IFB 24-1708 Sand Storage Facility Addendum 1.pdf
PDF 20 MB Posted
- Attached to
- UMW Physical Plant Sand Storage Facility
- Solicitation number
- 59181
- Issued by
- Fredericksburg City, Virginia
About this file
This document is an Addendum to Invitation for Bid (IFB) 24-1708 for the construction of a Pre-fabricated Building for Sand Storage for the University of Mary Washington (UMW) Physical Plant located in Fredericksburg, Virginia. The addendum provides clarification and modifications to the original solicitation, including changes to the Scope of Work, Drawings, and Specifications. The project involves the construction of a prefabricated building for the storage of sand. Responses to the IFB are due by 3:00 pm EST on February 17, 2023. A mandatory pre-bid conference was held on January 26, 2023 and the attendees list is provided. The contract will be awarded to the lowest responsive and responsible bidder.
The addendum addresses pricing, including the requirement for unit pricing on specific line items. There is no SWAM (Small, Women, and Minority-owned Business) set-aside for this project. The current incumbent contractor is not identified. Funding for the project is provided by the Commonwealth of Virginia and the University of Mary Washington. The total project budget is not specified in the addendum.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised 01/13/2016 1301 College Avenue Tel: (540) 654-1127 Fredericksburg, VA 22401-5300 Fax: (540) 654-1168
Page 1 of 1 adminfinance.umw.edu/procurement procure@umw.edu
ADDENDUM 1/IFB 24-1708
5 March 2024
ADDENDUM NO. 1 TO ALL OFFERORS:
Reference – Invitation for Bids: IFB 24-1708/State Project 215-B3215-012 Sand Shelter Facility Date Issued: 6 March 2024
For Delivery to: University of Mary Washington, Commonwealth of Virginia, Eagle Village Executive Offices/Procurement Services/Suite 480 Attn. IFB 24-1708/Patricia Canciglia 1125 Emancipation Highway, Fredericksburg, VA 22401
Bid Due Date: 26 March 2024, no later than 2PM.
This addendum consists of this page and (4) attachments. This addendum is hereby issued to inform new key deadlines, answers to questions submitted by offerors, and clarification on Bid Bond requirement. As attachments: the Pre-Bid Sign in Sheet, the Geotechnical report, existing survey of site and Constructions Drawings update. This update includes dimensions on G-000, information removed on G-001, and details on A-301.
Final date of submission of questions: 20 March 2024.
Bid Bond requirement: Bid Bond will be required only if bid exceeds $500,000 per Section 5 of the Instruction to Bidders.
Questions from Offerors:
1. Are the CAD drawings for survey? Answer – No. Attached survey drawings in pdf format.
2. Is there a stockpile for excess spoils on site? Answer – No. Unsuitable soils should be removed from site.
3. Are there liquidated damages? Answer – No, however the State reserves the right to pursue actual damages for non-excusable delays (General Conditions Section 43).
4. Confirm if the inspections are to be paid and coordinated by GC or just coordinated. Answer – Inspections are owner’s responsibility, not the GC.
END OF ADDENDUM NO. 1
Patricia A. Canciglia Senior Contract Officer University of Mary Washington 1301 College Avenue Fredericksburg, VA 22401 Phone: (540)654-1237
IFB 24-1708 Addendum No. 1 (and all addenda) should be acknowledged and included in the IFB submittal package.
NAME OF OFFERING FIRM:
NAME OF OFFEROR REPRESENTATIVE:
OFFEROR SIGNATURE:
DATE:
SAND SHED FOUNDATION DETAILS
UNIVERSITY OF MARY WASHINGTON
EVALUATION OF PRECAST BLOCK FOUNDATION
FOR A PROPOSED SAND STORAGE SHED;
FREDERICKSBURG, VIRGINIA
UMW PROJECT CODE 215-B3215-012
1-23-27861-001 OFGRAPHIC
10/3/23
DateApproved
By
Scale
DJH
By
Drawn Date
Project No. SheetRev.
A101
Ref
A101
Ref
A101
Ref
A101
1 Ref
A101
A3.888
Ref
DRAWING SCALE
DRAWING SHEET
VIEW TITLE
BUILDING SECTION MARKER
WALL SECTION MARKER
DETAIL SECTION MARKER
EXTERIOR ELEVATION MARKER
INTERIOR ELEVATION MARKER
DETAIL CALLOUT
DRAWING NUMBER (TYP)
DRAWING SHEET (TYP)
REFERENCE TYPE (SIM, OH)
DRAWING NUMBER
DRAWING SHEET
REFERENCE TYPE (SIM, OH)
DRAWING NUMBER
DRAWING SHEET
DRAWING DIRECTION
DRAWING NUMBER
DRAWING SHEET
REFERENCE TYPE (SIM, OH)
VIEW EXTENTS
DETAIL NUMBER
A1 A0.02
1/4" = 1'-0"FLOOR PLAN- LEVEL 1
DRAWING TITLES
VIEW MARKERS
DRAWING SYMBOLS
REFERENCE FLOOR LEVEL IDENTIFICATIONS
SLOPE TAG
RISE PER 12" RUN
4"
A. 2018 VIRGINIA UNIFORM STATEWIDE BUILDING CODE (2018 VUSBC)
• BUILDING CODE: 2018 VIRGINIA CONSTRUCTION CODE (2018 VCC)
• FUEL CODE: 2018 INTERNATIONAL FIRE CODE (2018 IFC)
• FIRE CODE: 2018 INTERNATIONAL FIRE CODE (2018 IFC)
• ENERGY CODE: 2018 VIRGINIA ENERGY CONSERVATION CODE (2018 VECC)
B. 2022 EDITION, CONSTRUCTION AND PROFESSIONAL SERVICES MANUAL, DIVISION OF
ENGINEERING AND BUILDINGS (DEB), REV 1, FEBRUARY 14, 2023
APPLICABLE CODES:
DIVISION OF ENGINEERING AND
BUILDINGS (DEB)
JURISDICTION:
THE SCOPE OF THE PROJECT IS THE INSTALLATION OF A PREFABRICATED STRUCTURE TO SHELTER
APPROXIMATELY 16 CU YD OF SAND. IT WILL BE LOCATED ON THE GROUNDS OF THE
PHYSICAL PLANT BUILDING AT THE FREDERICKSBURG CAMPUS OF THE UNIVERSITY OF MARY
WASHINGTON. THIS STRUCTURE WILL BE SEATING ON COMPACTED SOIL.
PROJECT SCOPE DESCRIPTION:
BUILDING INFORMATION AND CODE ANALYSIS:
TYPE OF WORK: NEW STRUCTURE
CHAPTER 5: BUILDING HEIGHT: 75' - 0" ALLOWABLE. NUMBER OF STORIES: 4 STORIES ALLOWABLE
ABOVE GRADE PLANE.
ALLOWABLE AREA: 26,000 SF; ACTUAL AREA: 870 SF.
CHAPTER 6: BUILDING CONSTRUCTION TYPE: IIB; 0HR FIRE RESISTANCE FOR EXTERIOR WALLS
BEARING WALLS AND ROOF CONSTRUCTION.
FOR A 0 HR EXTERIOR WALLS TYPE IIB BUILDING, FIRE SEPARATION DISTANCE FROM IMAGINARY LINE SHOUD BE WITHIN 10' > X > 30'. REFER TO VCC SECTION 602. PROPOSED FIRE SEPARATION DISTANCE
FROM IMAGINARY PROPERTY LINE 11'-0".
FABRIC COVER ONLY WILL BE FIRE RATED.
*ADJACENT EXISTING BUILDINGS AND GROUNDS: BUILDING CONSTRUCTION TYPE: IIIB; FIRE
RESISTANCE EXTERIOR WALLS 2HR. ROOF: 1 HR.
FOR A 1 HR EXTERIOR WALLS TYPE IIIB BUILDING, FIRE SEPARATION DISTANCE OF BUILDING FROM IMAGINARY LINE SHOULD BE WITHIN 5' > X > 10'. REFER TO VCC SECTION 602. PROPOSED FIRE
SEPARATION DISTANCE FROM IMAGINARY PROPERTY LINE 27'-4".
UNWALLED SHED: BUILDING CONSTRUCTION TYPE: IIB; 0 FIRE RESISTANCE FOR EXTERIOR WALLS
BEARING WALLS AND ROOF CONSTRUCTION.
FOR A 0 HR EXTERIOR WALLS TYPE IIB BUILDING, FIRE SEPARATION DISTANCE OF BUILDING FROM IMAGINARY LINE SHOULD BE WITHIN 10' > X > 30'. REFER TO VCC SECTION 602. PROPOSED FIRE
SEPARATION DISTANCE FROM IMAGINARY PROPERTY LINE 11'-0".
CHAPTER 3: OCCUPANCY CLASSIFICATION USE: S2 - STORAGE LOW HAZARD OCCUPANCY
*ADJACENT EXISTING BUILDINGS AND GROUNDS: S2 - STORAGE LOW HAZARD OCCUPANCY
UNWALLED SHED: S2.
EXISTING ACF UNDERGROUND
ENVIRONMENTAL TANK
EXG BUILDINGS AND
GROUND BUILDING
EXG POLE
BARN
EXG PARKING LOT
A2
A-301
EXG UNWALLED SHED
OPEN END
NEW
BUILDING36'-3"
22'-0"
A P
P R
O X
38'-3"
IMAGINARY
PROPERTY LINE FOR
FIRE SEPARATION
PURPOSES
26'-6"
30'-0"
11'-0"
11'-0"
27'-4"
BUILDING ELEMENTS
N 292.485 E 141.501
10.000 ELEVATION (MAY BE RELATIVE TO PROJECT
BENCHMARK OR OTHER DATUM- REFER TO
GENERAL NOTES
COORDINATES AT POINT (MAY BE RELATIVE TO
PROJECT BENCHMARK OR OTHER DATUM-
REFER TO GENERAL NOTES)
31.00 , @ 96° 00' 00"
.0
32.00
PROPERTY LINE LENGTH (IF TAGGED)
PROPERTY LINE BEARING (IF TAGGED)
PROPERTY LINE LENGTH (IF TAGGED)
PROPERTY LINES (TAGS MAY BE SHOWN FOR
REFERENCE ONLY. REFER TO CIVIL DRAWINGS
AND SURVEY FOR PROPERTY INFORMATION)
LEGEND - SITE PLANS
GENERAL NOTES - SITE PLANS
1. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL SITE FEATURES, HARDSCAPE, AND
LANDSCAPING WITHIN THE LIMITS OF DISTRUBANCE UNLESS OTHERWISE NOTED ON THE
PLANS.
2. CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL MATERIAL REMOVED FROM THE SITE
IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS.
3. PRIOR TO CONSTRUCTION THE UNIVERSITY WILL SALVAGE AND COLLECT SELECT SITE
FEATURES. REMAINING SITE FEATURES SHALL BE REMOVED BY THE CONTRACTOR.
4. SOIL WILL BE LEVELED AND COMPACTED AT THE AREA OF CONSTRUCTION SCOPE.
5. MAINTAIN PHASE 1 EROSION & SEDIMENT CONTROL UNITL SOILS IS STABILIZED.
6. DIG NOTICE: “CONTACT VIRGINIA 811 AT 811, 1-800-552-7001, OR HTTPS://WWW.VA811.COM NO
LESS THAN 72 HOURS PRIOR TO EXCAVATION AND DO NOT DISTURB THE SOIL UNTIL DIG
TICKET HAS BEEN PROCESSED.”
A/C AIR CONDITIONING
ABV ABOVE
ACST ACOUSTIC, ACOUSTICAL
ADA AMERICANS WITH DISABILITIES ACT
ADJ ADJUSTABLE
ADJT ADJACENT
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
ARCH ARCHITECT, ARCHITECTURAL
ASPH ASPHALT
ASSY ASSEMBLY
AUTO AUTOMATIC
BATT BATT INSULATION
BKR BACKER ROD
BD BOARD
BF BOTH FACES
BLDG BUILDING
BLKG BLOCKING
BLW BELOW
BM BEAM
BN BULLNOSE
BOD BASIS OF DESIGN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRG BEARING
BS BOTH SIDES
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT UP ROOFING
BW BOTH WAYS
BYND BEYOND
CG CORNER GUARD
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLST CLOSET
CLR CLEAR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CO COMPANY
COL COLUMN
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORDCOORDINATE
CORR CORRIDOR
CPT CARPET
CRS COURSE(S)
CSWK CASEWORK
CT CERAMIC TILE
CTR CENTER
CTV CABLE TELEVISION
CU CUBIC
CUH CABINET UNIT HEATER
CW COLD WATER PIPING
DBL DOUBLE
DEPT DEPARTMENT
DTL DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DL DEAD LOAD
DMPF DAMPROOFING
DN DOWN
DR DOOR
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
E EAST
EA EACH
ED EDUCATION
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
ENCL ENCLOSURE
ENGR ENGINEER
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXC EXCAVATE
EXIST EXISTING
EF EXHAUST FAN
EXP EXPANSION
EXT EXTERIOR
A
B
C
D
E
F/F FACE TO FACE
FA FIRE ALARM
FAAP FIRE ALARM ANNUNICATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FFE FINISH FLOOR ELEVATION
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH
FIXT FIXTURE
FLR FLOOR
FOF FACE OF FINISH
FOS FACE OF STUD
FR FRAME
FRP FIBERGLASS REINFORCED PLASTIC
FRTW FIRE RETARDANT TREATED WOOD
FT FOOT
FUR FURRING
GA GAGE
GALV GALVANIZED
GB GRAB BAR
GL GLASS
GLU LAM GLUED LAMINATED WOOD
GLAZ GLAZING
GYP GYPSUM
HB HOSE BIB
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HDRL HANDRAIL
HORIZ HORIZONTAL
HP HORSEPOWER
HT HEIGHT
HVAC HEATING VENTILATING & AIR CONDITIONING
HW HOT WATER
HYD HYDRANT
ID INSIDE DIAMETER
INCL INCLUDED
INSUL INSULATION
INT INTERIOR
JST JOIST
K KELVIN
kW KILOWATT
L ANGLE
LAV LAVATORY
LBR LUMBER
LF LINEAR FEET (FOOT)
LIB LIBRARY
LINO LINOLEUM
LKR LOCKER
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LT LIGHT
LVR LOUVER
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFD MANUFACTURED
MFR MANUFACTURER
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING
MO MASONRY OPENING
MTD MOUNTED
MTL METAL
NA NOT APPLICABLE
NONCOM NONCOMBUSTIBLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OF/OI OWNER FURNISHED/OWNER INSTALLED
OH OVERHEAD
OPP OPPOSITE
OPNG OPENING
ORD OVERFLOW ROOF DRAIN
F
PBD PARTICLEBOARD
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PREFAB PREFABRICATED
PREFINPREFINISHED
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE
QT QUARRY TILE
QTB QUARRY TILE BASE
QTY QUANTITY
R RADIUS, RISER
R-__ THERMAL RESISTANCE
RA RETURN AIR
RB RUBBER BASE
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RE: REFER TO
REINF REINFORCE
REQD REQUIRED
REV REVISION
RM ROOM
RO ROUGH OPENING
RPM REVOLUTIONS PRE MINUTE
RTU ROOF TOP UNIT
SECT SECTION
SF SQUARE FOOT, FEET
SA SUPPLY AIR
SAT SUSPENDED ACOUSTICAL TILE
SB SPLASH BLOCK
SCHED SCHEDULE
SCP SCUPPER
SD SOAP DISPENSER
SOG SLAB ON GRADE
SGFT STRUCTURAL GLAZED FACED TILE
SHT SHEET
SHTHG SHEATHING
SIM SIMILAR
SJ SLIP JOINT
SLDG SLIDING
SLNT SEALANT
SND SANITARY NAPKIN DISPENSER
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPEC SPECIFICATION
SQ SQUARE
SST STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPEND(ED)
SYMM SYMMETRICAL
SYS SYSTEM
T&G TONGUE & GROOVE
TD TOWEL DISPENSER
TEL TELEPHONE
THK THICKNESS
TO TOP OF
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TYP TYPICAL
UNFIN UNFINISHED
UON UNLESS OTHERWISE NOTED
UR URINAL
VAR VARIES, VARIABLE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W WEST
W/ WITH
W/O WITHOUT
WB WOOD BASE
WBL WOOD BLOCKING
WC WATER CLOSET
WCO WALL CLEAN OUT
WD WOOD
WF WIDE FLANGE
WP WORKING POINT
WSCT WAINSCOT
WWF WELDED WIRE FABRIC
WNDW WINDOW
YD YARD
P
G
H
I
J
K
L
M
N
O
Q
R
S
T
U
V
W
Y
ARCHITECTURAL ABBREVIATIONS
T H
E L
IN
E
S H
O W
N A
B O
V E
IS
X
A C
T
LY
O N
E
IN
C H
L O
N G
A T
T H
S
E E
T S
O R
IG
IN
A L
P A
G E
S
IZ
E
100% CONSTRUCTION
DOCUMENTS
Drawing
A
B
C
D
E
1 2 3 4 5 6
T H
E S
Q U
A R
E S
A B
O V
E A
R E
C O
LO
R
, W
IT
H B
LA
C
K
A N
D W
H
IT
E L
E T
T E
R S
, I F
P R
IN
T
E D
C O
R R
E C
T
LY
M C
Y K
Project Code:
Sheet Issue Date:
Drawn By:
Checked By:
© Hord Coplan Macht, Inc.
ARCHITECT
3/ 4/
:2
7:
P M
03.05.2024
Addendum N0. 1
SAND STORAGE FACILITY
UNIVERSITY OF MARY WASHINGTON
1204 HANOVER ST
FREDERICKSBURG, VA ZIP 22401
PROJ: 215-B3215-012
G-000
COVER SHEET
H A
N O
V E
R S
T
F R
E D
E R
IC
K
S B
U R
G , V
A Z
IP
S A
N D
S T
O R
A G
E F
A C
IL
IT
Y U
N
IV
E R
S
IT
Y O
F M
A R
Y W
A S
H
IN
G T
O N
215-B3215-012
03.05.2024
MR
Checker
STRUCTURAL ENGINEER
1025 Boulders Pkwy #310
DUNBAR STRUCTURAL
Richmond, VA 23225
(804) 323-0656
ARCHITECTURE
LANDSCAPE ARCHITECTURE
PLANNING
INTERIOR DESIGN
SHEET INDEX
NUMBER NAME ORIG ISSUE REV# DATE
PROJECT INFORMATION
G-000 COVER SHEET 03.05.2024 1 03.05.2024
G-001 SPECIFICATIONS 03.03.2024 1 03.05.2024
PROJECT INFORMATION: 2
ARCHITECTURAL BUILDING ELEVATIONS & SECTIONS
A-301 ARCHITECTURAL BUILDING PLAN, ELEVATION & SECTION 03.05.2024 1 03.05.2024
ARCHITECTURAL BUILDING ELEVATIONS & SECTIONS: 1
STRUCTURAL
S100 FOUNDATION PLAN AND SECTIONS 05.05.2023
STRUCTURAL: 1
Grand total: 4
NTSG-000A-301
A1 ARCHITECTURAL SITE PLAN- OVERALL
NTSG-000
C1 LOCATION MAP
TRUE
NORTH
RAPPAHANNOCK RIVER
R A
P P
A H
A N
N O
C K
R
IV
E R
BLUE AND GRAY PKWY
W
ILIAM
ST
WILIAM ST
E M
A N
C
IP
A T
IO
N
H W
Y
FALL HILL AVE
H W
Y
KINGS HW
Y
R
IV
E R
R D
FREDERICKSBURG
UMW
PHYSICAL
PLANT BLD.
1. The contractor will visit the site and acquaint himself with existing conditions and building restrictions prior to submitting bids and /or exectuing the work.
2. Should the contractor find any discrepancies or omissions in the Contract Documents that affect proper execution of the work, he must bring these to the attention of the Architect and Owner in writing prior to proceeding with the work in question.
3. Contractor will notify the Architect and Owner of any items specified herein with a lead-time that could adversely affect the construction schedule.
4. All materials and systems will be installed as per manufacturer's instructions and all construction will be of first class workmanship.
5. NOT USED.
6. Contractor material, equipment, debris and personnel may not obstruct the means of egress in areas outside of the area of work.
GENERAL NOTES
DEB PROJECT NUMBER: 215-B3215-012
Per CPSM 3.1.1.2.1, the following list includes the Agency preapproved Delegated Design list that meets or exceeds this Specification.
BGreystone Construction 2005 18th Street Spirit Lake, IA 51360
(712) 339-2160 https://www.greystoneconstruction.com/markets/salt-and-sand-storage-buildings.html
Freedom Buildings 508 3rd St Belle Plaine, IA 52208
(319) 777-8093 https://freedombuildings.us/
Sprung Structures 5000 Tilghman Street Suite 155 Allentown, PA 18104-9102 Phone: 1.610.904.9089 https://www.sprung.com/structures/industrial-buildings/warehouse-buildings/
ClearSpan Structures 1395 John Fitch Blvd South Windsor, Connecticut 06074
(866) 643-1010 https://www.clearspan.com/contact-us/need-a-custom-building/
Accu Steel Accu-Steel Fabric Covered Buildings 2245 110th Street Audubon, Iowa 50025 1-877-938-1654 https://asicoverbuildings.com/sand-storage-buildings
DELEGATED DESIGN:
1925 BALLENGER AVENUE
SUITE 525
ALEXANDRIA, VA 22314
571.388.7761
△ DATE SUBMISSION
1 03.05.2024 Addendum N0. 1
5 March, 2024
T
E L
IN
E
S H
O W
N A
B O
V
A C
T
LY
O N
E
IN
C H
L O
N G
A T
T
E E
T S
O R
IG
IN
A L
P A
G E
S
IZ
E
100% CONSTRUCTION
DOCUMENTS
Drawing
A
B
C
D
E
1 2 3 4 5 6
DATE DESCRIPTION∆
T H
E S
Q U
A R
E S
A B
O V
E A
R E
C O
LO
R
, W
IT
H B
LA
D W
H
IT
E L
E T
T E
R S
, I F
P R
IN
T
E D
C O
R R
E C
T
LY
M C
Y K
Project Code:
Sheet Issue Date:
Drawn By:
Checked By:
© Hord Coplan Macht, Inc.
ARCHITECT
G-001
SPECIFICATIONS
H A
N O
V E
R S
T
F R
E D
E R
IC
K
S B
U R
G , V
A Z
IP
S A
N D
S T
O R
A G
E F
A C
IL
IT
Y U
N
IV
E R
S
IT
Y O
F M
A R
Y W
A S
H
IN
G T
O N
CONSULTANT 7 PHONE
215-B3215-012
03.03.2024
MR
Checker
STRUCTURAL ENGINEER
1025 Boulders Pkwy #310
DUNBAR STRUCTURAL
Richmond, VA 23225
(804) 323-0656
ARCHITECTURE
LANDSCAPE ARCHITECTURE
PLANNING
INTERIOR DESIGN
SPECIFICATIONS
DIVISION 2 SITE WORK
SECTION 02 41 19, SELECTIVE DEMOLITION
A. Identify, terminate, and remove utilities and services within areas of demolition indicated on the
Drawings.
B. Prior to removal of equipment and materials, determine disposition and salvage. Obtain approval from
Architect/Engineer as to which items are property of the Owner and which items become property of
Contractor. Those items that become property of Contractor shall be promptly removed from Site.
C. Selectively demolish indicated construction. Provide protection and temporary work to prevent damage to existing items not indicated for demolition.
D. Demolition shall be carried out as expeditiously as possible. Demolition work shall be carefully planned and executed in an orderly manner with all due and proper consideration given to complete protection of existing facilities and services, Owner's personnel, occupants, and general public.
E. Demolition shall be accomplished with minimum noise and vibration. Work creating excessive noise shall be scheduled to satisfaction of Owner.
F. Cutting and removal of mechanical and electrical items shall be performed by licensed and qualified trades people. Do not cut openings in structural elements without prior approval of Engineer. Patching shall be done by specialist in applicable trade such as masonry, concrete , carpentry, etc.
G. Remove debris properly from site and legally dispose of debris. Do not burn or bury on site. Do not allow debris to enter sewers. Do not let piled debris accumulate and endanger structure, block exits or roadways.
H. Where finishes are to be removed, removal shall include removal of material as well as adhesives, mastics, mortars, and residue. Grind, patch, and fill remaining substrate to provide a suitable substrate for application of new finishes. Where partitions, fixtures, and other items are removed, patch existing surface to provide flush sound surface acceptable for application of new finish. Flash patch holes and depressed areas in floor. Remove high areas by grinding prior to installation of new finishes. Ensure surfaces are smooth and level to accept new finishes.
DIVISION 13 SPECIAL CONSTRUCTION
SECTION 13 34 21, PRE-ENGINEERED BUILDINGS
1.1 INTENT OF SPECIFICATION
1.1.1 This specification covers the design, manufacture, shipping, handling and erection of a prefabricated membrane covered structure.
1.1.2 The specification as heretofore set forth is general in nature and scope and shall not be construed as to limit the work other than the requirement that the new re-locatable building shall match the specifications in materials, appearance, configuration and details.
1.1.3 It is the intent of this specification that the bidder shall include all labor, materials, equipment services and transportation to locate the building on the site designated with all other work.
1.1.4 Buildings shall be complete and operating and shall include all exterior and interior materials and systems as shown or indicated in contract documents.
1.1.5 All workmen shall be skilled and qualified for the work they perform. All material used, unless otherwise specified, shall be new and of the types and grades specified. The contractor shall certify that no asbestos containing materials that exceed Federal mandated safe asbestos levels have been used in the construction of the membrane covered structure.
1.1.6 Work shall be performed as necessary and required for the construction of the project as indicated. Such work includes the supply and installation of a membrane-covered structure complete with exterior and interior finishes. The building shall be as dimensioned with all features and quantities as per specification.
1.2 APPROVAL OF PLANS
1.2.1 Upon award of this contract, the contractor shall furnish detailed drawings for all structural work stamped by an engineer certified in the state where the project is located to verify compliance to local building code.
1.2.2 All work to be performed under the conditions of this specification shall comply with the rules and regulations of all agencies having jurisdiction for this classification of construction and design and shall conform to the applicable live loads due to wind, rain and snow.
1.2.3 Manufacturer 's Qualification: The fabricator of the building or building components shall be regularly engaged in the fabrication of this type of building. They must meet the requirements of this Section and shall show evidence of having an adequate manufacturing facility, equipment, and a quality control system. The fabricator must provide evidence upon request that they have produced a minimum of 50 such structures in the previous 12 months before acceptance of this contract. A reference list of 5 salt buildings shall be provided upon request. The fabricator shall be subject to the Director's approval.
1.2.4 Fabric Warranty: All membranes used are to be North American made, water and mildew resistant, insect proof, and UV stabilized. They are to withstand extreme climatic variations and contain ultra-violet inhibitors to reduce degradation by the sun’s rays. Manufacturer is to provide a minimum 20-year pro-rata warranty on non-fire rated fabric and a 15- year pro-rata warranty on fire rated fabric according to the standard manufacturer’s warranty.
1.2.5 Steel Truss Warranty: Truss Framework tubing must be Hot Dip Galvanized inside and out of tubing -completely after fabrication. Failure to provide proof of this will cause the bid to be denied. The manufacturer is to provide a minimum 20-year pro-rata warranty on the trusses according to the standard manufacturer’s warranty.
1.2.6 Building Erectors: The building erector shall be regularly engaged in the erection of fabric covered buildings, meeting the requirements of this Section. The erectors must provide evidence that they have constructed a minimum of 5 such structures in a US Municipal contract setting in the past 12 months before acceptance of this contract. The erectors shall be subject to the approval of the Director.
1.2.7 Building Erector: Crew supervisor shall provide 10-Hour OSHA Card prior to work commencement. All workers on site shall provide and all applicable equipment operator certifications prior to work commencement.
1.3 WORKMANSHIP
1.3.1 The workmanship of all materials and components of the structure shall be commensurate with the functional requirements of the item
1.3.2 Building manufacturer shall fabricate such structure to include the membrane under factory conditions in a plant specifically arranged for this type of work. Fabricator shall provide adequate space, equipment, personnel and technical ability to coordinate the assembly and factory prefabrication of all major components of the work and all necessary operations in the packing, shipping and installation procedures. No fabrication shall be done until the materials have been tested and approved.
1.3.3 Welding: Truss fabricator must be an approved welding fabricator to standards listed herein. A copy of
AWS certification must accompany the structural drawings upon request.
1.3.4 On site welding: If welding is required on site, no welding shall commence until the AWS welding inspector has inspected and approved the materials, joint preparation, equipment and qualifications of the welders in accordance with the standards herein.
1.4 DIMENSIONS
1.4.1 The structure shall be arch shaped in profile as shown in the drawing
1.4.2 The structure shall occupy an area of at least 36 feet in width and 30 feet in length.
1.4.3 One end wall fully enclosed
1.4.4 One end wall open
1.4.5 See drawings for interior vertical clearance.
1.4.6 See drawings for overall height.
1.4.7 Britespan Atlas Series 36’ or approved equal.
1.5 SCOPE OF WORK
1.5.1 Provide design and construction for a permanent rectangular shape tension membrane covered truss type building. The structure shall meet or exceed the performance criteria of this specification.
Building:
a. Building shall be mounted on contractor-supplied concrete bunker block foundation with an overall footprint of approximately 36 feet wide and 24 feet long minimum, 3-sided
b. Bunker blocks to be 2’x2’x6’ and plated together with hot dipped galvanized plates per engineered foundation drawings
c. Truss spacing shall be 12 feet on center common
d. One end fully enclosed with (2ea) 3’ x 3’ passive vents minimum. Fabric wall and steel framework complete
e. One end open
f. Fabric terminated approximately 12” below the top of the concrete foundation – tensioning equipment shall be mounted to bunker wall.
g.
h. Hot Dipped Galvanized Anchor bolts by contractor
1.5.2 Building design to be stamped by an engineer certified by the state where the project is located to verify compliance to local building code and installed by contractor
1.5.3 Delivery of all materials to site by contractor
1.5.4 All lifts and equipment for installation of all items by contractor
1.5.5 Complete Structure & Accessory installation by contractor
PART 2
2.1 GENERAL DESIGN REQUIREMENTS
2.1.1 SCOPE
1. The membrane shall be tensioned over the framework. The structure shall be rectangular in shape with one enclosed and one open end wall. The interior of the structure below the main trusses shall be clear span free of any structural support members and shall provide unobstructed floor space.
No exterior purlins, guy ropes or cables shall be used for anchoring the structure.
2.1.2 DESIGN REQUIREMENTS – STRUCTURAL FRAME
1. Structure shall be engineered so it is capable of withstanding the loads specified in ASCE 7-16, and the 2018 VCC code year edition without failure or damage. Design must incorporate both balanced and unbalanced loads. Additional rain on snow surcharge loading must also be added to gable shaped (non arch) buildings per ASCE 7-16.
2. The main structure shall consist of a welded truss arches comprised of parallel tubes separated apart by tubular webs. The truss cords must be made from round tubular steel with a continuous round tubular web separating the inner and outer chords. Exact chord and tubular web diameter and gauge to be called out by the manufactures engineering requirements provided they meet or exceed the below minimum mandates. Chord plastification calculations must be included on the structural drawings when chords are made with lighter than 14ga. Steel.
a. Meet or exceed the following design dimensions for open web chord truss:
1. Truss Weight: 384 lbs Minimum
2. Truss Chord Depth: 18” Minimum
3. Chords Diameter 2.375” Minimum
4. Chords Wall 14ga Minimum
5. Web Size 1.125” Minimum
6. Web Wall 14ga Minimum
7. Truss spacing 16’ OC Max Mandatory
3. Structure must be capable of maintaining structural integrity in the event of a tear propagating in the fabric, without endangering occupants.
4. Truss framework tubing shall be Hot Dipped Galvanized after fabrication as per Building Product requirements stated herein. The Hot Dip Galvanizing must meet ASTM 123-12 as per the building code.
Acceptable products:
a. Hot Dip Galvanized Product, galvanized inside and out after fabrication is completed
b. Aluminum
5. All purlins used in the building must be a minimum of 2-7/8” inches in diameter, 14ga min, made from one single piece of pipe, and be attached to the truss using a double bolted configuration with
2-5/8” bolts minimum attached directly to the welding dog bone or kingpin of the truss on each end.
Saddle brackets are not suitable attachment as they allow rotational movement to occur. Purlins must be hot dipped galvanized – inline galvanizing, Gatorshield or Triple Coat are not acceptable. Cross “X” purlins will not be accepted as they tend to hold snow due to how they mount to the truss at the top chord.
6. Building must utilize cross cables in each end bay to prevent racking. Cables must be a minimum of 5/16” galvanized that is 7 by 19 commercial grade and must be secured to structural welded truss member using a solid bolted or clevis connection and they must be adjustable for proper tensioning with a galvanized, lockable turnbuckle. Cable assemblies attached with open hooks or loops will not be allowed. Cables are to be assembled using a press swedged connection, clamps will not be allowed as the can slide. Cables must terminate at every bay to prevent the removal of galvanizing at wear points causing rust.
7. All tie down pipe that is used to fasten the cover to the building must be secured by a 10,000-pound lashing winch at every truss located on the outside of the structure. This ensures the attachment hardware will not be exposed to the corrosive salt material diminishing the useful life of the hardware.
Ratchet strap attachment to the tie down pipe will not be accepted as a main cover tensioning system.
Tension pipe used for the main cover shall be oval or rectangular and installed in a vertical manner to minimize deflection when bay spacing exceeds 12’ on center.
8. All bearing plates and other structural members must be hot dipped galvanized “POST” fabrication, no welding shall take place after the galvanized coating is applied. All anchor bolts, bolts and washers etc., shall be Hot Dip Galvanized.
2.1.3 ENGINEERING DESIGN CRITERIA
1. 2018 VCC ASCE 7 - 16
2. SNOW LOAD 25 PSF ground snow load
3. COLLATERAL LOAD 0.25 pounds per square foot projected over entire roof
4. WIND LOAD 104 V-ult
5. OCCUPANCY CATEGORY CAT I – Low Human Occupancy
6. EXPOSURE CATEGORY C
7. RAINFALL 4” per hour, for at least 2 hours
8. USE GROUP S-2
9. CONSTRUCTION TYPE II-B
10. FLAMMABILITY ASTM E84
11. WIND IMPORTANCE FACTOR 1.0
12. SNOW IMPORTANCE FACTOR 0.8
13. Seismic Design Category B
D=Dead Load + Collateral Load
S=Symmetrical Snow or Live Load (Balanced or Unbalanced)
Ws = Wind Internal Suction
Wp = Wind With Internal Pressure
E = Earthquake
2.1.4 Structure shall be capable of being assembled, operated and dismantled in all ambient temperatures between -20F and 120F
2.2.2 Membrane Performance Minimum Standards
Coated Weight 12 oz/yd (407 gsm)+/-5%
Coating Thickness 4 mils average, each side +/-2%
Finished Thickness 23 mils (ASTM D1777)
Grab Tensile Strength, lbs 345 lbs Weft (ASTM -D5304)
370 lbs Warp (ASTM -D5035)
Tongue Tear Strength, lbs 100 lbs Weft (ASTM -D2261)
110 lbs Warp (ASTM -D2261)
Mullen Burst 650 psi (4428 kPa)
Cold Crack Resistance -55oC (ASTM –D2136)
Resistance to UV & Weathering 90% retention after 2000 hr.
Low Temperature Bend -60 Degrees Celcius ASTM D2136
FR Performance ASTM E84
2.2.3 The stressed membrane structure must be designed to shed snow before the design load is exceeded, or alternatively provide structural capacity to meet or exceed required roof snow load requirements of specified site. The architectural membrane shall be continuous from the base of the structure to the peak and manufactured in such a way that no eave will exist.
A. To reduce premature wear points, at no time may the fabric be in contact with the steel truss arch.
2.2.4 Membrane used in the building design shall be designed to withstand the corrosive UV light according to the manufacturer warranty.
2.2.5 Base tensioning system: The membrane cladding will be provided with a mechanical tensioning system that allows the membrane to be fully tensioned around the structure perimeter each panel. The system will be designed such that the membrane can be tightly and neatly secured over the structural frame and that the system has a remaining range of adjustment.
2.2.6 Converting raw fabric to finished membrane cover; To ensure quality control:
A. Raw fabric converted to finished product must be manufactured on the same site as steel trusses and under the same supervision for complete building package continuity and quality control.
B. Conversion plant/personnel must be CSA S367 Certified.
C. Produce documented evidence that fabricator personnel have been trained no less than 160 hours in practical application.
D. Fabric welding and construction of fabric covers shall be completed in a dedicated production plant, with the floor heated to 70 degrees Fahrenheit (+/- 2 degrees), and full environmental controls via HVAC system throughout the plant.
E. Fabric conversion systems will include “inline vision systems” for 100% testing of weld parameters, continuously monitoring weld temperatures throughout the entire process. “Spot checking” will not acceptable practice.
F. Fabric Panels using keder connection to truss MUST have a 2” weld – no exceptions.
G. In-house testing of raw fabric and new welds shall be completed daily using a 4 hour test utilizing certified Instron Lab Equipment as described below in the chart:
2.3 METAL SPECIFICATIONS
2.3.1 All steel tubing used in the structure must have the following minimum structural and mechanical properties (ASTM A-500):
1. Tube: ASTM A500/CSA G-40.21 (350W) Tensile 61,600 PSI Yield 45,700 PSI
2. Plate: ASTM A500/Gr 50 CSA G40.21-50W Tensile 65,000 PSI Yield 50,000 PSI
2.3.2 All steel flat bar, truss components shall be fabricated and hot dipped galvanized post fabrication to
ASTM A123-12 meeting ASTM Standard B6 zinc coatings.
PART 3
3.1 REFERENCES AND STANDARDS
1. 3.1 Except where more stringent requirements are specified, comply with the applicable requirements of the following organizations and standards, for products, materials, and construction methods:
• American Institute of Steel Construction (AISC)
• American Iron and Steel Institute (AISI)
• American Society of Civil Engineers (ASCE 7-10 Minimum Design Loads for Buildings and Other
Structures)
• American Welding Society (AWS)
1.3.2 The following publications are for the standards listed below but referred to thereafter by basic letter designation only. They form a part of this specification to the extent referenced thereto: American Institute of
Steel Construction (AISC):
A. ASCE 7 - Minimum Design Loads for Buildings and Other Structures; American
Society of Civil Engineers; 2011.
B. ASTM A36/A36M - Standard Specification for Carbon Structural Steel; 2008.
C. ASTM A53/A53M - Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless; 2012.
D. ASTM A307 - Standard Specification for Carbon Steel Bolts, Studs, and Threaded
Rod 60 000 PSI Tensile Strength; 2012.
E. ASTM A325 - Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength; 2010.
F. ASTM A325M - Standard Specification for Structural Bolts, Steel, Heat Treated 830
MPa Tensile Strength (Metric); 2013.
G. ASTM A500/A500M - Standard Specification for Cold-Formed Welded and Seamless
Carbon Steel Structural Tubing in Rounds and Shapes; 2010a.
H. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building
Materials; 2013a.
I. AWS D1.1/D1.1M - Structural Welding Code - Steel; American Welding Society;
2010 or CWB Canadian Welding Bureau.
J. NFPA 701 - Standard Methods of Fire Tests for Flame Propagation of Textiles and
Films; National Fire Protection Association; 2010.
K. SSPC-SP 6 - Commercial Blast Cleaning; Society for Protective Coatings; 2007.
L. SSPC-Paint 20 - Zinc-Rich Primers (Type I, "Inorganic," and Type II, "Organic");
Society for Protective Coatings; 2002 (Ed. 2004).
M. SSPC-Paint 22 - Epoxy-Polyamide Paints (Primer, Intermediate, and Topcoat);
Society for Protective Coatings; 1982 (Ed.2004).
1.3.3 PAINTING: Painting of steel components shall only be utilized if necessary for field repairs and shall not be employed as a factory finish. Should field repair be necessary, a zinc rich field coat shall be used
1.3.4 FIELD WELDING: In-Field fabric welding is accepted as a standard method of joining panels, rounding corners, repairing minor cuts or abrasions.
1.3.5 COLORS: As selected by the Director’s Representative from standard Manufacturer’s Color charts
1.3.6 ADJUSTING: Repair cut, welded, and/or abraded galvanized surfaces with a minimum 2 mil thick coating of cold galvanizing compound (containing 93 percent zinc) applied in accordance with manufacturer’s instructions.
1.3.7 APPROVED MANUFACTURERS:
1. The following manufacturers are preapproved and meets or exceeds this Specification.
BGreystone Construction
2005 18th Street
Spirit Lake, IA 51360
(712) 339-2160 https://www.greystoneconstruction.com/markets/salt-and-sand-storage-buildings.html
Freedom Buildings
508 3rd St
Belle Plaine, IA 52208
(319) 777-8093 https://freedombuildings.us/
Sprung Structures
5000 Tilghman Street
Suite 155
Allentown, PA
18104-9102
Phone: 1.610.904.9089 https://www.sprung.com/structures/industrial-buildings/warehouse-buildings/
ClearSpan Structures
1395 John Fitch Blvd
South Windsor, Connecticut 06074
(866) 643-1010 https://www.clearspan.com/contact-us/need-a-custom-building/
Accu Steel
Accu-Steel Fabric Covered Buildings
2245 110th Street
Audubon, Iowa 50025
1-877-938-1654 https://asicoverbuildings.com/sand-storage-buildings
Alaska Structures
6991 E Camelback Rd Suite D-216, Scottsdale, AZ 85251
+19073441565 https://alaskastructures.com/products/salt-sand-and-frac-sand-storage-buildings/
2. Equal manufacturer must be approved by director 7 days prior to bid opening.
3. Bidder must note manufacturer of structure at time of bid and may not be changed after.
END OF SECTION
1925 BALLENGER AVENUE
SUITE 525
ALEXANDRIA, VA 22314
571.388.7761
1 03.05.2024 Addendum N0. 1
A-301
C2
C4 A-301
RAISED LEVELED
COMPACTED SOIL
2'-0"32'-3"2'-0"
36'-3"
'-0
130'
131' 132'133'
6' -0
'-0
2' -0
APPROXIMATE
REPRESENTATION OF RAISED
MOUND AROUND BUILDING TO
KEEP WATER OUT.
DIMENSION PLAN GENERAL NOTES
1. BLACK DIMENSIONS INDICATED ARE TO FACE OF ELEMENTS, UON.
2. M.O. = MASONRY OPENING = NOMINAL DIMENSION SHOWN +3/8"
LEVEL 01
0"
1' -6
'-0
6' -0
V E
R
IF
Y W
IT
H
M A
N U
F A
C T
U R
E R
'-6
BACK SURFACE COVERED
WITH POLYETHYLENE
FABRIC
132'-6"
REFER TO STRUCT DWGS
FOR FOOTING DETAIL
REFER TO STRUCT DWGS
FOR FOOTING DETAIL
STAGGERED CONCRETE BLOCKS
LEVEL 01
0"
C4 A-301
6' -0
'-0
1' -6
OPEN WEB METAL TRUSS
2'x2'x6' PRECAST
CONCRETE BLOCKS UNITS
POLYETHYLENE FABRIC COVER
COVERED SURFACE BEYOND
V E
R
IF
Y W
IT
H
M A
N U
F A
C T
U R
E R
'-6
132'-6"
ANCHORAGE DETAILS FOR
THE TRUS AND THE
FABRIC ARE BY
MANUFACTURER
REFER TO STRUCT DWGS
FOR FOOTING DETAIL
REFER TO STRUCT DWGS
FOR FOOTING DETAIL
T H
E L
IN
E
S H
O W
N A
B O
V
A C
T
LY
O N
E
IN
C H
L O
N G
A T
T
E E
T S
O R
IG
IN
A L
P A
G E
S
IZ
E
100% CONSTRUCTION
DOCUMENTS
Drawing
A
B
C
D
E
1 2 3 4 5 6
DATE DESCRIPTION∆
T H
E S
Q U
A R
E S
A B
O V
E A
R E
C O
LO
R
, W
IT
H B
LA
D W
H
IT
E L
E T
T E
R S
, I F
P R
IN
T
E D
C O
R R
E C
T
LY
M C
Y K
Project Code:
Sheet Issue Date:
Drawn By:
Checked By:
© Hord Coplan Macht, Inc.
ARCHITECT
A-301
ARCHITECTURAL
BUILDING PLAN,
ELEVATION & SECTION
H A
N O
V E
R S
T
F R
E D
E R
IC
K
S B
U R
G , V
A Z
IP
S A
N D
S T
O R
A G
E F
A C
IL
IT
Y U
N
IV
E R
S
IT
Y O
F M
A R
Y W
A S
H
IN
G T
O N
CONSULTANT 7 PHONE
215-B3215-012
03.05.2024
MR
Checker
STRUCTURAL ENGINEER
1025 Boulders Pkwy #310
DUNBAR STRUCTURAL
Richmond, VA 23225
(804) 323-0656
ARCHITECTURE
LANDSCAPE ARCHITECTURE
PLANNING
INTERIOR DESIGN
A-301 1/4" = 1'-0"
A2 FLOOR PLAN
A-301 1/4" = 1'-0"
C4 BUILDING SECTION
A-301 1/4" = 1'-0"
C2 ELEVATION- EXTERIOR- NORTH
1925 BALLENGER AVENUE
SUITE 525
ALEXANDRIA, VA 22314
571.388.7761
1 03.05.2024 Addendum N0. 1
/0" )' 1!
2 334567 89:;45 <=> ?>
Si te
D e v e lo p m e n t
So lu ti o n s
@ A B C @D @ E FG H I JKL M N J OE P BD P Q @ E P
RSTUV WSXRSYZ[
\RVTU ]R \^
\YV _]Y _VZ[RS `
USRRVUS `^
| Addendum 01 (002) |
| IFB 24-1708 Addendum 1 |
| Addendum 01 |
| Pre-Bid Attendance |
| 23-27861-001-01-1023 Geotechnical Report |
| Addendum No.1 Storage Shelter Facility Drawings |
| G-000 |
| G-001 |
| A-301 |
Physical Plant C3.2
File details come from the government source that posted it. Updated .