IFB-080-2775902-SV.pdf

PDF 855 KB Posted

Attached to
Job Order Contract (JOC) for Pavement Maintenance and Repair Services at John Wayne Airport
Solicitation number
IFB# 080-2775902-SV
Issued by
Orange County, San Francisco City, California

About this file

This document is an Invitation for Bids (IFB) issued by the County of Orange, OC Public Works Procurement Services for a Job Order Contract (JOC) for Pavement Maintenance and Repair Services at John Wayne Airport. The County is soliciting competitive sealed bids from pre-qualified firms for a usage contract to perform pavement maintenance and repair services. The contract will be effective for one year or until the total contract amount of $6,000,000 is reached. The project requires a current California Class A Contractor's license, and there is a mandatory pre-bid meeting scheduled for February 25, 2025, at 10:00 am. Bids are due on March 10, 2025, at 2:00 pm and will remain valid for 180 days after the closing date.

The contract will utilize a Job Order Contracting (JOC) methodology, with pricing based on adjustment factors applied to a Construction Task Catalog® (CTC). Bidders must submit four adjustment factors covering different work scenarios: normal and non-normal working hours for both John Wayne Airport custom standards and non-custom sections. The contract includes specific invoicing instructions, payment terms with 5% retention, and requires electronic bid submission through the OpenGov portal. Contractors will be responsible for all costs related to project execution, including permits, labor, materials, equipment, and compliance with prevailing wage requirements. The total contract amount is capped at $6,000,000, with no guaranteed minimum work amount.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

County of Orange, OC Public Works IFB #080-2775902-SV

Job Order Contract (JOC) for Pavement Maintenance and Repair Services at John Wayne Airport

2775902 Page 1 of 70

OC PUBLIC WORKS

Procurement Services

601 N. Ross St., 4th Floor

Santa Ana, CA 92701

Date: February 24, 2025

INVITATION FOR BIDS

BID MUST BE RECEIVED

BEFORE:

March 10, 2025/ 2:00 PM PDT

DATE / TIME

IFB 080-2775902-SV

BID NUMBER

2775902

FILE FOLDER NUMBER

COVER PAGE

Procurement Services

Regular Office Hours:

8:00 AM. to 5:00 PM

Monday through Friday

The office is closed between

12:00 PM and 1:00 PM

The County of Orange, OC Public Works, (“County”) is requesting competitive sealed bids from qualified firms, (“Bidder”) for Job Order Contract (JOC) for Pavement Maintenance and Repair Services at John Wayne Airport. The awarded Contract (“Contract”) will be a usage Contract between the County and awarded Bidders (“Contractor”) in accordance with the Model Contract, attached hereto and incorporated herein, and Scope of Work attached hereto and incorporated herein by this reference as Attachment A. The proposed contract shall be effective for one (1) year, or until the total Contract amount is reached. The Contractor shall possess a current State of California Class A

Contractor’s license issued by the California State Contractor’s License Board.

BIDS ARE DUE ON OR BEFORE THE DATE AND TIME SPECIFIED.

Schedule of Activities Time Date

RSVP for Pre-Bid Meeting 5:00 pm February 24, 2025

Mandatory Pre-Bid Meeting 10:00 am February 25, 2025

Question & Answer Period Ends 2:00 pm February 27, 2025

Electronic Bid Opening 2:00 pm March 10, 2025

BIDS WILL BE VALID FOR 180 DAYS AFTER CLOSING DATE.

All questions and inquiries related to this IFB must be directed to: Suchitra Vattyam, County Deputy Purchasing

Agent (“DPA”), OC Public Works/Procurement Services, via the OpenGov at the: County’s online bidding system under the bid page for this solicitation.

Respondents are not to contact other County personnel for questions or clarifications concerning this IFB. OC

Public Works/Procurement Services will provide all official communication concerning this IFB. Any County response relevant to this IFB other than through or approved by OC Public Works/Procurement Services is unauthorized and will be considered invalid.

I have read and understand and agree to the terms and conditions herewith, and I am submitting a bid in response to this solicitation.

Date: ____________________ Company Name:

*Authorized Signature Print Name Title

*Authorized Signature Print Name Title

* If the Bidder is a corporation, (2) two signatures are required: one (1) signature by the Chairman of the Board, the President or any Vice President; and one (1) signature by the Secretary, any Assistant Secretary, the Chief Financial Officer or any Assistant Treasurer. The signature of one person alone is sufficient to bind a corporation, as long as he or she holds corporate offices in each of the two categories described above. For County purposes, proof of such dual office holding will be satisfied by having the individual sign the instrument twice, each time indicating his or her office that qualifies under the above-described provision. In the alternative, a single corporate signature is acceptable when accompanied by a corporate resolution demonstrating the legal authority of the signator to bind the corporation.

RETURN THIS COVER PAGE WITH YOUR BID

https://opengov.com/products/procurement/suppliers/

2775902 Page 2 of 70

I. GENERAL INFORMATION

1. Important Notice: The County of Orange has attempted to provide all information available. It is the responsibility of each Bidder to review, evaluate, and where necessary, request any clarification prior to submission of a bid. If any person contemplating submitting a bid in response to this IFB is in doubt as to the true meaning of any part of the solicitation documents attached hereto or finds discrepancies in or omissions from the specifications, they must submit a written request for clarification/interpretation to the DPA via OpenGov at the: County’s online bidding system under the bid page for this solicitation.

If clarification or interpretation of this solicitation is considered necessary by County, a written addendum shall be issued and the information will be posted on OpenGov at the: County’s online bidding system. Any interpretation of, or correction to, this solicitation will be made only by addendum issued by the County DPA. It is the responsibility of each Bidder to periodically check the County’s on-line bid system to ensure that they have received and reviewed any and all addenda to this solicitation. The County will not be responsible for any other explanations, corrections to, or interpretations of the documents, including any oral information.

All questions or requests for interpretation must be received by the time and date specified on the bid cover page.

2. OC Public Works/Procurement Services regular business hours are 8:00 AM to 12:00 PM and 1:00 PM to 5:00 PM, Monday through Friday. OC Public Works/Procurement will be closed on the following

County holidays:

February 12, 2025

February 17, 2025

3. Orange County does not require and neither encourages nor discourages the use of lobbyists or other consultants for the purpose of securing business.

II. GENERAL INSTRUCTIONS AND PROVISIONS

1. Before submitting a bid, Bidders shall carefully examine the solicitation contents, including the Contract

Terms and Conditions and Scope of Work. Bidders shall include in their bid response a monetary sum to cover the cost of all items included in the Contract.

2. This Invitation for Bids consists of the Cover Page and the following Attachments and Exhibits:

Section I General Information

Section II General Instructions and Provisions

Section III W-9 Requirements

Section IV County Contract Terms and Conditions, including:

Attachment A, Scope of Work;

Exhibit A, Gordian License and User Agreement;

Attachment B, Contractor’s Pricing

The Following Forms to be completed through OpenGov:

• Company Profile & References

• Non-Collusion Affidavit

• Labor & Material Bond (Awarded Contractor will provide later)

• Faithful Performance Bond (Awarded Contractor will provide later)

• Iran Contracting Act Certification Form https://opengov.com/products/procurement/suppliers/

2775902 Page 3 of 70

• Campaign Disclosure Form

• Contractor Safety Responsibility form

• Contractor Safety – Activity Checklist (Awarded Contractor will provide prior to the issuance of each task order)

• In-Use Off Road Diesel Fueled Fleets Regulation Form

3. Mandatory Pre-Bid Meeting Webinar: All Bidders must be in attendance at the Pre-Bid Webinar

Meeting in order to continue in the bidding process. The Pre-Bid Webinar Meeting will be conducted one time only. Attendance will be taken at the webinar meeting, in the beginning and the end of the meeting. Attendance during the entire webinar is required.

i. PRE-BID INFORMATION

DATE: FEBRUARY 25, 2025

TIME: 10:00 AM – NO ADMISSION AFTER 10:10AM

ii. Please RSVP your attendance by sending an email to Suchitra.Vattyam@ocpw.ocgov.com by

2 pm on February 24, 2025.

iii. The purpose of the Pre-Bid Meeting will be to discuss the Job Order Contract (JOC) concept and discuss JOC from a Contractor’s perspective. For Contractors who are new to the JOC process, a training workshop will be part of the Pre-Bid Meeting.

▪ The County strongly encourages a responsible managing officer from the Contractor’s office to attend this meeting.

4. Bid Submittal: This is a fully electronic Invitation for Bid (IFB). Bidders must submit their bid on

County’s online bidding system to be considered responsive. All bid documents specified in Section II of the IFB shall be uploaded electronically and bidders shall utilize OpenGov to provide their overall factor from Line 13 of the Award Formula on Attachment B of the Model Contract. Only electronic bids will be accepted, no exceptions. Once the Bid Due Date and Time has lapsed, bidders, the public and County staff are able to immediately see the results on OpenGov.

All bids are due no later than the due date and time specified within this solicitation. Late bids will not be accepted regardless of reason.

5. Responsive Bids shall include the following completed submittals:

i. Bid Cover Page: Dated and signed by Contractor’s authorized representative (note special requirements for Corporations)

ii. Attachment B: Contractor’s Pricing (2 pages, individual scores & award formula)

iii. Company Profile and References*

iv. Non-Collusion Affidavit*

v. Bid Bond in an amount not less than 10% of the total Contract amount

vi. Iran Contracting Act Certification Form*

vii. Campaign Disclosure Form*

viii. Safety Responsibility Form*

ix. In-Use Off-Road Diesel-Fueled Fleets Regulation Form*

* Forms are located on OpenGov. Forms must be completed and submitted through OpenGov.

2775902 Page 4 of 70

6. Bid Cover Page: The Cover Page of a responsive bid must include the date and company legal name and must be signed by person(s) with authority to bind the Bidder. If the Bidder is a corporation, then the signature of two corporate specific officers are required as follows: (1) signature by the Chairman of the Board, the President, or any Vice President; and one (1) signature by the Secretary, any Assistant

Secretary, the Chief Financial Officer, or any Assistant Treasurer. The signature of one person alone is sufficient to bind a corporation, as long as he or she holds corporate offices in each of the two categories described above. For County purposes, proof of such dual office holding will be satisfied by having the individual sign the instrument twice, each time indicating his or her office that qualifies under the above-described provision. In the alternative, a single corporate signature is acceptable when accompanied by a corporate resolution demonstrating the legal authority of the signator to bind the corporation. An unsigned or improperly signed bid submission is grounds for rejection of the bid and disqualification from further participation in this IFB process.

7. Pricing (Attachment B):

i. Adjustment Factors quoted shall be firm for the full term of the Contract.

ii. Bidder shall utilize Attachment B, Contractor’s Pricing, to provide all-inclusive Adjustment

Factors for Services in accordance with the requirements of the Scope of Work for the full term of the Contract. All items shall be properly filled in. The completed form shall be without alterations, interlineations, or erasure marks.

iii. Bids shall be submitted for Adjustment Factors as stated in the specifications; bids upon other bases will not be considered. Bids that do not reference all addenda or that are not submitted on the prescribed forms may be rejected.

iv. Each Bidder must submit two (4) Adjustment Factors in order to be considered responsive. The first Adjustment Factor is to be applied to The Construction Task Catalog® (CTC) Section 50 51

John Wayne Airport Custom Standards and Assemblies work anticipated to be performed during

Normal Working Hours (7:00 AM to 5:00 PM). The second Adjustment Factor is to be applied to

CTC Section 50 51 John Wayne Airport Custom Standards and Assemblies work anticipated to be performed during Other Than Normal Working Hours (5:01 PM to 6:59 AM). The third

Adjustment Factor is to be applied to CTC Sections Not Including 50 51 John Wayne Airport

Custom Standards and Assemblies work anticipated to be performed during Normal Working

Hours (7:00 AM to 5:00 PM). The fourth Adjustment Factor is to be applied to CTC Section Not

Including 50 51 John Wayne Airport Custom Standards and Assemblies work anticipated to be performed during Other Than Normal Working Hours (5:01 PM to 6:59 AM). It will be the responsibility of the winning Bidder to comply with all applicable Prevailing Wage laws.

v. The Construction Task Catalog® is priced at a net value of 1.0000. The bid shall be “net”, (i.e., 1.0000) or an adjustment “decrease from” (e.g., 0.9500) or “increase to” (e.g., 1.2000) the Unit

Prices listed in the Construction Task Catalog®. Bidders who submit separate Adjustment Factors for individual line items in the Construction Task Catalog® will be considered non-responsive and the bid will be rejected.

vi. The Bidder’s Adjustment Factors must contain allowances for overhead, profit, bond premiums, insurance, mobilization, Quote development, shop drawings and submittals, overtime and holiday pay, and all contingencies in connection therewith, as no additional allowance will be made later.

vii. Any change in the applicable minimum hourly wage rates during the contract period shall not affect the Unit Price to be paid by the County for work performed under the contract.

viii. Bids will be considered on the following criteria: Lowest responsible bidder using Adjustment

Factors. For the purposes of determining the low bid, with consideration of the performance of work at John Wayne Airport, the 1.) CTC Section 50 51 John Wayne Airport Custom Standards

2775902 Page 5 of 70 and Assemblies Normal Working Hours Adjustment Factor shall be multiplied by .20; 2.) the CTC

Section 50 51 John Wayne Airport Custom Standards and Assemblies Other Than Normal

Working Hours Adjustment Factor shall be multiplied by .80; 3.) the CTC Sections Not Including

50 51 John Wayne Airport Custom Standards and Assemblies Normal Working Hours Adjustment

Factor shall be multiplied by .20; and 4.) the CTC Sections Not Including 50 51 John Wayne

Airport Custom Standards and Assemblies Other Than Normal Working Hours Adjustment Factor shall be multiplied by .80. These four numbers will be summed (per a weighted formula) for a composite bid, and the lowest composite bid will be considered the low bid. Please utilize second page of Attachment B and submit with your bid.

8. Company Profile & References (OpenGov): Bidder shall utilize the forms provided in OpenGov to satisfy this requirement.

9. No person, firm, or corporation shall be allowed to make, file, or be interested in more than one bid for the Job Order Contract. A person, firm, or corporation who has submitted a sub-bid to a Bidder, or who has quoted prices on materials to a Bidder, is not hereby disqualified from submitting a sub-bid or quoting prices to other Bidders.

10. Bonds: Bonds shall be secured from an admitted surety company authorized to conduct surety insurance in California and satisfactory to County Counsel and County Risk Management and in accordance with the General Conditions.

i. Bid Bond: Bidder will be required to furnish a bid bond in an amount not less than 10% of the total Contract amount. Original bid security documents shall be received at the following address before 2:00 p.m. on the bid closing date or submittals shall be deemed non-responsive:

County of Orange/County Administration South Building

601 N. Ross St., 4th Floor

Santa Ana, CA 92701

Attn: Suchitra Vattyam

ii. Labor and Material Payment Bond and a Faithful Performance Bond (OpenGov): The successful Bidder, immediately upon award, will be required to furnish a Faithful Performance

Bond and a Labor and Material Payment Bond in an amount of $6,000,000 on the forms located on OpenGov. Submitted forms shall be subject to approval by CEO/Risk Management and County

Counsel.

iii. If the Contractor fails to provide the required Bonds (including insurance certificates and endorsements) within fourteen (14) days after Board award, County may terminate the Contract for cause and award to the next qualified Contractor.

11. Non-Collusion Affidavit (OpenGov):

i. Pursuant to Public Contract Code, Section 7106, each Bidder must execute and submit with their bid a Non-Collusion Affidavit. Bidder shall utilize OpenGov of this solicitation to satisfy this requirement.

ii. The County may require that the principal Contractor shall, before awarding any subcontract, secure a Non-Collusion Affidavit from the proposed subcontractor.

12. Contractor’s License: No bid may be considered from a Bidder who, at the time the bids are opened, is not licensed to perform the project in accordance with Division 3, Chapter 9, of the Business and

Professions Code of the State of California (see California Business and Professions Code, Section 7000, et seq). However, if federal funds are involved, the Bidder must be properly licensed at the time of award

(Public Contract Code 20103.5).

13. Bidders shall be required to meet any other legal, license or certificate requirements that are necessary to enable them to perform the services specified in this solicitation.

2775902 Page 6 of 70

14. Bidders shall take all responsibility for any errors or omissions in their bids. Any discrepancies in numbers or calculations shall be interpreted to reflect the lowest price to the County.

15. The County shall not be liable for any expenses incurred by potential Bidders in the preparation or submission of their bids. Pre-contractual expenses are not to be included in the Contractor’s Pricing

Sheet. Pre-contractual expenses are defined as, including but not limited to, expenses incurred by Bidder in:

i. Preparing its bid in response to this IFB;

ii. Submitting that bid to the County;

iii. Negotiating with the County any matter related to the bid; and,

iv. Any other expenses incurred by the Bidder prior to the date of the award and execution, if any, of the Contract.

16. Bid Protest & Appeal: Any bidder, respondent, or contractor who alleges an error or impropriety in the solicitation or award of a contract may submit a grievance or protest to the awarding department and the following procedures will apply.

a. Procedure

Prior to the filing of an Agenda Staff Report (ASR) for award of Board of Supervisor approved contracts, the DPA shall issue a Notice of Intent to Award to all participating vendors. This Notice shall initiate the protest period as follows:

1) Bidders will have five (5) business days from the date of the Notice described above in which to file a protest concerning the award of the Contract.

2) Protests relating to a Contract award which are received after the five (5) business day deadline will not be considered by the County.

3) During the five (5) business day protest period subsequent to the release of the County’s Notice of Intent to Award, the solicitation information, including bid summaries, proposals, and final evaluator score sheets with the names of individual evaluators redacted, are subject to public disclosure.

4) Upon expiration of the five (5) business day period or proper resolution of a protest/appeal, the department may move forward with the contract award or if necessary, filing the item for approval by the Board of Supervisors.

b. Protest Process

1) In the event of a timely protest, the County shall not proceed with the award of the contract until the DPA renders a decision on the protest, unless the exception in Section 3 below applies.

2) Upon receipt of a timely protest, the DPA will within ten (10) business days of the receipt of the protest, issue a decision in writing which shall state the reasons for the actions taken.

3) The County may, after providing written justification to be included in the procurement file, make the determination that an immediate award of the Contract is necessary to protect the substantial interests of the County. The award of a Contract shall in no way compromise the protestor’s right to protest procedures outlined herein.

4) If the protestor disagrees with the decision of the DPA, the protestor may submit a written appeal to the Office of the Director requesting an appeal, in accordance with the process stated below.

c. Appeal Process

2775902 Page 7 of 70

1) If the protesting Bidder wishes to appeal the decision of the DPA, the protesting bidder must submit, within three (3) business days from receipt of the DPA’s decision, a written appeal to the Office of the Director.

2) Within fifteen (15) business days, the Office of the Director will conduct a third-party review of all materials in connection with the grievance, assess the merits of the protest and provides a written determination that shall contain their decision.

3) The decision of the Director will be final and there shall be no right to any administrative appeals of this decision.

17. Acceptance/Rejection/Award

i. Bids are not to be marked as confidential or proprietary. The County may refuse to consider any bid so marked. Bids submitted in response to this IFB may become subject to public disclosure. The

County shall not be liable in any way for disclosure of any such records. Additionally, all bids shall become the property of the County.

ii. Bid packages will be reviewed by the County for responsiveness to all requirements. The County has the right to reject any bid deemed unresponsive or lacking the resources or experience to adequately perform the services described herein and is therefore not a responsible bidder.

iii. Only those responsible, responsive bids meeting all solicitation requirements and specifications shall be further reviewed for consideration for award. Award shall be based on the lowest, responsive, responsible bid.

Please take notice, non-acceptance of County of Orange terms and conditions will result in a bid being deemed non-responsive. The County will not accept any other terms, conditions, or provisions contrary to those contained within this solicitation.

iv. Final award determination based upon the lowest responsive, responsible bid, may also include a review of successful Bidder’s qualifications, experience, and resources; Bidder’s ability to meet the requirements and perform the services specified in this solicitation; Bidder’s references and past performance; and Bidder’s acceptance of County of Orange terms and conditions.

v. Awarded Contractor will be required to sign a Contract upon award. If Contractor is a corporation, signature will be provided in accordance with the corporation’s code as specified in this solicitation.

18. Rights Reserved to County: The County reserves the right to:

i. Waive, at its discretion, any irregularity or formality, which the County deems immaterial.

ii. Make multiple awards to Bidders for services requested in this solicitation, at its sole discretion, to serve the best interests of the County.

ii. Accept or reject all bids received as a result of this solicitation at its sole discretion and to solicit for new bids, as the best interests of the County may require;

iii. Withdraw or cancel this solicitation at any time without prior notice and furthermore makes no representation that any Contract will be awarded to any bidder responding to this solicitation;

19. Campaign Contribution Disclosure Requirements: Respondent agrees to comply with Government

Code Section 84308 and further agrees to disclose to the County any contribution made to any members of the Board of Supervisors or County Agency Officers by Contractor, Contractor’s agent or lobbyist, or if applicable, any subcontractor(s) for the twelve (12) months prior to and twelve (12) months following the approval, renewal, or extension of this Contract. In order to comply with this requirement, Respondent agrees to furnish the required Campaign Contribution Disclosure Information form as a required submittal with its Proposal. Failure to include the form as required will render the Proposal

2775902 Page 8 of 70 nonresponsive.

20. Title VI Solicitation Notice: The County of Orange, in accordance with the provisions of Title VI of the

Civil Rights Act of 1964 (78 Stat. 252, 42 USC §§ 2000d to 2000d-4) and the Regulations, hereby notifies all Bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin

(including limited English proficiency), creed, sex (including sexual orientation and gender identity), age or disability in consideration for an award.

III. W-9 REQUIREMENTS

1. Department of the Treasury, Internal Revenue Service Form W-9 Requirement: Effective June 3, 2006, all Contractors, entering into a contract with the County, who are not already established in the

Countywide Accounting and Personnel System (CAPS) as an Auditor-Controller vendor, will be required to submit to the County a federal Form W-9, or form W-8 for foreign vendors. The County will inform the Contractor, at the time of award, if the Form W-9, or W-8, will be required.

In order to comply with this County requirement, within ten days of notification of selection of award of

Contract but prior to official award of Contract, the selected Contractor agrees to furnish to the contract administrator, the County DPA, or the agency/department deputy purchasing agent the required W-9 or

W-8.

2775902 Page 9 of 70

COUNTY OF ORANGE MODEL CONTRACT

JOB ORDER CONTRACT (JOC) [TBD]

FOR

PAVEMENT MAINTENANCE AND REPAIR SERVICES AT JOHN WAYNE AIRPORT

This Job Order Contract [TBD] for Pavement Maintenance and Repair Services at John Wayne

Airport (“Contract”) is made and entered into as of the date fully executed by and between County of Orange, a political subdivision of the State of California, (“County”) and [TBD], (“Contractor”), which are sometimes individually referred to as “Party”, or collectively referred to as “Parties.”

RECITALS

WHEREAS, County and Contractor are entering into this Contract for Pavement Maintenance and

Repair Services at John Wayne Airport under a Usage Contract; and, WHEREAS, County solicited Job Order Contract (JOC) for Pavement Maintenance and Repair

Services at John Wayne Airport as set forth herein, and Contractor has represented that it is qualified and capable to provide Pavement Maintenance and Repair Services at John Wayne Airport to the County as further set forth herein; and, WHEREAS, Contractor agrees to provide Pavement Maintenance and Repair Services at John

Wayne Airport to the County as further set forth in the Scope of Work, attached hereto as Attachment A and incorporated herein; and, WHEREAS, County agrees to pay Contractor the fees as further set forth in Contractor’s Pricing, attached hereto as Attachment B and incorporated herein;

NOW, THEREFORE, the Parties mutually agree as follows:

DEFINITIONS

DEFINITIONS: The following terms shall have the definitions as set forth below:

1. A-E: The Architect or Engineer or his authorized representative retained by the County to design the work.

2. Adjustment Factor: The Bidder’s competitively bid price adjustment to the unit prices published in the

Construction Task Catalog®.

3. Board of Supervisors: The governing body of the County of Orange.

4. Brief Scope of Work: The initial Scope of Work developed by the County Project Manager and is utilized to provide adequate information to schedule the Joint Scope Meeting.

5. Best Management Practices (BMPs): As used herein, a BMP is defined as a technique, measure, or structural control that is used for a given set of conditions to manage the quantity and improve the quality of stormwater runoff in a cost-effective manner. Specific BMPs are found within the County’s LIP in the form of Model Maintenance Procedures and BMP Fact Sheets (the Model Maintenance Procedures and BMP Fact Sheets contained in the DAMP/LIP shall be referred to hereinafter collectively as "BMP

Fact Sheets") and contain pollution prevention and source control techniques to eliminate non-stormwater discharges and minimize the impact of pollutants on stormwater runoff.

6. Construction Task Catalog® (CTC): A comprehensive listing of specific construction related tasks identified by the County together with a specified unit of measurement and unit price. The price

2775902 Page 10 of 70 published in the CTC for a specific construction or construction-related task. The unit prices are fixed for the Term of this Contract. Each unit price is comprised of the labor, equipment and materials costs to accomplish that specific task.

7. Contract: Contract consists of Notice Inviting Bids, Job Order Contract Agreement, Performance Bond, Payment Bond, Certificates of Insurance, CTC, Specifications, Task Orders and all modifications and amendments hereto.

8. County: The County of Orange as a legal entity, a political subdivision of the State of California.

9. County Project Manager: The County’s assigned Project Manager.

10. DAMP/LIP: To assure compliance with the Stormwater Permits and water quality ordinances, the

County Parties have developed a Drainage Area Management Plan (DAMP) which includes a Local

Implementation Plan (LIP) for each jurisdiction that contains Best Management Practices (BMPs) that parties using properties within Orange County must adhere to.

11. Detailed Scope of Work: The complete description of services to be provided by the Contractor under an individual Job Order. Developed by the Contractor, after the Joint Scope Meeting and submitted for approval to the County Project Manager.

12. Director: The Director of OC Public Works or John Wayne Airport, County of Orange, or a designated representative for the work.

13. Final Acceptance: All Work has been completed and accepted by the County. The Contractor has provided all required close-out documentation and items as required by the Detailed Scope of Work for the specific Job Order, and these items and have accepted and approved by the County.

14. Job Order: A written order issued by the County requiring Contractor the complete the Detailed Scope of Work within the Job Order Completion Time for the Job Order Price. Work may consist of one or more Job Orders.

15. Job Order Authorization (JOA): Issued upon acceptance of quote and the duration schedule, stating that the quote is a firm fixed price. Must be issued prior to issuance of a Notice to Proceed.

16. Job Order Completion Time: The time within which the Contractor must complete the Detailed Scope of Work.

17. Job Order Notice to Proceed (NTP): The document prepared by the County, based on the approved Job

Order Quote, and issued to the Contractor which provides the specific instructions, specific bid items, and the duration to complete the approved Detailed Scope of Work.

18. Job Order Price: The value of the approved Job Order Price Proposal and the amount the Contractor will be paid for completing a Job Order.

19. Job Order Quote (Quote): Contractor’s irrevocable offer to perform Work associated with a Job Order and refers to the Contractor prepared document quoting a firm fixed-price and schedule for the completion of a specific Scope of Work. The Contractor’s Quote must be on forms provided by the

County and in an electronic version compatible with the County’s systems. The Quote may also contain approved drawings, Work schedule, permits, or other such documentation as the County might require for a specific Job Order

20. Joint Scope Meeting: A meeting at the Job Order location, attended by the Contractor and County and any other interested parties to outline the Scope of Work for the Task

21. Maximum Potential Contract Amount: The maximum potential value of the Contract as defined on the

Description of Work.

2775902 Page 11 of 70

22. Minimum Contract Amount: There is no minimum amount of Work that the Contractor is guaranteed under this Contract.

23. Non-Pre-Priced (NPP) Tasks: The units of Work that are not included in the CTC but are still within the general Scope of Work requested by the County under the Contract.

24. Normal Working Hours: means between the hours of 7:00 AM to 5:00 PM, Monday through Friday, inclusive. Saturdays, Sundays, and County holidays are excluded.

25. Other Than Normal Working Hours: means Work done between the hours of 5:01 PM to 6:59 AM, on weekdays and any times during Saturday, Sunday, and County holidays.

26. Pre-Priced Task: A task described in, and for which a Unit Price is set forth, in the CTC.

27. Project: The work to be performed by Contractor on behalf of County pursuant to this Contract as described in individual Job Orders.

28. Request for Quote (RFQ): The County’s Request for Quote for a specific Job Order.

29. Specifications: The explicit requirements for the material, design, product, system or service and workmanship for the work to be utilized in completing each Job Order.

30. Stormwater Permit: The Santa Ana and San Diego Regional Water Quality Control Boards have issued

National Pollutant Discharge Elimination System permits ("Stormwater Permits") to the County of

Orange, the Orange County Flood Control District and cities within Orange County, as co-permittees

(hereinafter collectively referred to as "County Parties") which regulate the discharge of urban runoff from areas within the County of Orange, including from all County facilities on which Work within

Contract is being performed. These permits are referred to as Stormwater Permits.

31. Unit Price: The price published in the CTC for a specific construction or construction-related task. Unit

Prices for new Pre-Priced Tasks can be established during the course of the Contract and added to the

CTC. The unit prices are fixed for the term of the Contract. Each Unit Price is comprised of the prevailing wage labor, equipment and materials costs to accomplish a specific task.

32. Work: The Work shall include, without limitation, all labor, materials, apparatus, supplies, services, facilities, utilities, transportation, manuals, warranties, training, and the like, necessary for the Contractor to faithfully perform and complete all of its obligations under the Contract.

ARTICLES

1. Scope of Contract: This Contract, including Attachments, specifies the contractual terms and conditions by which the Contractor will provide Pavement Maintenance and Repair Services at John Wayne Airport under a Usage Contract, as set forth in the Scope of Work identified as Attachment A to this Contract.

2. Term: Following the Contract’s award by the Board of Supervisors, this Contract shall become effective

May 25, 2025 if executed with all necessary signatures by this date, or upon the date of execution of all necessary signatures if execution occurs after May 25, 2025 (“Date of Commencement”); and shall be effective for one (1) year from the Date of Commencement or until the maximum Contract amount is expended, whichever occurs first; or unless otherwise terminated.

3. Contingency of Funds: Contractor acknowledges that funding or portions of funding for this Contract may be contingent upon state budget approval; receipt of funds from, and/or obligation of funds by, the state of California to County; and inclusion of sufficient funding for the services hereunder in the budget approved by County’s Board of Supervisors for each fiscal year covered by this Contract. If such

2775902 Page 12 of 70 approval, funding or appropriations are not forthcoming, or are otherwise limited, County may immediately terminate or modify this Contract without penalty.

4. County's Representatives:

A. The Contract will be under the general direction of the Board of Supervisors. OC Public Works and John Wayne Airport are the authorized representatives of the Board of Supervisors and, under the Board of Supervisors, has complete charge of the Contract, and shall exercise full control of the Contract, so far as it affects the interest of the County.

B. The provisions in this Article or elsewhere in this Contract regarding approval or direction by the

County, Board of Supervisors, OC Public Works or John Wayne Airport, or action taken pursuant thereto are not intended to and shall not relieve the Contractor of responsibility for the accomplishment of the Work, either as regards sufficiency or the time of performance, except as expressly otherwise provided herein.

C. County’s Contract Administrator is the County's exclusive contact agent to the Contractor with respect to this Contract during construction and until the completion of the Contract. The County will assign Project Managers for individual Job Orders. The County may utilize the services of an

Architect in relation to some, but not all Job Orders.

D. The County's communications with the Contractor and Architect shall be exclusively through the

County's Project Manager.

E. County Project Manager shall at all times have access to the Work whenever it is in preparation or progress. The Contractor shall provide safe facilities for such access.

F. The County and County Project Manager shall not be responsible for or have control or charge of the construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work, and will not be responsible for the Contractor's failure to carry out the Work in accordance with the Contract documents.

G. The County and County Project Manager shall not be responsible for the failure of the Contractor to plan, schedule, and execute the Work in accordance with the approved schedule or the failure of the Contractor to meet the Contract completion dates or the failure of the Contractor to schedule and coordinate the Work of his own trades and subcontractors or to coordinate with others separate

Contractors.

H. The County will not be responsible for the acts or omissions of the Contractor, or any subcontractor, or any Contractor's or subcontractor's agents or employees, or any other persons performing any of the Work.

I. County Project Manager has the authority to disapprove or reject Work on behalf of the County when, in the County Project Manager’s opinion, the Work does not conform to the Contract documents.

J. Whenever, in County Project Manager’s reasonable opinion, it is considered necessary or advisable to insure the proper implementation of the intent of the Contract documents, County Project

Manager has the authority to require special inspection or testing of any Work in accordance with the provisions of the Contract documents whether or not such Work shall then be fabricated, installed or completed.

K. County Project Manager has the authority to require special inspection or testing of the Work.

However, neither County Project Manager’s authority nor any decision made by the Project

Manager in good faith whether to exercise or not to exercise such authority shall give rise to any

2775902 Page 13 of 70 duty or responsibility of the County to the Contractor, or any subcontractor, or any of their agents, or employees, or any other person performing any portion of the Work.

L. County Project Manager has the authority and discretion to call, schedule, and conduct job meetings to be attended by the Contractor, representatives of his subcontractors and the Architect and his consultants, to discuss such matters as procedures, progress, problems, and scheduling.

M. County Contract Administrator will establish procedures to be followed for processing all submittals, Change Orders, Invoices, other project reports, documentation and test reports.

N. County Project Manager will issue Job Order if required.

O. County Project Manager will review and process all Invoices by the Contractor.

5. Contractor:

A. Composition: If the Contractor is comprised of more than one legal entity, each such entity shall be jointly and severally liable hereunder.

B. Superintendent: The Contractor shall maintain on site, at all times during the construction activities, a dedicated competent Superintendent. In addition to a General Superintendent and other administrative and supervisory personnel required for the performance of the Work, the Contractor shall provide specific coordinating personnel as reasonably required for interfacing of all the Work required for the total project, all satisfactory to County Project Manager. The superintendent shall not be changed except with consent of County Project Manager, unless the superintendent proves to be unsatisfactory to the Contractor and ceases to be in his employ, in which case he shall be replaced within 24 hours by a superintendent acceptable to County Project Manager. The superintendent shall represent the Contractor in his absence and all directions given to him shall be binding as if given to the Contractor.

If Contractor elects to appoint a Contractor’s Project Manager, all relevant provisions of the above paragraph shall also apply to Contractor’s Project Manager. If Contractor elects to not appoint a

Contractor’s Project Manager, any references to “Contractor’s Project Manager” in this Contract shall be deemed to be referring to Superintendent.

C. Licenses and Certificates: Contractor shall, at all times during the term of this Contract, maintain in full force and effect such licenses as may be required by the State of California or any other governmental entity for Contractor to perform the duties specified herein and provide the services required pursuant to this Contract. Contractor shall strictly adhere to, and obey, all governmental rules and regulations now in effect or as subsequently enacted or modified, as promulgated by any local, state, or federal governmental entities.

D. Superintendent and County Project Manager: The Contractor shall provide County Project

Manager with complete Work history profiles of management staff associated with this Project for

County Project Manager review.

6. Usage: Unless otherwise specified herein, no guarantee is given by the County to the Contractor regarding usage of this Contract. Usage figures, if provided, are approximate, based upon the last usage. The

Contractor agrees to supply services and/or commodities requested, as needed by the County of Orange, at prices listed in the Contract, regardless of quantity requested.

7. Reports/Meetings: The Contractor shall develop reports and any other relevant documents necessary to complete the services and requirements as set forth in this Contract. The County’s Project Manager and the Contractor’s Project Manager will meet at a County designated location to discuss the Contractor’s performance and progress under this Contract, at the request of the County’s Project Manager. If requested by County, the Contractor’s Project Manager and other project personnel shall attend all

2775902 Page 14 of 70 meetings. The Contractor shall provide such information that is requested by the County for the purpose of monitoring progress under this Contract.

8. Conflict Of Interest – Contractor’s Personnel: Contractor shall exercise reasonable care and diligence to prevent any actions or conditions that could result in a conflict with the best interests of County. This obligation shall apply to Contractor, Contractor’s officers, directors, employees, agents, and subcontractors associated with accomplishing work and services hereunder. Contractor’s efforts shall include, but not be limited to establishing precautions to prevent its employees, agents, and subcontractors from providing or offering gifts, entertainment, payments, loans, or other considerations which could be deemed to influence or appear to influence County staff or elected officers from acting in the best interests of County.

Contractor shall notify County, in writing, of any potential or actual conflicts of interest between

Contractor and County that may arise prior to, or during the period of, Contract performance, including, but not limited to, whether any known County public officer’s child is an officer or director of, or has an ownership interest of ten (10) percent or more in, Contractor. While Contractor will be required to provide this information without prompting from County any time there is a change regarding conflict of interest, Contractor must also provide an update to County upon request by County.

9. Conflict Of Interest – County Personnel: County of Orange Board of Supervisors policy prohibits its employees from engaging in activities involving a conflict of interest. Contractor shall not, during the period of this Contract, employ any County employee for any purpose.

10. Ownership of Documents: The County has permanent ownership of all directly connected and derivative materials produced under this Contract by the Contractor. All documents, reports and other incidental or derivative Work or materials furnished hereunder shall become, and remain, the sole property of the

County and may be used by the County as it may require without additional cost to the County. None of the documents, reports and other incidental or derivative Work or furnished materials shall be used by the Contractor without the express written consent of the County.

11. Title to Data: All materials, documents, data or information obtained from the County data files or any

County medium furnished to the Contractor in the performance of this Contract will at all times remain the property of the County. Such data or information may not be used or copied for direct or indirect use by the Contractor after completion or termination of this Contract without the express written consent of the County. All materials, documents, data or information, including copies, must be returned to the

County at the end of this Contract.

12. Contractor’s Personnel: Contractor warrants that all Contractor personnel engaged in the performance of Work under this Contract shall possess sufficient experience and/education to perform the services requested by the County. County expressly retains the right to have any of the Contractor personnel removed from performing services under this Contract. Contractor shall effectuate the removal of the specified Contractor personnel from providing any services to the County under this Contract within one business day of notification by County. County shall submit the request in writing to the Contractor’s

Project Manager. The County is not required to provide any reason, rationale or additional factual information if it elects to request any specific Contractor personnel be removed from performing services under this Contract.

13. Publication: No copies of sketches, schedules, written documents, computer based data, photographs, maps or graphs, including graphic art Work, resulting from performance or prepared in connection with this Contract, are to be released by Contractor and/or anyone acting under the supervision of Contractor to any person, partnership, company, corporation, or agency, without prior written approval by the

County, except as necessary for the performance of the services of this Contract. All press contacts, including graphic display information to be published in newspapers, magazines, etc., are to be administered only after County approval.

2775902 Page 15 of 70

14. News/Information Release: The Contractor agrees that it will not issue any news releases or make any contact with the media in connection with either the award of this Contract or any subsequent amendment of, or effort under this Contract. Contractors must first obtain review and approval of said media contact from the County through the County’s Project Manager. Any requests for interviews or information received by the media should be referred directly to the County. Contractors are not authorized to serve as a media spokesperson for County projects without first obtaining permission from the County Project

Manager.

15. Errors and Omissions: All reports, files and other documents prepared and submitted by Contractor shall be complete and shall be carefully checked by the professional(s) identified by Contractor as Project

Manager and key personnel attached hereto, prior to submission to the County. Contractor agrees that

County review is discretionary and Contractor shall not assume that the County will discover errors and/or omissions. If the County discovers any errors or omissions prior to approving Contractor's reports, files and other written documents, the reports, files or documents will be returned to Contractor for correction. Should the County or others discover errors or omissions in the reports, files or other written documents submitted by Contractor after County approval thereof, County approval of Contractor's reports, files or documents shall not be used as a defense by Contractor in any action between the County and Contractor, and the reports, files or documents will be returned to Contractor for correction.

16. Audits/Inspections: Contractor agrees to permit the County’s Auditor-Controller or the Auditor-

Controller’s authorized representative (including auditors from a private auditing firm hired by the

County) access during normal working hours to all books, accounts, records, reports, files, financial records, supporting documentation, including payroll and accounts payable/receivable records, and other papers or property of Contractor for the purpose of auditing or inspecting any aspect of performance under this Contract. The inspection and/or audit will be confined to those matters connected with the performance of the Contract including, but not limited to, the costs of administering the Contract. The

County will provide reasonable notice of such an audit or inspection.

The County reserves the right to audit and verify the Contractor’s records before final payment is made.

Contractor agrees to maintain such records for possible audit for a minimum of three years after final payment, unless a longer period of records retention is stipulated under this Contract or by law.

Contractor agrees to allow interviews of any employees or others who might reasonably have information related to such records. Further, Contractor agrees to include a similar right to the County to audit records and interview staff of any subcontractor related to performance of this Contract.

Should the Contractor cease to exist as a legal entity, the Contractor’s records pertaining to this Contract shall be forwarded to the surviving entity in a merger or acquisition or, in the event of liquidation, to the

County’s Project Manager.

17. Sub-Contractor Audit: Contractor shall include a clause in its contracts with subcontractors, and shall require subcontractors to include a clause in its contracts with sub-subcontractors, which reserves the right for a County representative to audit any cost, payment, or settlement resulting from any…

This is the start of the file's text. The full file is on GovTribe.