This document is a Special Provisions file for Invitation for Bid (IFB) No. 250137, involving a Highway Safety Improvement Program (HSIP) project for the City of Tucson, Arizona, funded by the Federal Highway Administration (FHWA) and the Arizona Department of Transportation (ADOT). The project involves installing six HAWK (High-Intensity Activated Crosswalk) or BikeHAWK pedestrian crossing signals at various intersections in Tucson, including locations on Golf Links Road, Broadway Boulevard, Ajo Way, Oracle Road, and Pima Street. The work includes sidewalk and ramp improvements, traffic signal installation, pavement marking, signing, and safety enhancements aimed at improving pedestrian access. The contract has a duration of 180 consecutive calendar days, with a planned construction start in May 2025, and will require comprehensive traffic signal equipment installation, electrical services, concrete work, signage, and utility coordination.
The project has an estimated budget between $1,000,000 and $5,000,000 and includes a Disadvantaged Business Enterprise (DBE) goal of 8.02%. Contractors must either meet this goal or demonstrate good faith efforts, with DBE participants required to be certified by the Arizona Unified Certification Program. The procurement includes specific insurance requirements of $1,000,000 in Commercial General Liability and Commercial Automobile Liability coverage. Liquidated damages are set at $1,860 per calendar day of delay, and the contract includes a one-year warranty on equipment and workmanship. Most utility companies consulted, including Tucson Water, Southwest Gas, Lumen, and Tucson Electric Power, have indicated no significant conflicts with the proposed improvements. Potential bidders must submit comprehensive documentation through the city's online procurement portal, including a bid schedule, offer and acceptance form, bid bond, DBE goal assurance form, subcontractor listing, and a contractor responsibility form.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T0492 01C – VARIOUS LOCATIONS, TUCSON (6 HAWKS)
SPECIAL PROVISIONS
ADOT Project No. T0492 01C
Federal Project No. TUC-0(283)D
COT Plan No. U-2024-033
MAY 2025
Page II
CONTRACT SPECIAL PROVISIONS FOR:
ADOT Project No. T0492 01C / Federal Project No. TUC-0(283)D / COT Plan No. U-2024-033
T0492 01C – VARIOUS LOCATIONS, TUCSON (6 HAWKS) at:
1. Golf Links Road and Langley Avenue
2. Broadway Boulevard and Maguire Avenue
3. Broadway Boulevard and Mountain View Avenue
4. Ajo Way and Valley Road
5. Oracle Road and Simmons Road
6. Pima Street and Rook Avenue
PROFESSIONAL SEALS
These specifications were prepared under the direction of the following individuals:
d
Date Signe
.C
ATENO
CIFITRE
A
ANOZIR
, U A..S.
s
R seforPderetsige ional Engineer (Civi)l
60430
TIMOTHY J.
RHINE
05 07 25
Page III
TABLE OF CONTENTS
GENERAL REQUIREMENTS
DIVISION 100 - GENERAL PROVISIONS
SECTION 101 - ABBREVIATIONS AND DEFINITIONS
SECTION 104 - SCOPE OF WORK
SECTION 105 - CONTROL OF WORK
SECTION 106 - CONTROL OF MATERIAL
SECTION 107 - LEGAL RELATIONS AND RESPONSIBILITY TO PUBLIC
SECTION 108 - PROSECUTION AND PROGRESS
SECTION 109 - MEASUREMENT AND PAYMENT
SECTION 202 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ITEM 2020034 - REMOVAL OF SIGNS AND DELINEATORS
ITEM 2020039 - REMOVE AND RELOCATE SIGN
SECTION 206 - FURNISH WATER SUPPLY
SECTION 303 - AGGREGATE BASE COURSE
SECTION 406 - ASPHALTIC CONCRETE
SECTION 510 - POTABLE WATER SYSTEMS
ITEM 5103101 - POTABLE WATER, ADJUST EXISTING VALVE BOX AND
COVER
SECTION 515 - UTILITY IMPACTS
ITEM 5150005 - UTILITY POTHOLING, DEPTH < TWELVE FEET (12')
ITEM 5150007 - UTILITY POTHOLING, DEPTH ≥ TWELVE FEET (12')
ITEM 5150101 - UTILITY IMPACTS ALLOWANCE
SECTION 607 - SIGN SUPPORTS
ITEM 6070010 - SIGN POST (PERFORATED) (SINGLE)
ITEM 6070110 - FOUNDATION FOR SIGN POST (PERFORATED)
Page IV
ITEM 6072000 - SIGN MOUNT ASSEMBLIES (MAST ARM MOUNTED)
ITEM 6072001 - SIGN MOUNT ASSEMBLIES (FLAG MOUNTED)
SECTION 608 - SIGN PANELS
SECTION 701 - MAINTENANCE AND PROTECTION OF TRAFFIC
SECTION 704 - THERMOPLASTIC STRIPES AND MARKINGS
SECTION 705 - PREFORMED PLASTIC PAVEMENT MARKING
SECTION 706 - RAISED PAVEMENT MARKERS
SECTION 708 - PAINTED PAVEMENT MARKINGS
SECTION 731 - STRUCTURAL SUPPORTS AND FOUNDATIONS FOR
TRAFFIC SIGNAL AND STREET LIGHTING SYSTEMS
SECTION 732 - ELECTRICAL MATERIAL AND SERVICE
ITEM 7320888 - ELECTRICAL SERVICE INSTALLATION FEES ALLOWANCE
SECTION 733 - SIGNAL INDICATIONS AND MOUNTING ASSEMBLIES
SECTION 734 - TRAFFIC SIGNAL CONTROLLER ASSEMBLY
SECTION 803 - LANDSCAPE BORROW AND PLATING MATERIAL
SECTION 908 - CONCRETE CURBS, GUTTERS, SIDEWALKS AND
DRIVEWAYS
SECTION 924 - CONTRACTOR QUALITY CONTROL
SECTION 1005 BITUMINOUS MATERIALS FOR SURFACING
SECTION 1007 - RETROREFLECTIVE SHEETING
ATTACHMENT A – TYPE B TRENCH DETAIL
ATTACHMENT B – HOLIDAY RESTRICTIONS
ATTACHMENT C – UTILITY COORDINATION STATUS SUMMARY
ATTACHMENT D – UTILITY COORIDNATION LETTERS
ATTACHMENT E – WESTERN BURROWING OWL AWARENESS FLYER
ATTACHMENT F – LUMEN HAND HOLE DETAIL
SPECIFICATIONS AND DETAILS
The work embraced herein shall be performed in accordance with the requirements of the following separate documents:
Specifications
Pima Association of Governments (PAG), Standard Specifications for Public Improvement, 2015
Edition, Volume 1 (typically referenced as “Standard Specifications” unless otherwise specified).
http://apps.pagnet.org/standardspecifications
Details
Pima Association of Governments (PAG), Standard Details for Public Improvements, 2015
Edition, Volume 2.
http://apps.pagnet.org/standardspecifications/
Manuals
U.S. Department of Transportation, Federal Highway Administration, Manual on Uniform Traffic
Control Devices for Streets and Highways, December 2009, and amendments.
http://mutcd.fhwa.dot.gov/pdfs/2009/pdf_index.htm
Arizona Supplement to the Manual on Uniform Traffic Control Devices (MUTCD), 2009 edition
(January 2012) https://azdot.gov/sites/default/files/2019/07/arizona-supplement-to-the-manual-on-uniform-traffic-control-devices-2009-mutcd-edition.pdf
2015 Edition of the Additions by the City of Tucson to the Manual on Uniform Traffic Control
Devices, for Temporary Traffic Control https://www.tucsonaz.gov/files/sharedassets/public/v/1/government/departments/department-of-transportation-and-mobility/documents/2015_cot_additions_final.pdf
City of Tucson Department of Transportation, Traffic Signal Design Manual, May 2003 and current revisions.
https://www.tucsonaz.gov/files/sharedassets/public/v/1/dtm/documents/divisions/traffic-eng/design_manual.pdf
Pima County/City of Tucson, Signing and Pavement Marking Manual, December 2020.
https://content.civicplus.com/api/assets/c8d13f95-b46c-446e-97fe-8e5127201983
Other Specifications and Details
The Arizona Department of Transportation (ADOT) Standard Specifications for Road and Bridge
Construction, 2021 Edition.
https://azdot.gov/business/contracts-and-specifications/specifications-pay-items-list http://apps.pagnet.org/standardspecifications http://apps.pagnet.org/standardspecifications/ http://mutcd.fhwa.dot.gov/pdfs/2009/pdf_index.htm https://azdot.gov/sites/default/files/2019/07/arizona-supplement-to-the-manual-on-uniform-traffic-control-devices-2009-mutcd-edition.pdf https://azdot.gov/sites/default/files/2019/07/arizona-supplement-to-the-manual-on-uniform-traffic-control-devices-2009-mutcd-edition.pdf https://www.tucsonaz.gov/files/sharedassets/public/v/1/government/departments/department-of-transportation-and-mobility/documents/2015_cot_additions_final.pdf https://www.tucsonaz.gov/files/sharedassets/public/v/1/government/departments/department-of-transportation-and-mobility/documents/2015_cot_additions_final.pdf https://www.tucsonaz.gov/files/sharedassets/public/v/1/dtm/documents/divisions/traffic-eng/design_manual.pdf https://www.tucsonaz.gov/files/sharedassets/public/v/1/dtm/documents/divisions/traffic-eng/design_manual.pdf https://content.civicplus.com/api/assets/c8d13f95-b46c-446e-97fe-8e5127201983 https://azdot.gov/business/contracts-and-specifications/specifications-pay-items-list
Pima County Regional Wastewater Reclamation Department, Standard Specifications and Details for Construction, 2022 Edition.
https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Wastewater%20Reclama tion/Engineering/SSDC_2022_Updated.pdf
Tucson Water, Standard Specifications and Details Manual, 2017 Edition:
https://www.tucsonaz.gov/files/water/docs/StandardSpecsDetails/Tucson_Water_Standard_Speci fications_and_Details_Manual_Complete_Dec_2017_V1.pdf
These Special Provisions, Bid Schedule, and the Project Plans.
https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Wastewater%20Reclamation/Engineering/SSDC_2022_Updated.pdf https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Wastewater%20Reclamation/Engineering/SSDC_2022_Updated.pdf https://www.tucsonaz.gov/files/water/docs/StandardSpecsDetails/Tucson_Water_Standard_Specifications_and_Details_Manual_Complete_Dec_2017_V1.pdf https://www.tucsonaz.gov/files/water/docs/StandardSpecsDetails/Tucson_Water_Standard_Specifications_and_Details_Manual_Complete_Dec_2017_V1.pdf
PROPOSED WORK
The proposed work is located in Pima County in the City of Tucson at the locations shown on the plans cover sheet.
The proposed project consists of:
HAWK OR BIKEHAWK SIGNAL PLANS
• Install HAWK or BikeHAWK traffic signal
• Reconstruction of curb access ramps at the crosswalk locations
• Sidewalk and driveway improvements where pedestrians and bicyclists share the sidewalk and bicyclists enter and leave the roadway.
• Pavement marking and signing.
The Contractor shall sequence all work to avoid conflicts with utility adjustments and complete the project within the approved schedule.
All work is to be completed within 180 Consecutive Calendar Days. The Contractor shall consider the following contract requirements:
• The Contractor shall schedule a pre-construction meeting within 14 calendar days of notice of award and the meeting shall be held within 30 days of notice of award.
• The Contractor shall prepare traffic control plans prior to the pre-construction meeting in accordance with these specifications. The Contractor shall, at a minimum, be required to maintain at least one open lane of traffic in each direction unless the Contractor offers an alternative traffic control approach that will minimize disturbance to residents and businesses along the project. No contract time extensions will be granted to the
Contractor for the DTM approval of a traffic control plan as the Construction Calendar timeframes are not flexible.
• The City will issue a Notice to Proceed after the pre-construction meeting.
• At the pre-construction meeting, the Contractor shall submit a construction schedule for all project elements that meet or decrease the allotted Construction Calendar timeframes and Calendar Contract Days.
GENERAL REQUIREMENTS
For the purpose of these Special Provisions, the terms City, City of Tucson and Engineer are synonymous.
1. Contract Time
Once the contract has been awarded and signed, the Contractor shall be issued a Notice to Proceed.
The Contractor shall have available 180 Consecutive Calendar Contract Days as indicated in these specifications to complete the work shown on the project plans and specified herein. The
Contractor shall field verify existing conditions shown on plans and specified herein prior to beginning construction. Any significant deviations to the conditions that may affect the timely construction of improvements shall be brought to the attention of the Engineer within 24 hours of discovery.
Prior to the delivery of any equipment, materials or supplies to the site of any work, or the beginning of any construction work, it is recommended that the Contractor take pre-construction photos or videos for the purpose of establishing the conditions existing in all the areas to be affected by the construction.
2. Construction Survey and Layout
Construction survey and layout, with the exception of pavement marking layout, will be provided by the City of Tucson.
3. Maintenance and Protection of Traffic
The contractor shall prepare and submit traffic control plans to the Engineer for review and approval two weeks prior to the start of the project construction activities (or at the Preconstruction
Meeting).
The traffic control plans shall conform to requirements of Part 6 of the Manual on Uniform Traffic
Control Devices (MUTCD), edition adopted by the Arizona Department of Transportation
(ADOT), Section 701 of the Standard Specifications, and these Special Provisions.
Construction work activities that impact traffic shall not begin until the traffic plan, days, and duration have been approved by the Engineer. No separate measurement or payment will be made for preparation and submittal of traffic control plans for review and approval, it will be considered included the price of the contract bid items.
Changes or revisions to the traffic control plan (TCP) and specifications shall be submitted and approved by the Engineer in advance of implementation.
The contractor shall not store equipment, supplies, materials, or debris on the sidewalks or bike paths.
The contractor shall be required to check on all traffic control barricading, signing, message board twice daily and maintain, as needed.
The contractor is advised of the Civil Sanctions for Temporary Traffic Control Violations included in Section 20 of the Additions by the City of Tucson to the Manual on Uniform Traffic Control
Devices, for Temporary Traffic Control.
The contractor shall provide a clear and safe pedestrian access travel way at all times during construction. Safe pedestrian access through the construction site shall be provided during and after regular work hours.
The contractor shall contact local law enforcement, local fire department and local ambulance services a minimum of 72 hours in advance of any roadway restrictions. The contractor shall ensure that emergency vehicles have access to the project area and each residence at all times.
The contractor shall not schedule any traffic restrictions during weekends or recognized holidays, unless otherwise approved by the Engineer. Holidays are from 12:00 PM of the last working day prior to the holiday until 6:00 AM of the first working day following the holiday. When the holiday falls on a Tuesday, the Monday before the holiday is considered part of the holiday.
The contractor shall provide all safety equipment, barricades, proper lighting and all other items to perform nighttime work when deemed necessary by the Engineer.
The contractor shall maintain access to all side streets, access roads, businesses, residences, driveways, alleys, and parking lots.
Throughout the duration of construction, access by Emergency Services, Sun Tran, and mail delivery shall be maintained.
The existing traffic signal operations at the various intersections identified in the plans shall be operational and continuous twenty-four (24) hours per day seven (7) days a week. Any periods of time for which the signals are temporarily out of service shall be controlled by Uniformed Law
Enforcement personnel and marked car.
4. Permits
Before undertaking work at any location covered by this project, the Contractor shall obtain Right of Way permits issued by the City of Tucson Engineering Division for work in public rights-of-way. Permit fees are waived on CIP projects under a contract administered by the City of Tucson, Department of Transportation and Mobility.
5. Construction Surveillance
City of Tucson forces, including consultant inspectors, shall perform the inspection of the contractor’s work. Assistance may be provided by the Engineering Division inspection staff.
6. Material Sources
Material sources shall be as specified in the project plans, Section 1004 and 1007 of the Standard
Specifications.
7. Salvaged Items
All materials identified as on the plans to be salvaged as part of this project shall be delivered to a location as directed by the Engineer.
Signs shall be removed and salvaged in accordance with the plans and these Special Provisions.
Salvaged signs shall be delivered to the City of Tucson Sign Shop at 4004 S. Park Avenue, Building 6 (West End). The contractor shall contact April Ormsby (520-373-3641, april.ormsby@tucsonaz.gov) at least 5 working days in advance to coordinate the time and location for delivery of salvaged signs.
Street lighting equipment shall be removed and salvaged in accordance with the plans and these
Special Provisions. Salvaged traffic signal equipment shall be delivered to the City of Tucson
Streets and Traffic Maintenance Division yard. The contractor shall contact Armando Bracamonte
(520-429-6647, armando.bracamonte@tucsonaz.gov) one week prior to delivery to coordinate the time and location for delivery of the salvaged traffic signal equipment.
The contractor shall be responsible for all loading, unloading, and hauling of all salvaged materials at the location specified. No measurement of direct payment will be made for this work, the cost being considered as included in the price of contract items.
8. Staging Area
Identification of equipment, materials storage/stockpiling and Contractor/Sub-contractor parking shall be the responsibility of the Contractor. The Contractor shall provide the Engineer with a copy of the written approval of the property owner indicating that the property owner is fully aware and agreeable to said equipment, material storage/stockpiling, and Contractor/Sub-contractor parking.
This written approval is to be provided to the Engineer prior to commencement of the work.
No work shall be allowed to commence unless the conditions and requirements of this specification section is adhered to. Failure of the contractor to abide by this specification section shall be sufficient grounds for the City to suspend work.
9. Environmental Requirements and Mitigation Measures
The project mitigation measures are not subject to change without written approval from ADOT
Environmental Planning. The Contractor shall follow all the requirements of the permits specified herein and comply with the project special provisions as well as the PAG Standard Specifications for Public Improvements, as well as all applicable local environmental requirements.
If vegetation clearing will occur during the migratory bird breeding season (March 1 to August
31), the contractor shall avoid any active bird nests. If the active nests cannot be avoided, the contractor shall notify the Engineer to evaluate the situation. During the non-breeding season
(September 1 to February 28) vegetation removal is not subject to this restriction.
Prior to construction, all personnel who will be on-site, including, but not limited to, contractors, Contractors’ employees, supervisors, inspectors, and subcontractors shall review the attached
Arizona Department of Transportation Environmental Planning “Western Burrowing Owl
Awareness” flyer.
If any burrowing owls or active burrows are identified the contractor shall notify the Engineer immediately. No construction activities shall take place within 100 feet of any active burrow.
If the Engineer in cooperation with the Environmental Planning Biologist determines that burrowing owls cannot be avoided, the contractor shall employ a qualified biologist holding a permit from the US Fish & Wildlife Service to relocate burrowing owls from the project area, as appropriate. The contractor shall develop a Noxious and Invasive Plant Species Treatment and
Control Plan in accordance with the requirements in the contract documents. Plants to be controlled shall include those listed in the state and federal noxious weed and the state invasive species lists in accordance with state and federal laws and executive orders. The plan and associated treatments shall include all areas within the project right-of-way and easements as shown on the project plans.
The treatment and control plan shall be submitted to the Engineer for the Department of
Transportation and Mobility Professional Landscape Architect for review and approval prior to implementation by the contractor.
Prior to the start of ground-disturbing activities and throughout the duration of construction and any landscape establishment period, the contractor shall arrange for and perform the control of noxious and invasive species in the project area.
For yellow median and orange scupper paint removal: Prior to beginning any work, an approved contractor shall develop and implement a Lead-Based Paint Removal and Abatement Plan for the removal of the lead-based paint, Toxicity Characteristic Leaching Procedure testing of the generated waste stream, and proper disposal of the waste stream derived from the removal of the yellow median paint and orange scupper paint within the project limits. The contractor shall select a lead abatement contractor that meets the qualification requirements specified within the special provisions and as approval by the Engineer. The contractor shall follow all applicable federal, state, and local codes and regulations, including Arizona Department of Transportation Standard
Specifications for Road and Bridge Construction (2021 Edition), related to the treatment and handling of lead-based paint. The contractor shall submit the Lead-Based Paint Removal and
Abatement Plan to the Engineer and the ADOT Environmental Planning Hazardous Materials
Coordinator (602.920.3882 or 602.712.7767) for review and approval at least 10 working days prior to beginning the saw cut and removal work.
Visible fugitive dust emissions from paint removal shall be controlled through wet or dry (e.g., vacuum) means during the removal process. If the liquid waste stream generated by a water-blasting obliteration method passes the Toxicity Characteristic Leaching Process analysis, it may be used as a dust palliative or for compaction on the project. If the water is not used on the project, it shall be properly disposed of in accordance with all applicable federal, state, and local regulations.
DIVISION 100 - GENERAL PROVISIONS
101-3 DEFINITIONS of the Standard Specifications is modified to add:
Major Items – A major item is an item whose total cost, determined by multiplying the bidding schedule quantity and the contract unit price, is equal to or greater than the amount indicated below.
A major item will remain a major item unless it is eliminated.
When the original total and including:
contract amount is from A major item shall be equal to or greater than the following amount:
o r
$ 0.00 $ 100,000 $ 5,000
100,001 200,000 10,000
200,001 450,000 15,000
450,001 750,000 25,000
750,001 1,100,000 35,000
1,110,001 1,500,000 45,000
1,500,001 2,000,000 55,000
2,000,001 2,500,000 65,000
2,500,001 3,000,000 75,000
3,000,001 5,000,000 85,000
5,000,001 7,000,000 120,000
7,000,001 10,000,000 150,000
10,000,001 25,000,000 250,000
25,000,001 50,000,000 350,000 over 50,000,000 500,000
Minor Item – A minor item is any item which is not a major item.
SECTION 101 - ABBREVIATIONS AND DEFINITIONS
101-3 TERMS: of the Standard Specifications are revised as follows:
Supplemental Agreement – Add the following: “All supplemental agreements will be issued in compliance with City of Tucson Procurement Code.”
SECTION 104 - SCOPE OF WORK
104-2 ALTERATIONS TO THE CONTRACT
104-2.01 By the Agency. The Standard Specifications is revised to read:
The Agency reserves the right to revise the contract at any time. Such revisions shall neither invalidate the contract nor release the surety. The contractor agrees to complete the contract as revised. The contractor shall not proceed with work for which a revision to the contract is required without prior approval from the Engineer. Once approval is received, the contractor shall proceed with such direction immediately, whether the Engineer considers that the contract has been revised or not.
It is the contractor's obligation to notify the Engineer in writing that a revision to the contract is necessary and provide such notification in accordance with Subsection 104-4. Whenever the words notice, notification, request or notify are used in this subsection, such notice or request shall be provided in accordance with the requirements of Subsection 104-4.
Supplemental Agreements will be issued for the reasons specified in 104-2.03 and 104-2.04 of the
Standard Specifications, in addition to the following reasons:
(A) To accomplish extra work as defined in Subsection 101-3 and specified in subsection
104-3.
(B) If the work is suspended by order of the Engineer as provided below:
(1) If the performance of all or any portion of the work is suspended or delayed by the
Engineer in writing for an unreasonable period of time (not originally anticipated, customary, or inherent to the construct ion industry) and the contractor believes that additional compensation and/or contract time is due as a result of such suspension or delay, the contractor shall submit to the Engineer, in writing, a request for adjustment within seven calendar days of receipt of the notice to resume work. The request shall set forth the reasons and support for such adjustment.
(2) Upon receipt, the Engineer will evaluate the contractor's request. If the Engineer agrees that the cost and/or time required for the performance of the contract has increased as a result of such suspension and the suspension was caused by conditions beyond the control of and not the fault of the contractor, its suppliers, or subcontractors at any approved tier, and not caused by weather, the Engineer will make an adjustment
(excluding profit) and modify the contract in writing accordingly. The contractor will be notified of the Engineer's determination whether an adjustment of the contract is warranted.
(3) No contract adjustment will be allowed unless the contractor has submitted the request for adjustment within the time prescribed.
(4) No contract adjustment will be allowed under this clause to the extent that performance would have been suspended or delayed by any other cause, or for which an adjustment is provided or excluded under any other term or condition of this contract.
(C) If there are significant changes in the character of work as provided below:
(1) The Engineer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Changes in quantities and alterations shall not invalidate the contract nor release the surety. The contractor agrees to perform the work as altered.
(2) If the alterations or changes in quantities significantly change the character of the work under the contract, whether such alterations or changes are in themselves significant changes to the character of the work or, by affecting other work, cause such other work to become significantly different in character, an adjustment, excluding anticipated profit, will be made to the contract. The basis for the adjustment shall be agreed upon prior to the performance of the work. If a basis cannot be agreed upon, then an adjustment will be made either for or against the contractor in such amount as the
Engineer may determine to be fair and equitable.
(3) If the alterations or changes in quantities do not significantly change the character of the work to be performed under the contract, the altered work will be paid for as provided in the contract.
(4) The term "significant change" shall be construed to apply only to the following circumstances:
(a) When the character of the work as altered differs materially in kind or nature from that involved or included in the original proposed construct ion; or
(b) When a major item of work, as defined elsewhere in the contract, is increased more than 125 percent or decreased below 75 percent of the original contract quantity. Any adjusted unit price for an increase in quantity shall apply only to that portion more than 125 percent of original contract item quantity. Any adjustment in contract unit price for a decrease in quantity below 75 percent shall apply only to the actual amount of work performed, except that the product of the adjusted unit price and the reduced quantity of work performed shall in no case exceed the product of the original contract unit price and 75 percent of the Bid Schedule quantity.
(D) To revise the contract time in accordance with Subsection 108-08. If the Supplemental
Agreement is to provide for an increase or decrease in the contract price or time, such increases or decreases will be determined in accordance with the requirements herein and Subsections 108-8 and 109-4.
When the Agency makes alterations in the details of construction or Specifications, that are limited in scope, to the extent that the cost of the alterations will not exceed $10,000.00, the Agency and the contractor may reach agreement upon the scope of work and an amount to cover the cost of the work to be performed. This agreement shall be reflected in a letter from the Agency to the contractor, which, when executed by both parties, shall have the same force and effect as a supplemental agreement. Work shall not proceed until both parties have signed the agreement.
This work will be paid for under ITEM 9240101 – Miscellaneous Work (Minor Alterations in
Details of Construction), which shall serve as an account for the payment of letter agreements in accordance with this specification. Any balance left in this account at the end of the construction phase will not be paid and will be expunged from the contract.
104-2.02 Due to Physical Conditions. The Standard Specifications is revised to read:
104-2.02 Differing Site Conditions.
(A) During the progress of the work, if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the contract or if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the work provided for in the contract, are encountered at the site, the party discovering such conditions shall promptly notify the other party in writing of the specific differing conditions before the site is disturbed and before the affected work is performed.
(B) Upon written notification, the Engineer will investigate the conditions and if it is determined that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the contract, an adjustment, excluding anticipated profits, will be made and the contract modified in writing accordingly. The Engineer will notify the contractor of the determination whether an adjustment of the contract is warranted.
(C) No contract adjustment, which results in a benefit to the contractor, will be allowed unless the contractor has provided the required written notice.
(D) No contract adjustment will be allowed under this clause for any effects caused on unchanged work.
(E) The contract contains no indication of the soil conditions to be encountered. Caliche-like material is prevalent throughout the Tucson area and the contractor is expected to utilize the proper equipment to excavate the material. Hard digging is not considered a differing site condition.
(F) Archaeological or cultural features shall be treated as noted in Subsection 107-6.
104-6 MAINTENANCE OF THE PROJECT SITE of the Standard Specifications is modified to add:
Any existing or salvaged materials damaged by the contractor during construction shall be repaired and/or replaced. The cost of such repair and replacement shall be at the Contractors expense. It is the responsibility of the contractor to become thoroughly familiar with all visible features of the site before preparing his proposal.
104-8 FINAL CLEAN UP of the Standard Specifications is modified to add:
No accumulation of materials, debris, rubbish, etc., shall be left at any site overnight. All areas
(sites) shall be left reasonably clean (as determined by the project inspector) at the end of each day.
104-10 MISCELLANEOUS WORK is added to the Standard Specifications:
General. Miscellaneous work shall be considered as a part of the total project, and there shall be no separate measurement or payment item for this work.
Miscellaneous Work shall include but not be limited to remobilization to and from the original bid work, equipment facilities and staging areas, minor pavement repair (existing pavement match), and removal of debris and excess material from the site. Miscellaneous Work shall include load testing for hauling legal loads and potholing for utility locations. Dump fees required for disposal of demolished or excess material shall be incidental and included in the respective removal item or total cost of the project.
Damages to public facilities within the right-of-way or on private property caused by the
Contractor shall be restored in-kind and at no cost to the Department. Temporary relocation of street, traffic, business, and bus stop signs and mailboxes, unless specifically itemized for the contract, shall be incidental to the overall cost of the project.
Miscellaneous work shall also include all coordination and notification necessary to complete the project. Such coordination shall include, but not be limited to utility coordination, coordination with businesses and residences for pedestrian and vehicular access, coordination required by the plans and/or the specifications, resident and business owner work hour notification, and all other coordination necessary whether mentioned on the plans or not.
(A) Notification.
Not later than seven (7) calendar days prior to the commencement of work, the Contractor shall distribute notices of the intent of the City of Tucson to begin construction on this project. The notices shall be distributed to the businesses and residences abutting the project rights-of-way.
Such notices shall be furnished by the Contractor to the Office of the City Engineer for review and approval prior to distribution. The contractor will be required to make enough copies of this notice for distribution. Notices are not to be placed in mailboxes. Where there is no response or there is no answer at the door, the notice is to be left in the door/screen door.
There shall be no separate pay item for the cost of the resident notification and shall be included as a part of the overall project.
SECTION 105 - CONTROL OF WORK
105-6 Cooperation with Utility Companies: the sixth paragraph of the Standard
Specification is modified to add:
The contractor will acknowledge and agree that no monetary compensation will be given to the contractor by the Agency as a result of the impacts or delays to his operations that are caused by the utility companies.
105-17.02 Substantial Completion: the Standard Specification is modified to add:
Once substantial completion is granted, the contractor shall actively work to achieve Final
Acceptance of the construction phase of the Contract within 21-calendar days from the
Substantial Completion date of that phase. Failure to prosecute the remaining work within this time period will result in the resumption of time charges and the application of liquidated damages from the date scheduled for final acceptance.
The contractor is responsible for maintenance and repairs of any project work until final acceptance, at which time the City will accept the improvements for operation and maintenance.
105-17.04 Final Acceptance: the thrid paragraph of the Standard Specification is modified to add:
In addition, final acceptance will not be made until all completed record drawings and working drawings, as required in Subsection 105-2, have been submitted and deemed acceptable by the
Engineer.
105-18 Claims: of the Standard Specification is modified to add:
The administrative process for resolution of disputes and claims is sequential in nature and is composed of the following steps:
Step I Review by City of Tucson DTM
Step II Review by Procurement
Step III Review by the City Attorney’s Office
If the contractor rejects the decision of DTM, the dispute or claim will be forwarded to the
Procurement for resolution in accordance with the Procurement Code.
105-18.01 Notice of Claims: of the Standard Specifications is modified to add:
Reference to the authorized representative shall mean the Procurement Contract Officer.
References to submissions to the Engineer or authorized representative shall be modified to include submissions to both the Engineer and authorized representative.
105-18.02 Submission of Claims: of the Standard Specifications is modified to add:
Reference to the authorized representative shall mean the Procurement Contract Officer.
References to submissions to the Engineer or authorized representative shall be modified to include submissions to both the Engineer and authorized representative.
Content of the Claim: The claim shall be in writing and shall include the following information:
(a) The name, address, telephone number and email address of the claimant;
(b) The signature of the claimant or its representative
(c) Identification of the solicitation or contract number
(d) A detailed statement of the legal and factual grounds of the claim including copies of relative documents as described in Section A and Section B of the
Standard Specifications; and
(e) The form of relief requested.
105-18.03 Decision on Claims: of the Standard Specifications is revised to read:
The decision of claims shall be made by the Procurement Department’s Contract Officer in accordance to Tucson Code Section 28-92.
105-20 MEDIATION OF CLAIMS AND DISPUTES: of the Standard Specifications is modified to add:
Notwithstanding Section 105-18.03of the Standard Specifications, if the contractor is not satisfied with the decision of the Engineer, and prior to filing for arbitration or litigation, the contractor may request a non-binding mediation by filing a request for mediation in writing with the Engineer.
The Engineer will then arrange for a mutually agreeable mediator. Such request for mediation shall be made within 30 calendar days from actually receiving the Engineer’s decision as provided for in this section.
In connection with the mediation, each party shall bear its own costs, and any fees and expenses assessed by the mediator shall be borne equally by both parties.
SECTION 106 - CONTROL OF MATERIAL
106-4 TESTS AND ACCEPTANCE OF MATERIALS: is modified to add:
106-4 (A) CONTRACTOR QUALITY CONTROL:
The Contractor is responsible for quality control measures necessary to provide acceptable quality in production, handling, and placement of all materials. The Contractor shall provide all the personnel, equipment, materials, supplies, and facilities necessary to obtain samples and perform tests listed in the applicable section. The Contractor shall designate a qualified employee as Quality Control Manager to be responsible for implementing, monitoring, and as necessary, adjusting the processes to assure acceptable quality. All testing shall be performed by a laboratory listed for the tests to be performed in the ADOT Directory of Approved Materials
Testing Laboratories, meeting the requirements of “System for the Evaluation of Testing
Laboratories.” Sampling and testing shall be performed by and under the direction of ATI and
ACI certified technicians and supervisor. The directory and certification requirements may be obtained from the City’s Materials Laboratory at (520) 791-3127. No separate measurement or payment shall be made for Contractor Quality Control. The cost of quality control shall be included in the cost of the respective bid items or measurement and payment shall be made as described in item specification 9240170 Contractor Quality Control.
The City will perform the quality assurance testing for the purpose of accepting the Contractor’s test results.
Minimum Testing Frequency information is shown in the following tables (Table 106-1) for any appropriate testing required as needed for the items in the project. Additional testing requirements are as specified in the most recent update of Section 900 of the Arizona
Department of Transportation, Materials Testing Manual. The Contractor may provide certificates of analysis or certificates of compliance for items identified in the Pima Association of Governments Standard Specifications for Public Improvements in lieu of the testing requirements of those materials identified in the ADOT Materials Testing Manual.
106-4 (B) SPECIFIC CONTRACTOR QUALITY CONTROL MEASURES:
Quality Control Plan: At the preconstruction conference, the Contractor shall designate a qualified employee as Quality Control Manager to be responsible for implementing, monitoring and, as necessary, adjusting the processes to assure acceptable quality. Also at the preconstruction conference, the Contractor shall be prepared to discuss his understanding of the quality control responsibilities for the specified materials.
Records: The Contractor shall maintain complete testing records and make them available to the
Engineer for review and copies as requested.
Weekly Quality Control Reports: The Contractor shall submit Weekly Quality Control Reports to the Engineer. The weekly reports shall state the types of work, such as earthwork, Portland cement concrete, or asphaltic concrete, which have been performed during the report period, and shall also include the process control measures taken to assure quality. The weekly report shall provide sample identification information for materials tested during the report period, including sample number, date sampled, sample location, person obtaining sample, and original source of material. The report shall also provide the results for all required tests and any retests, corrective actions, and any other information relevant to quality control. Although hand-written documentation can be included, the quality control report narrative, sample identification information, results for tests and any retests, and corrective actions shall be typed to ensure the
Department can make clear reproductions of the documents.
The report period shall end at midnight of each Friday, and the report shall be submitted to the
Engineer no later than 5:00 p.m. of the following Wednesday or at a time agreed upon by the
Engineer.
Table 106-1
CONTRACTOR QUALITY CONTROL TESTING REQUIREMENTS
TYPE OF
TEST
TEST
METHOD
SAMPLING
POINT
MINIMUM TESTING
FREQUENCY
Structural Backfill (203-5, 501, 502, 503, 505, 508, 509, 510, 610, 731, 732, 906 & 920)
Gradation ARIZ 201 Stockpile
1 per 500 CY per Source
1 per source PI AASHTO T 89, T 90
Proctor Density ARIZ 225, ARIZ 226, ARIZ 245
1 per Source
Compaction ARIZ 227, ARIZ 230, ARIZ 231, ARIZ 232, ARIZ 235, ARIZ 246
In-place 1 per 200 CY, minimum
1 per lift
Roadway Subgrade
Gradation ARIZ 201
Roadway
1 per Soil Type
PI AASHTO T 89, T 90
Proctor Density ARIZ 225, ARIZ 226, ARIZ 245
Compaction ARIZ 227, ARIZ 230, ARIZ 231, ARIZ 232, ARIZ 235, ARIZ 246
Roadway 1 per 1,000 feet
Sidewalk Subgrade
Proctor Density ARIZ 225, ARIZ 226, ARIZ 245
Roadway Prism 1 per Soil Type
Compaction ARIZ 227, ARIZ 230, ARIZ 231, ARIZ 232, ARIZ 235, ARIZ 246
Roadway Prism 1 per 2000 square feet of sidewalk and/or 1 per 500 square feet of curb access ramp
Proctor Density ARIZ 225, ARIZ 226, ARIZ 245
In-place 1 per Soil Type
Compaction ARIZ 227, ARIZ 230, ARIZ 231, ARIZ 232, ARIZ 235, ARIZ 246
In-place 1 per 1,000 feet per lift
Borrow Within Three Feet of Finished Subgrade Elevation
Gradation ARIZ 201 Stockpile 1 per Source
1 per Source PI AASHTO T 89, T 90
Aggregate Base
Fractured Coarse Aggregate
Particles
ARIZ 212
1 per Source
Gradation ARIZ 201 1 per 600 CY
PI AASHTO T89, T90
Proctor Density ARIZ 225, ARIZ 226, ARIZ 245
Crusher belt or
Stockpile
1 per Source
Compaction ARIZ 227, ARIZ 230
ARIZ 331, ARIZ 232
ARIZ 235, ARIZ 246
Roadway 1 per 600 CY
Asphaltic Concrete Aggregate (all types) MA for AC
Sand Equivalent AASHTO T 176 Cold Feed 1 per 2000 tons of total aggregate.
Table 106-1
CONTRACTOR QUALITY CONTROL TESTING REQUIREMENTS
TYPE OF
TEST
TEST
METHOD
SAMPLING
POINT
MINIMUM TESTING
FREQUENCY
Fractured Course Aggregate
Particles
ARIZ 212 Cold Feed 1 per 2000 tons of total aggregate.
Uncompacted Void Content
ARIZ 247 Cold Feed 1 per 2000 tons of total aggregate.
Gradation ARIZ 201 Cold Feed 1 per 500 tons
Asphaltic Concrete
Voids ARIZ 415, ARIZ 417, ARIZ 424
Roadway or Plant 1 per 500 tons of asphaltic concrete production
Asphalt Content ARIZ 421, ARIZ 427 or other approved methods
Roadway or Plant 1 per 500 tons of each mix
Gradation ARIZ 201 or ARIZ 427 Cold Feed or Plant 1 per 500 tons
Compaction ARIZ 412 OR ARIZ 104, Sec. 3, ARIZ 415, ARIZ 410a
Roadway 1 per 300 tons of asphaltic concrete production, minimum of one per shift
Asphaltic Concrete (Asphalt Rubber)
(in addition to the requirements above)
Asphalt Rubber Content
ARIZ 421 Roadway 4 times per full shift
Nuclear Gauge
Backfill and Bedding Material (501, 502, 508, 510, 511, 732 & 932)
Gradation ARIZ 201 Stockpile
1 per 500 CY
1 per Source PI AASHTO T 89, T 90
Proctor Density ARIZ 225, 226, 245 1 per Source
Compaction ARIZ 227, 230, 231, 232, 235, 246
In-place 1 per 200 CY, minimum 1 per lift
Thermoplastic Striping (704)
Thickness Standard Specification 704-
3.03
In-place 1 per color per production day of long line and of short line Fine Aggregate for Portland Cement Concrete
Gradation ARIZ 201 Crusher Belt or Stockpile
1 every other day
1 every other day Sand Equivalent AASHTO T176
Coarse Aggregate for Portland Cement Concrete
Gradation ARIZ 201 Crusher Belt or Stockpile
1 every other day
Class B and Class S Portland Cement Concrete
Entrained Air (above 3,000
ft. elev. only)
AASHTO T 152 At Point of Discharge 1 per 100 Cubic Yards of Ea.
Class of Concrete
Slump AASHTO T 119 At Point of Discharge 1 per 100 CY or fraction thereof of continuously placed concrete, on a daily basis, for each class or source
Temperature ASTM C 1064 At Point of Discharge
(SS
–1006-5.02 and 5.03)
1 per 100 CY or fraction thereof of continuously placed concrete, on a daily basis, for each class or source
Fabrication of Test
Cylinders
AASHTO T 141 At Point of Discharge
(SS-1006-7.02)
1 set per 100 CY or fraction thereof of continuously placed concrete, on a daily basis, for each class or source
Table 106-1
CONTRACTOR QUALITY CONTROL TESTING REQUIREMENTS
TYPE OF
TEST
TEST
METHOD
SAMPLING
POINT
MINIMUM TESTING
FREQUENCY
Compressive Strength Test
Cylinders 28 day *
AASHTO T 23 At Point of Discharge
(SS-1006-7.06)
1 set per 100 CY or fraction thereof of continuously placed concrete, on a daily basis, for each class or source
(a) * Additional cylinders may be taken by the contractor for their convenience for early breaks at the contractor’s cost.
(b) For asphalt concrete testing the contractor shall perform the quality control measures described in the table above and the measures detailed below. At the weekly meeting, the contractor shall be prepared to explain and discuss how the following processes will be employed.
(c) Aggregate production, including crusher methods, pit extraction, and washing.
(d) Stockpile management, including stacking methods, separation technique, plant feed technique, stockpile pad thickness, and segregation prevention.
(e) Proportioning and plant control, including plant scale calibration, mix temperature control, storing method, and addition of admixture.
(f) Transporting and placing, including hauling distance and temperature control, segregation and non-uniform placement control, and joint placement and technique.
(e) Compaction, including types and weight of rollers, establishing and monitoring of roller patterns, and temperature controls.
SECTION 107 - LEGAL RELATIONS AND RESPONSIBILITY TO PUBLIC
107-6.01 Archaeological Features. The Standard Specifications is modified to add:
In the event that archaeological or historical features are encountered, cease work that could damage the features and contact the City of Tucson Historic Preservation Office at 837-6968 or
791-4171 and the Engineer.
107-8 PUBLIC CONVENIENCE AND SAFETY
The Standard Specifications is modified to add:
The contractor shall provide pedestrian and bicycle access at all times, adjacent to the work area.
Any disturbance of landscaping by grading needed to provide access shall be replaced when the work is complete. Materials necessary to meet the intent of this requirement shall be removed upon completion. The costs of said work or materials shall be considered incidental to the contract and included in the overall bid price.
In general, business access will be maintained at all times. Where additional driveway access is necessary to provide access and to ensure the safe traffic circulation of large delivery vehicles, secondary driveways or affecting improvements, driveways shall be built one half at a time to provide at least one lane ingress/egress during the respective construction.
107-15 PREVENTION OF LANDSCAPE DEFACEMENT; PROTECTION OF
STREAMS, LAKES, AND RESERVOIRS is hereby added to the Standard
Specifications:
107-15.01 National Pollution Discharge Elimination System
107-15.01(A) General.
This project is less than 1 acre. The Contractor shall implement the Arizona Department of
Environmental Quality (ADEQ) requirements for protecting the quality of stormwater runoff during construction, as specified under the Arizona Pollutant Discharge Elimination System
(AZPDES) General Permit for Construction Activities.
The construction activities are considered “Exempt Discharges” under AZPDES General Permit for Construction Activities, Part 1.D.6.b. However, efforts to prevent pollutants from discharging from the project must be utilized by providing, installing, maintaining, removing and disposing of erosion control measures including, but not limited to, such items as gravel filter berms, dikes, catch basin inlet protection, end-of-pipe filtering devices, silt fences, dams, sediment basins, netting, straw bale barriers, slope drains, and other erosion control devices or methods.
107-15.01(B) Materials.
The Contractor shall not be required to prepare a Stormwater Pollution Prevention Plan (SWPPP) but shall follow Best Management Practices in accordance with the AZPDES General Permit for
Construction Activities, in conjunction with the City of Tucson Construction Project Manager and the City of Tucson Stormwater Management Section.
A Notice of Intent (NOI) and Notice of Termination (NOT) shall not be required.
107-15.01(C) Construction.
As part of the contractor’s Best Management Practices, the following items shall be considered to protect stormwater quality during the course of construction:
• Spill Containment Plan
• Stabilized construction entrances
• Equipment maintenance procedures
• Designated washout areas
• Protected chemical and materials storage area
• Solid Waste Management
• Dust control
• Construction road stabilizing
• Protection of catch basins
• Sediment traps and barriers
• Any non-stormwater discharges
107-15.01(D) Method of Measurement.
There shall be no separate measurement for providing ‘good housekeeping’ practices, the cost being considered as included in the price of the other items.
107-15.01(E) Basis of Payment.
No measurement or direct payment will be made for the contractor’s Best Management Practices to protect stormwater quality.
107-21 CONTRACTOR’S RESONSIBILITY FOR UTILITY PROPERTY AND
SERVICES of the Standard Specifications is modified to add:
The following utility companies have facilities in the project area but are not anticipated to be in conflict:
Utility Agency Contact Phone
American Telephone & Telegraph Joseph Forkert (714) 963-7964
City Of Tucson Fiber Sam Aggrey D’Almeida (520) 354-0196
Cox Communications - Tucson Jacob Horsman (623) 238-2202
Congruex
Lumen/Century Link
Kevin Wagner
Anthony Miller
(815) 245-9640
(520) 300-1349
First Digital John Trahey (520) 262-5667
Verizon Wireless Ray Moreno (480) 564-3455
MCI - (Verizon Business) Ray Moreno (480) 564-3455
Pima County Wastewater Reclamation Tom Porter (520) 724-6719
Southwest Gas - Tucson - Distribution Aridai Rosas (520) 667-5442
Southwest Gas – Tucson – High Pressure Aridai Rosas (520) 667-5442
Tucson Electric Power Miranda Jackson (520) 449-4309
Tucson Water Josh Bohan (520) 633-9672
Zayo group, LLC Ryan Erfert (480) 564-3455
The project has a network of underground and overhead power lines.