This is an Invitation for Bid (IFB) for construction of potable water delivery turnout buildings and associated infrastructure at seven sites across northwest New Mexico as part of the Navajo-Gallup Water Supply Project. The Bureau of Reclamation's Upper Colorado Region (Four Corners Construction Office) is soliciting sealed bids for turnkey turnout building installations at Sanostee, Newcomb, Naschitti, BBN9, Coyote Canyon, Rock Springs, and Window Rock. The project magnitude ranges from $18 million to $23 million with a firm fixed-price contract structure.
Work at each site includes sitework with buried piping, valves, and accessories; steel connections to existing lateral and distribution pipes; fiberoptic cable infrastructure; precast concrete buildings with geotechnical and building design; interior piping systems; mechanical, electrical, controls, instrumentation, and security systems; SCADA system integration; and piping disinfection. The contract requires full-time safety and quality control representatives, qualified survey personnel, and comprehensive submittals including as-built drawings in .dwg format. Sealed bids are due by November 10, 2026, with 21 calendar days to commence work after receiving the notice to proceed. Contract performance runs from December 16, 2026, through April 16, 2029, with liquidated damages of $4,536 per day for delays. The solicitation emphasizes strict environmental compliance (including SWPPP requirements), archaeological monitoring, Indian preference and employment programs, quantity survey documentation for all invoices, and specialized submittals reviewed by Reclamation's engineering-focused personnel. A mandatory site visit is scheduled for August 26, 2026. Questions must be submitted by September 9, 2026. New Mexico Gross Receipts Tax (estimated at 6.8125%) and Navajo Nation Tax (estimated at 6.00%) are reimbursable with proof of payment documentation.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Navajo-Gallup Water Supply Project Turnout Buildings
Solicitation No. 140R4026B0002
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF RECLAMATION
UPPER COLORADO REGION
SALT LAKE CITY, UTAH
Solicitation
Document No.
140R4026B0002
Document Title NGWSP Turnout Buildings
Preface This section is a synopsis of the items identified by Reclamation that have been problematic for some contractors. The items have been identified through previous real-world performance of construction with Reclamation. The following items are not all-encompassing of problems that may or may not be encountered and are only meant to identify general challenges contractors may run into when contracting with Reclamation for construction work. The purpose of this document is to allow contractors to propose construction more accurately at contract inception and reduce contract interpretation disagreements after contract award. It is highly recommended the Contractor read and become intimately familiar with both the solicitation and contract specifications and drawings prior to construction, as that can also head off potential disagreements as the work is being completed.
NOTE: The examples given within are for reference purposes only. Reclamation does not take responsibility for the application of calculations during offer creation. The Contractor is required to apply all calculations internally, and the items in this document are for awareness purposes only.
DISCLOSURE OF THE MAGNITUDE OF THE CONSTRUCTION PROJECT: The magnitude of this project is between $18,000,000.00 and $23,000,000.00.
SUBMISSION OF BIDS:
1) If providing a bid electronically, email your submission to Brittney Nielson at brittney_nielson@ios.doi.gov and Amy Loveless at amy_loveless@ios.doi.gov.
2) If providing a bid via mail, use the following information:
Bureau of Reclamation Four Corners Construction Office Attn: Philoma Singer 1235 La Plata Highway Farmington, NM 87401
3) If providing a bid in person, please deliver to Philoma Singer at the following address:
Bureau of Reclamation Four Corners Construction Office 1235 La Plata Highway Farmington, NM 87401
4) Bids must be submitted in accordance with section 13(a) of the SF-1442
5) Regardless of whether the bid is submitted electronically, via mail, or in person, it is the responsibility of the contractor to confirm their bids are received by the bid date and time stated in the solicitation.
Quality Control & Quality Assurance:
FAR Clause 52.246-12 - Inspection of Construction, requires the Contractor to establish a construction inspection system to ensure quality. Accordingly, per section 01 46 00 – Quality Procedures, a Quality Control Testing is required to evaluate results of tests when determining acceptability of work. Contractor may use the test results as part of the Quality Assurance (QA)/ Quality Control (QC), however the tests do not relieve the Contractor of maintaining adequate quality system in accordance with the clause at FAR 52.246-12 - Inspection of Construction.
The contractor will conduct its own Quality Assurance (QA) program, and Reclamation will only intermittently conduct its own Quality Assurance for specification compliance only, which may include inspection and tests performed by Government staff to ensure compliance with terms of the contract. Test performed by Reclamation will be used to ensure compliance with contract requirements and are not to be a replacement for specified Contractor quality contract and quality assurance testing. In the event of a discrepancy between Contractor’s and Government’s test results if performed, Reclamation’s quality assurance test results will be compared to the contractor’s mailto:brittney_nielson@ios.doi.gov mailto:amy_loveless@ios.doi.gov results and a determination must be made whether the item conforms to the specifications or needs to be repaired/replaced at no additional cost to the government.
Quantity Surveys:
FAR Clause 52.236-16 Alt I Quantity Surveys will be included in this contract. Many contractor personnel have had issues providing adequate survey data IAW the referenced clause. This requires both preliminary and final surveys to be performed by the contractor. The contract requires (specs and clause) that a surveying plan be submitted (Surveying Plan) IAW specification 01 33 00. The surveying plan must be approved by Reclamation prior to the beginning of surveying work. The contract also requires submittal of all quantity survey notes and computations, as well as workday’s survey notes. This is important as the quantity for payment must be verified against the actual survey data. Quantity surveys and calculations, along with as-built drawings, are required to be submitted with each monthly construction progress payment for a contractor’s invoice to be considered as proper. Once construction is complete and all submittals are finalized, the balance of the lump sum price will be paid in the final invoice, quantity surveys are used to ensure the government does not unintentionally advance pay during progress payments.
The Government will have survey crews on site as part of its internal construction oversight and inspection program. However, this is not to be relied on by the Contractor as meeting the survey specifications. The Contractor is expected to provide fulltime survey support under the direction of a registered professional land surveyor licensed in the state where the work is being completed IAW the survey specifications (section 01 71 20 – Surveying). Historically, many contractors have missed this requirement, and it has led to payment disagreements.
Submittals:
The submittals required for Reclamation projects can be very detailed. Reclamation is a very data-centric organization of engineering-minded personnel. As such, the data needs to be correct and submittals shall be thought out, in a logical format, and be thorough. A ‘shotgun-spread’ approach will not work. Meaning, if a contractor submits superfluous information and/or with no format or shown understanding of the items, it will likely lead to rejection and a required resubmittal of the items. The same is true if a contractor only submits a portion of the items required under a requirement submittal number (RSN). The Contractor is responsible for providing quality control of contractor and subcontractor submittals to ensure they contain all, but no more than, the items required by a particular RSN.
Reclamation will retain many, if not all, of the records in library retention for many years. This is for awareness purposes only.
As-Built Drawings:
Section 01 78 30 of the specifications covers this in detail. Reclamation expects full compliance with keeping drawings on site as required in the specifications and final electronic as-builts in .dwg format. As noted in the specification, final as-builts are to include manufacturer/subcontractor drawings (mechanical etc.). See specifications for further information.
Environmental Compliance and Permitting:
Environmental Compliance is a very strictly enforced item. Reclamation has built a healthy and trusting relationship with the Navajo Nation Environmental Protection Agency (NNEPA), the U.S. Environmental Protection Agency (EPA), and the Army Corps of Engineers in complying with various environmental regulations, namely the Clean Water Act (CWA). Reclamation values these relationships and expects full compliance from the Contractor on all environmental items.
Many contractors unfamiliar with Reclamation run into initial issues because they: 1) do not have a dedicated environmental compliance member/team familiar with Clean Water Act (33 U.S.C. §1251 et seq. (1972)) permitting implementation experience, and specifically Storm Water Pollution Prevention Plan (SWPPP), 2) and rely on Reclamation to point out non-compliance reactively, rather than proactively implementing and managing this aspect of the job.
Some items of small nature may be required after contract award to comply with local Right of Way (ROW) changes/requirements.
These items will be paid on a case-by-case basis on actual costs plus any reasonable overhead or profit.
Example: encountered well water, directed safety and water preservation compliance, paid back based on quantity surveys of actual qty (not payline) for overage, directed work. Site runoff water creating a path to other natural sites off the approved right of way, etc.
Concern Example: Standing water pooled up near open manholes, Reclamation directed that the manholes be covered to prevent rainwater backfilling the pipe, per the specification requirements. Environmental personnel inspections identified multiple discrepancies
Solicitation Document No.
Document Title NGWSP Turnout Buildings with SWPPP compliance, directed fixes at no additional cost to the government. Be mindful of the requirements as they can add up if not initially planned for.
Cultural Resources Compliance and Archaeological Monitoring:
Given the density of archaeological sites and artifacts in this area of the country, some items of archaeological and cultural importance are expected to be encountered during construction, including previously unknown sites and artifacts called discoveries. The delays for any ROW restrictions needed to protect those resources shown in the bid documents shall be included in the initial bid. The contract may be modified for time and/or cost if cultural resources discoveries are encountered, and the Contractor does not have other areas where work can be shifted. Be sure to read the specifications sections. See specifications section 01 57 60 and 01 57 90 for further details. It can be expected that the construction monitors of an Archaeological or Monitoring Firm may contact the Reclamation personnel and have the CO direct a temporary stop work until the discovery is mitigated or otherwise addressed and resolved.
Project Specific Areas of Concern:
There are no specific areas of concern for this project.
Schedule B CLINs 1-4, 1-5, 2-4, 2-5, 3-4, 3-5, 4-4, 4-5, 5-4, 5-5, 6-4, 6-5, 7-4, 7-5:
These CLINs for As-Built Drawings and Final Drawings have pre-priced amounts listed. This is done to ensure a significant amount can be retained before final invoice to ensure As-Built Drawings and Final Drawings are received before final invoice is paid. The contractor may propose an alternate amount; however, it will be reviewed to ensure a meaningful amount has been proposed that allows Reclamation to guarantee the delivery of the As-Built Drawings and Final Drawings required by the contract.
Taxes:
In accordance with FAR 52.229-3- Federal, State, and Local Taxes, the contract price offered by contractors includes all applicable Federal, State, and local taxes with the exception of New Mexico Gross Receipts Tax and Navajo Nation Tax. The Contractor must rely on its internal tax experts to ensure full compliance with tax laws. Be aware that both New Mexico Gross Receipts Tax (NMGRT) and Navajo Nation (NN) tax may apply to the work.
Taxes will be reimbursed on the actual tax rate at the time of each invoice period. The tax filing documents/receipts must be submitted with the invoice to be reimbursed the taxes paid. Taxes can be withheld to quarterly or longer if it is easier to process based on the business model of the contractor, but the tax forms/receipts (i.e. GRT-PV for NM or Form 600/601/604 for NN taxes – proof of payment) from either the State of New Mexico (NM) or the Navajo Nation (NN) must be submitted to be reimbursed for taxes.
Taxes must be presented/estimated in the proposal to allow for appropriate budgeting of dollars for the resultant contract. The tax rate is subject to change during multiple years of performance, which historically happens in the State of NM (e.g. awarded at 6.5% NMGRT, June of the same year rate rises to 6.875% NMGRT, the following January the tax rate drops back to 6.5% NMGRT, etc.). This is a recent change in strategy for taxes, but the idea is Reclamation will reimburse actual NMGRT and NN taxes paid during each invoice/tax period to handle fluctuations in taxes during performance with receipts/proof of payment provided with each invoice.
Site Visit:
An organized site visit is scheduled for – Wednesday August 26, 2026 @ 8 AM MT
Participant will meet at – Four Corners Construction Office 1235 La Plata Highway
Farmington, New Mexico 87401
Please contact Tim Gonzales (TJGonzales@usbr.gov, 505-360-0289) to be added to the attendee list and for any additional questions information concerning the site visit.
Questions:
All questions must be submitted to Brittney Nielson (brittney_nielson@ios.doi.gov) and Amy Loveless (amy_loveless@ios.doi.gv) by 09/09/2026 1300 MT. All answers will be provided via amendments to the solicitation.
Subcontractors:
Subcontractors cannot submit partial proposals straight to the Government. Subcontractors shall propose directly to prime contractors.
Items will not be pre-qualified during the synopsis or solicitation period. It is the prime contractor’s responsibility to confirm items meet the specifications of this requirement.
52.236-8 OTHER CONTRACTS – RECLAMATION DEVIATION APRIL 1984:
Please carefully read this clause as this effort will potentially overlap with other Reclamation contracts.
52.222-11 SUBCONTRACTS (LABOR STANDARDS) MAY 2014:
Please carefully read this clause and ensure SF-1413’s are submitted to the Contracting Officer (by email). You should cc the Contract Specialist (CS) and Contracting Officer’s Representative (COR).
Note:
The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
Contents Solicitation No. 140R4026B0002
Preface
SECTION A – SF-1442
SECTION C – Statement / Description / Specification of Work SECTION D – Packaging and Marking SECTION E – Inspection and Acceptance
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
SECTION F - Deliveries or Performance
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
F.2 52.211-12 LIQUIDATED DAMAGES-CONSTRUCTION SEPTEMBER 2000
SECTION G - Contract Administration Data G.1 DOI-AAAP 0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP)
APRIL 2013
G.2 WBR 1452.242-80 POST AWARD CONFERENCE - BUREAU OF RECLAMATION (MARCH 2022)
G.3 WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES AND LIMITATIONS -BUREAU OF
RECLAMATION (MAY 2018)
SECTION H - Special Contract Requirements
H.1 DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM
H.2 INDIAN PREFERENCE
H.3 INDIAN PREFERENCE PROGRAM
H.4 VARIATION IN ESTIMATED QUANTITY
H.5 AUTHORITIES AND DELEGATIONS
H.6 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
H.7 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND
COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29
H.8 AVAILABILITY OF DEFENSE SPECIFICATIONS, STANDARDS, AND DATA ITEM DESCRIPTIONS IN THE ACQUISITION STREAMLINING AND STANDARDIZATION INFORMATION SYSTEM (ASSIST) WEBSITE
SECTION I - Contract Clauses
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
I.2 52.203-14 DISPLAY OF HOTLINE POSTER(S) NOVEMBER 2021
I.3 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION (RFO Deviation) JANUARY 2026
I.4 52.222-9 APPRENTICES AND TRAINEES JULY 2005 DEVIATION FEBRUARY 2025
I.5 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (SEPTEMBER 2025)(DEVIATION) I.6 52.223-2 REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS MAY 2024
DEVIATION FEBRUARY 2025
I.7 52.223-22 PUBLIC DISCLOSURE OF GREENHOUSE GAS EMISSIONS AND REDUCTION GOALS
– REPRESENTATION DECEMBER 2016 RESERVED DEVIATION FEBRUARY 2025
I.8 52.223-23 SUSTAINABLE PRODUCTS AND SERVICES MAY 2024 DEVIATION FEB 2025
I.9 52.236-8 OTHER CONTRACTS – RECLAMATION (RFO Deviation) January 2026 I.10 52.236-21 ALT II SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION JANUARY 2026 (DEVIATION)
I.11 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS. (RFO DEVIATION) MARCH 2026
I.12 52.240-93 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS. MARCH 2026 I.13 52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES JANUARY 2025 DEVIATION
FEBRUARY 2025
I.14 52.225-11 BUY AMERICAN-CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (NOVEMBER 2023)
I.15 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES NOVEMBER 2020
I.16 WBR 1452.223-81 SAFETY AND HEALTH – BUREAU OF RECLAMATION OCTOBER 2022
I.17 WBR 1452.232-81 – PAYMENT FOR MOBILIZATION AND PREPARATORY WORK – BUREAU OF RECLAMATION MARCH I.18 WBR 1452.236-84 PRESERVATION OF CULTURAL RESOURCES BUREAU OF RECLAMATION MARCH 2022
I.19 WBR 1452.237-80 SECURITY REQUIREMENTS - BUREAU OF RECLAMATION (MAR 2022)
I.20 WBR 1452.243-80 MODIFICATION PROPOSALS – BUREAU OF RECLAMATION MARCH 2022
SECTION J – List of Attachments and Exhibits SECTION K – Representations, Certifications and Other Statements of Offerors
K.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE FEBRUARY 1998
K.2 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY SEPTEMBER 2023
K.3 52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION APRIL 1985
K.4 52.204-20 PREDECESSOR OF OFFEROR AUGUST 2020
K.5 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS AUGUST 2020
K.6 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS OCTOBER 2018
K.7 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY CONVICTION
UNDER ANY FEDERAL LAW FEBRUARY 2016
K.8 52-209-12 CERTIFICATION REGARDING TAX MATTERS (OCT 2025)
K.9 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS – CERTIFICATION NOVEMBER 2021
K.10 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS FEBRUARY 2024
K.11 52.219-2 Equal Low Bids (Oct 1995)
SECTION L – Instructions, Conditions and Notices to Bidders
L.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE FEBRUARY 1998
L.2 52.216-1 – TYPE OF CONTRACT APRIL 1984
L.3 52.228-1 - BID GUARANTEE SEPT 1996
L.4 52.252-5 – AUTHORIZED DEVIATIONS IN PROVISIONS (NOVEMBER 2020)
L.5 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS L.6 1452.233-2 – SERVICE OF PROTEST DEPARTMENT OF THE INTERIOR (JUL 1996) (DEVIATION)
L.7 WBR 1452.236-85 INSTRUCTION FOR MOBILIZATION AND PREPARATORY WORK SCHEDULE LINE ITEM - BUREAU OF
RECLAMATION (MAR 2022)
L.8 DOI-AAAP-0076 – MINIMUM SUBCONTRACTING GOALS FOR THIS SOLICITATION
SECTION M - Evaluation Factors for Award
M.1 NOTICE OF BID OPENING
Document Title NGWSP Turnout Buildings
SECTION A – SF-1442
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
NEGOTIATED (RFP) REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF
SEALED BID (IFB) INVITATION FOR BID
9. FOR
INFORMATION CALL
PAGES
140R4026B0002
Bureau of Reclamation Upper Colorado Region Regional Office 125 South State Street, Room 8100 Salt Lake City UT 84138
Bureau of Reclamation- FCCO Attn: Philoma Singer 1235 La Plata Highway Farmington, NM 87401
0044049792
R40
Brittney Nielson 8015243724
11/10/2026
21 831
The principal components of work for NGWSP Turnout Buildings include, but are not limited to the following:
A. Work consists of constructing a potable water delivery turnout building and associated improvements at each site.
B. Install at each site:
1.Sitework, including buried piping, valves, and accessories; access road (Coyote Canyon and Window
Rock only); steel fencing with gate; gravel surfacing; and drainage.
2.Steel piping connection to existing steel lateral (supply) pipe.
3.Steel piping connection to existing steel distribution (delivery) pipe.
4.Buried thrust blocks.
5.Fiberoptic cable infrastructure from existing lateral alignment to building.
6.Precast concrete building and foundation, including geotechnical investigation, foundation design, and building design.
7.Interior exposed piping, valves, and accessories.
8.Building mechanical, electrical, controls, instrumentation, and security.
Continued...
10 97
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Continued...
AMENDMENT
NUMBER
DATE.
Amy Loveless
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140R4026B0002
9.Controls integration with existing San
Juan Lateral SCADA system.
C. Flush, test, and disinfect installed piping, including furnishing and disposal of water.
D. NTUA will provide a transformer to each turnout location to step-down power for each locations power needs. At each site, a transformer will feed into a meter then disconnect before powering up the building. The meter socket will delineate ownership with equipment upstream from the meter, including the meter, will be owned and maintained by
NTUA. FCCO will own and maintain from the meter socket and downstream.
Work is located at 7 sites in northwest New
Mexico between Gallup and Shiprock, approximate latitude and longitude coordinates for each are:
1.Sanostee: 36.429389, -108.720139 in San
Juan County.
2.Newcomb: 36.288306, -108.704806 in San
Juan County.
3.Naschitti: 36.068778, -108.682833 in San
Juan County.
4.BBN9: 35.869694, -108.657278 in McKinley
County.
5.Coyote Canyon: 35.746306, -108.741778 in
McKinley County.
6.Rock Springs: 35.636472, -108.869389 in
McKinley County.
7.Window Rock: 35.663306, -109.045278 in
McKinley County.
Delivery Location Code: 0011285648
Bureau of Reclamation-UC-FCCO
Four Corners Construction Office
1235 La Plata Hwy
Farmington NM 87401 US
Period of Performance: 12/16/2026 to
04/16/2029
00010 NGWSP Turnout Buildings - All work shall be in accordance with the attached specifications
Continued...
PAGES
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140R4026B0002 and drawings.
See Specifications (Section J Attachment 1) and
Drawings (Section J Attachments 2-3) for more details.
Quantity: 1
Unit of Measure: AU (Activity Unit)
Pricing Arrangement - Firm Fixed Price
NAICS 237110 -Water and Sewer Line and Related
Structures Construction
See Schedule B for the Price Schedule continuation which includes all CLINs and sub-CLINs.
CLIN includes all items and personnel necessary to ensure turnkey turnout buildings installation to
Reclamation. All inclusive of items, equipment, materials, personnel, specialized personnel, etc.
All invoices against this CLIN must include quantity survey data, if applicable.
Full time safety representative and quality control representative, as well as qualified survey personnel are required.
Product/Service Code: Y1NE
PAGES
Document Title NGWSP Turnout Buildings
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES
SAN JUAN LATERAL – TURNOUT BUILDINGS
NAVAJO-GALLUP WATER SUPPLY PROJECT, NEW MEXICO
B.1 PRICE SCHEDULES
(a) Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only part of the Price Schedules. Offers are subject to the terms and conditions of this solicitation.
(b) Quantities in Price Schedules are estimated quantities for comparison of offers only. Except as provided with the provision at H.4, Variation in Estimated Quantity, no claim shall be made against Government for overruns or underruns. Contract clause at H.4, Variation in Estimated Quantity does not apply to lump sum items.
(c) See contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLINs 1-1 and 2-1.
(d) Definitions:
(1) CLIN – Contract Line Item Number
(e) Note: In accordance with Section 7-9-3.3 of New Mexico Statutes Annotated (NMSA) 1978 and Section 402 of Navajo Nation’s Business Activity Tax Statute, it is Contractor’s responsibility to ensure that all applicable New Mexico Gross Receipts Tax and Navajo Nation Gross Receipts Tax are included in their price proposal.
(f) In accordance with FAR 52.232-5 (Payments under Fixed-Price Construction Contracts) (b)(2), payment may be approved for materials delivered to Contractor at locations other than the site if Contractor obtains CO approval prior to making arrangements for obtaining the materials. Contractor shall also be required to complete a “Materials on Hand Certificate” which will certify:
(1) Materials described for use on identified contract.
(2) Materials are clearly marked to identify that they belong to contract cited.
(3) Full title for those materials vested in Prime Contractor sited.
(4) Materials are free of liens and encumbrances.
(5) Materials are properly stored, secured, and protected against loss or damage.
PRICE SCHEDULE 1 (Sanostee)
CLIN Section Supplies or Services Quantity and Unit
Unit Price Amount
1-1 WBR
1452.232-
Mobilization and Preparatory Work
For the lump sum of $
1-2 01 31 30 Contract Document Management System (CDMS)
For the lump sum of $
1-3 01 56 15 Utility Crossing Investigations
For the lump sum of $
1-4 01 78 30 As-built Drawings For the lump sum of $10,000
1-5 01 78 30 Final Drawings For the lump sum of $5,000
1-6 13 34 00 Turnout Buildings For the lump sum of $
1-7 25 00 01 System Control and Monitoring
For the lump sum of $
1-8 26 05 02 Complete Electrical System for Outdoor Equipment Only
For the lump sum of $
1-9 26 05 33 Electrical Conduit 450 ft. Per location
1-10 26 05 33 Fabricated Sheet Steel Boxes, Wiring Troughs, and Precast Handholes
For the lump sum of $
1-11 26 42 00 Corrosion System(s) for Turnout Yard Pipe
For the lump sum of $
1-12 26 42 11 Buried Galvanic Anode Cathodic Protection for Turnout Yard Pipe
For the lump sum of $
1-13 27 30 31 Telephone System For the lump sum of $
1-14 28 10 01 Security and Surveillance System
For the lump sum of $
1-15 31 02 10 Water for Dust Abatement 15 M (1,000) Gal
1-16 31 02 30 Dust Palliative 0.19 acre $ $
PRICE SCHEDULE 1 (Sanostee)
Unit
Unit Price Amount
1-17 31 37 00 Riprap 50 yd3 $ $
1-18 32 15 10 Gravel Surfacing 90 yd3 $ $
1-19 32 31 15 Ornamental Fence 220 ft. $ $
1-20 32 92 20 Seeding 0.06 acre $ $
1-21 33 13 00 Disinfection of Water Utility Distribution
For the lump sum of $
1-22 35 21 95 Steel Manifold Piping For the lump sum of $
1-23 35 22 14 Valves and Equipment For the lump sum of $
Subtotal FOR PRICE SCHEDULE 1 (Sanostee) $_________________
Estimated NMGRT at 6.8125% for Price Schedule 1 (if applicable) $_________________
Estimated Navajo Nation Taxes at 6.00% for Price Schedule 1 (if applicable) $_________________
TOTAL FOR PRICE SCHEDULE 1 $_________________
PRICE SCHEDULE 2 (Newcomb)
Unit
Unit Price Amount
2-1 WBR
1452.232-
Mobilization and Preparatory Work
For the lump sum of $
2-3 01 56 15 Utility Crossing Investigations
For the lump sum of $
2-4 01 78 30 As-built Drawings For the lump sum of $10,000
2-5 01 78 30 Final Drawings For the lump sum of $5,000
2-6 13 34 00 Turnout Buildings For the lump sum of $
PRICE SCHEDULE 2 (Newcomb)
Unit
Unit Price Amount
2-7 25 00 01 System Control and Monitoring
For the lump sum of $
2-8 26 05 02 Complete Electrical System for Outdoor Equipment Only
For the lump sum of $
2-9 26 05 33 Electrical Conduit 250 ft. $ $
2-10 26 05 33 Fabricated Sheet Steel Boxes, Wiring Troughs, and Precast Handholes
For the lump sum of $
2-11 26 42 00 Corrosion System(s) for Turnout Yard Pipe
For the lump sum of $
2-12 26 42 11 Buried Galvanic Anode Cathodic Protection for Turnout Yard Pipe
For the lump sum of $
2-13 27 30 31 Telephone System For the lump sum of $
2-14 28 10 01 Security and Surveillance System
For the lump sum of $
2-15 31 02 10 Water for Dust Abatement 9.2 M (1,000) Gal
2-16 31 02 30 Dust Palliative 0.13 acre $ $
2-17 31 23 50 Access Road to Window Rock
For the lump sum of $
2-19 31 37 00 Riprap 32 yd3 $ $
2-20 32 15 10 Gravel Surfacing 50 yd3 $ $
2-21 32 31 15 Ornamental Fence 170 ft. $ $
2-22 32 92 20 Seeding 0.05 acre $ $
2-23 33 13 00 Disinfection of Water Utility Distribution
For the lump sum of $
2-24 35 21 95 Steel Manifold Piping For the lump sum of $
2-25 35 22 14 Valves and Equipment For the lump sum of $
Subtotal FOR PRICE SCHEDULE 2 (Newcomb) $_________________
Estimated NMGRT at 6.8125% for Price Schedule 2 (if applicable) $_________________
Estimated Navajo Nation Taxes at 6.00% for Price Schedule 2 (if applicable) $_________________
TOTAL FOR PRICE SCHEDULE 2 $_________________
PRICE SCHEDULE 3 (Naschitti)
Unit
Unit Price Amount
3-1 WBR
1452.232-
Mobilization and Preparatory Work
For the lump sum of $
3-3 01 56 15 Utility Crossing Investigations
For the lump sum of $
3-4 01 78 30 As-built Drawings For the lump sum of $10,000
3-5 01 78 30 Final Drawings For the lump sum of $5,000
3-6 13 34 00 Turnout Buildings For the lump sum of $
3-7 25 00 01 System Control and Monitoring
For the lump sum of $
3-8 26 05 02 Complete Electrical System for Outdoor Equipment Only
For the lump sum of $
3-9 26 05 33 Electrical Conduit 250 ft. $ $
3-10 26 05 33 Fabricated Sheet Steel Boxes, Wiring Troughs, and Precast Handholes
For the lump sum of $
3-11 26 42 00 Corrosion System(s) for Turnout Yard Pipe
For the lump sum of $
3-12 26 42 11 Buried Galvanic Anode Cathodic Protection for Turnout Yard Pipe
For the lump sum of $
3-13 27 30 31 Telephone System For the lump sum of $
PRICE SCHEDULE 3 (Naschitti)
Unit
Unit Price Amount
3-14 28 10 01 Security and Surveillance System
For the lump sum of $
3-15 31 02 10 Water for Dust Abatement 19 M (1,000) Gal
3-16 31 02 30 Dust Palliative 0.25 acre $ $
3-18 31 37 00 Riprap 125 yd3 $ $
3-19 32 15 10 Gravel Surfacing 135 yd3 $ $
3-20 32 31 15 Ornamental Fence 220 ft. $ $
3-21 32 92 20 Seeding 0.03 acre $ $
3-22 33 11 12 Line Pipe for BBN9 Turnout For the lump sum of $
3-23 33 13 00 Disinfection of Water Utility Distribution
For the lump sum of $
3-24 3-24 Steel Manifold Piping For the lump sum of $
3-25 35 22 14 Valves and Equipment For the lump sum of $
Subtotal FOR PRICE SCHEDULE 3 (Naschitti) $_________________
Estimated NMGRT at 6.8125% for Price Schedule 3 (if applicable) $_________________
Estimated Navajo Nation Taxes at 6.00% for Price Schedule 3 (if applicable) $_________________
TOTAL FOR PRICE SCHEDULE 3 $_________________
PRICE SCHEDULE 4 (BBN9)
Unit
Unit Price Amount
4-1 WBR
1452.232-
Mobilization and Preparatory Work
Unit
Unit Price Amount
4-3 01 56 15 Utility Crossing Investigations
For the lump sum of $
4-4 01 78 30 As-built Drawings For the lump sum of $10,000
4-5 01 78 30 Final Drawings For the lump sum of $5,000
4-6 13 34 00 Turnout Buildings For the lump sum of $
4-7 25 00 01 System Control and Monitoring
For the lump sum of $
4-8 26 05 02 Complete Electrical System for Outdoor Equipment Only
For the lump sum of $
4-9 26 05 33 Electrical Conduit 250 ft. $ $
4-10 26 05 33 Fabricated Sheet Steel Boxes, Wiring Troughs, and Precast Handholes
For the lump sum of $
4-11 26 42 00 Corrosion System(s) for Turnout Yard Pipe
For the lump sum of $
4-12 26 42 11 Buried Galvanic Anode Cathodic Protection for Turnout Yard Pipe
For the lump sum of $
4-13 27 30 31 Telephone System For the lump sum of $
4-14 28 10 01 Security and Surveillance System
For the lump sum of $
4-15 31 02 10 Water for Dust Abatement 19 M (1,000) Gal
4-16 31 02 30 Dust Palliative 0.25 acre $ $
4-17 31 23 50 Low Water Crossing For the lump sum of $
4-19 31 37 00 Riprap 52 yd3 $ $
4-20 32 15 10 Gravel Surfacing 81 yd3 $ $
4-21 32 31 15 Ornamental Fence 180 ft. $ $
Unit
Unit Price Amount
4-22 32 92 20 Seeding 0.13 acre $ $
4-23 33 11 12 Line Pipe for BBN9 Turnout For the lump sum of $
4-24 33 13 00 Disinfection of Water Utility Distribution
For the lump sum of $
4-25 35 21 95 Steel Manifold Piping For the lump sum of $
4-26 35 22 14 Valves and Equipment For the lump sum of $
Subtotal FOR PRICE SCHEDULE 4 (BBN9) $_________________
Estimated NMGRT at 6.8125% for Price Schedule 4 (if applicable) $_________________
Estimated Navajo Nation Taxes at 6.00% for Price Schedule 4 (if applicable) $_________________
TOTAL FOR PRICE SCHEDULE 4 $_________________
PRICE SCHEDULE 5 (Coyote Canyon)
Unit
Unit Price Amount
5-1 WBR
1452.232-
Mobilization and Preparatory Work
For the lump sum of $
5-3 01 56 15 Utility Crossing Investigations
For the lump sum of $
5-4 01 78 30 As-built Drawings For the lump sum of $10,000
5-5 01 78 30 Final Drawings For the lump sum of $5,000
5-6 13 34 00 Turnout Buildings For the lump sum of $
5-7 25 00 01 System Control and Monitoring
PRICE SCHEDULE 5 (Coyote Canyon)
Unit
Unit Price Amount
5-8 26 05 02 Complete Electrical System for Outdoor Equipment Only
For the lump sum of $
5-9 26 05 33 Electrical Conduit 250 ft. $ $
5-10 26 05 33 Fabricated Sheet Steel Boxes, Wiring Troughs, and Precast Handholes
For the lump sum of $
5-11 26 42 00 Corrosion System(s) for Turnout Yard Pipe
For the lump sum of $
5-12 26 42 11 Buried Galvanic Anode Cathodic Protection for Turnout Yard Pipe
For the lump sum of $
5-13 27 30 31 Telephone System For the lump sum of $
5-14 28 10 01 Security and Surveillance System
For the lump sum of $
5-15 31 02 10 Water for Dust Abatement 12 M (1,000) Gal
5-16 31 02 30 Dust Palliative 0.16 acre $ $
5-17 31 23 50 Access Road to Coyote Canyon
For the lump sum of $
5-19 31 37 00 Riprap 53 yd3 $ $
5-20 32 15 10 Gravel Surfacing 67 yd3 $ $
5-21 32 31 15 Ornamental Fence 165 ft. $ $
5-22 32 92 20 Seeding 0.05 acre $ $
5-23 33 11 12 Line Pipe for Coyote Canyon Turnout
For the lump sum of $
5-24 33 13 00 Disinfection of Water Utility Distribution
For the lump sum of $
5-25 4-25 Steel Manifold Piping For the lump sum of $
5-26 35 22 14 Valves and Equipment For the lump sum of $
Subtotal FOR PRICE SCHEDULE 5 (Coyote Canyon) $_________________
Estimated NMGRT at 6.8125% for Price Schedule 5 (if applicable) $_________________
Estimated Navajo Nation Taxes at 6.00% for Price Schedule 5 (if applicable) $_________________
TOTAL FOR PRICE SCHEDULE 5 $_________________
PRICE SCHEDULE 6 (Rock Springs)
Unit
Unit Price Amount
6-1 WBR
1452.232-
Mobilization and Preparatory Work
For the lump sum of $
6-3 01 56 15 Utility Crossing Investigations
For the lump sum of $
6-4 01 78 30 As-built Drawings For the lump sum of $10,000
6-5 01 78 30 Final Drawings For the lump sum of $5,000
6-6 13 34 00 Turnout Buildings For the lump sum of $
6-7 25 00 01 System Control and Monitoring
For the lump sum of $
6-8 26 05 02 Complete Electrical System for Outdoor Equipment Only
For the lump sum of $
6-9 26 05 33 Electrical Conduit 250 ft. $ $
6-10 26 05 33 Fabricated Sheet Steel Boxes, Wiring Troughs, and Precast Handholes
For the lump sum of $
6-11 26 42 00 Corrosion System(s) for Turnout Yard Pipe
For the lump sum of $
6-12 26 42 11 Buried Galvanic Anode Cathodic Protection for Turnout Yard Pipe
For the lump sum of $
6-13 27 30 31 Telephone System For the lump sum of $
6-14 28 10 01 Security and Surveillance System
PRICE SCHEDULE 6 (Rock Springs)
Unit
Unit Price Amount
6-15 31 02 10 Water for Dust Abatement 13.5 M (1,000) Gal
6-16 31 02 30 Dust Palliative 0.18 acre $ $
6-18 31 37 00 Riprap 515 yd3 $ $
6-19 32 15 10 Gravel Surfacing 97 yd3 $ $
6-20 32 31 15 Ornamental Fence 175 ft. $ $
6-21 32 92 20 Seeding 0.03 acre $ $
6-22 33 13 00 Disinfection of Water Utility Distribution
For the lump sum of $
6-23 35 21 95 Steel Manifold Piping For the lump sum of $
6-24 35 22 14 Valves and Equipment For the lump sum of $
Subtotal FOR PRICE SCHEDULE 6 (Rock Springs) $_________________
Estimated NMGRT at 6.8125% for Price Schedule 6 (if applicable) $_________________
Estimated Navajo Nation Taxes at 6.00% for Price Schedule 6 (if applicable) $_________________
TOTAL FOR PRICE SCHEDULE 6 $_________________
PRICE SCHEDULE 7 (Window Rock)
Unit
Unit Price Amount
7-1 WBR
1452.232-
Mobilization and Preparatory Work
For the lump sum of $
7-3 01 56 15 Utility Crossing Investigations
Unit
Unit Price Amount
7-4 01 78 30 As-built Drawings For the lump sum of $10,000
7-5 01 78 30 Final Drawings For the lump sum of $5,000
7-6 13 34 00 Turnout Buildings For the lump sum of $
7-7 25 00 01 System Control and Monitoring
For the lump sum of $
7-8 26 05 02 Complete Electrical System for Outdoor Equipment Only
For the lump sum of $
7-9 26 05 33 Electrical Conduit 250 ft. $ $
7-10 26 05 33 Fabricated Sheet Steel Boxes, Wiring Troughs, and Precast Handholes
For the lump sum of $
7-11 26 42 00 Corrosion System(s) for Turnout Yard Pipe
For the lump sum of $
7-12 26 42 11 Buried Galvanic Anode Cathodic Protection for Turnout Yard Pipe
For the lump sum of $
7-13 27 30 31 Telephone System For the lump sum of $
7-14 28 10 01 Security and Surveillance System
For the lump sum of $
7-15 31 02 10 Water for Dust Abatement 10 M (1,000) Gal
7-16 31 02 30 Dust Palliative 0.14 acre $ $
7-17 31 23 50 Access Road to Window Rock
For the lump sum of $
7-19 31 37 00 Riprap 64 yd3 $ $
7-20 32 15 10 Gravel Surfacing 59 yd3 $ $
7-21 32 31 15 Ornamental Fence 135 ft. $ $
7-22 32 92 20 Seeding 0.03 acre $ $
Unit
Unit Price Amount
7-23 33 13 00 Disinfection of Water Utility Distribution
For the lump sum of $
7-24 35 21 95 Steel Manifold Piping For the lump sum of $
7-25 35 22 14 Valves and Equipment For the lump sum of $
Subtotal FOR PRICE SCHEDULE 7 (Window Rock) $_________________
Estimated NMGRT at 6.8125% for Price Schedule 7 (if applicable) $_________________
Estimated Navajo Nation Taxes at 6.00% for Price Schedule 7 (if applicable) $_________________
TOTAL FOR PRICE SCHEDULE 7 $_________________
TOTAL BID PRICE (TBP) - Price Schedules 1 through 7 without estimated taxes $_________________
END OF SUPPLIES OR SERVICES AND PRICES
SECTION C – Statement / Description / Specification of Work
Please See Section J Attachment(s) 1-3 specifications, drawings, and supporting data.
SECTION D – Packaging and Marking
There are no clauses included in this section.
SECTION E – Inspection and Acceptance
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following addresses:
FAR Clauses - https://www.acquisition.gov/far/
CLAUSES INCORPORATED BY REFERENCE
Clause Title Date
52.246-12 Inspection of Construction August 1996 https://www.acquisition.gov/far/
SECTION F - Deliveries or Performance
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following addresses:
FAR Clauses - https://www.acquisition.gov/far/ & FAR Overhaul - FAR Part Deviation Guidance | Acquisition.GOV**
**NOTE: Please visit FAR Overhaul - FAR Part Deviation Guidance | Acquisition.GOV for updated clauses and provisions. It is strongly encouraged to review due to the FAR overhaul updates.
52.211-13 Time Extensions September 2000 52.236-15 Schedules for Construction Contracts (RFO Deviation) January 2026 52.242-14 Suspension of Work April 1984
F.2 52.211-12 LIQUIDATED DAMAGES-CONSTRUCTION SEPTEMBER 2000
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $4,536.00 or each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of Clause) https://www.acquisition.gov/far/ https://www.acquisition.gov/far-overhaul/far-part-deviation-guide
SECTION G - Contract Administration Data
G.1 DOI-AAAP 0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE
PROCESSING PLATFORM (IPP) APRIL 2013
Payment requests must be submitted electronically through the U.S. Department of the Treasury's Internet Payment Platform System (IPP).
"Payment requests" means any request for contract financing payment or invoicing payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions-Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice, failure to provide the items will result in invoice rejection:
1 – Quantity Surveys (if applicable) 2 – Current Copy of As-Built Drawings 3 – Quantity sheets reflecting the CLIN in schedule B, percentage complete, and bold any items nearing or exceeding 100% of the CLIN amount.
4 – Tax documents and receipts for payment (NMGRT or NN tax stubs/payment receipts) for reimbursement of taxes.
5 – Approved construction schedule
Once the invoice has been submitted into the IPP system, the Contractor shall also submit an electronic copy of the invoice to the following:
Contracting Officer: Amy Loveless - amy_loveless@ios.doi.gov Contract Specialist: Brittney Nielson – brittney_nielson@ios.doi.gov
Procurement Technician: Joe Murphy – joseph_murphy@ios.doi.gov
Failure to transmit invoices via electronic transmission may cause significant delay or possible rejection of your payment request.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in CCR) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3-5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
G.2 WBR 1452.242-80 POST AWARD CONFERENCE - BUREAU OF RECLAMATION (MARCH
2022)
(a) Prior to the contractor starting work, a postaward conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The contractor's project manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.
https://www.ipp.gov/ mailto:amy_loveless@ios.doi.gov mailto:brittney_nielson@ios.doi.gov mailto:joseph_murphy@ios.doi.gov mailto:ippgroup@bos.frb.org
(b) The conference (in-person) will be held at Four Corners Construction Office 1235 La Plata Highway in Farmington, NM. If it cannot be held in-person for any reason, it will be held virtually using Microsoft Teams. If held virtually, each attendee shall attend using a separate computer/camera.
(c) The Contracting Officer and the Contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the contracting officer shall establish the date for the conference.
(d) The Contractor shall not be entitled to the reimbursement any costs associated with attendance at the conference beyond the agreed-to contract price.
G.3 WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES AND
LIMITATIONS -BUREAU OF RECLAMATION (MAY 2018)
(a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.
(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that -
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled “Changes;”
(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;
(4) Changes any of the expressed terms, conditions or specifications of the contract; or
(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.
(d) All technical direction shall be issued in writing by the COR.
(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5)…