IDS_ACS Building List Summary v2_1_Redacted.pdf

PDF 132 KB Posted

Attached to
Sources Sought - IDS Expansion Scoping
Solicitation number
SSIDSES06102026
Issued by

About this file

This document is a detailed requirements and specifications list for the Integrated Building Distribution Security System (IBDSS) Electronic Security System (ESS) Replacement project at Eielson Air Force Base, Alaska, scheduled for completion by May 19, 2026.

The project encompasses comprehensive replacement and upgrade of intrusion detection systems (IDS) and access control systems (ACS) across multiple buildings and facilities at the installation. Work is categorized into three primary types: New installations of IDS/ACS systems, Replacements of existing systems, and Firmware/appliance upgrades. The base standard platform is Honeywell Vindicator, though alternative platforms from the Certified Manufacturer's Directory (CMD) may be substituted if presented as entire system replacements without parallel systems. All new or replacement appliances must transmit over fiber optic lines at 1Gbps minimum to achieve compatibility with approved switchgear; wireless, DSL, and POTS-based solutions are explicitly prohibited. Infrastructure requirements include installation of an 8-10 mile overhead 24+ strand fiber backbone with spurs to individual equipment closet modules (ECMs), with approved Cisco switchgear (such as the C9200CX model) included in bids. Specific location requirements address dedicated conduit, hardwired power circuits, and additional hardware coordination for various installations. Additional ACS requirements include multiple campus control capability with redacted specifications. The scope encompasses numerous individual work items across Owner, Security Access Protection (SAP), and Sensitive Compartmented Information Facility (SCIF) spaces, ranging from simple duress button replacements to large hangar installations requiring coordinated IDS, ACS, and gate hardware deployments.

View the file

Other files

File Type Posted
PWS IDS_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

Bldg Num Room Num Space Description Space Type IDS ACS

Existing Medium

Conduit Required Work Type Work Description

Owner Y N Copper No Replacement Replace duress button setup Owner Y N Copper No Replacement Replace duress button setup Owner Y N Copper Yes Replacement Replace duress button setup Owner Y N None Yes New Install IDS in vault Owner Y N None Yes Replacement Replace existing IDS, connect to fiber network Owner N Y None Yes New Currently under MILCON Owner Y Y None Yes New Install IDS & ACS in Hangar, large project SAP Y Y Copper Yes Replacement Replace existing IDS & ACS SAP Y Y None Yes New Separate MPC vault from Main vault SAP Y Y Copper Yes Replacement Separate Unit Rooms area from Main vault SAP Y Y None Yes New Install IDS & ACS SAP Y Y Fiber No Replacement Firmware and/or appliance upgrade SAP Y Y Fiber No Replacement Firmware and/or appliance upgrade Owner Y Y Fiber No Replacement Firmware and/or appliance upgrade Owner Y Y Copper No Upgrade Firmware and/or appliance upgrade, fiber replacement SAP Y Y Copper No Upgrade Firmware and/or appliance upgrade, fiber replacement Owner Y Y Copper No Upgrade Firmware and/or appliance upgrade, fiber replacement Owner Y Y Copper No Upgrade Firmware and/or appliance upgrade, fiber replacement Owner Y Y Copper No Upgrade Firmware and/or appliance upgrade, fiber replacement Owner Y Y None Yes New Install IDS & ACS in Hangar, large project Owner Y Y Copper Yes Replacement Replace existing IDS Owner Y Y None Yes New Install IDS & ACS in Hangar, large project SCIF Y Y Fiber No Replacement Firmware and/or appliance upgrade SAP Y Y Fiber No Replacement Firmware and/or appliance upgrade Owner Y Y None Yes New Install IDS & ACS in Hangar, large project Owner Y Y None Yes New Install IDS & ACS in Hangar, large project Owner N Y Fiber No Upgrade Firmware upgrade SAP Y Y Fiber No Upgrade Gate hardware Owner Y Y Fiber No Upgrade Firmware upgrade SAP Y Y Fiber No Upgrade Firmware upgrade SAP Y Y Fiber No Replacement V5 Firmware upgrade, SAW/VCC/VBM replacement SAP Y Y Fiber No Upgrade Firmware upgrade SCIF Y Y Fiber No Upgrade Firmware upgrade Owner Y Y Fiber No Upgrade Firmware upgrade SAP Y Y Fiber No Upgrade Firmware upgrade Owner Y Y Fiber Yes Upgrade Relocate IDS/ACS to secure space, Firmware upgrade Owner Y Y Copper Yes Replacement Replace existing IDS Owner N Y Fiber No Upgrade Firmware upgrade Owner Y Y Fiber No Upgrade Firmware upgrade Owner Y Y None Yes New Potentially under contract now Owner Y Y None Yes New Potentially under contract now Owner Y Y None Yes New Currently under MILCON SAP Y Y Fiber No Upgrade Firmware upgrade SCIF Y Y Fiber No Upgrade Firmware upgrade SAP Y Y Fiber No Upgrade Replace excess sensors, Firmware upgrade Owner Y Y Fiber No Upgrade Firmware upgrade, VPC -> V3 firmware change Owner Y Y Fiber No Upgrade Firmware upgrade Owner Y Y Fiber No Upgrade Firmware upgrade Owner Y Y Fiber No Upgrade Firmware upgrade Owner Y Y Copper No Replacement Replace existing IDS Owner Y N Fiber Yes New Install IDS in evidence vault Owner Y Y Copper Yes Replacement Replace existing IDS SAP Y Y Fiber No None Installation by MILCON Owner Y Y None Yes New Install IDS & ACS in vault Owner Y Y Copper Yes Replacement Replace existing IDS Owner Y Y Copper Yes Replacement Replace and expand IDS to addition room Owner Y N None Yes New Install IDS along fenceline Owner Y N Copper Yes Replacement Replace existing IDS; ACS replacement project currently in development Owner Y N None Yes New Install IDS in Generator Area Owner Y N Copper Yes Replacement Replace existing IDS Owner Y N Copper Yes Replacement Replace existing IDS Owner Y Y Fiber No Upgrade Firmware upgrade Owner Y Y None Yes New Install IDS & ACS in briefing room workcenter Owner Y Y Fiber No Upgrade Firmware ugprade Owner Y Y Copper Yes Replacement Replace existing IDS Owner Y N Copper Yes Replacement Replace existing IDS Duress functions Owner Y N Copper Yes Replacement Replace existing IDS Duress functions, Relocate Alarm Panel Owner Y N None Yes New Install IDS Duress functions Owner Y N Copper Yes Replacement Replace existing IDS Owner Y N Copper Yes Replacement Replace existing IDS SCIF Y Y Copper Yes Replacement Replace existing IDS, add ACS Owner Y N Copper Yes Replacement Replace existing IDS Owner Y N None No Replacement *Shares IDS with neighboring Vault Owner Y N Copper Yes Replacement Replace existing IDS Owner Y Y None No Replacement Replace Master V5 setup; remove 8103 devices; Add ACS to ; VSS, VCC, & SAW replacements Owner N N None No New Install Vindicator VST workstation (or SFF-equivalent) & monitor, KVM, Printer Owner Y N Copper No Replacement Replace existing IDS Owner Y N Copper No Replacement Replace existing IDS Owner Y N Copper Yes Replacement Replace existing IDS Owner Y N None Yes New Install IDS & ACS in conference room Owner Y N Copper Yes Replacement Replace existing IDS Owner Y N Copper Yes Replacement Replace existing IDS; DECA Owner Y N Copper Yes Replacement Replace existing IDS Owner Y N Copper Yes Replacement Replace existing IDS; large store, multiple areas; AAFES Owner Y N Copper Yes Replacement Replace existing IDS Owner Y N Copper Yes Replacement Replace existing IDS Owner Y N Copper Yes Replacement Replace existing IDS Owner Y N Copper Yes Replacement Replace existing IDS, notification appliances, display Owner Y N Copper Yes Replacement Replace existing IDS Owner Y N Copper Yes Replacement Replace existing IDS SAP Y Y Fiber No Upgrade Firmware upgrade SCIF Y Y Fiber No Upgrade Firmware upgrade Owner Y N None Yes New Install IDS Duress functions SAP Y Y Fiber No Upgrade Firmware upgrade Owner Y N Copper Yes Replacement Replace existing IDS Owner Y N Copper Yes Replacement Replace existing IDS Owner Y N Copper Yes Replacement Replace existing IDS Owner Y N Copper Yes Replacement Replace existing IDS Owner Y N Fiber No Replacement Replace existing IDS Owner Y N Fiber No Replacement Replace existing IDS Owner Y N Fiber No Replacement Replace Secondary V5 setup, VCC Owner Y N Copper Yes Replacement Replace existing IDS Owner Y N Copper Yes Replacement Replace existing IDS v2.1

IBDSS ESS Replacement Eielson AFB, AK

19-May-26

Owner Y N Copper Yes Replacement Replace existing IDS Owner Y N Copper Yes Replacement Replace existing IDS Owner Y N Copper Yes Replacement Replace existing IDS; Install fenceline IDS Owner Y N Fiber No Upgrade Firmware upgrade or appliance replacement Owner Y N Fiber No Upgrade Firmware upgrade or appliance replacement Owner Y N Fiber No Upgrade Firmware upgrade or appliance replacement Owner Y N Fiber No Upgrade Firmware upgrade or appliance replacement Owner Y N Fiber No Upgrade Firmware upgrade or appliance replacement Owner Y N Fiber No Upgrade Firmware upgrade or appliance replacement Owner Y N Copper Yes Replacement Replace existing IDS

Y N Fiber Yes New Install IDS for Duress setup Y N Fiber Yes New Install fenceline IDS; 4 miles N Y Fiber Yes New Install ACS & related gate hardware Y Y Fiber Yes New Install IDS, ACS & related gate hardware Y Y Fiber Yes New Install IDS, ACS & related gate hardware N Y Fiber Yes Replacement Replace existing gate controls with ACS N Y Fiber Yes New Install ACS & related gate hardware N Y Fiber Yes New Install ACS & related gate hardware N Y Fiber Yes New Install ACS & related gate hardware N Y Fiber Yes New Install ACS & related gate hardware N Y Fiber Yes New Install ACS & related gate hardware N Y Fiber Yes New Install ACS & related gate hardware N Y Fiber Yes New Install ACS & related gate hardware Y Y Fiber Yes New Install ACS & related gate hardware Y Y Fiber Yes New Install ACS & related gate hardware

Location Requirements Requires an 8-10 mile overhead 24+ strand fiber from , then spurs to each required ECM. Additional ECMs may be identified by user for system installation. Approved switchgear must also be included in bid.

Requires a fiber spur from patch box back to the Approved switchgear must also be included in bid.

Requires power and fiber to be trenched to . Additional hardware will be required. Coordinate with for the exact Requires dedicated conduit to ; dedicated hardwired power circuit Requires additional Cisco switchgear. Must account for the additional space required in wall cases. Example Cisco C9200CX.

Requires additional Cisco switchgear. Must account for the additional space required in wall cases. Example Cisco C9200CX.

General IDS / ACS Requirements Base Standard Eielson AFB uses Honeywell Vindicator exclusively. However, alternative platforms may be selected from the CMD, provided the bid is an entire system replacement. No parallel systems.

Transmission Medium All new or replacement appliances must be capable of transmission over fiber optic lines, either direct or via a media converter.

No Wireless, DSL, or POTS-based solutions will be accepted.

Must be able to transmit at 1Gbps to be compatible with switchgear.

Additional switchgear will be required in bid.

Additional ACS Requirements Multiple Campus Control