This document contains technical specifications for the construction of a pre-fabricated sand storage building at the University of Mary Washington's Physical Plant in Fredericksburg, Virginia. The project involves installing a 36-foot by 24-foot prefabricated, membrane-covered structure with one enclosed and one open end. The building must meet specific structural, material, and performance requirements, including compliance with the 2018 Virginia Uniform Statewide Building Code. The project is being managed by the Virginia Department of Engineering and Buildings, and construction must be completed by the contractor. The document provides details on the design, manufacturing, shipping, handling, and erection of the building, as well as requirements for warranties, certifications, and approved manufacturers.
The specifications outline the technical requirements for the building's structural frame, membrane performance, and metal components. Key design criteria include snow, wind, and seismic loads, as well as fire rating and safety standards. The contractor is responsible for providing all labor, materials, equipment, and transportation to install the building at the designated site, including a concrete block foundation. The document also outlines the required special inspections and submittals for the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A101
Ref
A101
Ref
A101
Ref
A101
1 Ref
A101
A3.888
Ref
DRAWING SCALE
DRAWING SHEET
VIEW TITLE
BUILDING SECTION MARKER
WALL SECTION MARKER
DETAIL SECTION MARKER
EXTERIOR ELEVATION MARKER
INTERIOR ELEVATION MARKER
DETAIL CALLOUT
DRAWING NUMBER (TYP)
DRAWING SHEET (TYP)
REFERENCE TYPE (SIM, OH)
DRAWING NUMBER
DRAWING SHEET
REFERENCE TYPE (SIM, OH)
DRAWING NUMBER
DRAWING SHEET
DRAWING DIRECTION
DRAWING NUMBER
DRAWING SHEET
REFERENCE TYPE (SIM, OH)
VIEW EXTENTS
DETAIL NUMBER
A1 A0.02
1/4" = 1'-0"FLOOR PLAN- LEVEL 1
DRAWING TITLES
VIEW MARKERS
DRAWING SYMBOLS
REFERENCE FLOOR LEVEL IDENTIFICATIONS
SLOPE TAG
RISE PER 12" RUN
4"
A. 2018 VIRGINIA UNIFORM STATEWIDE BUILDING CODE (2018 VUSBC)
• BUILDING CODE: 2018 VIRGINIA CONSTRUCTION CODE (2018 VCC)
• FUEL CODE: 2018 INTERNATIONAL FIRE CODE (2018 IFC)
• FIRE CODE: 2018 INTERNATIONAL FIRE CODE (2018 IFC)
• ENERGY CODE: 2018 VIRGINIA ENERGY CONSERVATION CODE (2018 VECC)
B. 2022 EDITION, CONSTRUCTION AND PROFESSIONAL SERVICES MANUAL, DIVISION OF
ENGINEERING AND BUILDINGS (DEB), REV 1, FEBRUARY 14, 2023
APPLICABLE CODES:
DIVISION OF ENGINEERING AND
BUILDINGS (DEB)
JURISDICTION:
THE SCOPE OF THE PROJECT IS THE INSTALLATION OF A PREFABRICATED STRUCTURE TO SHELTER
APPROXIMATELY 16 CU YD OF SAND. IT WILL BE LOCATED ON THE GROUNDS OF THE
PHYSICAL PLANT BUILDING AT THE FREDERICKSBURG CAMPUS OF THE UNIVERSITY OF MARY
WASHINGTON. THIS STRUCTURE WILL BE SEATING ON COMPACTED SOIL.
PROJECT SCOPE DESCRIPTION:
BUILDING INFORMATION AND CODE ANALYSIS:
TYPE OF WORK: NEW STRUCTURE
CHAPTER 5: BUILDING HEIGHT: 75' - 0" ALLOWABLE. NUMBER OF STORIES: 4 STORIES ALLOWABLE
ABOVE GRADE PLANE.
ALLOWABLE AREA: 26,000 SF; ACTUAL AREA: 870 SF.
CHAPTER 6: BUILDING CONSTRUCTION TYPE: IIB; 0HR FIRE RESISTANCE FOR EXTERIOR WALLS
BEARING WALLS AND ROOF CONSTRUCTION.
FOR A 0 HR EXTERIOR WALLS TYPE IIB BUILDING, FIRE SEPARATION DISTANCE FROM IMAGINARY LINE SHOUD BE WITHIN 10' > X > 30'. REFER TO VCC SECTION 602. PROPOSED FIRE SEPARATION DISTANCE
FROM IMAGINARY PROPERTY LINE 11'-0".
FABRIC COVER ONLY WILL BE FIRE RATED.
*ADJACENT EXISTING BUILDINGS AND GROUNDS: BUILDING CONSTRUCTION TYPE: IIIB; FIRE
RESISTANCE EXTERIOR WALLS 2HR. ROOF: 1 HR.
FOR A 1 HR EXTERIOR WALLS TYPE IIIB BUILDING, FIRE SEPARATION DISTANCE OF BUILDING FROM IMAGINARY LINE SHOULD BE WITHIN 5' > X > 10'. REFER TO VCC SECTION 602. PROPOSED FIRE
SEPARATION DISTANCE FROM IMAGINARY PROPERTY LINE 27'-4".
UNWALLED SHED: BUILDING CONSTRUCTION TYPE: IIB; 0 FIRE RESISTANCE FOR EXTERIOR WALLS
BEARING WALLS AND ROOF CONSTRUCTION.
FOR A 0 HR EXTERIOR WALLS TYPE IIB BUILDING, FIRE SEPARATION DISTANCE OF BUILDING FROM IMAGINARY LINE SHOULD BE WITHIN 10' > X > 30'. REFER TO VCC SECTION 602. PROPOSED FIRE
SEPARATION DISTANCE FROM IMAGINARY PROPERTY LINE 11'-0".
CHAPTER 3: OCCUPANCY CLASSIFICATION USE: S2 - STORAGE LOW HAZARD OCCUPANCY
*ADJACENT EXISTING BUILDINGS AND GROUNDS: S2 - STORAGE LOW HAZARD OCCUPANCY
UNWALLED SHED: S2.
EXISTING ACF UNDERGROUND
ENVIRONMENTAL TANK
EXG BUILDINGS AND
GROUND BUILDING
EXG POLE
BARN
EXG PARKING LOT
A2
A-301
EXG UNWALLED SHED
OPEN END
NEW
BUILDING36'-3"
22'-0"
A P
P R
O X
38'-3"
IMAGINARY
PROPERTY LINE FOR
FIRE SEPARATION
PURPOSES
26'-6"
24'-0"
11'-0"
11'-0"
27'-4"
BUILDING ELEMENTS
N 292.485 E 141.501
10.000 ELEVATION (MAY BE RELATIVE TO PROJECT
BENCHMARK OR OTHER DATUM- REFER TO
GENERAL NOTES
COORDINATES AT POINT (MAY BE RELATIVE TO
PROJECT BENCHMARK OR OTHER DATUM-
REFER TO GENERAL NOTES)
31.00 , @ 96° 00' 00"
.0
32.00
PROPERTY LINE LENGTH (IF TAGGED)
PROPERTY LINE BEARING (IF TAGGED)
PROPERTY LINE LENGTH (IF TAGGED)
PROPERTY LINES (TAGS MAY BE SHOWN FOR
REFERENCE ONLY. REFER TO CIVIL DRAWINGS
AND SURVEY FOR PROPERTY INFORMATION)
LEGEND - SITE PLANS
GENERAL NOTES - SITE PLANS
1. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL SITE FEATURES, HARDSCAPE, AND
LANDSCAPING WITHIN THE LIMITS OF DISTRUBANCE UNLESS OTHERWISE NOTED ON THE
PLANS.
2. CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL MATERIAL REMOVED FROM THE SITE
IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS.
3. PRIOR TO CONSTRUCTION THE UNIVERSITY WILL SALVAGE AND COLLECT SELECT SITE
FEATURES. REMAINING SITE FEATURES SHALL BE REMOVED BY THE CONTRACTOR.
4. SOIL WILL BE LEVELED AND COMPACTED AT THE AREA OF CONSTRUCTION SCOPE.
5. MAINTAIN PHASE 1 EROSION & SEDIMENT CONTROL UNITL SOILS IS STABILIZED.
6. DIG NOTICE: “CONTACT VIRGINIA 811 AT 811, 1-800-552-7001, OR HTTPS://WWW.VA811.COM NO
LESS THAN 72 HOURS PRIOR TO EXCAVATION AND DO NOT DISTURB THE SOIL UNTIL DIG
TICKET HAS BEEN PROCESSED.”
A/C AIR CONDITIONING
ABV ABOVE
ACST ACOUSTIC, ACOUSTICAL
ADA AMERICANS WITH DISABILITIES ACT
ADJ ADJUSTABLE
ADJT ADJACENT
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
ARCH ARCHITECT, ARCHITECTURAL
ASPH ASPHALT
ASSY ASSEMBLY
AUTO AUTOMATIC
BATT BATT INSULATION
BKR BACKER ROD
BD BOARD
BF BOTH FACES
BLDG BUILDING
BLKG BLOCKING
BLW BELOW
BM BEAM
BN BULLNOSE
BOD BASIS OF DESIGN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRG BEARING
BS BOTH SIDES
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT UP ROOFING
BW BOTH WAYS
BYND BEYOND
CG CORNER GUARD
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLST CLOSET
CLR CLEAR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CO COMPANY
COL COLUMN
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORDCOORDINATE
CORR CORRIDOR
CPT CARPET
CRS COURSE(S)
CSWK CASEWORK
CT CERAMIC TILE
CTR CENTER
CTV CABLE TELEVISION
CU CUBIC
CUH CABINET UNIT HEATER
CW COLD WATER PIPING
DBL DOUBLE
DEPT DEPARTMENT
DTL DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DL DEAD LOAD
DMPF DAMPROOFING
DN DOWN
DR DOOR
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
E EAST
EA EACH
ED EDUCATION
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
ENCL ENCLOSURE
ENGR ENGINEER
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXC EXCAVATE
EXIST EXISTING
EF EXHAUST FAN
EXP EXPANSION
EXT EXTERIOR
A
B
C
D
E
F/F FACE TO FACE
FA FIRE ALARM
FAAP FIRE ALARM ANNUNICATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FFE FINISH FLOOR ELEVATION
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH
FIXT FIXTURE
FLR FLOOR
FOF FACE OF FINISH
FOS FACE OF STUD
FR FRAME
FRP FIBERGLASS REINFORCED PLASTIC
FRTW FIRE RETARDANT TREATED WOOD
FT FOOT
FUR FURRING
GA GAGE
GALV GALVANIZED
GB GRAB BAR
GL GLASS
GLU LAM GLUED LAMINATED WOOD
GLAZ GLAZING
GYP GYPSUM
HB HOSE BIB
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HDRL HANDRAIL
HORIZ HORIZONTAL
HP HORSEPOWER
HT HEIGHT
HVAC HEATING VENTILATING & AIR CONDITIONING
HW HOT WATER
HYD HYDRANT
ID INSIDE DIAMETER
INCL INCLUDED
INSUL INSULATION
INT INTERIOR
JST JOIST
K KELVIN
kW KILOWATT
L ANGLE
LAV LAVATORY
LBR LUMBER
LF LINEAR FEET (FOOT)
LIB LIBRARY
LINO LINOLEUM
LKR LOCKER
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LT LIGHT
LVR LOUVER
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFD MANUFACTURED
MFR MANUFACTURER
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING
MO MASONRY OPENING
MTD MOUNTED
MTL METAL
NA NOT APPLICABLE
NONCOM NONCOMBUSTIBLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OF/OI OWNER FURNISHED/OWNER INSTALLED
OH OVERHEAD
OPP OPPOSITE
OPNG OPENING
ORD OVERFLOW ROOF DRAIN
F
PBD PARTICLEBOARD
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PREFAB PREFABRICATED
PREFINPREFINISHED
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE
QT QUARRY TILE
QTB QUARRY TILE BASE
QTY QUANTITY
R RADIUS, RISER
R-__ THERMAL RESISTANCE
RA RETURN AIR
RB RUBBER BASE
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RE: REFER TO
REINF REINFORCE
REQD REQUIRED
REV REVISION
RM ROOM
RO ROUGH OPENING
RPM REVOLUTIONS PRE MINUTE
RTU ROOF TOP UNIT
SECT SECTION
SF SQUARE FOOT, FEET
SA SUPPLY AIR
SAT SUSPENDED ACOUSTICAL TILE
SB SPLASH BLOCK
SCHED SCHEDULE
SCP SCUPPER
SD SOAP DISPENSER
SOG SLAB ON GRADE
SGFT STRUCTURAL GLAZED FACED TILE
SHT SHEET
SHTHG SHEATHING
SIM SIMILAR
SJ SLIP JOINT
SLDG SLIDING
SLNT SEALANT
SND SANITARY NAPKIN DISPENSER
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPEC SPECIFICATION
SQ SQUARE
SST STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPEND(ED)
SYMM SYMMETRICAL
SYS SYSTEM
T&G TONGUE & GROOVE
TD TOWEL DISPENSER
TEL TELEPHONE
THK THICKNESS
TO TOP OF
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TYP TYPICAL
UNFIN UNFINISHED
UON UNLESS OTHERWISE NOTED
UR URINAL
VAR VARIES, VARIABLE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W WEST
W/ WITH
W/O WITHOUT
WB WOOD BASE
WBL WOOD BLOCKING
WC WATER CLOSET
WCO WALL CLEAN OUT
WD WOOD
WF WIDE FLANGE
WP WORKING POINT
WSCT WAINSCOT
WWF WELDED WIRE FABRIC
WNDW WINDOW
YD YARD
P
G
H
I
J
K
L
M
N
O
Q
R
S
T
U
V
W
Y
ARCHITECTURAL ABBREVIATIONS
T H
E L
IN
E
S H
O W
N A
B O
V E
IS
X
A C
T
LY
O N
E
IN
C H
L O
N G
A T
T H
S
E E
T S
O R
IG
IN
A L
P A
G E
S
IZ
E
100% CONSTRUCTION
DOCUMENTS
Drawing
A
B
C
D
E
1 2 3 4 5 6
T H
E S
Q U
A R
E S
A B
O V
E A
R E
C O
LO
R
, W
IT
H B
LA
C
K
A N
D W
H
IT
E L
E T
T E
R S
, I F
P R
IN
T
E D
C O
R R
E C
T
LY
M C
Y K
Project Code:
Sheet Issue Date:
Drawn By:
Checked By:
© Hord Coplan Macht, Inc.
ARCHITECT
/3
1/
:2 4:
P
M
10.31.2023
DEB Permit Comments
SAND STORAGE FACILITY
UNIVERSITY OF MARY WASHINGTON
1204 HANOVER ST
FREDERICKSBURG, VA ZIP 22401
PROJ: 215-B3215-012
G-000
COVER SHEET
H A
N O
V E
R S
T
F R
E D
E R
IC
K
S B
U R
G , V
A Z
IP
S A
N D
S T
O R
A G
E F
A C
IL
IT
Y U
N
IV
E R
S
IT
Y O
F M
A R
Y W
A S
H
IN
G T
O N
215-B3215-012
05.05.2023
MR
Checker
STRUCTURAL ENGINEER
1025 Boulders Pkwy #310
DUNBAR STRUCTURAL
Richmond, VA 23225
(804) 323-0656
ARCHITECTURE
LANDSCAPE ARCHITECTURE
PLANNING
INTERIOR DESIGN
SHEET INDEX
NUMBER NAME ORIG ISSUE REV# DATE
PROJECT INFORMATION
G-000 COVER SHEET 05.05.2023 B 10.31.2023
G-001 SPECIFICATIONS 05.05.2023 A 06.05.2023
PROJECT INFORMATION: 2
ARCHITECTURAL BUILDING ELEVATIONS & SECTIONS
A-301 ARCHITECTURAL BUILDING PLAN, ELEVATION & SECTION 05.05.2023 B 10.31.2023
ARCHITECTURAL BUILDING ELEVATIONS & SECTIONS: 1
STRUCTURAL
S100 FOUNDATION PLAN AND SECTIONS 05.05.2023 B 10.31.2023
STRUCTURAL: 1
Grand total: 4
NTS G-000 A-301
A1 ARCHITECTURAL SITE PLAN- OVERALL
NTS G-000
C1 LOCATION MAP
TRUE
NORTH
RAPPAHANNOCK RIVER
R A
P P
A H
A N
N O
C K
R
IV
E R
BLUE AND GRAY PKWY
WILIAM ST
WILIAM ST
E M
A N
C
IP
A T
IO
N
H W
Y
FALL HILL AVE
H W
Y
KINGS HW
Y
R
IV
ER
R
D
FREDERICKSBURG
UMW
PHYSICAL
PLANT BLD.
1. The contractor will visit the site and acquaint himself with existing conditions and building restrictions prior to submitting bids and /or exectuing the work.
2. Should the contractor find any discrepancies or omissions in the Contract Documents that affect proper execution of the work, he must bring these to the attention of the Architect and Owner in writing prior to proceeding with the work in question.
3. Contractor will notify the Architect and Owner of any items specified herein with a lead-time that could adversely affect the construction schedule.
4. All materials and systems will be installed as per manufacturer's instructions and all construction will be of first class workmanship.
5. NOT USED.
6. Contractor material, equipment, debris and personnel may not obstruct the means of egress in areas outside of the area of work.
GENERAL NOTES
DEB PROJECT NUMBER: 215-B3215-012
Per CPSM 3.1.1.2.1, the following list includes the Agency preapproved Delegated Design list that meets or exceeds this Specification.
BGreystone Construction 2005 18th Street Spirit Lake, IA 51360
(712) 339-2160 https://www.greystoneconstruction.com/markets/salt-and-sand-storage-buildings.html
Freedom Buildings 508 3rd St Belle Plaine, IA 52208
(319) 777-8093 https://freedombuildings.us/
Sprung Structures 5000 Tilghman Street Suite 155 Allentown, PA 18104-9102 Phone: 1.610.904.9089 https://www.sprung.com/structures/industrial-buildings/warehouse-buildings/
ClearSpan Structures 1395 John Fitch Blvd South Windsor, Connecticut 06074
(866) 643-1010 https://www.clearspan.com/contact-us/need-a-custom-building/
Accu Steel Accu-Steel Fabric Covered Buildings 2245 110th Street Audubon, Iowa 50025 1-877-938-1654 https://asicoverbuildings.com/sand-storage-buildings
DELEGATED DESIGN:
1925 BALLENGER AVENUE
SUITE 525
ALEXANDRIA, VA 22314
571.388.7761
△ DATE SUBMISSION
A 06.05.2023 DEB Permit Comments
B 10.31.2023 DEB Permit Comments
B
B
Jan 02, 2024
01/02/2024
01.02.2024 01.02.2024
01.02.2024
01.02.2024
T
E L
IN
E
S H
O W
N A
B O
V
A C
T
LY
O N
E
IN
C H
L O
N G
A T
T
E E
T S
O R
IG
IN
A L
P A
G E
S
IZ
E
100% CONSTRUCTION
DOCUMENTS
Drawing
A
B
C
D
E
1 2 3 4 5 6
DATE DESCRIPTION∆
T H
E S
Q U
A R
E S
A B
O V
E A
R E
C O
LO
R
, W
IT
H B
LA
D W
H
IT
E L
E T
T E
R S
, I F
P R
IN
T
E D
C O
R R
E C
T
LY
M C
Y K
Project Code:
Sheet Issue Date:
Drawn By:
Checked By:
© Hord Coplan Macht, Inc.
ARCHITECT
G-001
SPECIFICATIONS
H A
N O
V E
R S
T
F R
E D
E R
IC
K
S B
U R
G , V
A Z
IP
S A
N D
S T
O R
A G
E F
A C
IL
IT
Y U
N
IV
E R
S
IT
Y O
F M
A R
Y W
A S
H
IN
G T
O N
CONSULTANT 7 PHONE
215-B3215-012
05.05.2023
MR
Checker
STRUCTURAL ENGINEER
1025 Boulders Pkwy #310
DUNBAR STRUCTURAL
Richmond, VA 23225
(804) 323-0656
ARCHITECTURE
LANDSCAPE ARCHITECTURE
PLANNING
INTERIOR DESIGN
SPECIFICATIONS
DIVISION 2 SITE WORK
SECTION 02 41 19, SELECTIVE DEMOLITION
A. Identify, terminate, and remove utilities and services within areas of demolition indicated on the
Drawings.
B. Prior to removal of equipment and materials, determine disposition and salvage. Obtain approval from
Architect/Engineer as to which items are property of the Owner and which items become property of
Contractor. Those items that become property of Contractor shall be promptly removed from Site.
C. Selectively demolish indicated construction. Provide protection and temporary work to prevent damage to existing items not indicated for demolition.
D. Demolition shall be carried out as expeditiously as possible. Demolition work shall be carefully planned and executed in an orderly manner with all due and proper consideration given to complete protection of existing facilities and services, Owner's personnel, occupants, and general public.
E. Demolition shall be accomplished with minimum noise and vibration. Work creating excessive noise shall be scheduled to satisfaction of Owner.
F. Cutting and removal of mechanical and electrical items shall be performed by licensed and qualified trades people. Do not cut openings in structural elements without prior approval of Engineer. Patching shall be done by specialist in applicable trade such as masonry, concrete , carpentry, etc.
G. Remove debris properly from site and legally dispose of debris. Do not burn or bury on site. Do not allow debris to enter sewers. Do not let piled debris accumulate and endanger structure, block exits or roadways.
H. Where finishes are to be removed, removal shall include removal of material as well as adhesives, mastics, mortars, and residue. Grind, patch, and fill remaining substrate to provide a suitable substrate for application of new finishes. Where partitions, fixtures, and other items are removed, patch existing surface to provide flush sound surface acceptable for application of new finish. Flash patch holes and depressed areas in floor. Remove high areas by grinding prior to installation of new finishes. Ensure surfaces are smooth and level to accept new finishes.
DIVISION 13 SPECIAL CONSTRUCTION
SECTION 13 34 21, PRE-ENGINEERED BUILDINGS
1.1 INTENT OF SPECIFICATION
1.1.1 This specification covers the design, manufacture, shipping, handling and erection of a prefabricated membrane covered structure.
1.1.2 The specification as heretofore set forth is general in nature and scope and shall not be construed as to limit the work other than the requirement that the new re-locatable building shall match the specifications in materials, appearance, configuration and details.
1.1.3 It is the intent of this specification that the bidder shall include all labor, materials, equipment services and transportation to locate the building on the site designated with all other work.
1.1.4 Buildings shall be complete and operating and shall include all exterior and interior materials and systems as shown or indicated in contract documents.
1.1.5 All workmen shall be skilled and qualified for the work they perform. All material used, unless otherwise specified, shall be new and of the types and grades specified. The contractor shall certify that no asbestos containing materials that exceed Federal mandated safe asbestos levels have been used in the construction of the membrane covered structure.
1.1.6 Work shall be performed as necessary and required for the construction of the project as indicated. Such work includes the supply and installation of a membrane-covered structure complete with exterior and interior finishes. The building shall be as dimensioned with all features and quantities as per specification.
1.2 APPROVAL OF PLANS
1.2.1 Upon award of this contract, the contractor shall furnish detailed drawings for all structural work stamped by an engineer certified in the state where the project is located to verify compliance to local building code.
1.2.2 All work to be performed under the conditions of this specification shall comply with the rules and regulations of all agencies having jurisdiction for this classification of construction and design and shall conform to the applicable live loads due to wind, rain and snow.
1.2.3 Manufacturer 's Qualification: The fabricator of the building or building components shall be regularly engaged in the fabrication of this type of building. They must meet the requirements of this Section and shall show evidence of having an adequate manufacturing facility, equipment, and a quality control system. The fabricator must provide evidence upon request that they have produced a minimum of 50 such structures in the previous 12 months before acceptance of this contract. A reference list of 5 salt buildings shall be provided upon request. The fabricator shall be subject to the Director's approval.
1.2.4 Fabric Warranty: All membranes used are to be North American made, water and mildew resistant, insect proof, and UV stabilized. They are to withstand extreme climatic variations and contain ultra-violet inhibitors to reduce degradation by the sun’s rays. Manufacturer is to provide a minimum 20-year pro-rata warranty on non-fire rated fabric and a 15- year pro-rata warranty on fire rated fabric according to the standard manufacturer’s warranty.
1.2.5 Steel Truss Warranty: Truss Framework tubing must be Hot Dip Galvanized inside and out of tubing -completely after fabrication. Failure to provide proof of this will cause the bid to be denied. The manufacturer is to provide a minimum 20-year pro-rata warranty on the trusses according to the standard manufacturer’s warranty.
1.2.6 Building Erectors: The building erector shall be regularly engaged in the erection of fabric covered buildings, meeting the requirements of this Section. The erectors must provide evidence that they have constructed a minimum of 5 such structures in a US Municipal contract setting in the past 12 months before acceptance of this contract. The erectors shall be subject to the approval of the Director.
1.2.7 Building Erector: Crew supervisor shall provide 10-Hour OSHA Card prior to work commencement. All workers on site shall provide and all applicable equipment operator certifications prior to work commencement.
1.3 WORKMANSHIP
1.3.1 The workmanship of all materials and components of the structure shall be commensurate with the functional requirements of the item
1.3.2 Building manufacturer shall fabricate such structure to include the membrane under factory conditions in a plant specifically arranged for this type of work. Fabricator shall provide adequate space, equipment, personnel and technical ability to coordinate the assembly and factory prefabrication of all major components of the work and all necessary operations in the packing, shipping and installation procedures. No fabrication shall be done until the materials have been tested and approved.
1.3.3 Welding: Truss fabricator must be an approved welding fabricator to standards listed herein. A copy of
AWS certification must accompany the structural drawings upon request.
1.3.4 On site welding: If welding is required on site, no welding shall commence until the AWS welding inspector has inspected and approved the materials, joint preparation, equipment and qualifications of the welders in accordance with the standards herein.
1.4 DIMENSIONS
1.4.1 The structure shall be arch shaped in profile as shown in the drawing
1.4.2 The structure shall occupy an area of at least 36 feet in width and 24 feet in length.
1.4.3 One end wall fully enclosed
1.4.4 One end wall open
1.4.5 The structure shall provide a minimum interior vertical clearance 19’-3” tall (including foundation) from finished floor.
1.4.6 Overall height of structure to be appx 20-22 feet tall including foundation
1.4.7 Britespan Atlas Series 36’ or approved equal.
1.5 SCOPE OF WORK
1.5.1 Provide design and construction for a permanent rectangular shape tension membrane covered truss type building. The structure shall meet or exceed the performance criteria of this specification.
Building:
a. Building shall be mounted on contractor-supplied concrete bunker block foundation with an overall footprint of approximately 36 feet wide and 24 feet long minimum, 3-sided
b. Bunker blocks to be 2’x2’x6’ and plated together with hot dipped galvanized plates per engineered foundation drawings
c. Truss spacing shall be 12 feet on center common
d. One end fully enclosed with (2ea) 3’ x 3’ passive vents minimum. Fabric wall and steel framework complete
e. One end open
f. Fabric terminated approximately 12” below the top of the concrete foundation – tensioning equipment shall be mounted to bunker wall.
g. Paving by others
h. Hot Dipped Galvanized Anchor bolts by contractor
1.5.2 Building design to be stamped by an engineer certified by the state where the project is located to verify compliance to local building code and installed by contractor
1.5.3 Delivery of all materials to site by contractor
1.5.4 All lifts and equipment for installation of all items by contractor
1.5.5 Complete Structure & Accessory installation by contractor
PART 2
2.1 GENERAL DESIGN REQUIREMENTS
2.1.1 SCOPE
1. The membrane shall be tensioned over the framework. The structure shall be rectangular in shape with one enclosed and one open end wall. The interior of the structure below the main trusses shall be clear span free of any structural support members and shall provide unobstructed floor space.
No exterior purlins, guy ropes or cables shall be used for anchoring the structure.
2.1.2 DESIGN REQUIREMENTS – STRUCTURAL FRAME
1. Structure shall be engineered so it is capable of withstanding the loads specified in ASCE 7-16, and the 2018 VCC code year edition without failure or damage. Design must incorporate both balanced and unbalanced loads. Additional rain on snow surcharge loading must also be added to gable shaped (non arch) buildings per ASCE 7-16.
2. The main structure shall consist of a welded truss arches comprised of parallel tubes separated apart by tubular webs. The truss cords must be made from round tubular steel with a continuous round tubular web separating the inner and outer chords. Exact chord and tubular web diameter and gauge to be called out by the manufactures engineering requirements provided they meet or exceed the below minimum mandates. Chord plastification calculations must be included on the structural drawings when chords are made with lighter than 14ga. Steel.
a. Meet or exceed the following design dimensions for open web chord truss:
1. Truss Weight: 384 lbs Minimum
2. Truss Chord Depth: 18” Minimum
3. Chords Diameter 2.375” Minimum
4. Chords Wall 14ga Minimum
5. Web Size 1.125” Minimum
6. Web Wall 14ga Minimum
7. Truss spacing 16’ OC Max Mandatory
3. Structure must be capable of maintaining structural integrity in the event of a tear propagating in the fabric, without endangering occupants.
4. Truss framework tubing shall be Hot Dipped Galvanized after fabrication as per Building Product requirements stated herein. The Hot Dip Galvanizing must meet ASTM 123-12 as per the building code.
Acceptable products:
a. Hot Dip Galvanized Product, galvanized inside and out after fabrication is completed
b. Aluminum
5. All purlins used in the building must be a minimum of 2-7/8” inches in diameter, 14ga min, made from one single piece of pipe, and be attached to the truss using a double bolted configuration with
2-5/8” bolts minimum attached directly to the welding dog bone or kingpin of the truss on each end.
Saddle brackets are not suitable attachment as they allow rotational movement to occur. Purlins must be hot dipped galvanized – inline galvanizing, Gatorshield or Triple Coat are not acceptable. Cross “X” purlins will not be accepted as they tend to hold snow due to how they mount to the truss at the top chord.
6. Building must utilize cross cables in each end bay to prevent racking. Cables must be a minimum of 5/16” galvanized that is 7 by 19 commercial grade and must be secured to structural welded truss member using a solid bolted or clevis connection and they must be adjustable for proper tensioning with a galvanized, lockable turnbuckle. Cable assemblies attached with open hooks or loops will not be allowed. Cables are to be assembled using a press swedged connection, clamps will not be allowed as the can slide. Cables must terminate at every bay to prevent the removal of galvanizing at wear points causing rust.
7. All tie down pipe that is used to fasten the cover to the building must be secured by a 10,000-pound lashing winch at every truss located on the outside of the structure. This ensures the attachment hardware will not be exposed to the corrosive salt material diminishing the useful life of the hardware.
Ratchet strap attachment to the tie down pipe will not be accepted as a main cover tensioning system.
Tension pipe used for the main cover shall be oval or rectangular and installed in a vertical manner to minimize deflection when bay spacing exceeds 12’ on center.
8. All bearing plates and other structural members must be hot dipped galvanized “POST” fabrication, no welding shall take place after the galvanized coating is applied. All anchor bolts, bolts and washers etc., shall be Hot Dip Galvanized.
2.1.3 ENGINEERING DESIGN CRITERIA
1. 2018 VCC ASCE 7 - 16
2. SNOW LOAD 25 PSF ground snow load
3. COLLATERAL LOAD 0.25 pounds per square foot projected over entire roof
4. WIND LOAD 104 V-ult
5. OCCUPANCY CATEGORY CAT I – Low Human Occupancy
6. EXPOSURE CATEGORY C
7. RAINFALL 4” per hour, for at least 2 hours
8. USE GROUP S-2
9. CONSTRUCTION TYPE II-B
10. FLAMMABILITY ASTM E84
11. WIND IMPORTANCE FACTOR 1.0
12. SNOW IMPORTANCE FACTOR 0.8
13. Seismic Design Category B
D=Dead Load + Collateral Load
S=Symmetrical Snow or Live Load (Balanced or Unbalanced)
Ws = Wind Internal Suction
Wp = Wind With Internal Pressure
E = Earthquake
2.1.4 Structure shall be capable of being assembled, operated and dismantled in all ambient temperatures between -20F and 120F
2.2.2 Membrane Performance Minimum Standards
Coated Weight 12 oz/yd (407 gsm)+/-5%
Coating Thickness 4 mils average, each side +/-2%
Finished Thickness 23 mils (ASTM D1777)
Grab Tensile Strength, lbs 345 lbs Weft (ASTM -D5304)
370 lbs Warp (ASTM -D5035)
Tongue Tear Strength, lbs 100 lbs Weft (ASTM -D2261)
110 lbs Warp (ASTM -D2261)
Mullen Burst 650 psi (4428 kPa)
Cold Crack Resistance -55oC (ASTM –D2136)
Resistance to UV & Weathering 90% retention after 2000 hr.
Low Temperature Bend -60 Degrees Celcius ASTM D2136
FR Performance ASTM E84
2.2.3 The stressed membrane structure must be designed to shed snow before the design load is exceeded, or alternatively provide structural capacity to meet or exceed required roof snow load requirements of specified site. The architectural membrane shall be continuous from the base of the structure to the peak and manufactured in such a way that no eave will exist.
A. To reduce premature wear points, at no time may the fabric be in contact with the steel truss arch.
2.2.4 Membrane used in the building design shall be designed to withstand the corrosive UV light according to the manufacturer warranty.
2.2.5 Base tensioning system: The membrane cladding will be provided with a mechanical tensioning system that allows the membrane to be fully tensioned around the structure perimeter each panel. The system will be designed such that the membrane can be tightly and neatly secured over the structural frame and that the system has a remaining range of adjustment.
2.2.6 Converting raw fabric to finished membrane cover; To ensure quality control:
A. Raw fabric converted to finished product must be manufactured on the same site as steel trusses and under the same supervision for complete building package continuity and quality control.
B. Conversion plant/personnel must be CSA S367 Certified.
C. Produce documented evidence that fabricator personnel have been trained no less than 160 hours in practical application.
D. Fabric welding and construction of fabric covers shall be completed in a dedicated production plant, with the floor heated to 70 degrees Fahrenheit (+/- 2 degrees), and full environmental controls via HVAC system throughout the plant.
E. Fabric conversion systems will include “inline vision systems” for 100% testing of weld parameters, continuously monitoring weld temperatures throughout the entire process. “Spot checking” will not acceptable practice.
F. Fabric Panels using keder connection to truss MUST have a 2” weld – no exceptions.
G. In-house testing of raw fabric and new welds shall be completed daily using a 4 hour test utilizing certified Instron Lab Equipment as described below in the chart:
2.3 METAL SPECIFICATIONS
2.3.1 All steel tubing used in the structure must have the following minimum structural and mechanical properties (ASTM A-500):
1. Tube: ASTM A500/CSA G-40.21 (350W) Tensile 61,600 PSI Yield 45,700 PSI
2. Plate: ASTM A500/Gr 50 CSA G40.21-50W Tensile 65,000 PSI Yield 50,000 PSI
2.3.2 All steel flat bar, truss components shall be fabricated and hot dipped galvanized post fabrication to
ASTM A123-12 meeting ASTM Standard B6 zinc coatings.
PART 3
3.1 REFERENCES AND STANDARDS
1. 3.1 Except where more stringent requirements are specified, comply with the applicable requirements of the following organizations and standards, for products, materials, and construction methods:
• American Institute of Steel Construction (AISC)
• American Iron and Steel Institute (AISI)
• American Society of Civil Engineers (ASCE 7-10 Minimum Design Loads for Buildings and Other
Structures)
• American Welding Society (AWS)
1.3.2 The following publications are for the standards listed below but referred to thereafter by basic letter designation only. They form a part of this specification to the extent referenced thereto: American Institute of
Steel Construction (AISC):
A. ASCE 7 - Minimum Design Loads for Buildings and Other Structures; American
Society of Civil Engineers; 2011.
B. ASTM A36/A36M - Standard Specification for Carbon Structural Steel; 2008.
C. ASTM A53/A53M - Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless; 2012.
D. ASTM A307 - Standard Specification for Carbon Steel Bolts, Studs, and Threaded
Rod 60 000 PSI Tensile Strength; 2012.
E. ASTM A325 - Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength; 2010.
F. ASTM A325M - Standard Specification for Structural Bolts, Steel, Heat Treated 830
MPa Tensile Strength (Metric); 2013.
G. ASTM A500/A500M - Standard Specification for Cold-Formed Welded and Seamless
Carbon Steel Structural Tubing in Rounds and Shapes; 2010a.
H. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building
Materials; 2013a.
I. AWS D1.1/D1.1M - Structural Welding Code - Steel; American Welding Society;
2010 or CWB Canadian Welding Bureau.
J. NFPA 701 - Standard Methods of Fire Tests for Flame Propagation of Textiles and
Films; National Fire Protection Association; 2010.
K. SSPC-SP 6 - Commercial Blast Cleaning; Society for Protective Coatings; 2007.
L. SSPC-Paint 20 - Zinc-Rich Primers (Type I, "Inorganic," and Type II, "Organic");
Society for Protective Coatings; 2002 (Ed. 2004).
M. SSPC-Paint 22 - Epoxy-Polyamide Paints (Primer, Intermediate, and Topcoat);
Society for Protective Coatings; 1982 (Ed.2004).
1.3.3 PAINTING: Painting of steel components shall only be utilized if necessary for field repairs and shall not be employed as a factory finish. Should field repair be necessary, a zinc rich field coat shall be used
1.3.4 FIELD WELDING: In-Field fabric welding is accepted as a standard method of joining panels, rounding corners, repairing minor cuts or abrasions.
1.3.5 COLORS: As selected by the Director’s Representative from standard Manufacturer’s Color charts
1.3.6 ADJUSTING: Repair cut, welded, and/or abraded galvanized surfaces with a minimum 2 mil thick coating of cold galvanizing compound (containing 93 percent zinc) applied in accordance with manufacturer’s instructions.
1.3.7 APPROVED MANUFACTURERS:
1. The following manufacturers are preapproved and meets or exceeds this Specification.
BGreystone Construction
2005 18th Street
Spirit Lake, IA 51360
(712) 339-2160 https://www.greystoneconstruction.com/markets/salt-and-sand-storage-buildings.html
Freedom Buildings
508 3rd St
Belle Plaine, IA 52208
(319) 777-8093 https://freedombuildings.us/
Sprung Structures
5000 Tilghman Street
Suite 155
Allentown, PA
18104-9102
Phone: 1.610.904.9089 https://www.sprung.com/structures/industrial-buildings/warehouse-buildings/
ClearSpan Structures
1395 John Fitch Blvd
South Windsor, Connecticut 06074
(866) 643-1010 https://www.clearspan.com/contact-us/need-a-custom-building/
Accu Steel
Accu-Steel Fabric Covered Buildings
2245 110th Street
Audubon, Iowa 50025
1-877-938-1654 https://asicoverbuildings.com/sand-storage-buildings
Alaska Structures
6991 E Camelback Rd Suite D-216, Scottsdale, AZ 85251
+19073441565 https://alaskastructures.com/products/salt-sand-and-frac-sand-storage-buildings/
2. Equal manufacturer must be approved by director 7 days prior to bid opening.
3. Bidder must note manufacturer of structure at time of bid and may not be changed after.
END OF SECTION
1925 BALLENGER AVENUE
SUITE 525
ALEXANDRIA, VA 22314
571.388.7761
A 06.05.2023 DEB Permit Comments
Jan 02, 2024
01/02/2024
A-301
C2
C4 A-301
RAISED LEVELED
COMPACTED SOIL
2'-0"32'-3"2'-0"
36'-3"
'-0
130'131'132'
133'
'-0
2'
-0
APPROXIMATE
REPRESENTATION OF RAISED
MOUND AROUND BUILDING TO
KEEP WATER OUT.
DIMENSION PLAN GENERAL NOTES
1. BLACK DIMENSIONS INDICATED ARE TO FACE OF ELEMENTS, UON.
2. M.O. = MASONRY OPENING = NOMINAL DIMENSION SHOWN +3/8"
LEVEL 01
0"
1' -6
'-0
6' -0
V E
R
IF
Y W
IT
H
M A
N U
F A
C T
U R
E R
'-6
BACK SURFACE COVERED
WITH POLYETHYLENE
FABRIC
132'-6"
REFER TO STRUCT DWGS
FOR FOOTING DETAIL
REFER TO STRUCT DWGS
FOR FOOTING DETAIL
LEVEL 01
0"
C4 A-301
6' -0
'-0
1' -6
OPEN WEB METAL TRUSS
2'x2'x6' PRECAST
CONCRETE BLOCKS UNITS
POLYETHYLENE FABRIC COVER
COVERED SURFACE BEYOND
V E
R
IF
Y W
IT
H
M A
N U
F A
C T
U R
E R
'-6
132'-6"
ANCHORAGE DETAILS FOR
THE TRUS AND THE
FABRIC ARE BY
MANUFACTURER
REFER TO STRUCT DWGS
FOR FOOTING DETAIL
REFER TO STRUCT DWGS
FOR FOOTING DETAIL
T H
E L
IN
E
S H
O W
N A
B O
V
A C
T
LY
O N
E
IN
C H
L O
N G
A T
T
E E
T S
O R
IG
IN
A L
P A
G E
S
IZ
E
100% CONSTRUCTION
DOCUMENTS
Drawing
A
B
C
D
E
1 2 3 4 5 6
DATE DESCRIPTION∆
T H
E S
Q U
A R
E S
A B
O V
E A
R E
C O
LO
R
, W
IT
H B
LA
D W
H
IT
E L
E T
T E
R S
, I F
P R
IN
T
E D
C O
R R
E C
T
LY
M C
Y K
Project Code:
Sheet Issue Date:
Drawn By:
Checked By:
© Hord Coplan Macht, Inc.
ARCHITECT
A-301
ARCHITECTURAL
BUILDING PLAN,
ELEVATION & SECTION
H A
N O
V E
R S
T
F R
E D
E R
IC
K
S B
U R
G , V
A Z
IP
S A
N D
S T
O R
A G
E F
A C
IL
IT
Y U
N
IV
E R
S
IT
Y O
F M
A R
Y W
A S
H
IN
G T
O N
CONSULTANT 7 PHONE
215-B3215-012
05.05.2023
MR
Checker
STRUCTURAL ENGINEER
1025 Boulders Pkwy #310
DUNBAR STRUCTURAL
Richmond, VA 23225
(804) 323-0656
ARCHITECTURE
LANDSCAPE ARCHITECTURE
PLANNING
INTERIOR DESIGN
A-301 1/4" = 1'-0"
A2 FLOOR PLAN
A-301 1/4" = 1'-0"
C4 BUILDING SECTION
A-301 1/4" = 1'-0"
C2 ELEVATION- EXTERIOR- NORTH
1925 BALLENGER AVENUE
SUITE 525
ALEXANDRIA, VA 22314
571.388.7761
A 06.05.2023 DEB Permit Comments
B 10.31.2023 DEB Permit Comments
Jan 02, 2024
22'-0
2'-0
2'-0"
32'-3"
2'-0"
36'-3"
24'-0
(3) LAYERS OF 2'-0" WIDE
X 2'-0" DEEP PRECAST
CONCRETE BLOCKS W/ (2)
#5 MIN TOP AND BOTTOM
S100
FD-1: LENGTH OF INDIVIDUAL PRECAST BLOCKS TO BE COORDINATED WITH BUILDING ANCHOR
LOCATIONS SUCH THAT JOINTS ARE 1'-0" MINIMUM FROM ANCHOR LOCATIONS.
FD-2: TOP OF FOOTING TO MATCH FINISHED GRADE.
FOUNDATION PLAN
1/4"=1'-0"
N
GBC-1: ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE 2018 VIRGINIA CONSTRUCTION CODE, PART 1
OF THE VIRGINIA UNIFORM STATEWIDE BUILDING CODE (VUSBC), EFFECTIVE JULY 1, 2021.
GBC-2: NO LOADS IN EXCESS OF THE DESIGN LIVE LOADS LISTED SHALL BE IMPOSED UPON ANY AREA DURING CONSTRUCTION, UNLESS ADEQUATE SHORING OR OTHER MEANS IS PROVIDED TO SUPPORT THE EXCESSIVE
LOADS.
GBC-3: TEMPORARY BRACING, GUY WIRES, SHORING, ETC., SHALL BE USED AS NECESSARY TO RESIST ALL LOADS TO WHICH THE STRUCTURE MAY BE SUBJECTED DURING CONSTRUCTION, INCLUDING EQUIPMENT AND ITS
OPERATION.
GBC-4: THE STRUCTURE IS DESIGNED TO BE SELF-SUPPORTING AND STABLE AFTER THE BUILDING IS FULLY COMPLETED. THE ERECTION PROCEDURE AND SEQUENCE INCLUDING THE DESIGN ADEQUACY AND SAFETY OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS, ETC., IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
SDS-1: PROVIDE (1) ELECTRONIC PDF COPY OF ALL STRUCTURAL SUBMITTALS.
SDS-2: SHOP DRAWINGS ARE TO BE REVIEWED BY THE CONTRACTOR AND SUBCONTRACTOR PRIOR TO BEING SUBMITTED FOR APPROVAL. SUBMITTED SHEETS SHALL CONTAIN THE CONTRACTOR'S SIGNED AND DATED
REVIEW STAMP.
GENERAL STRUCTURAL NOTES
DL-1: BUILDING RISK CATEGORY (TABLE 1604.5) = CATEGORY II
DL-2: LIVE LOADS (REFER TO FRAMING PLANS FOR MORE SPECIFIC LOADS)
ROOF 20 PSF
ROOF LIVE LOAD REDUCTION NOT USED
DL-4: SNOW LOADS
Pg=25 PSF (GROUND SNOW) Ce=1.0 (SNOW EXPOSURE FACTOR) Ct=1.2 (THERMAL FACTOR) Is=1.0 (SNOW LOAD IMPORTANCE FACTOR: ASCE 7-16 TABLE 1.5-2) Pf (SNOW LOAD FOR LOW-SLOPE ROOF)=0.7X(Ce)X(Ct)X(Is)X(Pg) = 0.7X1.0X1.2X1.0X25 = 21.0 PSF MINIMUM Pf (LOW-SLOPE ROOF WHERE Pg> 20.0 PSF) = Pm =( 20)X(Is) = 20.0X1.0 = 20.0 PSF (USE 21 PSF MINIMUM) Cs (SLOPED ROOF SNOW LOAD FACTOR) VARIES FROM
CS = 1.0 AT 2'-7" FROM CENTERLINE, TO
CS = 0.0 AT 12'-0" FROM CENTERLINE
DL-5: WIND LOADS
V=104 MPH (BUILDING RISK CATEGORY: I ) (BASIC WIND SPEED: 3-SECOND GUST)
Vasd = 81 MPH
EXPOSURE B
Kd=0.85 (WIND DIRECTIONALITY FACTOR) Kzt=1.0 (TOPOGRAPHIC FACTOR) Ke=1.0 (GROUND ELEVATION FACTOR) GCpi=±0.55 (PARTIALLY ENCLOSED BUILDING)
WIND LOAD DETERMINATION BY: ASCE 7-16, CHAPTERS 26, 27, 29, 30 (DIRECTIONAL PROCEDURE)
DL-6: SEISMIC LOADS
Ie=1.0 (ASCE 7-16 TABLE 1.5-2)
SEISMIC SITE CLASS = D (ASSUMED)
Ss=18.0%G Sms=(Fa)X(Ss)=(1..6)X(18.0) = 28.8%G S1=4.9%G Sm1=(Fv)X(S1)=(2.4)X(4.9) = 11.8%G Fa=1.6 Sds=(2/3)X(Sms) = 19.2%G Fv=2.40 Sd1=(2/3)X(Sm1) = 7.8%G
SEISMIC DESIGN CATEGORY = B
DL-8: ICE LOADS
ICE DENSITY= 56 pcf (ASCE 7-16, SECTION 10.4) t=1.5" (NOMINAL ICE THICKNESS AT 33' HT, ASCE 7-16 Fig 10.4-2)
CONCURRENT TEMPERATURE = 15 DEGREES F
GUST SPEED = 30 MPH
Ii=1.0 (ICE LOAD IMPORTANCE FACTOR, ASCE 7-16, TABLE 1.5-2)
Z=15' (HT ABOVE GROUND)
fz=(Z/33)0.10 (HT FACTOR, ASCE 7-16 EQ 10.4-4) = (15/33)0.10 = 0.93 Kzt=1.0 (TOPOGRAPHIC FACTOR, ASCE 7-16 CH. 26) td=(t)(Ii)(fz)(Kzt)0.35 (DESIGN ICE THICKNESS, ASCE 7-16 EQ 10.4-5) = (1.5") (1.0) (0.93) (1.0)0.35 = 1.40"
WEIGHT OF ICE = 1.40"/12 X 56 PCF = 6.51 PSF SURFACE AREA
GENERAL/BUILDING CODE
SPECIAL INSPECTIONS
SHOP DRAWING SUBMITTALS
DESIGN LOADS AND PARAMETERS
PRECAST AND CAST-IN-PLACE STRUCTURAL CONCRETE
AB = ANCHOR BOLT
AFF = ABOVE FINISHED FLOOR
APC = ARCHITECTURAL PRECAST CONCRETE
ARCH = ARCHITECTURAL
BLDG = BUILDING
BM = BEAM
BOT = BOTTOM
BRG = BEARING
CANT = CANTILEVER
CFS-S = COLD-FORMED STEEL- STRUCTURAL
CFS-NS= COLD-FORMED STEEL- NON STRUCTURAL
CFST = COLD-FORMED STEEL TRUSS
CIP = CAST-IN-PLACE
CJ = CONTROL JOINT
CL = CENTERLINE
CLG = CEILING
CLR = CLEAR
CLSM = CONTROLLED LOW-STRENGTH MATERIAL
CMU = CONCRETE MASONRY UNIT
COL = COLUMN
CONC = CONCRETE
CONN = CONNECTION
CONT = CONTINUOUS
COORD = COORDINATE
CSP = CONCRETE SURFACE PROFILE
DBA = DEFORMED BAR ANCHOR
DET = DETAIL
DFT = DRY FILM THICKNESS
DIA = DIAMETER
DIAG = DIAGONAL
DIM = DIMENSION
DL = DEAD LOAD
DN = DOWN
DWGS= DRAWINGS
EA = EACH
EJ = EXPANSION JOINT
EL = ELEVATION
ELEV = ELEVATOR
EOS = EDGE OF SLAB
EQ = EQUAL
EQUIP = EQUIPMENT
EXIST = EXISTING
EW = EACH WAY
EXP = EXPANSION
EXT = EXTERIOR
FFE = FINISHED FLOOR ELEVATION
FLR = FLOOR
FLT = FLAT BAR
FRT = FIRE RETARDANT TREATED
FTG = FOOTING
GA = GAUGE
GALV = GALVANIZED
GC = GENERAL CONTRACTOR
GT = GIRDER TRUSS
HK = HOOK
HORIZ = HORIZONTAL
HS = HIGH STRENGTH
HT = HEIGHT
INT = INTERIOR
JBE = JOIST BEARING ELEVATION
JT = JOINT
LBS = POUNDS
LL = LIVE LOAD
LLH = LONG LEG HORIZONTAL
LLV = LONG LEG VERTICAL
LSH = LONG SIDE HORIZONTAL
LSV = LONG SIDE VERTICAL
LVL = LAMINATED VENEER LUMBER
LW = LIGHT WEIGHT
MAS = MASONRY
MAX = MAXIMUM
MECH = MECHANICAL
MFR = MANUFACTURER
MISC = MISCELLANEOUS
MIN = MINIMUM
[NC] = NON-COMPOSITE
NO. = NUMBER
NIC = NOT IN CONTRACT
NTS = NOT TO SCALE
NW = NORMAL WEIGHT
OC = ON CENTER
OPP = OPPOSITE
OH = OPPOSITE HAND
OWSJ = OPEN WEB STEEL JOIST
PAF = POWDER ACTUATED FASTENER
PL = PLATE
PLF = POUNDS PER LINEAR FOOT
POJ = PLANE OF JOIST
PSF = POUNDS PER SQUARE FOOT
PSI = POUNDS PER SQUARE INCH
REF = REFERENCE
REINF = REINFORCING
REQD = REQUIRED
SECT = SECTION
SIM = SIMILAR
SOG = SLAB-ON-GROUND
SOMD = SLAB-ON-METAL DECK
SPA = SPACE
STD = STANDARD
STIFF = STIFFENER
TBE = TRUSS BEARING ELEVATION
T&B = TOP AND BOTTOM
T&G = TONGUE AND GROOVE
TOB = TOP OF BEAM
TOC = TOP OF CONCRETE
TOS = TOP OF STEEL
TYP = TYPICAL
UNO = UNLESS NOTED OTHERWISE
VERT = VERTICAL
WCJ = WALL CONTROL JOINT
WT = WEIGHT
WWF = WELDED WIRE FABRIC
(H) = HIGH
(L) = LOW
PA-1: ALL POST-INSTALLED ANCHORS (IN CONCRETE OR CMU) ARE TO BE INSTALLED IN STRICT CONFORMANCE WITH THE MANUFACTURER'S RECOMMENDATIONS (INCLUDING BUT NOT LIMITED TO DRILL BIT SIZE, PROPER
CLEANING OF HOLES, INSTALLATION TORQUE, AND TEMPERATURE CONSTRAINTS).
PA-2: WHEN A SPECIFIC PRODUCT AND MANUFACTURER IS REFERENCED IN THE CONTRACT DOCUMENTS, THAT SPECIFIC PRODUCT SHALL BE USED UNLESS AN ALTERNATE PRODUCT IS APPROVED IN WRITING BY THE STRUCTURAL ENGINEER OF RECORD PRIOR TO USE. CONTRACTOR SHALL PROVIDE CODE COMPLIANT STRENGTH DESIGN CALCULATIONS DEMONSTRATING THAT THE SUBSTITUTED PRODUCT IS CAPABLE OF ACHIEVING THE PERFORMANCE VALUES OF THE SPECIFIED PRODUCT. SUBSTITUTIONS WILL BE EVALUATED BY THEIR HAVING AN ICC - ES REPORT SHOWING COMPLIANCE WITH THE RELEVANT BUILDING CODE FOR SEISMIC USES, LOAD RESISTANCE, INSTALLATION CATEGORY, AND AVAILABILITY OF COMPREHENSIVE INSTALLATION INSTRUCTIONS.
ADHESIVE ANCHOR EVALUATION WILL ALSO CONSIDER CREEP, IN-SERVICE TEMPERATURE AND INSTALLATION
TEMPERATURE.
PA-3: THE ANCHOR MANUFACTURER'S REPRESENTATIVE SHALL BE PRESENT DURING THE INITIAL INSTALLATION OF EACH TYPE OF ANCHOR TO REVIEW AND APPROVE OF THE CONTRACTOR'S INSTALLATION PROCEDURES. THE OWNER'S TESTING AGENCY SHALL ALSO OBSERVE THE INITIAL INSTALLATION OF EACH ANCHOR TYPE, AND PROVIDE THE INSPECTION OF ANCHORS DURING INSTALLATION TO VERIFY CONFORMANCE WITH THE
MANUFACTURER'S INSTALLATION RECOMMENDATIONS. SUBMIT REPORT FROM MANUFACTURER'S
REPRESENTATIVE FOR DUNBAR REVIEW. INSTALLATION OF ALL HORIZONTAL OR UPWARDLY INCLINED ADHESIVE ANCHORS SHALL BE PERFORMED BY PERSONNEL CERTIFIED BY ACI/CRSI ADHESIVE ANCHOR INSTALLER CERTIFICATION PROGRAM OR APPROVED EQUIVALENT. SUBMIT CREDENTIALS OF CERTIFIED INSTALLERS.
CONTINUOUS INSPECTION IS REQUIRED FOR ALL HORIZONTAL OR UPWARDLY INCLINED ADHESIVE ANCHORS.
REMOVE AND REPLACE MISPLACED OR MALFUNCTIONING ANCHORS. FILL EMPTY ANCHOR HOLES AND PATCH
FAILED ANCHOR LOCATIONS WITH HIGH-STRENGTH, NONMETALLIC GROUT.
PA-4: CHEMICAL ADHESIVE ANCHORING SYSTEMS USED IN CONCRETE GENERICALLY REFERRED TO AS "ADHESIVE
ANCHORS" SHALL BE ONE OF :
• SET - 3G BY SIMPSON STRONG-TIE
• HIT-RE 500-V3 BY HILTI
• HIT-HY 200-V3 BY HILTI
• PURE 110+ BY DEWALT
• AC 200+ BY DEWALT
THREADED ROD ANCHORS USED WITH THESE SYSTEMS SHALL BE PROVIDED BY THE ADHESIVE MANUFACTURER AND HAVE A MINIMUM STEEL STRENGTH OF Fy = 36 KSI UNLESS NOTED OTHERWISE.
PA-5: ANCHORS OR REINFORCING STEEL SHALL BE INSTALLED ONLY IN DRY CONCRETE A MINIMUM OF 21 DAYS
OLD. DRILL AND INSTALL BY ONE OF THE FOLLOWING METHODS:
• USE ONLY A CARBIDE BIT (NO CORE DRILLING) AND CLEAN HOLE FOLLOWING MANUFACTURER'S INSTRUCTIONS USING AIR COMPRESSOR WITH NOZZLE AND WIRE BRUSH PROVIDED BY ADHESIVE
MANUFACTURER.
• USE HOLLOW DRILL BIT SYSTEM WITH ACCOMPANYING VACUUM PROVIDED BY THE ADHESIVE
MANUFACTURER.
FOR ADHESIVE ANCHORS, OVERHEAD HOLES AND ANY HOLES GREATER THAN 10 INCHES DEEP REQUIRE THE USE OF A PISTON PLUG AT THE END OF THE ADHESIVE APPLICATOR. USE ADHESIVE RETAINING CAP AT OVERHEAD
CONDITIONS.
PA-6: OTHER MANUFACTURER'S PRODUCTS MAY BE SUBMITTED AS A FORMAL REQUEST FOR SUBSTITUTION IF REQUIREMENTS ABOVE ARE MET. SIZES AND EMBEDMENTS OF SUBSTITUTE ANCHORS SHALL BE INCREASED AS NECESSARY TO ACHIEVE SHEAR AND TENSION VALUES PUBLISHED FOR LISTED ANCHORS. CONTRACTOR SHALL SUBMIT A COMPLETE SUBSTITUTION LIST FOR ALL ANCHOR SIZES AND SUBSTRATES. DUE TO HIGH VARIABILITY BETWEEN NOMINAL SIZES AND ACTUAL SIZES OF SCREW ANCHORS (AND HOLES REQUIRED), THIS SUBSTITUTION REQUEST SHALL BE SUBMITTED PRIOR TO STEEL SHOP DRAWINGS. ANY PRODUCTS SUBMITTED AS A REQUEST FOR SUBSTITUTION IN CONCRETE SHALL BE COMPLIANT WITH ACI 318-14 CHAPTER 17 AND APPROVED FOR USE IN CRACKED CONCRETE. PROPOSED SUBSTITUTE PRODUCTS SHALL HAVE AN ICC-ES REPORT WHICH CONSIDERS
EQUIVALENT EDGE AND SPACING REQUIREMENTS AS THE SPECIFIED PRODUCTS.
POST-INSTALLED ANCHORS
ABBREVIATIONS
DEFERRED STRUCTURAL SUBMITTALS
DS-1: THE FOLLOWING ITEMS ARE CONSIDERED TO BE DEFERRED STRUCTURAL SUBMITTALS AND SHALL BE SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE FOR REVIEW, WHO SHALL REVIEW THEM AND FORWARD THEM TO THE CONTRACTOR WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. THE CONTRACTOR IS RESPONSIBLE FOR FORWARDING REVIEWED DEFERRED SUBMITTALS TO THE BUILDING OFFICIAL. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE CONTRACTOR. ALL DEFERRED SUBMITTALS SHALL BE SEALED BY THE SPECIALTY STRUCTURAL ENGINEER REGISTERED IN THE JURISDICTION OF THE PROJECT, WHO IS RESPONSIBLE FOR THEIR PREPARATION. REFER TO ARCHITECTURAL DRAWINGS FOR NON-STRUCTURAL
DEFERRED SUBMITTALS.
1. PREFABRICATED STORAGE BUILDING
C-1: ALL CONCRETE WORK SHALL CONFORM TO ALL REQUIREMENTS OF ACI 301-10 "SPECIFICATIONS FOR STRUCTURAL CONCRETE" AND ACI 318-14 "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE".
C-2: STEEL REINFORCING OF CONCRETE SHALL MEET THE FOLLOWING REQUIREMENTS.
• ASTM A615 GRADE 60 (TYPICAL REINFORCING STEEL)
CONCRETE
CLASS
PROJECT
LOCATION
EXPOSURE
CLASS
CONC
WT
MIN F'c
(PSI)
MAX W/CM
RATIO
AIR
CONTENT
SI-1: SPECIAL INSPECTIONS ARE REQUIRED BY THE BUILDING CODE (CHAPTER 17). THE FOLLOWING IS A LIST OF ITEMS THAT REQUIRE SPECIAL INSPECTION. THE INDEPENDENT INSPECTION AGENCY, ENGAGED BY THE OWNER, SHALL REVIEW THE TEST PROCEDURES AND INSPECTIONS WITH THE STRUCTURAL ENGINEER OF RECORD, THE
GENERAL CONTRACTOR, AND THE OWNER PRIOR TO CONDUCTING TESTS AND INSPECTIONS.
A. EARTH MOVING
B. POST INSTALLED ANCHORS REF NOTE, THIS SHEET
C. CAST-IN-PLACE CONCRETE REF QA NOTES, THIS SHEET
A WALLS AND
FOUNDATIONS
F2 NW 4500 0.45 6.0% ± 1.5%
ALL ZONES
ZONE 1/2e/2r
ZONE 2n/3r
ZONES 4,5
ZONE 4
ZONE 5
WALL DESIGN PRESSURES (PSF)
ROOF DESIGN PRESSURES (PSF)
(FIGURE 30.3-2D) ROOF SLOPES 27°<θ≤45° DEGREES)
ROOF AND OVERHANG PRESSURE ZONES
(PLAN VIEW)
a
3e
2e
BARREL VAULT ROOF
22.8 22.0 20.9 20.2 19.4 18.4
-24.2 -23.4 -22.4 -21.6 -20.9 -19.8
-28.6 -27.1 -25.0 -23.4 -21.9 -19.8
ZONE 3e
21.3 19.5 17.2 16.0
-34.5 -30.1 -24.2 -19.8 -19.8 -19.8
-37.4 -34.0 -29.6 -26.2 -22.8 -22.8
-44.7 -40.2 -34.3 -29.8 -25.4 -22.8
3e
3e 3e
2e 1 12r 2r
2n 2n
2n 2n aaa a a
3r 3r
3r 3r
EFFECTIVE
WIND AREA
(SQ FT)
EFFECTIVE
WIND AREA
(SQ FT)
5 5 a a a a
WALL PRESSURE ZONES
NOTES:
1. h = = MEAN ROOF HEIGHT
2. a =
3. PLUS SIGN ( + ) SIGNIFIES PRESSURE ACTING TOWARD THE SURFACE.
4. MINUS SIGN ( - ) SIGNIFIES PRESSURE ACTING AWAY FROM THE SURFACE.
5. ALL PRESSURES INDICATED ARE STRENGTH-LEVEL DESIGN LOADS.
COMPONENTS AND CLADDING DESIGN WIND PRESSURE TABLE
FOR BUILDINGS WITH MEAN ROOF HEIGHT H≤60'
16'-0" 3'-0"
9'-0"
TREAT 2'-1" PLAN
WIDTH AS WALL
16.0 16.0
SECTION 033000 – CAST-IN-PLACE CONCRETE
QUALITY ASSURANCE
A. MANUFACTURER QUALIFICATIONS: A FIRM EXPERIENCED IN MANUFACTURING READY-MIXED
CONCRETE PRODUCTS AND THAT COMPLIES WITH ASTM C 94/C 94M REQUIREMENTS FOR
PRODUCTION FACILITIES AND EQUIPMENT.
1. MANUFACTURER CERTIFIED ACCORDING TO NRMCA'S "CERTIFICATION OF READY MIXED
CONCRETE PRODUCTION FACILITIES."
B. TESTING AGENCY QUALIFICATIONS: AN INDEPENDENT AGENCY, ACCEPTABLE TO AUTHORITIES HAVING
JURISDICTION, QUALIFIED ACCORDING TO ASTM C 1077 AND ASTM E 329 FOR TESTING INDICATED, AS DOCUMENTED ACCORDING TO ASTM E 548.
1. PERSONNEL CONDUCTING FIELD TESTS SHALL BE QUALIFIED AS ACI CONCRETE FIELD TESTING
TECHNICIAN, GRADE 1, ACCORDING TO ACI CP-01 OR AN EQUIVALENT CERTIFICATION PROGRAM.
2. PERSONNEL PERFORMING LABORATORY TESTS SHALL BE ACI-CERTIFIED CONCRETE STRENGTH
TESTING TECHNICIAN AND CONCRETE LABORATORY TESTING TECHNICIAN - GRADE I. TESTING
AGENCY LABORATORY SUPERVISOR SHALL BE AN ACI-CERTIFIED CONCRETE LABORATORY
TESTING TECHNICIAN - GRADE II.
C. SOURCE LIMITATIONS: OBTAIN EACH TYPE OR CLASS OF CEMENTITIOUS MATERIAL OF THE SAME
BRAND FROM THE SAME MANUFACTURER'S PLANT, OBTAIN AGGREGATE FROM ONE SOURCE, AND
OBTAIN ADMIXTURES THROUGH ONE SOURCE FROM A SINGLE MANUFACTURER.
D. ACI PUBLICATIONS: COMPLY WITH THE FOLLOWING UNLESS MODIFIED BY REQUIREMENTS IN THE
CONTRACT DOCUMENTS:
1. ACI 301, "SPECIFICATION FOR STRUCTURAL CONCRETE," SECTIONS 1 THROUGH 5. SECTIONS 1
THROUGH 5 AND SECTION 7, "LIGHTWEIGHT CONCRETE."
2. ACI 117, "SPECIFICATIONS FOR TOLERANCES FOR CONCRETE CONSTRUCTION AND MATERIALS.”
E. CONCRETE TESTING SERVICE: ENGAGE A QUALIFIED INDEPENDENT TESTING AGENCY TO PERFORM
MATERIAL EVALUATION TESTS AND TO DESIGN CONCRETE MIXTURES.
FIELD QUALITY CONTROL
A. TESTING AND INSPECTING: OWNER WILL ENGAGE A SPECIAL INSPECTOR AND QUALIFIED TESTING AND INSPECTING AGENCY TO PERFORM FIELD TESTS AND INSPECTIONS AND PREPARE TEST REPORTS.
TESTING AGENCY SHALL PROVIDE CERTIFICATION OF FIELD AND LABORATORY TECHNICIANS FOR QUALIFICATIONS REQUIRED IN ACI 318-08, SECTION 5.6.1 AND PARAGRAPH B.1 AND .2 OF THIS
SPECIFICATION.
B. INSPECTIONS:
1. STEEL REINFORCEMENT PLACEMENT.
2. VERIFICATION OF USE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .