IFB 158125 - DRAWINGS (05-04-23).pdf
PDF 11 MB Posted
- Solicitation number
- 21119
- Issued by
- Richmond County, Salem City, Virginia
About this file
This document is a set of drawings for IFB 158125, a project for the renovations to the toilets in Building B1 at the Salem District Headquarters located in Salem, Virginia. The project generally consists of renovations to three existing restrooms to allow ADA accommodations, a new janitors closet, updated finishes, new plumbing fixtures and toilet accessories, new HVAC, electrical, and plumbing within these rooms as detailed in the drawings. No additional details regarding the response dates, due dates, site visits, bidder's meetings, award dates, or contract terms are provided in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REQUIRED FORMS ADD IN (3).pdf | ||
| IFB 158125 - PROJECT MANUAL 1.pdf | ||
| ADDENDUM NUMBER 1 - 158125 8-8-23.pdf | ||
| Notice of Cancellation | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP:
BUILDING B1
CLEVELAND AVE
POAGE LANE
HARRISON AVE HARRISON AVE
B R
A N
D A
V E
B R
A X
T O
N A
V E
CRYSTAL DR
B R
IT
T
A N
Y L
N
C R
A
IG
A V
E
C R
A
IG
A V
E
C A
R E
Y A
V E
AREAS OF WORKMAIN FLOOR
| expect a difference |
C O
M M
O N
W E
ALTH OF
V
I
R G
I N
I A
ARCHITECT
Lic. No. 012264
TIM A. COLLEY
SUITE 200 200 N. MAIN STREET
BLACKSBURG, VA . 24060
DATE
SCALE
DRAWN
JOB
SHEET
AS NOTED
IFB # 158125
FORMATTED FOR
A 24" X 36" PRINT
AGENCY APPROVAL
P. 540.953.2724 F. 540.953.2725
CONSULTANT
PROJECT CODE 501-B2501-021
PREPARED BY:
22 LUCK AVENUE SW
ROANOKE, VA 24011
P. 540.952.9651
SUITE 200 200 N. MAIN STREET
BLACKSBURG, VA 24060
P: 540.953.2724(ARCH)
F: 540.953.2725
CONTACT: TIM COLLEY . AIA
INFO@COLLEYARCH.COM
T1
COVER SHEET
05 . 04 . 2023
BUILDING B1 TOILET
RENOVATION
RENOVATIONS TO
ECH
SALEM DISTRICT HEAD QUARTERS 731 HARRISON
AVENUE SALEM, VA 24153
05 . 04 . 2023
RENOVATIONS TO
731 HARRISON AVENUE
SALEM, VA 24153
TOILETS IN BUILDING B1 AT THE SALEM DISTRICT
HEADQUARTERS
SHEET INDEX
T1 COVER SHEET
T2 GENERAL NOTES + INFORMATION
LS1 LIFE SAFETY & BUILDING CODE DATA
A1.1 DEMO PLANS
A1.2 NEW WORK PLANS
A2.1 SECTIONS, DETAILS, FINISH PLANS & SCHEDULES
P1.1 PLUMBING DEMO PLANS
P1.2 PLUMBING NEW WORK PLANS
P2.1 PLUMBING SCHEDULES
M1.1 MECHANICAL DEMO PLANS
M1.2 MECHANICAL NEW WORK PLANS
M2.1 MECHANICAL DETAILS
M3.1 MECHANICAL SCHEDULES
E1.1 ELECTRICAL DEMO PLANS
E1.2 ELECTRICAL NEW WORK PLANS
E2.1 ELECTRICAL SCHEDULES AND NOTES
KEY PLAN:
FAACS: #2000025
PROJECT CODE: 501-B2501-021
IFB # 158125
THE REMOVAL OF THE ASBESTOS-CONTAINING MATERIAL IS INTEGRAL TO THE
SCOPE OF THIS PROJECT AND WILL BE COORDINATED, DIRECTED AND SUPERVISED
BY THE GENERAL CONTRACTOR AS PART OF THE CONTRACT WORK. THE GENERAL
CONTRACTOR IS RESPONSIBLE FOR HIRING THE ASBESTOS REMOVAL
CONTRACTOR. THE MONITOR REQUIRED FOR THE ASBESTOS REMOVAL IS
SUPPLIED BY VDOT AND SHALL BE CONTACTED AND COORDINATED BY THE
GENERAL CONTRACTOR.
ASBESTOS NOTE: AN INSPECTION TO IDENTIFY ASBESTOS-CONTAINING MATERIALS
HAS BEEN CONDUCTED AND CAN BE FOUND AS PART OF APPENDIX A TO THE
PROJECT SPECIFICATIONS. THE ASBESTOS-CONTAINING MATERIALS IDENTIFIED IN
THE REPORT WILL BE REMOVED BY A VIRGINIA LICENSED ASBESTOS ABATEMENT
CONTRACTOR HIRED BY THE GENERAL CONTRACTOR PRIOR TO ANY OTHER WORK
BEING CONDUCTED IN THIS AREA. SHOULD THE GENERAL CONTRACTOR ACCESS
ANY MATERIAL SUSPECTED OF CONTAINING ASBESTOS NOT IDENTIFIED IN THESE
REPORTS, HE SHALL STOP WORK IN THE IMMEDIATE AREA AND NOTIFY THE OWNER
(VDOT).
THE REMOVAL OF ASBESTOS MATERIALS IS NOT TO BE CONDUCTED WITHOUT THE
OWNERS ASBESTOS PROJECT MONITOR BEING ON-SITE.
ASBESTOS NOTE:
AN INSPECTION TO IDENTIFY LEAD COATED BUILDING COMPONENTS HAS BEEN
CONDUCTED AND CAN BE FOUND AS PART OF APPENDIX A TO THE ASBESTOS
PROJECT SPECIFICATIONS. THIS REPORT IS PROVIDED FOR THE CONTRACTOR’S
USE AND MAY NOT BE ALL INCLUSIVE. IT IS THE CONTRACTOR’S RESPONSIBILITY TO
COMPLY WITH ALL VIRGINIA OCCUPATIONAL SAFETY AND HEALTH (VOSH)
REGULATIONS AS THEY PERTAIN TO EMPLOYEE EXPOSURES TO LEAD.
ALL LEAD AND LEAD COATED BUILDING COMPONENTS ARE TO BE RECYCLED
WHENEVER POSSIBLE.
COLLEY ARCHITECTS ASSUMES NO RESPONSIBILITY FOR THE ADEQUACY OR
ACCURACY OF THE ASBESTOS AND LEAD INSPECTION REPORTS CONTAINED IN THE
CONTRACT DOCUMENTS AS THIS INFORMATION WAS PREPARED BY VDOT. THE
CONTRACTOR SHALL ADDRESS ANY RELATED QUESTIONS TO THE VDOT
REPRESENTATIVE.
LEAD COATING NOTE:
IN ACCORD WITH THE HIGH PERFORMANCE BUILDINGS ACT, THE BUILDING IS
EXEMPT FROM COMPLIANCE BECAUSE THE RENOVATED BUILDING AREA IS NOT
GREATER THAN 5,000 GROSS SQUARE FEET.
HIGH PERFORMANCE BUILDING ACT NOTE:
IN ACCORD WITH THE VIRGINIA ENERGY CONSERVATION CODE (VECC), THE
BUILDING SHALL COMPLY WITH VECC SECTIONS C402 THROUGH C405 AND C408.
VIRGINIA ENERGY CONSERVATION CODE NOTE:
SEE SHEET LS1 FOR BUILDING CODE DATA
05 . 04 . 2023
REVISIONS DATE
C O
M M
O N
W
EALTH OF
V I
R G
I N
I A
ARCHITECT
Lic. No. 012264
TIM A. COLLEY
SUITE 200 200 N. MAIN STREET
BLACKSBURG, VA . 24060
DATE
SCALE
DRAWN
JOB
SHEET
AS NOTED
IFB # 158125
FORMATTED FOR
A 24" X 36" PRINT
AGENCY APPROVAL
P. 540.953.2724 F. 540.953.2725
CONSULTANT
PROJECT CODE 501-B2501-021
T2
GENERAL NOTES +
INFORMATION
05 . 04 . 2023
BUILDING B1 TOILET
RENOVATION
RENOVATIONS TO
ECH
05 . 04 . 2023
SALEM DISTRICT HEAD QUARTERS 731 HARRISON
AVENUE SALEM, VA 24153
ACT
ADJ
AFF
AHU
ALT
ALUM
APPR
AVG
AWP
BD
BLDG
BLK
BOT
BRK
BTWN
CAB
CJ
CLG
CLOS
CLR
CMU
COL
CONC
CONT
CTL
CT
DEMO
DEPT
DF
DIAG
DIM
DN
DWG
EA
EIFS
ELEC
EPS
EQ
EQUIP
EXIST
EXT
FD
FF
FLR
FLUR
FRP
FRT
FT
FURR
GA
GAL
GALV
GB
GC
GFCMU
GL
GWB
GYP
HBD
HDR
HM
HR
HT
HVAC
HW
IN
INFO
INST
INSUL
INT
KIT
LAM
LAV
LBS
LF
LVR
MAT'L
MAX
MECH
MFR
MIN
MIR
MISC
MTL
NIC
NO
NOM
NTS
OC
OFCI
PC
PERF
PLAM
PLYWD
PNL
PREFAB
PREFIN
PREP
PT
QT
QTY
RB
RD
REF
REFG
REQD
RM
RT
SIM
SPEC
SQ
SS
STD
STL
STOR
SUSP
THK
TYP
UON
VAC
VB
VCT
VEST
WB
WC
WGL
WH
W/O
WSCT
WT
AT
ACOUSTICAL CEILING TILE
ADJUSTABLE
ABOVE FINISHED FLOOR
AIR HANDLING UNIT
ALTERNATE
ALUMINUM
APPROXIMATE
AVERAGE
ACOUSTICAL WALL PANEL
BOARD
BUILDING
BLOCK
BOTTOM
BRICK
BETWEEN
CABINET
CONTROL JOINT
CEILING
CLOSET
CLEAR
CONCRETE MASONRY UNIT
COLUMN
CONCRETE
CONTINUOUS
CARPET TILE
CERAMIC TILE
DEMOLISH, DEMOLITION
DEPARTMENT
DRINKING FOUNTAIN
DIAGONAL
DIMENSION
DOWN
DRAWING
EACH
EXTERIOR INSULATION
AND FINISH SYSTEM
ELECTRICAL
EXPANDED POLYSTYRENE
EQUAL
EQUIPMENT
EXISTING
EXTERIOR
FLOOR DRAIN
FINISHED FLOOR
FLUORESCENT
FIBERGLASS REINFORCED
PLASTIC
FIRE RETARDANT TREATED
FOOT, FEET
FURRING
GAUGE
GALLON
GALVANIZED
GRAB BAR
GENERAL CONTRACTOR
GROUND FACE CONCRETE
MASONRY UNIT
GLASS
GYPSUM WALL BOARD
GYPSUM
HARDBOARD
HEADER
HOLLOW
HOUR
HEIGHT
HEATING, VENTILATING,
AIR CONDITIONING
HOT WATER
INCH
INFORMATION
INSTALLATION
INSULATION
INTERIOR
KITCHEN
LAMINATE
LAVATORY
POUNDS
LINEAR FOOT/FEET
LOUVER
MATERIAL
MAXIMUM
MECHANICAL
MANUFACTURER
MINIMUM
MIRROR
MISCELLANEOUS
METAL
NOT IN CONTRACT
NUMBER
NOMINAL
NOT TO SCALE
ON CENTER
OWNER FURNISHED
CONTRACTOR INSTALL
PRECAST
PERFORATED
PLASTIC LAMINATE
PLYWOOD
PANEL
PREFABRICATED
PREFINISHED
PREPARE
PAINT
QUARRY TILE
QUANTITY
RUBBER BASE
ROOF DRAIN
REFERENCE
REFRIGERATOR
REQUIRED
ROOM
RUBBER TILE
SIMILAR
SPECIFICATION
SQUARE
STAINLESS STEEL
STANDARD
STEEL
STORAGE
SUSPENDED
THICKNESS
TYPICAL
UNLESS OTHERWISE NOTED
VACUUM
VAPOR BARRIER/
VINYL BASE
VINYL COMPOSITION
TILE
VESTIBULE
WOOD BASE
WATER CLOSET
WIRE GLASS
WATER HEATER
WITHOUT
WAINSCOT
WEIGHT
ABBREVIATIONS GENERAL NOTES
DISPOSAL OF MATERIALS
1. CONTRACTOR DISPOSE OF ALL MATERIALS PROPERLY AND IN ACCORDANCE WITH
ALL LAWS AND REGULATIONS.
ARCHITECTURAL
PLUMBING / MECHANICAL / ELECTRICAL DEMOLITION
DESIGN STANDARDS ACRONYMS:
VUSBC VIRGINIA UNIFORM STATEWIDE BUILDING CODE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
AGA AMERICAN GAS ASSOCIATION
AMCA AIR MOVEMENT AND CONTROL ASSOCIATION
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ARI AIR-CONDITIONING AND REFRIGERATION INSTITUTE
ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATING AND AIR
CONDITIONING ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS
ASSE AMERICAN SOCIETY OF SANITARY ENGINEERING
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
IEEE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS
MCA MECHANICAL CONTRACTORS ASSOCIATION
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
PDI PLUMBING AND DRAINAGE INSTITUTE
SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
UL UNDERWRITERS LABORATORIES, INC.
1. CONTRACTOR SHALL VERIFY ALL CONDITIONS IN THE FIELD PRIOR TO SUBMITTING A BID.
2. DIMENSIONS SHOWN ARE FROM FACE OF EXISTING CONSTRUCTION TO FACE OF EXISTING
CONSTRUCTION. NEW CONSTRUCTION DIMENSIONS ARE TO FINISH FACE UON.
3. MATCH THICKNESS OF NEW AND COMPLETED/EXISTING CONSTRUCTION.
4. PATCH AND REPAIR ALL EXISTING DAMAGED SURFACES WITH SIMILAR MATERIALS TO MATCH NEW
WORK, INCLUDING LEVEL OF FINISH.
5. THE OWNER SHALL BE RESPONSIBLE FOR THE FINAL SELECTION OF ALL FIXTURES, FINISHES, PATTERNS, COLORS, AND STYLES FROM THE FULL RANGE OF MANUFACTURER'S AVAILABLE STANDARDS.
6. COORDINATE WITH OWNER THE EXACT TYPE AND FINISHED LOCATION OF ANY EQUIPMENT, FIXTURES, ACCESSORIES, OUTLETS, SWITCHES, ETC.
7. WOOD PRODUCTS SHALL BE FROM SUSTAINABLE SOURCES, SUCH AS FSC CERTIFIED WOOD OR
REGIONALLY HARVESTED OR MANUFACTURED WOOD FROM ABUNDANT SPECIES. WOOD PRODUCTS
SHALL BE FREE OF UREA-FORMALDEHYDE BINDERS, COPPER OR ARSENIC.
1. CONTRACTOR MUST FAMILIARIZE THEMSELVES WITH THE PROJECT SITE PRIOR TO SUBMITTING THEIR
BID.
2. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND ACCESSORIES FOR WORK INDICATED HEREIN, UNLESS NOTED OTHERWISE. WORK SHALL BE COMPLETE AND IN ACCORDANCE WITH THE
CONSTRUCTION DOCUMENTS, MANUFACTURER'S RECOMMENDATIONS, GENERALLY ACCEPTED
INDUSTRY STANDARDS OF WORKMANSHIP AND CARE, AND AS REQUIRED FOR A FINISHED INSTALLATION
AND TO OBTAIN A CERTIFICATE OF OCCUPANCY.
3. SUBMITTALS ARE REVIEWED ONLY AS TO GENERAL CONFORMITY WITH DESIGN CONCEPT OF THE PROJECT AND GENERAL COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS.
CORRECTIONS AND/OR COMMENTS MADE AS PART OF THIS SUBMITTAL REVIEW DO NOT RELIEVE THE
CONTRACTOR OF RESPONSIBILITY FROM CONFORMANCE WITH THE CONTRACT DOCUMENTS,
APPLICABLE CODES, AND LAWS - ALL OF WHICH HAVE PRIORITY OVER SPECIFIC SUBMITTAL. THE DESIGN PROFESSIONAL DOES NOT WARRANT OR REPRESENT THAT THE INFORMATION WITHIN THE SUBMITTAL IS EITHER ACCURATE OR COMPLETE. SOLE RESPONSIBILITY FOR CORRECT DESIGN, DETAILS, AND DIMENSIONS SHALL REMAIN WITH THE PARTY PROVIDING THE SUBMITTAL. CONTRACTOR IS RESPONSIBLE FOR ALL DIMENSIONS, QUANTITIES, AND PERFORMANCE REQUIREMENTS TO BE CONFIRMED AND CORRELATED AT THE JOB SITE; FOR ALL INFORMATION THAT PERTAINS SOLELY TO THE FABRICATION PROCESSES OR TO THE TECHNIQUES OF CONSTRUCTION; FOR ALL COORDINATION OF THE WORK OF ALL TRADES; FOR ASSURING CONSISTENCY WITH THE CONTRACT DOCUMENTS; AND
FOR PERFORMING THE WORK IN A SAFE AND SATISFACTORY MANNER.
4. EXISTING SQUARE FOOTAGES, DIMENSIONS, TYPES/LOCATIONS OF FIRE-RESISTANCE RATED ASSEMBLIES, AND SIZES/LOCATIONS OF EXISTING EQUIPMENT ARE APPROXIMATE. CONTRACTOR IS RESPONSIBLE FOR THE FIELD VERIFICATION OF ALL SITE CONDITIONS PRIOR TO SUBMITTING A BID. IF
CONDITIONS IN FIELD DIFFER FROM THOSE SHOWN, NOTIFY OWNER/ARCHITECT IMMEDIATELY.
5. CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, SEQUENCING, SITE
SAFETY, AND SECURITY FOR THE DURATION OF THE PROJECT.
6. CONTRACTOR SHALL VERIFY THE AVAILABILITY OF EXISTING FACILITIES AND UTILITIES AT THE PROJECT SITE PRIOR TO SUBMITTING A BID. COSTS ASSOCIATED WITH THE USE OF EXISTING UTILITIES SHALL BE
THE CONTRACTOR'S RESPONSIBILITY.
7. CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF WORK WITH THE OWNER'S ACTIVITIES AND OTHER TRADES INVOLVED WITH WORK AT THE PROJECT SITE. CONTRACTOR SHALL COORDINATE WORK INCLUDING BUT NOT LIMITED TO ADDITION TO/MODIFICATION OF EXISTING MECHANICAL, ELECTRICAL, PLUMBING AS REQUIRED FOR A FINISHED AND FULLY FUNCTIONAL INSTALLATION.
8. IF A CONFLICT BETWEEN CONSTRUCTION DOCUMENTS, CODE REQUIREMENTS, AND/OR
MANUFACTURER'S DATA SHOULD ARISE, THE MORE STRINGENT SHALL PREVAIL.
9. CONTRACTOR SHALL PROVIDE ADEQUATE BRACING OF STRUCTURAL MEMBERS AND EXISTING & TEMPORARY STRUCTURES AS REQUIRED FOR THE DURATION OF THE WORK. IF CONDITIONS IN FIELD
DIFFER FROM THOSE SHOWN, NOTIFY ARCHITECT/ENGINEER IMMEDIATELY.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR DAILY CLEANUP AND REMOVAL OF DEBRIS FROM SITE.
11. CONTRACTOR SHALL ENFORCE THE USE OF PERSONAL PROTECTIVE EQUIPMENT AS REQUIRED BY
OSHA FOR INDUSTRIAL HIGH NOISE AREAS.
12. CONTRACTOR'S PERSONNEL SHALL CONDUCT THEMSELVES PROPERLY & MAINTAIN PROPER ATTIRE AT
ALL TIMES.
13. NO ASBESTOS CONTAINING MATERIALS SHALL BE USED IN THE COURSE OF THIS WORK.
14. CONTRACTOR SHALL PROTECT COMPLETED WORK FROM DAMAGE FROM ADJACENT ACTIVITIES OR
INCLEMENT WEATHER AT ALL TIMES. ITEMS DAMAGED BY CONTRACTOR SHALL BE REPLACED AT
CONTRACTOR'S EXPENSE & TO SATISFACTION OF OWNER.
15. CONTRACTOR SHALL SUBMIT A CONSTRUCTION SCHEDULE FOR OWNER REVIEW AS STIPULATED IN THE
GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT INCLUDED IN THE PROJECT MANUAL.
16. ALL AREAS ADJOINING WORK AREA TO BE PROTECTED DURING DEMOLITION WORK. CONTRACTOR
RESPONSIBLE TO REPAIR, REPLACE AND RESTORE ANY DAMAGE RESULTING FROM WORK TO THE
SATISFACTION OF OWNER, AND AT NO ADDITIONAL EXPENSE TO THE OWNER.
17. ALL NEW & EXIST. GLAZING IN AREAS OF SCOPE OF WORK SHALL BE PROFESSIONALLY CLEANED ON ALL
SIDES. CLEANLINESS OF GLAZING TO BE MAINTAINED THROUGH SUBSTANTIAL COMPLETION.
18. CONTRACTOR NOT TO SCALE DRAWINGS FOR LOCATIONS OF ANY NEW ELECTRICAL FIXTURES, OUTLETS, SWITCHES, AND PLUMBING FIXTURES.
19. PRIOR TO ANY CORE DRILLING, CONTRACTOR SHALL PROPERLY SURVEY THE EXISTING FLOOR USING X- RAY, GPR, OR OTHER ACCEPTABLE METHOD TO LOCATE REBAR, STRUCTURAL MEMBERS, IN-SLAB UTILITIES, OR OTHER IN-SLAB OBSTRUCTIONS. ALL CORES TO BE RETAINED & PROVIDED TO THE BUILDING OFFICIAL FOR INSPECTION. NOTIFY THE PROJECT MANAGER AND BUILDING OFFICIAL IF ANY
REBAR IS CUT OR DAMAGED. ANY STRUCTURAL REMEDIATION REQUIRED DUE TO CONTRACTOR'S
NEGLIGENCE SHALL BE PERFORMED BY CONTRACTOR AT NO ADDITIONAL CHARGE TO THE OWNER.
20. CONTRACTOR SHALL LABEL ALL CONCEALED FIRE WALLS, VERTICAL FIRE SEPARATION ASSEMBLIES, FIRE BARRIERS, FIRE PARTITIONS AND SMOKE BARRIERS ON ASSEMBLIES ABOVE CEILINGS AND ON
INSIDE SURFACES OF ALL CEILING ACCESS DOORS PROVIDING ACCESS TO SUCH FIRE RATED
ASSEMBLIES. REFERENCE DRAWINGS FOR ASSEMBLY RATING DESIGNATIONS AND TYPES. ALL
LETTERING TO BE IN A CONTRASTING AND HIGHLY VISIBLE COLOR TO SURFACE, 3 IN. TALL (1 INCH MIN.)
CAPITAL CASE, AND PROVIDED AT HORIZONTAL INTERVALS OF NO MORE THAN 8 FEET.
GENERAL:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR LABOR, MATERIALS, EQUIPMENT, ANCHORAGE TO
STRUCTURE, AND CONNECTIONS REQUIRED FOR THE INSTALLATION OF A COMPLETE AND FUNCTIONAL
SYSTEM.
2. CONTRACTOR SHALL COORDINATE WORK WITH THE INSTALLED WORK OF OTHER TRADES.
3. VERIFY "ROUGH-IN" LOCATIONS WITH OWNER PRIOR TO FINAL INSTALLATION.
4. PIPING, DUCTWORK, AND OTHER EQUIPMENT SHALL BE SUPPORTED BY OR ANCHORED TO THE BUILDING STRUCTURE. NON-STRUCTURAL CEILING CONSTRUCTION, NEW OR EXISTING, SHALL NOT BE USED FOR
ANCHORING ANY WORK.
5. SYSTEMS AND ACCESSORIES SHALL BE INSTALLED IN A NEAT MANNER CONSISTENT WITH INDUSTRY
STANDARDS OF QUALITY AND CARE.
6. CONTRACTOR IS RESPONSIBLE FOR RELOCATING ANY & ALL PIPES, CONDUIT, ELECTRICAL OR OTHER INFRASTRUCTURE ITEMS AS A RESULT OF THEIR BEING UNCOVERED DURING EXECUTION OF THE WORK.
PLUMBING:
1. PLUMBING DESIGN AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE 2018 EDITION OF THE
VIRGINIA PLUMBING CODE (VPC), INCLUDING REFERENCED CODES AND STANDARDS.
2. PLUMBING CONTRACTOR SHALL VERIFY ALL DIMENSIONS, LOCATIONS, AND FIELD CONDITIONS PRIOR TO
INSTALLATION.
3. CONTRACTOR SHALL COORDINATE WATER SHUTOFF WITH VDOT PROJECT MANAGER & VDOT UTILITIES
FOR INSTALLATION OF VALVES. NOTIFY OWNER 3 DAYS IN ADVANCE.
4. UPON COMPLETION OF WORK, PLUMBING CONTRACTOR SHALL CONDUCT A TEST. IN THE PRESENCE OF OWNER/ARCHITECT WITH ALL EQUIPMENT AND CONTROLS IN NORMAL OPERATING POSITION. THE SYSTEM SHALL OPERATE QUIETLY & PROPERLY. ADJUSTMENTS AND CORRECTIONS SHALL BE MADE
UNTIL SATISFACTORY OPERATION IS ACHIEVED.
MECHANICAL:
1. MECHANICAL DESIGN AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE 2018 EDITION OF THE
VIRGINIA MECHANICAL CODE (VMC), INCLUDING REFERENCED CODES AND STANDARDS.
2. MECHANICAL EQUIPMENT LOCATIONS SHOWN FOR DESIGN INTENT ONLY. CONTRACTOR SHALL VERIFY
ALL DIMENSIONS, LOCATIONS, AND FIELD CONDITIONS PRIOR TO INSTALLATION.
3. SHOP DRAWINGS TO BE PROVIDED FOR APPROVAL FOR ALL DUCTWORK.
ELECTRICAL:
1. COORDINATE WITH ARCHITECT THE EXACT LOCATION OF ANY FIXTURES, ACCESSORIES, OUTLETS, SWITCHES, ETC. PRIOR TO INSTALLATION.
2. ELECTRICAL DESIGN AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE 2017 EDITION OF THE NATIONAL ELECTRICAL CODE (NEC), INCLUDING REFERENCED CODES AND STANDARDS, UTILITY
COMPANY REGULATIONS.
3. ELECTRICAL EQUIPMENT LOCATIONS SHOWN FOR DESIGN INTENT ONLY. CONTRACTOR SHALL VERIFY
ALL DIMENSIONS, LOCATIONS, AND FIELD CONDITIONS PRIOR TO INSTALLATION.
4. ALL NON-LED LIGHT FIXTURES SHALL BE INSTALLED WITH LAMPS. PROVIDE 10%, BUT NOT LESS THAN
FIVE (5), ADDITIONAL LAMPS FOR EACH FIXTURE TYPE FOR FUTURE USE.
5. PROVIDE MEANS OF EGRESS LIGHTING AS INDICATED. MEANS OF EGRESS ILLUMINATION LEVEL SHALL NOT BE LESS THAN 1 FOOT-CANDLE AT FLOOR LEVEL. AN EMERGENCY POWER SYSTEM SHALL PROVIDE POWER FOR A DURATION OF NOT LESS THAN 90 MINUTES AND SHALL ILLUMINATE EXIT ACCESS CORRIDORS, PASSAGEWAYS, AISLES, AND PORTION OF EXTERIOR EXIT DISCHARGE IMMEDIATELY
ADJACENT TO EXIT DISCHARGE DOORWAYS..
1. EXISTING DIMENSIONS, SQUARE FOOTAGES, AND SIZES/LOCATION OF EXISTING EQUIPMENT ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL SITE CONDITIONS PRIOR TO SUBMITTING A BID. IF
CONDITIONS IN FIELD DIFFER FROM THOSE SHOWN, NOTIFY OWNER/ARCHITECT IMMEDIATELY.
2. CONTRACTOR SHALL VERIFY THE AVAILABILITY OF EXISTING FACILITIES AND UTILITIES AT THE PROJECT SITE PRIOR TO SUBMITTING A BID. COSTS ASSOCIATED WITH THE USE OF EXISTING UTILITIES SHALL BE
THE CONTRACTOR'S RESPONSIBILITY.
3. CONTRACTOR SHALL NOTIFY ALL UTILITIES, INCLUDING BUT NOT LIMITED TO WATER/ SEWER, ELECTRIC, GAS, TELEPHONE, HAVING SERVICE CONNECTIONS TO THE EXISTING BUILDING PRIOR TO DEMOLITION TO ENSURE THAT ANY EQUIPMENT HAS BEEN PROPERLY REMOVED, UNPLUGGED, CAPPED/PLUGGED, OR SEALED AS REQUIRED FOR DEMOLITION AND/OR NEW WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER REMOVAL, CAPPING/PLUGGING, AND SEALING OF SERVICES REMAINING IN WORK AREAS AS
REQUIRED FOR DEMOLITION AND/OR NEW WORK.
4. REMOVE EXISTING ITEMS/MATERIALS TO SUBSTRATE AS INDICATED AND REQUIRED FOR NEW WORK.
5. REMOVE DEMOLISHED MATERIALS FROM SITE DAILY AFTER ALLOWING OWNER FIRST RIGHT OF REFUSAL
FOR ANY SALVAGEABLE MATERIALS.
6. COORDINATE DEMOLITION AND ITEMS TO BE REMOVED WITH NEW WORK AND ITEMS TO BE REPLACED OR
RELOCATED.
7. EXISTING ITEMS TO BE RELOCATED/REINSTALLED SHALL BE REMOVED, STORED, AND PROTECTED BY CONTRACTOR DURING DEMOLITION ACTIVITIES AS REQUIRED FOR REINSTALLATION. ITEMS DAMAGED BY
CONTRACTOR SHALL BE REPLACED WITH EQUAL ITEMS APPROVED BY THE OWNER AND AT
CONTRACTOR'S EXPENSE.
8. EXISTING ITEMS AND ADJACENT CONSTRUCTION TO REMAIN IN AREAS OF WORK SHALL BE PROTECTED
DURING DEMOLITION ACTIVITIES. ITEMS DAMAGED BY CONTRACTOR SHALL BE REPLACED AT
CONTRACTOR'S EXPENSE AND TO THE SATISFACTION OF THE OWNER.
9. PATCH AND REPAIR ANY DAMAGED EXISTING SURFACES TO REMAIN WITH SIMILAR MATERIALS AND AS
REQUIRED TO MATCH NEW WORK.
10. CONTRACTOR SHALL PROVIDE ADEQUATE BRACING OF STRUCTURAL MEMBERS AND
EXISTING/TEMPORARY STRUCTURES, AND PROVIDE ADDITIONAL SHORING DURING DEMOLITION OF
EXISTING WALLS, ETC. AS REQUIRED FOR THE DURATION OF THE PROJECT.
11. NO EXISTING STRUCTURAL MEMBERS ARE TO BE CUT, PENETRATED, OR OTHERWISE ALTERED WITHOUT
PRIOR WRITTEN APPROVAL OF ARCHITECT/ENGINEER.
12. THE OWNER SHALL BE RESPONSIBLE FOR THE RELOCATION AND STORAGE OF NON-FIXED EQUIPMENT AND FURNISHINGS, INCLUDING FURNITURE, PRIOR TO THE START OF WORK, UNLESS OTHERWISE
INDICATED.
A. THE SITE WILL BE IN USE FOR THE DURATION OF THE PROJECT. CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF WORK WITH OWNER'S ACTIVITIES AND OTHER TRADES INVOLVED WITH WORK AT THE PROJECT SITE. DISRUPTIVE ACTIVITIES TO BE COORDINATED WITH VDOT PROJECT MANAGER.
13. CONTRACTOR SHALL PROVIDE AND MAINTAIN CLEAR PATHS OF EGRESS FOR THE DURATION OF THE
WORK.
14. ANY REQUIRED MECHANICAL, ELECTRICAL, AND PLUMBING DEMOLITION TO BE PERFORMED IN, OR AFFECTING THE USE OF, ADJACENT SPACES IN THE BUILDING SHALL BE COORDINATED WITH THE OWNER PRIOR TO THE START OF WORK. A MINIMUM OF FIVE (5) DAYS NOTICE IS REQUIRED PRIOR TO ANY UTILITY
SHUTDOWN.
15. MAINTAIN WORKING CONDITION OF ANY EXISTING EMERGENCY & FIRE ALARM SYSTEMS AND
COMPONENTS FOR THE DURATION OF THE WORK.
16. ALL ROOMS & AREAS ADJOINING WORK AREA, INCLUDING ABOVE AND BELOW AREAS OF WORK, TO BE
PROTECTED DURING DEMOLITION WORK. CONTRACTOR RESPONSIBLE TO REPAIR, REPLACE AND
RESTORE AT THEIR OWN EXPENSE ANY DAMAGE RESULTING FROM WORK AND TO THE SATISFACTION OF
OWNER.
CLOSE OUT DOCUMENTS
1. CONTRACTOR SHALL PROVIDE ONE (1) COMPREHENSIVE SET OF ELECTRONIC (PDF) AS-BUILT DRAWINGS
DOCUMENTING IN RED ALL AS-BUILT CONDITIONS. AS-BUILT DRAWINGS MARKUPS SHALL BE CLEARLY LEGIBLE ON THE ORIGINAL, APPROVED AND STAMPED CONTRACT DOCUMENTS, AND MAINTAINED IN GOOD ORDER AND GOOD CONDITION. MARKUPS TO INCLUDE ALL REPRESENTED DISCIPLINES ON THEIR SPECIFIC SHEETS. AS-BUILT DRAWINGS TO INCLUDE, BUT NOT LIMITED TO, ALL DEVIATIONS FROM CONTRACT DOCUMENT LAYOUTS; LOCATIONS & QUANTITIES OF PIPING, UTILITIES, DEVICES, FIXTURES, ETC.; SPECIFICATIONS, ETC.; RATED ASSEMBLIES, FIRE DAMPERS, ETC.; RFI'S, CHANGE ORDERS, ETC.
2. CONTRACTOR TO PROVIDE OWNER WITH ELECTRONIC (PDF) DOCUMENTS OF ALL REQUIRED OPERATION AND MAINTENANCE (O&M) MANUALS PRIOR TO PROJECT COMPLETION. MANUALS SHALL INCLUDE, BUT NOT LIMITED TO, ALL APPROVED SUBMITTAL ITEMS, APPROVED SHOP DRAWINGS, RFI'S W/ ANSWERS, FINAL TAB REPORTS & OTHER ITEMS APPROPRIATE FOR A COMPREHENSIVE REFERENCE DOCUMENT FOR
THE LIFE OF THE BUILDING AREA, ETC. O&M SHALL INCLUDE:
A. COVER PAGE WITH PROJECT TITLE, PROJECT NUMBER, GENERAL CONTRACTOR, DATE MANUALS
PROVIDED.
B. TABLE OF CONTENTS W/ CATEGORIES FOR ARCHITECTURAL, PLUMBING, MECHANICAL & ELECTRICAL
ITEMS. TABLE OF CONTENTS SHALL BE SEARCHABLE.
C. TABBED SEPARATIONS FOR EACH CATEGORY. TABBED SECTIONS TO INCLUDE MANUFACTURER CUT
SHEETS FOR ALL FIXTURES, DEVICES, CONTROLS, ACCESSORIES, FINISHES,
ADHESIVES/MORTARS/GROUTS.
3. CONTRACTOR SHALL PROVIDE OWNER WITH COMPLETED CO-13 AFFIDAVIT OF PAYMENT OF CLAIMS, DGS-30-136 (CO-13.2) CERTIFICATE OF COMPLETION BY CONTRACTOR, DGS-30-140 (CO-13.2a)
CERTIFICATE OF PARTIAL OR SUBSTANTIAL COMPLETION BY CONTRACTOR.
4. CONTRACTOR SHALL PROVIDE ADDITIONAL ATTIC STOCK OF FINISH MATERIALS FOR FUTURE USE AND ONE (1) COMPREHENSIVE ATTIC STOCK LIST AS STIPULATED BELOW. ALL ATTIC STOCK MATERIALS AND THE ATTIC STOCK LIST SHALL BE DELIVERED TO OWNER AT ONE TIME AND SHALL BE SIGNED BY GENERAL CONTRACTOR AND PROJECT MANAGER AT THAT TIME OF DELIVERY AND RECEIPT. ATTIC STOCK LIST SHALL INDICATE DESCRIPTIONS AND REQUIRED QUANTITIES OF MATERIALS LISTED BELOW:
A. ONE (1) GAL OF EACH PAINT, STAIN, & POLYURETHANE TYPE, COLOR, & FINISH.
B. FULL TILES OF CERAMIC & PORCELAIN FINISHES EQUAL TO AT LEAST FIVE PERCENT (5%) OF EACH
TYPE, SIZE, & COLOR, BUT NOT LESS THAN FIVE (5) FULL TILES OF EACH TYPE, SIZE, & COLOR.
C. FULL TILES OF FLOORING FINISHES EQUAL TO AT LEAST FIVE PERCENT (5%) OF EACH TYPE, SIZE &
COLOR, BUT NOT LESS THAN FIVE (5) FULL TILES OF EACH TYPE, SIZE, & COLOR.
D. FULL WIDTH OF ROLLED GOODS OF FLOORING FINISHES EQUAL TO AT LEAST FIVE PERCENT (5%) OF
EACH TYPE, SIZE & COLOR, BUT NOT LESS THAN SIX FEET (6 FT.) IN LENGTH OF FULL WIDTH OF EACH
ROLLED GOOD.
E. FIVE PERCENT (5%) MINIMUM OF EACH RUBBER BASE SIZE, TYPE & COLOR, BUT NOT LESS THAN TEN
(10) CONTINUOUS LINEAR FEET OF EACH SIZE, TYPE & COLOR.
F. FIVE PERCENT (5%) MINIMUM OF EACH ROOFING SHINGLE, TYPE & COLOR.
GENERAL NOTES GENERAL NOTES
1 HR. FIRE RATED PARTITION
LEGEND
2 HR. FIRE RATED PARTITION
PATH OF TRAVEL
AREA OF WORK
URINAL DRINKING
FOUNTAIN
FIRE
EXT.
HAND - DRYER
1 1/4" ROUND
GRAB BARS, 1 1/2"
CLEAR OFF WALL
R E
F L E
C T
IV
E
S U
R F
A C
E
M A
X A
F F
T O
11" MIN
MIRRORS NOT
AT LAVATORY
MIRROR
(REFLECTIVE
SURFACE)
M
IN
URINAL DRINKING
FOUNTAIN
FIRE
EXT.
SRF MNT
MOP
HOLDER
SEAT COVER
DISPENSER
BABY
CHANGING
STATION
HAND - DRYER
1 1/4" ROUND
GRAB BARS, 1 1/2"
CLEAR OFF WALL
TOILET PAPER
DISPENSER
COAT/ TOWEL
HOOKS
CLEAR
30" MIN
FRONT
APPROACH
SHELVES
WITHIN TOILET
COMPARTMENTS
17" MIN
11" MIN 6" MAX
25" MAX
48" MIN
CLEAR FRONT
APPROACH
SOAP
DISPENSER
NAPKIN DISPOSAL MIRRORS NOT
AT LAVATORY
MIRROR
(REFLECTIVE
SURFACE)
M A
X 7
M
IN
A F
F
M
IN
M A
X
T O
O P
N G
M A
X
M A
X
M
IN
T O
S P
O U
T
M A
X
M A
X
M A
X
36" MAX
24" MIN12" MIN
42" MIN 1
M
IN
7" - 9"
12" MAX
M
IN 8"
54" MIN
39" - 41"
/8
1' - 8 3/8" "
FIXTURES ALLOWED IN THIS AREA
60" MIN NO OTHER
TOILET PAPER
DISPENSER
/2
M
IN
ABOVE GRAB BAR
GRAB BAR
BELOW
GRAB BAR
TOILET PAPER
DISPENSER
/2
M
IN
M
IN
M
IN
M A
X
PLAN
FRONT
APPROACH
PARALLEL APPROACH
PLAN
/2
M
IN
M A
X
M
IN
TOWEL
DISPEN./
DISPOSE
M
IN
PROVIDE
SUPPLY PIPE &
WASTE PIPE
DRAIN
PROTECTION
PER ASAD 606.5
FIXTURES ALLOWED IN THIS AREA
59" MIN NO OTHER
1 1/4" ROUND
GRAB BARS, 1 1/2"
CLEAR OFF WALL
TOILET PAPER
DISPENSER
1 1/4" ROUND
GRAB BARS, 1 1/2"
CLEAR OFF WALL
TOILET PAPER
DISPENSER
36" MAX
24" MIN12" MIN
42" MIN 1
M
IN
7" - 9"
FIXTURES ALLOWED IN THIS AREA
56" MIN NO OTHER
12" MAX
54" MIN
39" - 41"
FIXTURES ALLOWED IN THIS AREA
60" MIN NO OTHER
FLOOR MOUNTED WATER CLOSET WALL MOUNTED WATER CLOSET
MIRROR
LAVATORY
MAIN FLOOR
TRAVEL DISTANCE = 64'
TRAVEL DISTANCE = 42'
TRAVEL DISTANCE = 62'
JAN. CLOSET
WOMEN'S
RESTROOM
UNISEX
RESTROOM
EXISTING SHOWER WILL BE
DECOMMISSIONED BY OWNER
PHASE 1
PHASE 2
C O
M M
O N
W
EALTH OF
V I
R G
I N
I A
ARCHITECT
Lic. No. 012264
TIM A. COLLEY
SUITE 200 200 N. MAIN STREET
BLACKSBURG, VA . 24060
DATE
SCALE
DRAWN
JOB
SHEET
AS NOTED
IFB # 158125
FORMATTED FOR
A 24" X 36" PRINT
AGENCY APPROVAL
P. 540.953.2724 F. 540.953.2725
CONSULTANT
PROJECT CODE 501-B2501-021
LS1
LIFE SAFETY &
BUILDING CODE DATA
05 . 04 . 2023
BUILDING B1 TOILET
RENOVATION
RENOVATIONS TO
ECH
05 . 04 . 2023
SALEM DISTRICT HEAD QUARTERS 731 HARRISON
AVENUE SALEM, VA 24153
BUILDING & PROJECT CODE DATALIFE SAFETY
PROJECT DATA
REFERENCE CODES:
BUILDING NAME:
FAACS NUMBER:
SCOPE OF WORK:
BUILDING OCCUPANCY USE GROUP:
ZONING:
OCCUPANT LOAD AREA OF WORK:
CONSTRUCTION TYPE:
STORIES:
FLOOR AREA, GROSS:
FIRE SUPPRESSION:
FIRE ALARMS:
FIRE EXTINGUISHER:
MAX TRAVEL DISTANCE:
NUMBER OF EXIT DOORS:
CORRIDOR RATING:
• 2018 VIRGINIA CONSTRUCTION CODE: PART I OF THE VUSBC (2018 VCC)
• 2018 VIRGINIA EXISTING BUILDING CODE (2018 VEBC)
• 2018 VIRGINIA UNIFORM STATEWIDE BUILDING CODE (2018 VUSBC) AS
REFERENCED BY VEBC
• 2018 VIRGINIA STATEWIDE FIRE PREVENTION CODE (VSFPC)
• 2018 INTERNATIONAL FIRE CODE (IFC) AS REFERENCED BY THE VIRGINIA CODES
• 2016 NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE
• 2017 NFPA 70 NATIONAL ELECTRICAL CODE
• 2016 NFPA 80 STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES
• 2018 VIRGINIA MECHANICAL CODE (VMC)
• 2018 VIRGINIA PLUMBING CODE (VPC)
• 2018 VIRGINIA ENERGY CONSERVATION CODE (2018 VECC)
• 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN – 9/15/2010 (2010 ASAD)
• CONSTRUCTION AND PROFESSIONAL SERVICES MANUAL: (CPSM 2022, REV 1 -
2/14/2023)
BUILDING B1
2000025
RENOVATION OF EXISTING RESTROOMS, LEVEL 2 ALTERATION
BUSINESS, USE GROUP B / MODERATE-HAZARD STORAGE, GROUP S-1
LM
THIS RENOVATION IS LIMITED TO RESTROOMS
3B
7,375 SF BUSINESS / 25,885 SF STORAGE = 33,260 SF GROSS
NO, NOT REQUIRED
YES, EXISTING - WORK IS LIMITED TO RENOVATED AREA ONLY
NO, NOT REQUIRED
42', 62', & 64' FROM AREAS OF RENOVATION, NOT CHANGED
2, NOT CHANGED
1 HOUR
0 16 24 328
1/8" = 1' - 0"N
MOUNTING HEIGHTS
PLUMBING FIXTURE COUNT
BASED ON 2018 VCC SECTION 29 TABLE 403.1
B OCCUPANT LOAD: 71 OCCUPANTS = 36 MALE & 35 FEMALE
S-1 OCCUPANT LOAD: 96 OCCUPANTS = 48 MALE & 48 FEMALE
THE EXISTING RESTROOMS ARE NOT ACCESSIBLE, RESTROOMS IN SCOPE OF WORK ARE BEING BROUGHT UP TO ADA ACCESSIBLE STANDARDS.
ALL EXISTING STRUCTURAL MEMBERS ARE TO REMAIN.
REFERENCE CODES:
ORIGINAL BUILDING CONSTRUCTED:
OCCUPANCY CLASS:
CONSTRUCTION TYPE:
BUILDING AREA, GROSS:
BUILDING DATA
VIRGINIA FIRE SAFETY REGULATIONS PART ONE
BETWEEN 1958-1965
GROUP D
SEMI-FIREPROOF
33,260 SQ. FT.
OCCUPANCY CALCULATIONS
THE BELOW OCCUPANT LOADS ARE FOR
THE FIRST FLOOR ONLY.
BUSINESS (B): SF OCC
MAIN LEVEL
1 OCC / 100 SF 4,317 44
1 OCC / 15 SF 392 27
TOTAL 4,709 71
STORAGE (S-1):
MAIN LEVEL
1 OCC / 300 SF 28,505 96
TOTAL ALL OCCUPANCIES 167
FIXTURES
REQUIRED EXISTING
EXISTING
TO REMAIN NEW
TOTAL
PROVIDED
M F M F M F M F UNISEX M F UNISEX
WATER CLOSETS
- B OCCPANCY 1.44 1.40
- S OCCUPANCY 0.48 0.48
TOTAL 2 2 7 3 5 0 0 2 1 5 2 1
LAVATORIES
- B OCCUPANCY 0.90 0.88
- S OCCUPANCY 0.48 0.48
TOTAL 2 2* 5** 2 4** 0 0 1 1 4 1* 1*
DRINKING
FOUNTAINS
AS
EXISTS
AS
EXISTS
SERVICE SINKS 1 0 0 1 1
*VPC SECTION 403.1.2 ALLOWS FOR FIXTURE COUNTS TO BE "BASED ON THE AGGREGATE OF
ANY COMBINATION OF SINGLE-USER OR SEPARATE FACILITIES."
**BASED ON 4 FAUCETS AT EXISTING MULTI-USER ROUND LAVATORY.
GENERAL:
1. THE BUILDING IS TO REMAIN OPEN AND OPERABLE DURING ENTIRE CONSTRUCTION TIME
FRAME. CONSTRUCTION IS TO OCCUR IN 2 PHASES OF CONSTRUCTION -- SEE LIFE SAFETY PLAN
FOR PHASING AREAS. THE CONTRACTOR IS TO COORDINATE CONSTRUCTION PHASING WITH
OWNER.
2. CONTRACTOR TO PROVIDE A 1-HR RATED (UL U419 OR EQUAL) TEMPORARY DUST PARTITION TO
LIMIT DUST & DIRT MIGRATION TO AREAS NOT UNDER THE CONTROL OF THE CONTRACTOR.
COORDINATE FINAL PARTITION LOCATIONS W/ ARCHITECT & OWNER. - DO NOT ATTACH
TEMPORARY WALLS TO FLOOR OR CEILING
• CONTRACTOR SHALL REPAIR ANY DAMAGE DUE TO DUST PARTITION WALL TO
SURROUNDING EXIST. SURFACES AND FINISHES TO MATCH EXISTING ADJACENT SURFACES.
• DOORS TO BE 3' - 0" WIDTH W/ SELF CLOSING DEVICES AND A MIN 45-MINUTE RATING.
• ALTERNATE DUST CONTROL METHODS SHALL BE COORDINATED WITH THE OWNER.
3. CONTRACTOR SHALL PROVIDE AND MAINTAIN CLEAR PATHS OF EGRESS FOR THE DURATION OF
THE WORK.
4. CONTRACTOR SHALL MAINTAIN THE FIRE ALARM SYSTEM FOR THE DURATION OF THE WORK.
COORDIANTE ANY LIMITED DOWN TIMES WITH THE OWNER AND PROVIDE A FIRE WATCH.
5. CONTRACTOR TO MAINTAIN EMERGENCY EGRESS FROM EXISTING BUILDINGS.
6. THE OWNER WILL WORK WITH THE CONTRACTOR TO FINALIZE THE BEST COURSE OF ACTION
FOR THE PHASING PLAN.
CONSTRUCTION PHASING NOTES
PHASE 1:
1. RESTROOM 103
PHASE 2:
2. RESTROOM 101
3. JANITOR 102
A1.1A1.1
A1.1---
A1.1 ---
2&53&6
1&4
PHASE 2
PHASE 2PHASE 1
1. EXIST FLOORING TILE & GROUT TO BE REMOVED TO CONC
SLAB. PREP FOR NEW WORK.
2. REMOVE EXISTING WALL TILE & GROUT BACK TO CMU
WALL. PREP FOR NEW WORK.
3. EXIST TOILET PARTITIONS TO BE REMOVED. PREP FOR
NEW WORK.
4. EXIST PLUMBING FIXTURES TO BE REMOVED.
- SEE PLUMBING
5. DEMO EXIST WALL AND BULKHEAD. DEMO ALL PIPING &
CONDUIT IN WALLS. PATCH & PREP WALLS, FLOORS, &
CEILINGS FOR NEW WORK.
- SEE PLUMBING & ELECTRICAL
6. EXIST WALL TO BE REMOVED WHERE INDICATED.
7. REMOVE EXIST DOOR, FRAME, AND HARDWARE. PREP FOR
NEW WORK.
8. EXIST SHOWER STEP AND SHOWER INSERT TO BE
REMOVED.
- SEE PLUMBING
9. SCRAPE & PREP GYPSUM BOARD TO RECEIVE NEW FINISH.
10. REMOVE EXIST TOILET ACCESSORIES. PATCH AND PREP
FOR NEW WORK.
11. EXIST LIGHT FIXTURES TO BE REMOVED WHERE
INDICATED. PATCH AND PREP GYP BD CEILING FOR NEW
WORK.
- SEE ELECTRICAL
12. REMOVE EXIST WOOD FINISH AND ASSOCIATED ADHESIVES
& ATTACHMENTS BACK TO CMU WALL WHERE INDICATED.
SALVAGE ENOUGH TO REUSE TO PATCH NEW DOORS 101 &
102.
13. DEMO EXIST WALL BASE WHERE INDICATED.
14. DEMO EXIST CROWN MOULDING TRIM WHERE INDICATED.
15. DEMO EXIST COUNTERTOP AND CABINETRY. PREP FOR
NEW WORK.
16. DEMO EXIST WALL FINISH BACK TO EXIST CMU. PREP FOR
NEW WORK.
17. EXISTING MECH VENTS TO BE REMOVED.
- SEE MECHANICAL
18. DEMO EXIST ACT CEILING GRID AND TILES. REMOVE ALL
EXIST. DEBRIS, RESIDUES, HANGERS AND ASSOCIATED
HARDWARE. PREP FOR NEW CEILING.
19. REMOVE EXIST WALL MOUNTED FIRE ALARM FIXTURE AND
MOUNT ON NEW FINISH. REMOVE EXISTING EMERGENCY
LIGHTS.
- SEE ELECTRICAL
20. REMOVE EXIST FINISH BACK TO CMU WHERE INDICATED.
- SEE JAMB AND ELEVATION DETAIL
21. APPROXIMATE AREA OF SAW CUTTING. CONTRACTOR TO
SAW CUT AS NECESSARY FOR NEW WORK.
- SEE PLUMBING
22. THE CONTRACTOR IS TO HAVE THE ACM REMOVED BY A
LICENSED ASBESTOS CONTRACTOR USING APPROVED
PROCEDURES AS SPECIFIED TO COMPLETELY REMOVE THE
EXISTING CEILING TILE AND ASBESTOS ADHESIVE (HOCKEY
PUCKS) ABOVE THE EXIST ACT CEILING IN RESTROOM 2 & 3.
- SEE APPENDIX A
KEYED DEMOLITION NOTES XGENERAL WORK NOTES
APPLY TO ALL SHEETS & PHASES OF THE WORK.
A. ALL NEW & EXIST. SURFACES TO REMAIN ARE TO BE FREE OF ALL EXIST. OR NEW
BUILD-UPS, DRIPS, ETC. TO PROVIDE A SMOOTH, PROFESSIONAL APPEARANCE.
B. UNLESS OTHERWISE NOTED, ALL EXIST, ABANDONED DUCT WORK, PIPING, AND
EQUIPMENT SHALL BE REMOVED. ALL DUCTS AND PIPES SHALL BE CAPPED BEHIND
FINISH SURFACES. WHERE THIS OCCURS WITHIN EXIST SURFACES THAT ARE LEFT
EXPOSED IN THE FINISHED WORK, THESE SURFACES SHALL BE PATCHED WITH NEW
MATERIALS TO MATCH AND BLEND WITH EXISTING.
C. PROTECT ALL EXIST SURFACES & FINISHES THAT ARE TO REMAIN IN THE FINISHED
WORK. PREP SURFACES AS REQ'D FOR NEW FINISHES AS SCHEDULED.
D. WHEREVER ANY SURFACE THAT IS LEFT EXPOSED IN THE FINISHED WORK AND IS
NEWLY EXPOSED, CUT, SOILED, OR OTHERWISE DAMAGED AS PART OF THIS WORK IT
SHALL BE PATCHED WITH NEW MATERIALS TO MATCH AND BLEND INTO THE EXISTING.
E. ALL EXIST OR NEWLY EXPOSED SURFACES REMAINING IN THE FINISHED WORK SHALL
BE PATCHED AND PREPPED WITH NEW MATERIALS AS REQ'D TO RECEIVE NEW WORK
AND FINISHES AS SHOWN AND AS SCHEDULED.
F. PATCH ALL EXIST WALLS, FLOORS, CEILINGS, AND/OR OTHER SURFACES TO MATCH
SURROUNDING WORK WHERE ANY ARCHITECTURAL, MECHANICAL, ELECTRICAL, OR
PLUMBING ITEM OR EQUIPMENT IS REMOVED FROM THAT SURFACE AND THE WALL OR
SURFACE REMAINS EXPOSED IN THE FINISHED WORK.
G. REFER TO PLUMBING, MECHANICAL & ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION. FULLY COORDINATE DEMO & NEW WORK WITH ALL OTHER DISCIPLINES.
H. PROVIDE AV DATA & ELECTRICAL ROUGH-IN TO ACCOMMODATE ALL EQUIPMENT.
- SEE ELECTRICAL
I. PROVIDE & INSTALL NEW LIGHT FIXTURES.
- SEE ELECTRICAL
DEMO LEGEND
EXISTING TO DEMO
EXISTING TO REMAIN
APPROXIMATE AREA OF EXISTING
SLAB TO DEMO FOR PLUMBING
- SEE PLUMBING
CEILING HEIGHT A.F.F.
DIFFUSER
- SEE MECHANICAL
EXHAUST
- SEE MECHANICALVANITY LIGHT FIXTURE
- SEE ELECTRICAL
LIGHT FIXTURE
- SEE ELECTRICAL
WOMENS RESTROOM
5 4
MENS RESTROOM
7 3
9 21
WOMENS RESTROOM
8' - 1"8' - 1"
8' - 1"
8' - 1"+/-
EXIST
EXIST
EXIST
EXIST
55 11
7' - 10"+/-
EXIST
S L O
P E
D S
L O
P E
D
7' - 9"
7' - 9"+/-
EXIST
EXIST
C O
M M
O N
W
EALTH OF
V I
R G
I N
I A
ARCHITECT
Lic. No. 012264
TIM A. COLLEY
SUITE 200 200 N. MAIN STREET
BLACKSBURG, VA . 24060
DATE
SCALE
DRAWN
JOB
SHEET
AS NOTED
IFB # 158125
FORMATTED FOR
A 24" X 36" PRINT
AGENCY APPROVAL
P. 540.953.2724 F. 540.953.2725
CONSULTANT
PROJECT CODE 501-B2501-021
A1.1
DEMO PLANS
05 . 04 . 2023
BUILDING B1 TOILET
RENOVATION
RENOVATIONS TO
ECH
05 . 04 . 2023
SALEM DISTRICT HEAD QUARTERS 731 HARRISON
AVENUE SALEM, VA 24153
1/2" = 1'-0"A1.1A1.1
1 DEMO FLOOR PLAN - RESTROOM 1
1/2" = 1'-0"A1.1A1.1
2 DEMO FLOOR PLAN - RESTROOM 2
1/2" = 1'-0"A1.1A1.1A1.1
3 DEMO FLOOR PLAN - RESTROOM 3
1/2" = 1'-0"A1.1A1.1
4 DEMO RCP - RESTROOM 1
1/2" = 1'-0"A1.1A1.1
5 DEMO RCP - RESTROOM 2
1/2" = 1'-0"A1.1A1.1
6 DEMO RCP - RESTROOM 3
A1.1 A1.1
1&4
3&6 2&5
A1.1 A1.1
A1.1 A1.1
KEY PLAN
FIRST FLOOR PLAN N
0 4 6 82
1/2" = 1' - 0"
S
1. PROVIDE & INSTALL PLUMBING FIXTURES.
- SEE PLUMBING
2. PROVIDE & INSTALL NEW TOILET PARTITIONS.
3. PROVIDE & INSTALL NEW 2X2 ACT CEILING GRID AND
NEW TILES.
4. PROVIDE & INSTALL NEW TOILET ACCESSORIES
INDICATED ON THE TOILET ACCESSORIES
SCHEDULE. INSTALL VDOT PROVIDED TOILET
ACCESSORIES AS INDICATED.
5. PROVIDE & INSTALL NEW TILE FLOORING WHERE
INDICATED.
- SEE FINISH SCHEDULE
6. PRIME & PAINT CEILING/WALL SURFACE WHERE
INDICATED.
7. PROVIDE & INSTALL NEW LIGHT FIXTURES &
MECHANICAL DIFFUSERS.
- SEE ELECTRICAL & MECHANICAL
8. USE SALVAGED WOOD PANELS TO PATCH
PREVIOUSLY LOCATED DOORS 101 & 102 AS
REQUIRED. PROVIDE FURRING STRIPS AS
REQUIRED.
9. SKIM COAT CMU, PRIME & PAINT WHERE INDICATED.
PROVIDE NEW 1X SPF CORNER TRIM & NEW
RESILIENT BASE AND FLOORING TO MATCH
EXISTING. SEE JAMB DETAIL, ELEVATION, &
SECTION.
10. NOT USED
11. REFORM NEW CONCRETE SLAB WHERE SAW CUT.
- SEE PLUMBING & CONCRETE CONNECTION DETAIL
12. PROVIDE & INSTALL NEW FLOOR DRAIN.
- SEE PLUMBING AND FLOOR DRAIN DETAIL
KEYED NEW WORK NOTES X
/8
/8
/4
3/4"3/4" 1' - 10" 6' - 8" 1' - 5"
UNISEX
RESTROOM
BC
CH
SD
M
GB
TP
ND
PT
C2
B
B
A2.1A1.2
A1.2A2.1
2' - 8"
E Q
E Q
3/4" 2"
/4
/4
/4
/4
/4
1" 3' - 8 1/2" 3/4" 1' - 2 3/4" 3/4"
C L E
A R
/4
/8
/8
/4
WOMEN'S
RESTROOM
5' - 0"
3/4" 1' - 8" 1' - 8" 4' - 0 1/2"
PT
GB
M SD
TPND
TP
ND
3' - 4" 1' - 6" 1" 4' - 11 1/2" 3/4"
C2 B
C1
B
30" DR
36" DR
/8
/8
/4
B
A1.2A2.1
E Q
E Q
A2.1A1.2
A1.2
7/ A2.1 1' - 2"1' - 2"
E Q
E Q
3' - 0"
BC
8' - 1"+/-
EXIST
7E
Q E
Q
EQ EQ
2' - 0" FROM CL 2' - 0" FROM CL
ALIGN W/ EXIST
S L O
P E
D
7' - 10"3
EQ EQ
ALIGN ACT GRID TO SLOPING CLG
ALIGN W/ EXIST
7' - 9"
EQ EQ
E Q
E Q
A1.2---
A1.2 ---
A1.2 ---
PHASE 2
PHASE 2PHASE 1
CEILING HEIGHT A.F.F.
DIFFUSER
- SEE MECHANICAL
EXHAUST
- SEE MECHANICAL
LEGEND
VANITY LIGHT FIXTURE
- SEE ELECTRICAL
LIGHT FIXTURE
- SEE ELECTRICAL
NEW CONSTRUCTION
EXISTING TO REMAIN
S OCCUPANCY SENSOR
LIGHT FIXTURE W/ BATTERY
BACKUP
- SEE ELECTRICAL
APPROXIMATE AREA OF
NEW CONCRETE SLAB
- SEE PLUMBING
A WALL TYPE
- SEE A2.1
1/ A101
ELEVATION
A1.0
JAN. CLOSET
MOP SINK
A
A
A
A
1 MH
A1.2A2.1
A2.1A1.2
E Q
E Q
2' - 4 1/2" 4' - 8"
GENERAL WORK NOTES
APPLY TO ALL SHEETS & PHASES OF THE WORK.
A. ALL NEW & EXIST. SURFACES TO REMAIN ARE TO BE FREE OF ALL EXIST. OR NEW
BUILD-UPS, DRIPS, ETC. TO PROVIDE A SMOOTH, PROFESSIONAL APPEARANCE.
B. UNLESS OTHERWISE NOTED, ALL EXIST, ABANDONED DUCT WORK, PIPING, AND
EQUIPMENT SHALL BE REMOVED. ALL DUCTS AND PIPES SHALL BE CAPPED BEHIND
FINISH SURFACES. WHERE THIS OCCURS WITHIN EXIST SURFACES THAT ARE LEFT
EXPOSED IN THE FINISHED WORK, THESE SURFACES SHALL BE PATCHED WITH NEW
MATERIALS TO MATCH AND BLEND WITH EXISTING.
C. PROTECT ALL EXIST SURFACES & FINISHES THAT ARE TO REMAIN IN THE FINISHED
WORK. PREP SURFACES AS REQ'D FOR NEW FINISHES AS SCHEDULED.
D. WHEREVER ANY SURFACE THAT IS LEFT EXPOSED IN THE FINISHED WORK AND IS
NEWLY EXPOSED, CUT, SOILED, OR OTHERWISE DAMAGED AS PART OF THIS WORK IT
SHALL BE PATCHED WITH NEW MATERIALS TO MATCH AND BLEND INTO THE EXISTING.
E. ALL EXIST OR NEWLY EXPOSED SURFACES REMAINING IN THE FINISHED WORK SHALL
BE PATCHED AND PREPPED WITH NEW MATERIALS AS REQ'D TO RECEIVE NEW WORK
AND FINISHES AS SHOWN AND AS SCHEDULED.
F. PATCH ALL EXIST WALLS, FLOORS, CEILINGS, AND/OR OTHER SURFACES TO MATCH
SURROUNDING WORK WHERE ANY ARCHITECTURAL, MECHANICAL, ELECTRICAL, OR
PLUMBING ITEM OR EQUIPMENT IS REMOVED FROM THAT SURFACE AND THE WALL OR
SURFACE REMAINS EXPOSED IN THE FINISHED WORK.
G. REFER TO PLUMBING, MECHANICAL & ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION. FULLY COORDINATE DEMO & NEW WORK WITH ALL OTHER DISCIPLINES.
H. PROVIDE AV DATA & ELECTRICAL ROUGH-IN TO ACCOMMODATE ALL EQUIPMENT.
- SEE ELECTRICAL
I. PROVIDE & INSTALL NEW LIGHT FIXTURES.
- SEE ELECTRICAL
C O
M M
O N
W
EALTH OF
V I
R G
I N
I A
ARCHITECT
Lic. No. 012264
TIM A. COLLEY
SUITE 200 200 N. MAIN STREET
BLACKSBURG, VA . 24060
DATE
SCALE
DRAWN
JOB
SHEET
AS NOTED
IFB # 158125
FORMATTED FOR
A 24" X 36" PRINT
AGENCY APPROVAL
P. 540.953.2724 F. 540.953.2725
CONSULTANT
PROJECT CODE 501-B2501-021
A1.2
NEW WORK PLANS
05 . 04 . 2023
BUILDING B1 TOILET
RENOVATION
RENOVATIONS TO
ECH
05 . 04 . 2023
SALEM DISTRICT HEAD QUARTERS 731 HARRISON
AVENUE SALEM, VA 24153
1/2" = 1'-0"A1.2A1.2
1 NEW FLOOR PLAN - RESTROOM 1
1/2" = 1'-0"A1.2A1.2
3 NEW FLOOR PLAN - RESTROOM 3
1/2" = 1'-0"A1.2A1.2
4 NEW RCP - RESTROOM 1
1/2" = 1'-0"A1.2A1.2
5 NEW RCP - JAN CLOSET
1/2" = 1'-0"A1.2A1.2
6 NEW RCP - RESTROOM 3 A1.2 A1.2 A1.2 A1.2
A1.2 A1.2
1&4
3&6 2&5FIRST FLOOR PLAN
KEY PLAN
N
1/2" = 1'-0"A1.2A1.2
2 NEW FLOOR PLAN - JAN CLOSET
0 4 6 82
1/2" = 1' - 0"
EXIST CMU WALL
A
WALL TYPES
ACT CEILING WHERE
APPLICABLE, SEE RCP
GLUE & SCREW 5/8"
HIGH IMPACT GYP BD
TO EXIST CMU WALL,
LEVEL 4 FINISH, PRIME
& PAINT ABOVE FRP
CAULK FRP JOINT
AT FLOOR
STRUCTURE OR EXIST
GYP BD CEILING
FRP OVER GYP BD
UP TO 4' AFF
EXIST CMU WALL
B
PORCELAIN TILE &
MORTAR OVER
EXIST CMU, EXTEND
TILE 4" ABOVE ACT
CLG OR TO EXIST
GYP CLG
EXIST CMU WALL
C
PORCELAIN TILE &
MORTAR OVER 1/2"
CEMENT BACKER BOARD
18 GA MIN, 3-5/8"
METAL STUDS @
16" OC
18 GA MIN, 2-1/2"
METAL STUDS @
16" OC
C2
C1
BASE PORCELAIN
TILE - SEE TYPICAL
WALL PATTERN
BASE PORCELAIN
TILE - SEE TYPICAL
WALL PATTERN
3/4"
5/8"
CAULK FRP END
JOINT
S E
E D
O O
R S
C H
E D
U L E
2"
SEE DOOR
SCHEDULE 2"
WELDED
HOLLOW
METAL
FRAME
DOOR TYPES
FRAME TYPES
A
F-1
EXIST WALL PANEL
EXIST CMU WALL
NEW HM FRAME
NEW ADA
GRANITE
THRESHOLD,
SEE THRESHOLD
DETAIL
NEW TILE, SEE FINISH SCHEDULE
TOOTH-IN NEW CMU TO MATCH
EXIST THICKNESS, SEE TOOTH-IN
DETAIL
/4
SKIM COAT CMU & PAINT
NEW 1X SPF WOOD TRIM, PRIME &
PAINT
1' - 2"
T O
V E
R
IF
Y
/4
C O
N T
R A
C T
O R
PROVIDE NEW FURRING STRIP
/4
EXIST. CONC.. FLOOR SLAB TO
REMAIN
NEW FLOOR DRAIN (TYP.)
- SEE PLUMBING
NOTE: ALL FLOOR TILE, SCHLUTER KERDI PLIABLE WATERPROOFING AS BASIS
OF DESIGN. ALL GROUTS AS BASIS OF DESIGN TO BE MAPEI KERAPOXY EPOXY
GROUT. SCHLUTER KERDI PLIABLE WATERPROOFING MEMBRANE AS BASIS OF
DESIGN TO EXTEND UP WALLS BEHIND BASE.
SCHLUTER KERDI PLIABLE WATERPROOFING MEMBRANE AS BASIS OF DESIGN
TO BE INSTALLED PER 2018 TCNA (TILE COUNCIL OF NORTH AMERICA), ANSI, &
MANUFACTURER'S GUIDELINES.
TYP. WALL TYP. DRAIN TYP. FLOOR
SS ESCUTCHEON PLATE (TYP.)
PORCELAIN TILE & MORTAR OVER
WALL, EXTEND TILE 4" ABOVE ACT
CLG OR TO EXIST GYP CLG
WATERPROOFING MEMBRANE TO
EXTEND UP WALL 8" MIN. A.F.F.
- MEMBRANE THICKNESS TO BE MIN.
50 MIL WET FILM THICKNESS
FLOOR TILE
CONTINUOUS WATERPROOFING
MEMBRANE
SETTING BEDS
WATERPROOFING MEMBRANE BASIS OF
DESIGN TO BE SCHLUTER KERDI.
MEMBRANE TO BE APPLIED
CONTINUOUSLY TO COVER ENTIRE
FLOOR AREA AND TO BE AN INTEGRAL
COMPONENT OF THE FLOOR TILE &
SETTING BED SYSTEM AND INTEGRATE
PROPERLY WITH MORTAR, GROUT AND
ALL OTHER COMPONENT MATERIALS.
ALIGN
RESTROOM THIN SET FLOOR TILE,
SETTING BEDS & CONTINUOUS
WATERPROOFING MEMBRANE OVER
FLOOR SLAB (TYP.)
SETTING BED AS REQ'D.
FLOOR SLAB BELOW
DOOR
DOOR FRAME BEYOND
1:2 MAX. SLOPE FOR
COMPLIANT THRESHOLD
/2
M
A X
M A
X
/4
V
E R
T
/4
M A
X
GRANITE THRESHOLD
NEW ADA GRANITE THRESHOLD,
SEE THRESHOLD DETAIL
NEW DOOR SLAB
NEW HM FRAME
7"
NEW TILE OR GWB, SEE FINISH
SCHEDULE
NEW LINTEL
- SEE LINTEL SCHEDULE
NEW TILE FLOOR, SEE FINISH
SCHEDULE
EXIST WALL PANEL, PATCH WITH
WALL PANEL FROM RESTROOM 2
AS REQUIRED AND PRIME & PAINT
TO MATCH EXIST
CONTRACTOR TO VERIFY
10 3/4"
NEW ADA GRANITE THRESHOLD,
SEE THRESHOLD DETAIL
NEW HM FRAME
NEW TILE OR GWB, SEE FINISH
SCHEDULE
EXIST CMU WALL
EXIST WALL PANEL, PATCH WITH
WALL PANEL FROM RESTROOM 2
AS REQUIRED AND PRIME & PAINT
TO MATCH EXIST
TOOTH-IN NEW CMU TO MATCH
EXIST THICKNESS, SEE TOOTH-IN
DETAIL
7"
TO VERIFY
10 3/4" CONTRACTOR
7 3/4"
NEW ADA GRANITE THRESHOLD,
SEE THRESHOLD DETAIL
NEW DOOR SLAB
NEW TILE FLOOR, SEE FINISH
SCHEDULE
NEW HM FRAME
NEW WALL TILE, SEE
FINISH SCHEDULE
EXIST CMU WALL
EXIST WALL PANEL BEYOND
TO VERIFY
+/- 2 1/4" CONTRACTOR
CONTRACTOR TO VERIFY
11 1/4"
SKIM COAT EXIST CMU,
PRIME & PAINT
NEW 1X SPF WOOD TRIM, PRIME &
PAINT
PROVIDE NEW FURRING STRIP
NEW LINTEL
- SEE LINTEL SCHEDULE
TOOTH-IN NEW CMU
AS REQ'D AT DOOR
JAMBS; MATCH EXIST
CMU THICKNESS
NEW HM FRAME
EXIST CMU WALL
NEW LINTEL BEARING A MIN OF 8"
EACH SIDE
- SEE LINTEL SCHEDULE
1' - 2"1' - 2"
REMOVE FINISHES BACK
TO CMU
TOOTH-IN CMU TO FILL
IN PREVIOUS LOCATION
OF DOOR - SEE TOOTH-
IN DETAIL
NEW DOOR, SEE DOOR
SCHEDULE
HM FRAME
NEW RESILIENT BASE TO
MATCH ADJACENT COLOR
AND SIZE
SKIM COAT EXIST CMU &
PAINT
PATCH EXIST FLOORING
AS REQD
NEW 1X SPF WOOD TRIM,
PAINTED - PROVIDE NEW
FURRING STRIP BACKING
JAN. CLOSET
BEGIN 12"X12" FLOOR
TILE AT THE TILE
INDICATED IN GRAY
NEW ADA GRANITE
THRESHOLD, SEE
THRESHOLD DETAIL
UNISEX
RESTROOM
BEGIN 12"X12" FLOOR
TILE AT THE TILE
INDICATED IN GRAY
NEW ADA GRANITE
THRESHOLD, SEE
THRESHOLD DETAIL
WOMEN'S
RESTROOM
BEGIN 12"X12" FLOOR
TILE AT THE TILE
INDICATED IN GRAY
NEW ADA GRANITE
THRESHOLD, SEE
THRESHOLD DETAIL
ACCENT 6"X6" WALL
TILE, TILE #3
6"X12" WALL TILE BASE, TILE #2
6"X6" WALL TILE, TILE #1
EXTEND WALL TILE #1
UP TO CLG
EXIST CONC SLAB
NEW 4" MIN CONC SLAB
COMPRESSIVE
STRENGTH 4500 PSI MIN
4" MIN COMPACTED
GRAVEL FILL
ALIGN
#4 REBAR W/ YIELD STRENGTH
GRADE 60 PER ASTM A615 SET IN
EPOXY INTO EXIST SLAB @ 16" O.C.
E Q
E Q
8" MIN 8" MIN
VAPOR RETARDER (OMIT
IF NOT PRESENT IN EXIST)
LINTEL SCHEDULE
ROUGH
OPENING
TYPE
48" WIDE
MAX
48" WIDE
MAX
MAX 6" SOLID MASONRY
CONCRETE LINTEL
W/ 1 #3 REBAR AT BOTTOM
SIZE
8" SOLID MASONRY
CONCRETE LINTEL
W/ 2 #3 REBARS AT BOTTOM
NOTES:
1. PROVIDE MINIMUM 8" BEARING ON SOLID GROUTED MASONRY AT
EACH END OF ALL LINTELS.
2. VERIFY AND MATCH MASONRY WIDTHS OF EXIST WALLS.
3. SEE SPECIFICATIONS.
4. SEE TOOTH-IN CMU DETAIL ON THIS SHEET.
C O
M M
O N
W
EALTH OF
V I
R G
I N
I A
ARCHITECT
Lic. No. 012264
TIM A. COLLEY
SUITE 200 200 N. MAIN STREET
BLACKSBURG, VA . 24060
DATE
SCALE
DRAWN
JOB
SHEET
AS NOTED
IFB # 158125
FORMATTED FOR
A 24" X 36" PRINT
AGENCY APPROVAL
P. 540.953.2724 F. 540.953.2725
CONSULTANT
PROJECT CODE 501-B2501-021
A2.1
SECTIONS, DETAILS,
FINISH PLANS &
SCHEDULES
05 . 04 . 2023
BUILDING B1 TOILET
RENOVATION
RENOVATIONS TO
ECH
05 . 04 . 2023
SALEM DISTRICT HEAD QUARTERS 731 HARRISON
AVENUE SALEM, VA 24153
1" = 1'-0"A2.1A2.1A1.2
5 DOOR 103 JAMB DETAIL
1 1/2" = 1'-0"A2.1A2.1
11 DETAIL - TILE FLOOR DRAIN
1 1/2" = 1'-0"A2.1A2.1
6 DETAIL - THRESHOLD
1" = 1'-0"A2.1A2.1A1.2
1 DOORS 101 & 102 SECTION
1" = 1'-0"A2.1A2.1A1.2
4 DOORS 101 & 102 JAMB DETAIL
1" = 1'-0"A2.1A2.1A1.2
2 DOOR 103 SECTION
1/2" = 1'-0"A2.1A2.1
3 TOOTH-IN CMU DETAIL
TOILET ACCESSORY SCHEDULE
MARK ITEM COUNT REMARKS FURNISHED BY INSTALLED BY
BC BABY CHANGING STATION 2 CONTRACTOR CONTRACTOR
CH COAT HOOK 1 CONTRACTOR CONTRACTOR
GB 18, 24, 36 GRAB BARS 2 1 1/2" DIA. CONTRACTOR CONTRACTOR
M MIRROR 2 24" X 36" CONTRACTOR CONTRACTOR
MH MOP HOLDER 1 6' - 0" AFF CONTRACTOR CONTRACTOR
ND SANITARY NAPKIN DISPOSAL 3 CONTRACTOR CONTRACTOR
PT PAPER TOWEL DISPENSER 2 VDOT CONTRACTOR
SD SOAP DISPENSER 2 VDOT CONTRACTOR
TP TOILET PAPER DISPENSER 3 CONTRACTOR CONTRACTOR
SEE TOILET ELEV. - SHEET LS1 FOR MOUNTING HEIGHTS
PROVIDE BLOCKING AS REQ'D
DOOR SCHEDULE
DOOR
NO.
DOOR
FRAME
MAT'L. JAMB/HDR HD'W. REMARKSTYPE W H T MAT'L.
GLAZIN
G
101 A 3' - 0" 6' - 8" 0' - 1 3/4" WD -- HM SEE DETAIL H-2 20 MIN. FIRE DR
102 A 3' - 0" 6' - 8" 0' - 1 3/4" WD -- HM SEE DETAIL H-1 20 MIN. FIRE DR
103 A 3' - 0" 6' - 8" 0' - 1 3/4" WD -- HM SEE DETAIL H-2 20 MIN. FIRE DR
FINISH SCHEDULE
ROOM NO. ROOM NAME AREA
FLOOR
FINISH
BASE
MATERIAL
WALL CEILING
MATERIAL FINISH MATERIAL HEIGHT
101 UNISEX
RESTROOM
75 SF PORCELAIN
TILE
-- PORCELAIN TILE -- EXIST GYP BD EXIST +/- 8' - 1"
102 JAN. CLOSET 110 SF PORCELAIN
TILE
-- GWB / FRP UP
TO 4'
PAINT 2X2 ACT ALIGN W/ EXIST +/- 7' - 10"
103 WOMEN'S
RESTROOM
100 SF PORCELAIN
TILE
-- PORCELAIN TILE -- 2X2 ACT ALIGN W/ EXIST +/- 7' - 9"
3/8" = 1'-0"A2.1A2.1A1.2
7 DOOR 103 ELEVATION
1/4" = 1'-0"A2.1A2.1
12 FINISH PLAN - JAN CLOSET
1/4" = 1'-0"A2.1A2.1
9 FINISH PLAN - RR 1
1/4" = 1'-0"A2.1A2.1
13 FINISH PLAN - RESTROOM 3
3/8" = 1'-0"A2.1A2.1
8 TYP WALL TILE PATTERN
1" = 1'-0"A2.1A2.1
10 DTL - SLAB CONNECTION
21 3
WOMEN'S
RESTROOM
1 2
MEN'S
RESTROOM
DEMO RESTROOM TWO KEYED NOTES
1 REMOVE WATER CLOSET AND ALL RELATED APPURTENANCES. PLUG
SEWER BELOW SLAB, CAP VENT AND COLD WATER LINE OVERHEAD
INTO CEILING SPACE.
REMOVE URINAL AND ALL RELATED APPURTENANCES. CONTRACTOR
SHALL PLUG, CAP AND COVER WATER, SEWER AND VENT LINES IN WALL
FOR FUTURE FIXTURES.
REMOVE LAVATORY AND ALL RELATED APPURTENCES. PLUG SEWER
BELOW SLAB, CAP VENT AND COLD WATER LINE OVERHEAD INTO
CEILING SPACE.
DEMO RESTROOM THREE KEYED NOTES
1 REMOVE WATER CLOSET AND ALL RELATED APPURTENANCES. PLUG
SEWER BELOW SLAB, CAP VENT LINE OVERHEAD INTO CEILING SPACE
AND CAP WATER LINE IN WALL.
CONTRACTOR SHALL REPLACE WATER CLOSET IN THIS AREA. REFER
PLUMBING PLAN FOR NEW LOCATOIN . RESTORE OR REPLACE WATER
SUPPLY PIPING AS NECESSARY TO MANUFACTURER'S ORIGINAL
CONDITION, INCLUDING ALL HARDWARE AND SEALS AS REQUIRED FOR
SATISFACTORY OPERATION AND COMPLETENESS. THIS ALSO SHALL
INCLUDE CLEANING THE EXTERIOR OF ALL EXPOSED PIPING TO LIKE
NEW CONDITION.
REMOVE LAVATORY AND ALL RELATED APPURTENCES. CONTRACTOR
SHALL PLUG, CAP AND COVER WATER, SEWER AND VENT LINES IN WALL
FOR FUTURE FIXTURES.
DEMO RESTROOM ONE KEYED NOTES
1 REMOVE LAVATORY AND ALL RELATED APPURTENANCES. CONTRACTOR SHALL
PLUG, CAP AND COVER WATER, SEWER AND VENT LINES IN WALL FOR FUTURE
FIXTURES.
REMOVE WATER CLOSET AND ALL RELATED APPURTENANCES. PLUG SEWER
BELOW SLAB, CAP VENT AND COLD WATER LINE OVERHEAD INTO CEILING
SPACE.
REMOVE SHOWER AND ALL RELATED APPURTENCES. CONTRACTOR SHALL
PLUG, CAP AND COVER WATER, SEWER AND VENT LINES IN WALL FOR FUTURE
FIXTURES.
1.ALL WORK, METHODS AND INSTALLATIONS INVOLVED IN THE PLUMBING DESIGN SHALL BE IN ACCORDANCE WITH THE CITY BUILDING CODE, INSPECTION REGULATIONS AND ALL OTHER OFFICIALS
HAVING JURISDICTION.
2.ALL SANITARY PIPING 3" AND LARGER ROUTED AT 1/8" SLOPE PER FOOT UNLESS OTHERWISE NOTED.
ALL PIPE LESS THAN 3" SHALL BE ROUTED AT 1/4" SLOPE PER FOOT.
3.EACH VENT SHALL TERMINATE VERTICALLY NOT LESS THAN 6" ABOVE ROOF, MAINTAIN MINIMUM 10'-0" DISTANCE BETWEEN VENT TERMINALS THROUGH ROOF AND ALL FRESH AIR INTAKES, AND A MINIMUM
5'-0" FROM ANY EXTERIOR WALL.
4.CONTRACTOR TO FIELD VERIFY AS NECESSARY THE EXACT ROUTING AND SIZES OF ALL PIPING.
5.PROVIDE A TWO-WAY CLEANOUT AT CIVILS POINT OF CONNECTION.
6.CONTRACTOR SHALL COORDINATE ROUTING OF PIPING BELOW SLAB WITH COLUMN FOOTINGS,
GRADE BEAMS, UNDERGROUND PLUMBING AND ELECTRICAL UTILITIES, AND OTHER SUB-SURFACE
BUILDING ELEMENTS.
7.CONTRACTOR SHALL COORDINATE ROUTING OF PIPING IN CEILING SPACES WITH MECHANICAL AND ELECTRICAL EQUIPMENT, DUCTWORK AND CONDUIT. SHOULD A CONFLICT OCCUR THE CONTRACTOR SHALL NOTIFY THE ARCHITECT/ENGINEER PRIOR TO INSTALLING AN ALTERNATE PIPING PLAN.
8.COORDINATE ALL FIXTURE AND EQUIPMENT LOCATIONS AND CONNECTION REQUIREMENTS WITH
LATEST ARCHITECTURAL DRAWINGS AND SPECIFICATIONS PRIOR TO ANY ROUGH-INS.
9.DO NOT ROUGH-IN FROM THESE DRAWINGS. REFER TO LATEST ARCHITECTURAL DRAWINGS FOR
DIMENSIONED LOCATIONS.
10.PRIOR TO BEGINNING CONSTRUCTION, COORDINATE BUILDING BACKFLOW PREVENTION
REQUIREMENTS WITH THE LOCAL AUTHORITY HAVING JURISDICTION AND PROVIDE AS DIRECTED.
11.WITHIN THE EXISTING BUILDING, EXISTING WATER, WASTE AND VENT SERVICES ARE TO BE MODIFIED AS REQUIRED AND REUSED FOR THE INSTALLATION OF NEW AND/OR RELOCATED PLUMBING FIXTURES.
REFER TO PLUMBING FLOOR PLANS FOR POINTS OF CONNECTION.
12.WITHIN THE EXISTING BUILDING, SAWCUT AND REMOVE EXISTING FLOOR SLAB AS REQUIRED TO PROVIDE NEW AND/OR RELOCATED PLUMBING FIXTURES, CLEANOUTS, AND UNDERSLAB WASTE AND
VENT PIPING. PATCH AND REFINISH FLOOR TO MATCH EXISTING.
13.IN AREAS WHERE THE FLOOR SLAB IS REMOVED, CONTRACTOR SHALL ALSO REMOVE UNDERSLAB
WASTE AND VENT PIPING WHICH SERVES FIXTURES DESIGNATED FOR REMOVAL. PRIOR TO ANY
REMOVAL, FIELD VERIFY THAT LINES TO BE REMOVED DO NOT SERVE ANY EXISTING FIXTURES TO
REMAIN OR NEW FIXTURES TO BE INSTALLED.
14.IN AREAS WHERE THE FLOOR SLAB IS NOT REMOVED, CONTRACTOR SHALL ABANDON IN PLACE ANY UNDERSLAB WASTE AND VENT PIPING NO LONGER NEEDED, UNLESS THE PIPING MUST BE REMOVED
TO ACCOMMODATE NEW CONSTRUCTION. IF NEW WORK DOES NOT NECESSITATE THEIR REMOVAL,
CUT AND PLUG SUCH LINES BELOW SLAB, AND PATCH FLOOR TO MATCH EXISTING.
15.FIELD VERIFY EXACT LOCATION, SIZE, DEPTH, DIRECTION OF FLOW, CAPACITY, PIPE MATERIAL AND CONDITION OF EXISTING WASTE PIPING PRIOR TO BEGINNING CONSTRUCTION. ENSURE THAT PROPER
CONNECTIONS TO AND EXTENSION OF SUCH UTILITIES CAN BE MADE.
16.WASTE LINES TO BE RE-USED OR RECONNECTED TO SHALL BE THOROUGHLY RODDED OUT AND
FLUSHED TO ENSURE THEY ARE FREE FROM BLOCKAGES.
17.CONTRACTOR TO COORDINATE ALL REMODEL WORK WITH THE WORK OF OTHER TRADES TO AVOID
CONFLICTS AND TO MINIMIZE INTERRUPTION OF SERVICES.
18.THE PROPER INSTALLATION OF NEW FIXTURES AND THE PROPER CONTINUED OPERATION OF
EXISTING FIXTURES TO REMAIN SHALL DETERMINE THE EXTENT AND NATURE OF PLUMBING REMODEL
WORK.
19.THERE SHALL BE NO PLUMBING FIXTURES OR EQUIPMENT, PIPING, VALVES, CARRIERS OR
ASSOCIATED DEVICES/APPURTENANCES TO REMAIN IN THE BUILDING UNLESS SPECIFICALLY NOTED
OTHERWISE IN THE DOCUMENTS.
21.CONTRACTOR SHALL CHECK ALL LOCATIONS, MEASUREMENTS, DEPTHS, AND REPORT ANY
DISCREPANCIES FOR CORRECTION BEFORE DEMOLITION.
22. THESE CONSTRUCTION DRAWINGS ARE DIAGRAMMATIC AND DO NOT NECESSARILY REFLECT THE ACTUAL DIMENSIONS.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .