
CONTRACTOR IS RESPONSIBLE FOR DEWATERING OF WORK AREA. CONTRACTOR MUST
SECURE CITY OF AUSTIN APPROVAL OF PROPOSED DEWATERING PROCEDURES PRIOR TO
INSTALLATION OR USE. APPROVAL MUST BE SECURED FROM THE GENERAL PERMIT
PROGRAM (GPP) OFFICE OF THE PLANNING AND DEVELOPMENT REVIEW DEPARTMENT.
CONTRACTOR MUST PROVIDE COMPLETE SUBMITTAL TO GPP OFFICE AND ALLOW AN ONE
WEEK (MIN.) COMMENT PERIOD FOR EACH REVIEW. CONTACT THE GPP OFFICE FOR
SUBMITTAL REQUIREMENTS.
FUEL STORAGE:
FUEL STORAGE IS PROHIBITED ON THIS PROJECT. ADDITIONALLY, THE CONTRACTOR IS
REQUIRED TO NOTIFY THE GENERAL PERMIT PROGRAM OFFICE IMMEDIATELY FOLLOWING
ANY SPILL OF FUEL OR OTHER TOXIC MATERIAL. CONTRACTOR IS REQUIRED TO FOLLOW-UP
WITH WRITTEN DOCUMENTATION, INCLUDING A COMPLETE DESCRIPTION OF THE INCIDENT,
MATERIAL SPILLED, AND ACTIONS TAKEN TO CONTAIN AND CLEAN-UP MATERIAL.
FUGITIVE DUST CONTROL:
ALL PROJECTS APPROVED THROUGH THE GENERAL PERMIT PROGRAM (GPP) MUST COMPLY
WITH THE CODE OF THE CITY OF AUSTIN AND THE ENVIRONMENTAL CRITERIA MANUAL
REQUIREMENTS TO CONTROL AIRBORNE DUST. COMPLIANCE IS REQUIRED FOR ENTIRE
PROJECT SITE AS WELL AS ASSOCIATED OPERATIONS. CONTACT THE GPP OFFICE FOR
RECOMMENDED CONTROL METHODS.
SPOILS STORAGE:
NO SPOILS STORAGE IS ALLOWED WITHIN A CRITICAL WATER QUALITY ZONE, A 100-YEAR
FLOODPLAIN, OR ON A SLOPE WITH A GRADIENT OF MORE THAN 15 PERCENT.
E/S CONTROLS FOR BORE / RECEIVING PIT LOCATIONS:
TEMPORARY E/S CONTROLS MUST SURROUND THE ENTIRETY OF BORING OPERATIONS,
INCLUDING PIT, EQUIPMENT, ETC. FOR LOCATIONS WITHIN IMPERVIOUS AREAS, TEMPORARY
CONTROL WILL BE TRIANGULAR FILTER DIKE (COA STANDARD DETAIL #628S). DIKE FLAP WILL
BE CONTINUOUSLY WEIGHTED DOWN THROUGH THE USE OF 1" BY 4" WOOD STRIPS NAILED
TO THE PAVEMENT, EXCEPT FOR THE ACCESS POINT. PLACEMENT OF TEMPORARY E/S
CONTROLS ACROSS ACCESS POINT WILL BE REQUIRED WHENEVER THE SITE IS NOT
ACTIVELY USED. FOR LOCATIONS WITHIN PERVIOUS AREAS, TEMPORARY CONTROL WILL BE
SILT FENCE (COA STANDARD DETAIL #642S-1) OR MULCH SOCKS (COA STANDARD DETAIL
#648S-1), AS INDICATED ON APPROVED PLANS.
SOIL RETENTION BLANKET:
UNLESS OTHERWISE INDICATED IN THE PROJECT DOCUMENTS, INSTALLATION OF SOIL
RETENTION BLANKET WILL BE REQUIRED FOR ALL IMPACTED SLOPES GREATER THAN 3:1
AND ALL IMPACTED AREAS WITHIN DRAINAGE CONVEYANCES. (CITY OF AUSTIN STANDARD
SPECIFICATION ITEM 605S) SOIL RETENTION BLANKET SUBMITTAL MUST BE APPROVED BY
PROJECT ENGINEER AND GENERAL PERMIT PROGRAM (GPP) REPRESENTATIVE PRIOR TO
USE AND MUST INCLUDE PRODUCT AND INSTALLATION DETAILS PROVIDED BY
MAN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .