This document is a pre-bid conference presentation for the Navajo-Gallup Water Supply Project (NGWSP) Turnout Buildings contract opportunity, issued by the Bureau of Reclamation on August 26, 2026.
The NGWSP is a $2.4 billion federal water infrastructure project currently under construction since June 2012, scheduled for completion in December 2028. The project includes two main laterals (Cutter and San Juan) totaling 300 miles of pipelines, two water treatment plants, 19 pumping plants, 13 turnout buildings, and numerous storage tanks. The contract focuses on construction of seven turnout buildings at Sanostee (Reach 4C), Newcomb (Reach 6), Naschitti (Reach 8), Crownpoint/BBN9 (Reach 9), Coyote Canyon (Reach 10), Rock Springs (Reach 12.1), and Window Rock (Reach 12.2). Turnout buildings must be complete and ready for service by September 1, 2028 for the priority BBN9 and Coyote Canyon sites, with all remaining turnouts complete by April 1, 2029. The scope of work includes design and construction of precast concrete buildings with mechanical, electrical, controls, and security systems; pipe and valving connections to lateral and community public water system distribution pipes; sitework including fencing, drainage, and access roads; controls integration with existing SCADA systems; and fiber optic cable infrastructure. Specific site conditions include connection to 48-inch diameter pipe at BBN9, connection to 42-inch diameter pipe at Coyote Canyon, and a larger precast concrete footprint with 12-inch diameter pipe at Window Rock. The presentation includes a Job Hazard Analysis addressing travel, site safety, weather hazards, and emergency response procedures with designated contact persons and nearby hospital locations.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Navajo-Gallup Water Supply Project (NGWSP)
August 26, 2026
Turnout Buildings Pre-Bid Conference Site Tour
Agenda
• Introduction
• NGWSP Overview
• Turnout Building Locations and Scope
• Procurement Requirements
• Travel Plan
• JHA
• Questions
• Adjourn
NGWSP Background
• Description
• Currently estimated at $2.4 Billion
• 2 Main Laterals (Cutter and San Juan) totaling 300 miles of Pipelines (20”-48”)
• 2 Conventional Water Treatment Plants with ultimate capacity of 5 & 38 MGD
• 19 Pumping Plants -- raw and finished water
• 13 Turnout Buildings
• Numerous Storage Tanks
• Construction began in June 2012
• Scheduled to end in December 2028
Project Overview Map
Cutter Lateral
San Juan Lateral
Operational Completed Under Construction In Design (As of February 2024)
FCWR
Reach 1
SJLWTP
Shiprock Connection
Intake Pumping Plant
Block 2-3
CLWTP
CrownpointWindow Rock
City of Gallup
Turnout Building Locations
Turnout Building Scope
• Precast concrete building Contractor design, including building, floor slab and foundation Building mechanical, electrical, controls and security
• Pipe and valving Connection to lateral distribution pipe (supply) Connection to cPWS distribution pipe (delivery) Interior exposed piping, valves, and accessories Buried piping, valves, and accessories
•Sitework Fenced site with gate Buried thrust blocks Gravel surfacing Drainage Access Roads Coyote Canyon and Window Rock only Low water crossing at BBN9
•Controls integration with existing San Jaun Lateral SCADA System
•Fiber optic cable infrastructure •Project Power Transformer provided by NTUA
Turnout Features
• Connection to lateral distribution pipe (supply)
• Upstream turnout isolation valve
• Connection to cPWS distribution pipe
(delivery)
• Iron Fence with vehicle access gates
• Fiber and power location varies per site
• 80’ Permanent ROW
Isolation valve
Turnout Building
• Standardized layout, with a few exceptions at Window Rock turnout
• Precast concrete building footprint is larger
• Larger dia. Pipe (12”)
• No double check valve
• No flow control valve
• Photo of interior exposed piping, valves and accessories at an existing turnout
Turnout Features – Site Specific BBN9 Turnout Connection to 48” diameter lateral distribution pipe to be constructed.
Turnout Features – Site Specific Coyote Canyon Turnout Connection to 42” diameter lateral distribution pipe to be made at existing sectionizing valve.
6” Dia. Pipe 233 psi Max. Pressure
2.27 cfs Max. Flow
8” Dia. Pipe 184 psi Max. Pressure
1.52 cfs Max. Flow
6” Dia. Pipe 210 psi Max. Pressure
1.77 cfs Max. Flow
8” Dia. Pipe 123 psi Max. Pressure
3.80 cfs Max. Flow
6” Dia. Pipe 230 psi Max. Pressure
1.25 cfs Max. Flow
6” Dia. Pipe 148 psi Max. Pressure
1.71 cfs Max. Flow
12” Dia. Pipe 138 psi Max. Pressure
11.51 cfs Max. Flow
Complete, ready for service, by September 1, 2028.
All other turnouts complete, ready for service, by April 1, 2029.
Complete work on lateral by January 1, 2028.
- Upstream turnout isolation valves
- BBN9 connection to lateral constructed
- Coyote Canyon connection to lateral constructed
Outage on lateral limited to 28-days.
Turnout Buildings
Schedule & Hydraulic Requirements
Travel Plan
1. Newcomb (36°17'18.40"N, 108°42'17.64"W)
2. BBN9 (Crownpoint) (35°52'11.04"N, 108°39'25.69"W)
3. Coyote Canyon (35°44'45.89"N, 108°44'30.37"W)
4. Window Rock (35°39'48.01"N, 109° 2'43.38"W) Turnout Buildings
Job Hazard Analysis
| Navajo-Gallup Water Supply Project (NGWSP) |
| Agenda |
| NGWSP Background |
| Project Overview Map |
| Turnout Building Locations |
| Turnout Building Scope |
| Turnout Features |
| Turnout Building |
| Slide Number 9 |
| Turnout Features – Site Specific |
| Turnout Features – Site Specific |
| Turnout Buildings ��Schedule & Hydraulic Requirements |
| Travel Plan |
| Job Hazard Analysis |
| Job Hazard Analysis |
| Job Hazard Analysis |
| Slide Number 17 |