IFB - 3000011900 - Questions2.pdf
PDF 124 KB Posted
- Solicitation number
- 65-3000011900
- Issued by
- Orange County, Cleveland Town, North Carolina
About this file
This document is an Addendum to a Request for Proposals (IFB) issued by the University of North Carolina at Chapel Hill for the procurement of power-operated, load-interrupting, solid dielectric insulated switches. The scope of work specifies the required electrical, mechanical, and performance characteristics of these switches, which are to be used in subsurface vault or manhole facilities on electric distribution systems. The addendum clarifies that three (3) solid dielectric switches are required, not a gas-insulated switch as initially indicated. The proposal submission deadline is September 18, 2024, at 1:00 PM Eastern Standard Time.
The contract opportunity is for the supply of these electric distribution switches and three-phase pad-mount transformers. The transformers must comply with applicable NEMA, ANSI, and NEC standards and be Factory Mutual Approved. The contract is for the State of North Carolina, with the primary jurisdictions being Orange County and the Town of Cleveland.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB - 3000011900 - Addendum2.docx | DOCX document | |
| IFB - 3000011900 - Addendum4.pdf | ||
| IFB - 3000011900 - Addendum3.pdf | ||
| IFB - 3000011900 - Answers.docx | DOCX document | |
| IFB - 3000011900 - Switch_Transformers.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE UNIVERSITY OF NORTH CAROLINA AT CHAPEL HILL
REQUEST FOR PROPOSALS (IFB) ADDENDUM
FAILURE TO RETURN THIS ADDENDUM IN ACCORDANCE WITH THE INSTRUCTIONS BELOW MAY
SUBJECT YOUR PROPOSAL TO REJECTION
RFP Number: 65-3000011900 Addendum Number: 04 Addendum Date: September 11, 2024 RFP Opening Date / Time: September 18, 2024 at 1:00 PM Eastern Standard Time (EST)
Instructions: Return one properly executed copy of this addendum prior to the RFP Opening Date / Time specified above. This addendum must be included with your proposal.
A. Please see the following University response to the following question:
Question:
1. General Question – Reference Page 18 and Page 20 - it is asking for a POWER
OPERATED LOAD INTERRUPTING GAS INSULATED SWITCH. On page 20 under the IV. SWITCH CONSTRUCTION, 2nd paragraph, it refers to a solid dielectric module which is a completely different switch a solid dielectric. Can you confirm two things? Is a gas insulated or a solid dielectric switch needed and confirm the quantity, is it 1 or 3 total switches. Thanks. Solid Dielectric Switch. Qty = 3
Execute Addendum:
Vendor Name:
Authorized Signature: Date:
Name and Title:
Email Address: