NGWSP_-_FCWR_Turnout_Buildings_Prebid__Site_Visit_-26_AUG_2026_0001.pdf

PDF 4 MB Posted

Attached to
Turnout Buildings
Solicitation number
140R4026B0002
Issued by
Not on record

About this file

This document is a pre-bid conference presentation for the Navajo-Gallup Water Supply Project (NGWSP) Turnout Buildings contract opportunity, issued by the Bureau of Reclamation on August 26, 2026.

The NGWSP is a $2.4 billion federal water infrastructure project currently under construction since June 2012, scheduled for completion in December 2028. The project includes two main laterals (Cutter and San Juan) totaling 300 miles of pipelines, two water treatment plants, 19 pumping plants, 13 turnout buildings, and numerous storage tanks. The contract focuses on construction of seven turnout buildings at Sanostee (Reach 4C), Newcomb (Reach 6), Naschitti (Reach 8), Crownpoint/BBN9 (Reach 9), Coyote Canyon (Reach 10), Rock Springs (Reach 12.1), and Window Rock (Reach 12.2). Turnout buildings must be complete and ready for service by September 1, 2028 for the priority BBN9 and Coyote Canyon sites, with all remaining turnouts complete by April 1, 2029. The scope of work includes design and construction of precast concrete buildings with mechanical, electrical, controls, and security systems; pipe and valving connections to lateral and community public water system distribution pipes; sitework including fencing, drainage, and access roads; controls integration with existing SCADA systems; and fiber optic cable infrastructure. Specific site conditions include connection to 48-inch diameter pipe at BBN9, connection to 42-inch diameter pipe at Coyote Canyon, and a larger precast concrete footprint with 12-inch diameter pipe at Window Rock. The presentation includes a Job Hazard Analysis addressing travel, site safety, weather hazards, and emergency response procedures with designated contact persons and nearby hospital locations.

View the file

Other files

File Type Posted
Sol_140R4026B0002_Amd_0005.pdf PDF
Sol_140R4026B0002_Amd_0004.pdf PDF
Sol_140R4026B0002_Amd_0003.pdf PDF
140R4026B0002_-_Attachment_1_1_00_00_01__Specifications__20261009_0002.pdf PDF
140R4026B0002_-_Attachment_2_1_00_00_02_-Drawings_-20261009_0002.pdf PDF
Questions___Answers_0002.pdf PDF
140R4026B0002_-__Attachment_3_1_00_00_02A_Test_Pit_Log_TPTB-25-2_20261008_0002.pdf PDF
Attachment__7_WD_NM20260011_Heavy_-_McKinley_County__NM_0002.pdf PDF
140R4026B0002_-_Attachment_3_1_00_00_02B_Corrosivity_Report_NGWSP_Turnout_Bldgs_20261009_0002.pdf PDF
Attachment__8_WD_NM20260024_Building_-_McKinley_County__NM_0002.pdf PDF
Sol_140R4026B0002_Amd_0002.pdf PDF
Sol_140R4026B0002_Amd_0001.pdf PDF
Turnout_Site_Tour_Sign-in_Sheet_26_AUG_2026_0001.pdf PDF
_5_Attachment_WD_NM20260040_Heavy_-_San_Juan_County__NM.pdf PDF
_3_Attachment_00_00_02A_-_Geology_Drawings_04032026.pdf PDF
Sol_140R4026B0002.pdf PDF
_4_Attachment_Small_Business_Subcontracting_Plan.docx DOCX document
_1_Attachment_00_00_01_NGWSP_TURNOUT_BLDGS_Specifications_20260707.pdf PDF
IFB_140R4026B0002_NGWSP_Turnout_Buildings.pdf PDF
_2_Attachment_00_00_02_Drawings_Combined_34x22_20260707.pdf PDF
_6_Attachment_WD_NM20260046_Building_-_San_Juan_County__NM.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Navajo-Gallup Water Supply Project (NGWSP)

August 26, 2026

Turnout Buildings Pre-Bid Conference Site Tour

Agenda

• Introduction

• NGWSP Overview

• Turnout Building Locations and Scope

• Procurement Requirements

• Travel Plan

• JHA

• Questions

• Adjourn

NGWSP Background

• Description

• Currently estimated at $2.4 Billion

• 2 Main Laterals (Cutter and San Juan) totaling 300 miles of Pipelines (20”-48”)

• 2 Conventional Water Treatment Plants with ultimate capacity of 5 & 38 MGD

• 19 Pumping Plants -- raw and finished water

• 13 Turnout Buildings

• Numerous Storage Tanks

• Construction began in June 2012

• Scheduled to end in December 2028

Project Overview Map

Cutter Lateral

San Juan Lateral

Operational Completed Under Construction In Design (As of February 2024)

FCWR

Reach 1

SJLWTP

Shiprock Connection

Intake Pumping Plant

Block 2-3

CLWTP

CrownpointWindow Rock

City of Gallup

Turnout Building Locations

Turnout Building Scope

• Precast concrete building Contractor design, including building, floor slab and foundation Building mechanical, electrical, controls and security

• Pipe and valving Connection to lateral distribution pipe (supply) Connection to cPWS distribution pipe (delivery) Interior exposed piping, valves, and accessories Buried piping, valves, and accessories

•Sitework Fenced site with gate Buried thrust blocks Gravel surfacing Drainage Access Roads Coyote Canyon and Window Rock only Low water crossing at BBN9

•Controls integration with existing San Jaun Lateral SCADA System

•Fiber optic cable infrastructure •Project Power Transformer provided by NTUA

Turnout Features

• Connection to lateral distribution pipe (supply)

• Upstream turnout isolation valve

• Connection to cPWS distribution pipe

(delivery)

• Iron Fence with vehicle access gates

• Fiber and power location varies per site

• 80’ Permanent ROW

Isolation valve

Turnout Building

• Standardized layout, with a few exceptions at Window Rock turnout

• Precast concrete building footprint is larger

• Larger dia. Pipe (12”)

• No double check valve

• No flow control valve

• Photo of interior exposed piping, valves and accessories at an existing turnout

Turnout Features – Site Specific BBN9 Turnout Connection to 48” diameter lateral distribution pipe to be constructed.

Turnout Features – Site Specific Coyote Canyon Turnout Connection to 42” diameter lateral distribution pipe to be made at existing sectionizing valve.

6” Dia. Pipe 233 psi Max. Pressure

2.27 cfs Max. Flow

8” Dia. Pipe 184 psi Max. Pressure

1.52 cfs Max. Flow

6” Dia. Pipe 210 psi Max. Pressure

1.77 cfs Max. Flow

8” Dia. Pipe 123 psi Max. Pressure

3.80 cfs Max. Flow

6” Dia. Pipe 230 psi Max. Pressure

1.25 cfs Max. Flow

6” Dia. Pipe 148 psi Max. Pressure

1.71 cfs Max. Flow

12” Dia. Pipe 138 psi Max. Pressure

11.51 cfs Max. Flow

Complete, ready for service, by September 1, 2028.

All other turnouts complete, ready for service, by April 1, 2029.

Complete work on lateral by January 1, 2028.

- Upstream turnout isolation valves

- BBN9 connection to lateral constructed

- Coyote Canyon connection to lateral constructed

Outage on lateral limited to 28-days.

Turnout Buildings

Schedule & Hydraulic Requirements

Travel Plan

1. Newcomb (36°17'18.40"N, 108°42'17.64"W)

2. BBN9 (Crownpoint) (35°52'11.04"N, 108°39'25.69"W)

3. Coyote Canyon (35°44'45.89"N, 108°44'30.37"W)

4. Window Rock (35°39'48.01"N, 109° 2'43.38"W) Turnout Buildings

Job Hazard Analysis

Navajo-Gallup Water Supply Project (NGWSP)
Agenda
NGWSP Background
Project Overview Map
Turnout Building Locations
Turnout Building Scope
Turnout Features
Turnout Building
Slide Number 9
Turnout Features – Site Specific
Turnout Features – Site Specific
Turnout Buildings ��Schedule & Hydraulic Requirements
Travel Plan
Job Hazard Analysis
Job Hazard Analysis
Job Hazard Analysis
Slide Number 17

File details come from the government source that posted it. Updated .