IDOT 46918-083.pdf
PDF 760 KB Posted
- Solicitation number
- 46918
- Issued by
- Vermilion County, Illinois
About this file
Summary
This is a Letting Notice to Bidders and Specifications document issued by the Illinois Department of Transportation (IDOT) for Contract No. 46918, a reconstruction project in Marshall and Woodford Counties involving two State Fish and Wildlife Areas (SFWAs). The project encompasses reconstruction of roads and parking areas with Bituminous Surface Treatment with Fog Seal surface, excavation and reconstruction at sinkhole locations, placement of aggregate surface courses, installation of pipe culverts, removal of buildings, tree removal, and installation of various site improvements across both the Woodford SFWA (located at R.R. 1, Low Point, IL) and Marshall SFWA (located at 236 State Rt. 26, Lacon, IL). Electronic bids must be submitted to the iCX-Integrated Contractors Exchange system by 12:00 p.m. on June 12, 2026. The project involves a gross length of 0.9 mile and includes construction within the Illinois River floodway, requiring adherence to Nationwide Permit 14 and Regional Permit 16 from the U.S. Army Corps of Engineers, as well as Statewide permits from the Illinois Department of Natural Resources. Construction sequencing is complex due to ongoing site operations, including duck hunting season constraints (October 24, 2026 through January 3, 2027) and required coordination with IDNR site personnel.
The contract will be awarded to the lowest responsive and responsible bidder. All work is subject to Illinois Department of Transportation Standard Specifications for Road and Bridge Construction, Supplemental Specifications, and Recurring Special Provisions, with several provisions marked as applicable to this contract including EEO requirements, specific EEO responsibilities for nonfederal-aid contracts, required state contract provisions, construction layout stakes, quality control/quality assurance of concrete mixtures, and concrete mix design provisions. The Department reserves the right to reject any or all proposals, readvertise the project, and waive technicalities. Traffic control costs are included as a single lump sum price covering both SFWA sites, and contractor costs for staging, safety measures, temporary movement and reinstallation of items shall be considered incidental to the contract. The project is anticipated to be funded through Illinois state construction funds (County O&C 2020 account).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
June 12, 2026 Letting
Notice to Bidders, Specifications and Proposal
Contract No. 46918 MARSHALL-WOODFORD Counties Section M-W COUNTY O&C 2020 Route PARK ROAD District 4 Construction Funds
Prepared by S Checked by
(Printed by authority of the State of Illinois)
NOTICE TO BIDDERS
1. TIME AND PLACE OF OPENING BIDS. Electronic bids are to be submitted to the electronic bidding system (iCX-Integrated Contractors Exchange). All bids must be submitted to the iCX system prior to 12:00 p.m.
June 12, 2026 prevailing time at which time the bids will be publicly opened from the iCX SecureVault.
2. DESCRIPTION OF WORK. The proposed improvement is identified and advertised for bids in the
Invitation for Bids as:
MARSHALL-WOODFORD Counties Section M-W COUNTY O&C 2020 Route PARK ROAD District 4 Construction Funds
Reconstruction of SFWA roads with a Bituminous Surface Treatment_with Fog Seal Surface, the excavation and reconstruction at sinkhole locations in the Woodford State Fish and Wildlife Area (SFWA). Placement of a Bituminous Surface Treatment with Fog Seal Surface on the parking lot and camp road are proposed at the Marshall SFWA. Other necessary work at the two locations is included.
0.9 mile gross length.
3. INSTRUCTIONS TO BIDDERS. (a) This Notice, the invitation for bids, proposal and letter of award shall, together with all other documents in accordance with Article 101.09 of the Standard Specifications for Road and Bridge Construction, become part of the contract. Bidders are cautioned to read and examine carefully all documents, to make all required inspections, and to inquire or seek explanation of the same prior to submission of a bid.
(b) State law, and, if the work is to be paid wholly or in part with Federal-aid funds, Federal law requires the bidder to make various certifications as a part of the proposal and contract. By execution and submission of the proposal, the bidder makes the certification contained therein. A false or fraudulent certification shall, in addition to all other remedies provided by law, be a breach of contract and may result in termination of the contract.
4. AWARD CRITERIA AND REJECTION OF BIDS. This contract will be awarded to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Department in the rules, Invitation for Bids and contract documents. The issuance of plans and proposal forms for bidding based upon a prequalification rating shall not be the sole determinant of responsibility. The Department reserves the right to determine responsibility at the time of award, to reject any or all proposals, to readvertise the proposed improvement, and to waive technicalities.
By Order of the Illinois Department of Transportation
Gia Biagi, Secretary
Woodford SFWA and Marshall SFWA (Park Roads) Section M-W County O&C 2020
Marshall and Woodford Counties
INDEX
FOR
SUPPLEMENTAL SPECIFICATIONS
AND RECURRING SPECIAL PROVISIONS
Adopted January 1, 2026
This index contains a listing of SUPPLEMENTAL SPECIFICATIONS, frequently used RECURRING SPECIAL PROVISIONS, and LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS.
ERRATA Standard Specifications for Road and Bridge Construction (Adopted 1-1-22) (Revised 1-1-26)
SUPPLEMENTAL SPECIFICATIONS
Std. Spec. Sec. Page No.
109 Measurement and Payment 202 Earth and Rock Excavation 204 Borrow and Furnished Excavation 207 Porous Granular Embankment 211 Topsoil and Compost 214 Grading and Shaping Ditches 406 Hot-Mix Asphalt Binder and Surface Course 407 Hot-Mix Asphalt Pavement (Full-Depth) 420 Portland Cement Concrete Pavement 502 Excavation for Structures 504 Precast Concrete Structures 509 Metal Railings 522 Retaining Walls 540 Box Culverts 542 Pipe Culverts 550 Storm Sewers 586 Granular Backfill for Structures 601 Pipe Drains, Pipe Underdrains, and French Drains 630 Steel Plate Beam Guardrail 632 Guardrail and Cable Road Guard Removal 644 High Tension Cable Median Barrier 665 Woven Wire Fence 701 Work Zone Traffic Control and Protection 781 Raised Reflective Pavement Markers 782 Reflectors 801 Electrical Requirements 821 Roadway Luminaires
1003 Fine Aggregates 1004 Coarse Aggregates 1010 Finely Divided Minerals 1020 Portland Cement Concrete ……… 1030 Hot-Mix Asphalt 1040 Drain Pipe, Tile, and Wall Drain 1042 Precast Concrete Products 1061 Waterproofing Membrane System 1067 Luminaire ……… 1097 Reflectors 1102 Hot-Mix Asphalt Equipment
RECURRING SPECIAL PROVISIONS
The following RECURRING SPECIAL PROVISIONS indicated by an “X” are applicable to this contract and are included by reference:
CHECK SHEET # PAGE NO.
1 Additional State Requirements for Federal-Aid Construction Contracts 2 Subletting of Contracts (Federal-Aid Contracts)
3 X EEO
4 X Specific EEO Responsibilities Nonfederal-Aid Contracts 5 X Required Provisions - State Contracts 6 Asbestos Bearing Pad Removal 7 Asbestos Waterproofing Membrane and Asbestos Hot-Mix Asphalt Surface Removal 8 Temporary Stream Crossings and In-Stream Work Pads 9 X Construction Layout Stakes
10 Use of Geotextile Fabric for Railroad Crossing 11 Subsealing of Concrete Pavements 12 Hot-Mix Asphalt Surface Correction 13 Pavement and Shoulder Resurfacing 14 Patching with Hot-Mix Asphalt Overlay Removal 15 Polymer Concrete 16 Reserved 17 Bicycle Racks 18 Temporary Portable Bridge Traffic Signals 19 Nighttime Inspection of Roadway Lighting 20 English Substitution of Metric Bolts 21 Calcium Chloride Accelerator for Portland Cement Concrete 22 Quality Control of Concrete Mixtures at the Plant 23 X Quality Control/Quality Assurance of Concrete Mixtures 24 Reserved 25 Reserved 26 Temporary Raised Pavement Markers 27 Restoring Bridge Approach Pavements Using High-Density Foam 28 Portland Cement Concrete Inlay or Overlay 29 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 30 Longitudinal Joint and Crack Patching 31 X Concrete Mix Design – Department Provided 32 Station Numbers in Pavements or Overlays i
TABLE OF CONTENTS
LOCATION OF PROJECT
DESCRIPTION
TRAFFIC CONTROL PLAN
CONSTRUCTION COORDINATION WITH SITE OPERATIONS
AGGREGATE SURFACE COURSE, TYPE B
BITUMINOUS SURFACE TREATMENT WITH FOG SEAL (BDE)
BUILDING REMOVAL (BDE)
EARTH EXCAVATION (SPECIAL)
FILLING EXISTING SEPTIC TANK
GEOTECHNICAL FABRIC FOR GROUND STABILIZATION
GRADING AND SHAPING DITCHES
MINOR SIGN COMPLETE
PCC AUTOMATIC BATCHING EQUIPMENT
PCC QMP ELECTRONIC REPORT SUBMITTALS
PERIMETER EROSION BARRIER, (SPECIAL)
PIPE CULVERTS, CLASS C, TYPE 1
PRECAST CONCRETE PARKING BLOCK
REMOVE AND REINSTALL PARKING BLOCKS
REMOVE EXISTING PARKING BLOCKS
STONE DUMPED RIPRAP, CLASS A3
SUBBASE GRANULAR MATERIAL, TYPE C
TOPSOIL FURNISH AND PLACE, VARIABLE DEPTH
TRAFFIC CONTROL AND PROTECTION (SPECIAL)
TREE REMOVAL
WASHOUT BASIN
CEMENT, FINELY DIVIDED MINERALS, ADMIXTURES, CONCRETE, AND MORTAR (BDE)
COMPENSABLE DELAY COSTS (BDE)
GUARDRAIL (BDE)
ILLINOIS WORKS APPRENTICESHIP INITIATIVE – STATE FUNDED CONTRACTS (BDE) ..36
PAVEMENT MARKING (BDE)
REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES (BDE)
SEEDING (BDE)
ii
SIGN PANELS AND APPURTENANCES (BDE)
SUBCONTRACTOR AND DBE PAYMENT REPORTING (BDE)
SUBCONTRACTOR MOBILIZATION PAYMENTS (BDE)
SUBMISSION OF BIDDERS LIST INFORMATION (BDE)
SUBMISSION OF PAYROLL RECORDS – STATE CONTRACT (BDE)
SURVEYING SERVICES (BDE)
IDOT TRAINING PROGRAM GRADUATE ON-THE-JOB TRAINING SPECIAL PROVISION ...47
VEHICLE AND EQUIPMENT WARNING LIGHTS (BDE)
WOOD SIGN SUPPORT (BDE)
WORK ZONE TRAFFIC CONTROL DEVICES (BDE)
WORKING DAYS (BDE)
STATE OF ILLINOIS
SPECIAL PROVISIONS
The following Special Provisions supplement the "Standard Specifications for Road and Bridge Construction" adopted January 1, 2022, the latest edition of the "Illinois Manual on Uniform Traffic Control Devices for Streets and Highways", and the “Manual of Test Procedures for Materials" in effect on the date of invitation for bids, and the “Supplemental Specifications and Recurring Special Provisions" indicated on the Check Sheet included herein which apply to and govern the construction of Woodford SFWA and Marshall SFWA (Park Roads), Section M-W County O&C 2020, Marshall and Woodford Counties, Contract No. 46918 and in case of conflict with any part or parts of said specifications, the said Special Provisions shall take precedence and shall govern.
As this project will be constructed within the floodway of the Illinois River, all excess excavated materials shall be removed from floodway and floodplain areas as shown on the FEMA Flood Insurance Rate Maps No. 17123C0310C in Marshall County and 17203C0025D in Woodford County.
It is anticipated that this project will be constructed under Nationwide permit 14 and Regional permit 16 from the U.S. Army, Corps of Engineers, and Statewide permits number 6 and number 9 from the Illinois Department of Natural Resources. The contractor will be required to adhere to the conditions of these permits.
WOODFORD STATE FISH AND WILDLIFE AREA (IDNR)
MARSHALL STATE FISH AND WILDLIFE AREA (IDNR)
SECTION M-W COUNTY O&C 2020
MARSHALL AND WOODFORD COUNTIES
LOCATION OF PROJECT
The project limits are within the Woodford SFWA, located at R.R. 1, Low Point, IL in Woodford County, and the Marshall SFWA, located at 236 State Rt. 26, Lacon, IL in Marshall County.
DESCRIPTION
The proposed improvements at the Woodford SFWA consist of the excavation and reconstruction at sinkhole locations in the SFWA, the reconstruction of the SFWA roads and parking lots with a Bituminous Surface Treatment with Fog Seal surface, and all other necessary work to complete the project as noted in the plans. The proposed improvements at the Marshall SFWA consist of the placement of a Bituminous Surface Treatment with Fog Seal surface on the parking lot and camp road, and all other necessary work to complete the project as noted in the plans.
TRAFFIC CONTROL PLAN
Traffic control shall be in accordance with the applicable sections of the Standard Specifications for Road and Bridge Construction, the applicable guidelines contained in the Illinois Manual on Uniform Traffic Control Devices for Streets and Highways, these Special Provisions, any special details and Highway Standards contained herein and in the plans.
Special attention is called to Sections 107 and 701 through 705 of the Standard Specifications for Road and Bridge Construction, and as amended by the Supplemental Specifications, Recurring Special Provisions, the Special Provisions contained herein, and the following highway standards relating to traffic control:
WOODFORD STATE FISH AND WILDLIFE AREA (IDNR)
MARSHALL STATE FISH AND WILDLIFE AREA (IDNR)
SECTION M-W COUNTY 2023
WOODFORD AND MARSHALL COUNTIES
HIGHWAY STANDARDS:
701001 701006 701011 701301 701901
BLR 17 BLR 18 BLR 21 BLR 22
Limitations of Construction: The Contractor shall coordinate the items of work in order to keep hazards and traffic inconveniences to a minimum, as specified below.
1. The Contractor shall provide, erect, and maintain all the necessary barricades, cones, drums, and lights for the warning and protection of traffic as required by Sections 107 and 701 through 703 of the Standard Specifications and as modified.
2. The Contractor shall be responsible for the traffic control devices at all times during construction activities and shall coordinate the items of work in order to keep hazardous traffic inconveniences to a minimum.
3. The Contractor will be responsible for the traffic control devices at all times during any construction shut-down periods.
4. Traffic control devices shall be in new or like-new condition equipped with new reflective sheeting at the time of use. The Engineer will be the sole judge of the condition of the devices.
All warning signs shall be 48 inches by 48 inches and have a black legend on a fluorescent orange reflectorized background.
5. At the direction of the Engineer, when closing road or parking lots to traffic, two Type III barricades with Standard Sign R11-2 or (ROAD CLOSED) signs mounted on them shall be used.
6. At the direction of the Engineer, W20-3 (ROAD CLOSED AHEAD) signs shall be placed prior to active work areas.
Sequence and Limits of Construction: The following is the anticipated sequence of construction for the sites:
MARSHALL SFWA
• Duck Hunting season begins on October 24th, 2026 and closes on January 3rd, 2027.
IDNR will issue paper permit holders that are to be placed in the windshields of vehicles that are authorized to access the boat ramp.
• Close the campground to all traffic until work in that area is completed.
• The access from IL Route 26 to the boat ramp must have at least one lane available for traffic, at all times. While the boat ramp is under construction, the tent camping area will be used for parking for the boat ramp.
• The parking lot around the office can be closed until October 16th. The parking lot to the office must be accessible prior to October 24th for site staff. The parking lot must be open to all traffic by October 24th, 2026.
• Move all parking blocks, trash cans, and related items that would impact the preparation for or placement of the bituminous surface treatment or aggregate, to a temporary location.
• Prepare the base on the entire site, including the camper pads and boat ramp.
• Place the aggregate surface course and bituminous surface treatment.
• Move the parking blocks, trash cans, and related items from their temporary location to their original location.
• Open the site to traffic.
WOODFORD SFWA
• Duck Hunting season begins on October 24th, 2026 and closes on January 3rd, 2027.
IDNR will issue paper permit holders that are to be placed in the windshields of vehicles that are authorized to access the boat ramp.
• Close the SFWA to all but emergency vehicle, duck permit holders, and IDNR site personnel traffic. A sign on the barricades at the entrance to the SFWA should note the restricted access and the fine for violation of the restriction. Continuous access to the campground host pad for the host shall be provided.
• The campground can be closed for the duration of the project. The campground host site trailer will be on site and does not need to be moved for any of the construction activities. The Campground host shall be provided with access to their pad.
• The contractor will be allowed to close access to the boat ramps for 14 continuous calendar days while replacing the culvert at Station 6+45. The contractor will be required to give IDNR at least a 14-day advance notice of the closure to provide for their notification of the permit holders of the access closure. The closure can take place between August 17th through September 25th. Access must be open to traffic to the boat ramp after those 14 days or September 25th, whichever is sooner.
• One-half of the boat ramp parking lot must be open to all traffic except the 14-day closure period. The parking lot must be completely open by October 24th.
• Work should progress from the Illinois River toward the east to minimize construction traffic on completed portions of the project.
• Move all parking blocks, trash cans, and related items that would impact the preparation for or placement of the bituminous surface treatment or aggregate, to a temporary location.
• Excavate the sinkhole locations in the campground site and fill the excavated areas with the aggregate and related materials. Place stone riprap over the aggregate along the channel bank.
• Prepare the base for the roadway, parking areas, driveways, boat ramp areas, and the camper pads. Place the aggregate base and surface courses and bituminous surface treatment.
• Move the parking blocks, trash cans, and related items from their temporary location to their original location.
• Open the site to all traffic.
The contractor is expected to coordinate activities to facilitate necessary site operations. The contractor may propose a different construction sequence but must receive approval from the Engineer and Site Personnel prior to implementation.
Traffic Control and Protection will be accomplished in accordance with the Traffic Control and Protection (Special) special provision.
CONSTRUCTION COORDINATION WITH SITE OPERATIONS
The work at the Marshall SFWA and the Woodford SFWA will require coordination with the site personnel to ensure necessary site operations. All construction area preparations, means and methods are required to be submitted to site personnel and must receive written approval prior to the initiation of construction.
Safety measures, including barricades, lighting, and traffic control measures, must be provided and maintained during the entire period from initiation of work at a location within the site until all the work at that location is completed. The costs involved with providing the necessary staging, related safety measures, temporary movement and reinstallation of items, will not be paid for separately but shall be considered incidental to the contract.
AGGREGATE SURFACE COURSE, TYPE B
This item shall consist of the installation of aggregate surface course materials in accordance with the applicable articles of Sections 301, 351, and 402 of the Standard Specifications and this special provision.
For the Woodford and Marshall SFWA campground sites, the contractor shall first probe the area of the existing campsites to locate the limits of the existing aggregate materials beneath the surface of the ground. This work shall consist of excavating and disposing of the top 3 inches of material from the top of the existing aggregate base course material, blending the surface of the existing aggregate to a depth of 2 inches with the 3 inches of new aggregate surface course materials prior to the compaction of the aggregate in accordance with Section 351 of the Standard Specifications. The blending shall be accomplished by disking, or other methods approved by the Engineer, to sufficiently break down oversized clods, mix the different materials, secure a uniform moisture content, and ensure uniform density and compaction. For the Woodford and Marshall SFWA boat launch areas a similar excavation and placement sequence shall be used. At the western portion of the Woodford SFWA boat launch area, additional aggregate shall be placed as noted in the plans to provide access to the boat ramp at the west end of the area. At locations where the aggregate is to be placed adjacent to the campsite pads the area shall be excavated to provide for the thickness of the aggregate noted in the plans.
This work will be paid for at the contract unit price per Ton for AGGREGATE SURFACE COURSE, TYPE B of the thickness indicated on the plans, which price shall include all labor, materials, and equipment needed to complete the work as specified above.
BITUMINOUS SURFACE TREATMENT WITH FOG SEAL (BDE)
Effective: January 1, 2020 Revised: April 1, 2026
Replace Section 403 of the Standard Specifications with the following:
“SECTION 403. BITUMINOUS SURFACE TREATMENT WITH FOG SEAL
403.01 Description. This work shall consist of constructing a single or multiple course bituminous surface treatment with fog seal.
(a) A-1. A-1 shall consist of an emulsified asphalt and a seal coat aggregate with an emulsified asphalt fog seal.
(b) A-2. A-2 shall consist of an emulsified asphalt and a cover coat aggregate, and an emulsified asphalt and seal coat aggregate with an emulsified asphalt fog seal.
(c) A-3. A-3 shall consist of two separate applications of an emulsified asphalt and cover coat aggregate, and an emulsified asphalt and seal coat aggregate with an emulsified asphalt fog seal.
403.02 Materials. Materials shall be according to the following.
Item Article/Section
(a) Cover Coat Aggregate (Note 1) ........................................................................... 1004.03
(b) Seal Coat Aggregate (Note 1) ............................................................................. 1004.03
(c) Emulsified Asphalts (Note 2) (Note 3)
Note 1. The coarse aggregate shall be crushed gravel, crushed stone, wet bottom boiler slag, crushed slag, crushed sandstone, or crushed steel slag. The coarse aggregate material shall be selected from the table in Article 1004.03(a) based upon the friction aggregate mixture specified. The aggregate quality shall be Class B and the total chert count shall be no more than 25.0 percent by weight (mass) as determined by the ITP 203.
The cover coat aggregate gradation shall be CA 14 or CA 15, as specified on the plans.
The seal coat aggregate gradation shall be CA 16 or CA 20, as specified on the plans.
The gradations for both cover coat and seal coat aggregates shall contain a maximum of
2.0 percent Minus No. 200 material.
Note 2. The emulsified asphalt used to construct the bituminous surface treatment shall be either CRS-2P or HFRS-2P.
Note 3. The emulsified asphalt used to construct the fog seal shall be either SS-1h or CSS-1h.
403.03 Equipment. Equipment shall be according to the following.
(a) Self-Propelled Pneumatic-Tired Roller (Note 1) ................................................... 1101.01
(b) Mechanical Sweeper (Note 2) ............................................................................. 1101.03
(c) Aggregate Spreaders (Note 3) ............................................................................. 1102.04
(d) General Use Pressure Distributor (Note 4) ...................................................... 1102.05(a)
(e) Heating Equipment .............................................................................................. 1102.07
Note 1. There shall be a minimum of two rollers, with the final number of rollers determined by the rollers’ abilities to maintain proper spacing with the aggregate spreader as directed by the Engineer.
Note 2. The mechanical sweeper shall be power driven and self-propelled with the broom located between the axles. The mechanical sweeper shall not use a cantilever-mounted broom and the broom rotation shall not be operated by forward movement.
Note 3. The aggregate spreader shall be a self-propelled mechanical type with the receiving hopper in the rear and shall pull the aggregate truck. The spreader shall be fitted with an automated system which provides positive interconnected control of the aggregate flow with the forward speed of the spreader. The automated system shall provide uniform and consistent aggregate application at the rate specified.
The Engineer will check the spread roll of the aggregate spreader for straightness each day before operations begin. Should the surface of the spread roll vary off a straight line along its longitudinal dimension by more than 1/16 in. (1.5 mm), the Engineer will inspect the application of aggregate for corrugations and, should these occur, the machine shall be repaired or replaced. The forward speed of the spreader during calibration shall be the same as is to be used during construction. The equipment required for aggregate spreader calibration may consist of several sheets of canvas, each being exactly 1 sq yd (0.8 sq m), and a weight scale. By making several runs at different gate openings over the sheets of canvas, placed to cover the full width applied by the spreader, and carefully measuring the aggregate on each canvas sheet, the gate opening at the pre-established speed required to apply aggregate at the specified rate may be determined.
Note 4. The general use pressure distributor shall have a minimum capacity of 3000 gal (11,500 L). The application rate control shall be automated and shall control the application rate regardless of ground speed or spray bar width. The computer shall have the capability of recording the application rate, gallons sprayed, square yards, and feet traveled. The general use pressure distributor shall be capable of maintaining the asphalt emulsion at the specified temperature. The spray bar nozzles shall produce a uniform triple lap application fan spray, and the shutoff shall be instantaneous, with no dripping.
The general use pressure distributor shall be capable of maintaining the specified application rate within ± 0.015 gal/sq yd (± 0.070 L/sq m) for each load. The spray-bar nozzles shall be turned to make the same angle with the longitudinal axis of the spray bar as recommended by the manufacturer.
Application rates shall be determined by the procedures listed in ASTM D 2995, except the sample may be taken on three 8 x 12 in. (200 x 300 mm) metal plates. The three plates shall be positioned as directed by the Engineer.
CONSTRUCTION REQUIREMENTS
403.04 Weather Limitations. This work shall be done between May 1 and August 31.
Emulsified asphalt shall be applied only when the temperature of the air in the shade is above 55 °F (13 °C). No work shall be started if local conditions indicate that rain is imminent.
Fog seal operations shall be performed during daylight hours and not during foggy weather.
The road surface may be damp but shall be free of standing water.
This work may be done between September 1 and September 15 provided both of the following conditions are met:
(a) The temperature of the air in the shade is above 70 °F (20 °C) and the temperature of the surface to which the asphalt will be applied is 70 °F (20 °C) or above, and
(b) The National Weather Service forecast for the area does not show any rain or any temperatures below 55 °F (13 °C) for the day the work is to be done or for the following five days.
403.05 Mix Design. Prior to beginning work, the Contractor shall submit designs for each required mixture to the Department for verification and approval. The mixture design shall be performed at a laboratory accredited for pavement preservation testing by AASHTO re:source in addition to the following.
The bituminous surface treatment design shall be according to the Bureau of Research’s (BR)
PT003 “Bituminous Surface Treatment Design Form”. A minimum of four weeks prior to beginning construction, aggregate samples used in the proposed designs shall be submitted to the Central Bureau of Materials for verification and approval of the application rates. The sample quantities shall be 20 ± 5 lbs (9 ± 2 kg).
The Department will verify the samples and application rates according to the following acceptable limits.
AASHTO R 102
Material Acceptable Limits
Aggregate ± 1.0% Emulsified Asphalt ± 0.5%
After the mix design is approved, no substitutions will be permitted unless approved by the
Engineer.
403.06 Repair and Preparation of Base or Existing Surface. The base or existing surface shall be prepared according to Section 358.
403.07 Calibration. At least three days prior to starting the work, the Contractor shall provide the Engineer with a copy of the manufacturer's recommendations for the equipment to be used.
The working day prior to starting construction, the general use pressure distributor and aggregate spreader shall be calibrated and adjusted according to the manufacturer's recommendations.
Calibrations and adjustments shall be made in the presence of the Engineer on a level surface at a location approved by the Engineer. The Contractor shall maintain proper calibration and adjustment of the equipment and the Engineer reserves the right to check application rates as the work progresses. Should the equipment fail to consistently apply the specified rates, the work shall be stopped, and the Contractor shall recalibrate and readjust the equipment.
403.08 Preparation of Emulsified Asphalt. The temperature of the emulsified asphalt at the time of application shall be such that it sprays uniformly without clogging the spraying nozzles and is applied within the temperature range of 150 – 190 °F (65 – 90 °C).
403.09 Preparation of Aggregate. The aggregate shall be stockpiled near the jobsite according to Article 1003.01(e) or 1004.01(e). The aggregate used shall contain no free moisture, but the aggregate shall be slightly damp (saturated surface-dry or drier).
403.10 Application of Emulsified Asphalt. The emulsified asphalt shall be applied with a general use pressure distributor. The entire length of the spray bar shall be set at the height above the surface recommended by the manufacturer for even distribution of the emulsified asphalt. A hand spray bar shall be used at locations not covered by the distributor.
The distributor shall be operated in a manner such that missing or overlapping of transverse joints shall be avoided. To prevent overlapping of successive applications of emulsified asphalt at transverse joints, heavy paper shall be spread over the previously applied emulsified asphalt and aggregates. In order to obtain a uniform application of the emulsified asphalt, the distributor shall be traveling at the speed required for the specified rate of application when the spray bar crosses the paper.
Adjacent construction, such as concrete pavement, curb and gutter, bridge floors, raised reflective pavement markers, and bridge handrails, shall be protected by shields, covers or other means. If emulsified asphalt is applied to adjacent construction, the Contractor shall remove such material to the satisfaction of the Engineer.
The emulsified asphalt shall not be applied when the wind conditions will inhibit uniform coverage from the fans of asphalt being applied.
403.11 Application of Aggregates. The cover and seal coat aggregates shall be spread evenly with an aggregate spreader over the entire surface being treated. When treating one-half of the pavement width at a time, an inside strip of uncovered emulsified asphalt 3 in. (75 mm) wide shall be left during construction of the first half to provide center joint overlap when the second half of the treatment is placed. In all cases, the aggregate shall be applied ahead of the truck or spreader wheels. Hand spreading will be permitted only when approved by the Engineer and, when so permitted, the aggregate shall be spread uniformly and at the approximate rate specified. Any ridges of aggregate left by the aggregate spreader shall be smoothed out with hand brooms immediately behind the aggregate spreader.
Equipment involved in the work shall operate as close to each other as practical. The aggregate spreader shall be within 150 ft (45 m) of the pressure distributor and the aggregate shall cover the asphalt emulsion within 30 seconds of application to ensure proper asphalt/aggregate adhesion.
Each aggregate truck shall be equipped with a suitable hitch for connection to the aggregate spreader while unloading. The trucks shall avoid contact between the truck body or bed and the aggregate spreader. The body or bed of the truck shall be modified, if necessary, to empty cleanly and completely into the receiving hopper of the aggregate spreader. No aggregate shall be allowed to spill onto the road surface when the truck is emptying into this hopper.
403.12 Cover Coat. Emulsified asphalt for the cover coat shall not be applied until the previous application is acceptable to the Engineer.
At the beginning of each day’s work, no emulsified asphalt shall be applied until there is sufficient cover coat aggregate in the trucks at the work site to completely cover the first application of asphalt emulsion. The amount of surface area covered by each successive application of emulsified asphalt shall be determined by the Engineer. In no case shall this area be greater than can be covered with cover coat aggregate and given the initial rolling while the emulsified asphalt is still in condition to hold aggregate.
The emulsified asphalt shall be applied uniformly over the surface at the rate specified in the table above. Immediately following the application of the asphalt emulsion, the cover coat aggregate shall be spread over the treated surface at the rate specified in the table above.
The aggregate shall be rolled following spreading. A maximum time of five minutes will be allowed between the spreading of aggregate and completion of the initial rolling of the aggregate.
The rollers shall proceed in a longitudinal direction at a speed less than or equal to 5 mph (8 km/h). Each roller will travel over the aggregate a minimum of two times. The entire surface shall be rolled immediately with a self-propelled pneumatic-tired roller. Rolling shall proceed in a longitudinal direction beginning at the edges and progressing toward the center, overlapping on successive trips by at least 1/2 the width of the roller. The aggregate shall then be rolled with a separate pneumatic-tired roller until the aggregate is properly seated in the asphalt emulsion.
403.13 Seal Coat. When constructing an A-2 or A-3 treatment, the seal coat shall not be started until the cover coat immediately preceding the seal coat is completed.
Application of the emulsified asphalt and aggregate and rolling of the seal coat shall be the same as specified above for the cover coat.
During the construction period, the Contractor shall maintain the completed work. If necessary, the Contractor shall apply additional seal coat aggregate to absorb excess bitumen appearing on the surface and shall repair any areas where pickup has occurred.
The Contractor shall use the appropriate sweeping equipment to perform an initial sweeping after a minimum of two hours curing and not less than one hour before sunset on the day the bituminous surface treatment is placed. The initial sweeping shall remove excess aggregate by lightly sweeping each pavement lane. The sweeping shall be sufficient to prevent migration of loose aggregate back onto any part of the pavement.
The Contractor shall sweep the pavement surface as needed to remove excess aggregate.
403.14 Application of Fog Seal. The emulsified asphalt for the fog seal shall not be applied to the treated surface until the seal coat has cured for at least 24 hours.
The emulsified asphalt shall be applied uniformly and at a rate that will provide a residual asphalt rate on the prepared surface of 0.03 to 0.08 lb/sq ft (0.146 to 0.391 kg/sq m). An application rate greater than 0.05 lb/sq ft (0.244 kg/sq m) shall be applied in two passes, one from each direction. The Contractor shall demonstrate the application will produce 100 percent coverage of the surface after curing. If the application demonstration does not meet the coverage requirements, the spray pattern shall be adjusted until approved by the Engineer. The emulsified asphalt shall be applied in a manner to minimize the amount of overspray.
A check shall be performed in the first 1,000 ft (300 m) to verify the application rate according to the test procedure for “Determination of Residual Asphalt in Prime and Tack Coat Materials”.
403.15 Opening to Traffic. The road shall be opened to traffic according to Article 701.17(c)(4).
403.16 Method of Measurement. The bituminous surface treatment (A-1, A-2, or A-3) will be measured for payment in place and the area computed in square yards (square meters). The width for measurement will be the top width of the bituminous surface treatment as shown on the plans or as directed by the Engineer.
Emulsified asphalt for fog seal will be measured for payment as specified in Section 1032.
Preparation of the base or existing surface will be measured for payment according to
Article 358.06.
403.17 Basis of Payment. This work will be paid for at the contract unit price per square yard (square meter) for BITUMINOUS SURFACE TREATMENT, of the type specified.
Emulsified asphalt for fog seal will be paid for at the contract unit price per pound (kilogram) of residual asphalt for BITUMINOUS MATERIALS (FOG SEAL).
Preparation of the base or existing surface will be paid for according to Article 358.07.
When the contract does not contain a pay item for preparation of the base or existing surface and this item is required, it will be paid for according to Article 109.04.”
Replace Article 1004.03(c) of the Standard Specifications with the following:
“ (c) Gradation. The coarse aggregate gradations shall be as listed in the following table.
Use Size/Application Gradation No.
Class A-1, A-2, & A-3 3/8 in. (10 mm) Seal CA 16 or CA 20 Class A-2 & A-3 Cover Coat CA 14 or CA 15
HMA High ESAL
IL-19.0 CA 11 1/
SMA 12.5 2/ CA 13, CA 14, or CA 16 3/ SMA 9.5 2/ CA 13, CA 14, or CA 16 3/
IL-9.5 CA 16
IL-9.5FG CA 16
HMA Low ESAL IL-19.0L CA 11 1/
IL-9.5L CA 16
1/ CA 16 or CA 13 may be blended with CA 11.
2/ The coarse aggregates shall be capable of being combined with the fine aggregates and mineral filler to meet the approved mix design and the mix requirements noted herein.
3/ The specified coarse aggregate gradations may be blended.”
BUILDING REMOVAL (BDE)
Effective: September 1, 1990 Revised: August 1, 2022
Description. This work shall consist of the removal and disposal of building(s), including all foundations, retaining walls, and piers, down to a plane 1 ft (300 mm) below the ultimate bottom of building elevation or proposed bottom of construction elevation. The building(s) are identified as noted in the plans.
CONSTRUCTION REQUIREMENTS
General. The IEPA’s "State of Illinois Demolition/Renovation/Asbestos Project Notification Form” shall be submitted and a copy sent to the Engineer. It shall be updated if there is a change in the start and/or finish date or if asbestos is found to be present in the building(s) to be removed.
Discontinuance of Utilities. The Contractor shall arrange for the discontinuance of all utility services and the removal of the metering devices that serve the building(s) according to the respective requirements and regulations of the city, county, and utility companies involved.
The Contractor shall disconnect and seal the service outlets.
Posting. Upon execution of the contract and prior to the removal of any buildings, the Contractor shall paint or stencil, in contrasting colors of an oil base paint, on all sides of each building or structure, the following posting:
NO TRESPASSING
VIOLATORS WILL BE PROSECUTED
The postings shall be positioned prominently on the structure so they can be easily read and at a sufficient height to prevent defacing.
Any holes, such as basements, shall be backfilled according to Article 502.10.
Basis of Payment. This work will be paid for at the contract lump sum unit price for BUILDING REMOVAL NO. 1 and BUILDING REMOVAL NO. 2.
EARTH EXCAVATION (SPECIAL)
This work shall consist of excavation to a depth specified in the plans under the existing roads, parking lot surfaces, campground pads, and at locations shown on the plans, and as specified herein. This work shall be done in accordance with all applicable requirements of Section 202 of the Standard Specifications for Road and Bridge Construction in Illinois and per the details located in plans. Earth excavations shall be done within the limits specified on the typical sections.
For uniform thickness item locations, the quantity of excavation shall be computed by measuring the surface area of the item to be constructed and multiplying it by the thickness of the item to be constructed to determine the cubic yards of excavation, regardless of material. For items of uniform configurations, the repair of the sinkhole locations in the campground, or additional excavation for subbase aggregate material, the quantity of excavation shall be computed by using the end areas of the items to be constructed, as noted on the typical sections or measured by the Engineer in the field, and multiplying it by the length of the item to be constructed to determine the cubic yards of excavation, regardless of material. All additional excavation of all materials to achieve the lines and grades noted on the plans, including all additional excavation above the materials to be constructed, will not be paid for separately, but shall be considered as incidental to this pay item.
This project will be constructed within the floodway of the Illinois River, all excess excavated materials shall be removed from floodway and floodplain areas, and disposed in accordance with Article 202.03. Temporary stockpiles in the floodway will be allowed but must be completely removed if the Illinois River stage at Chillicothe is forecast to exceed elevation 446.0.
This work shall be paid for at the contract unit price cubic yard for EARTH EXCAVATION (SPECIAL) which price shall include all labor, materials, disposal, tools and equipment necessary to complete the work as specified above.
FILLING EXISTING SEPTIC TANK
This work shall include the filling of the existing septic tanks to the level of the existing ground at the sites noted in the plans. All work shall follow the rules and regulations set out by the Private Sewage Disposal Code (77Ill. Adm. Code 905), and directions of the Woodford County Health Department. The contractor shall comply with the provisions of Private Sewage Disposal Code 905.4(f) which states:
“Abandoned Treatment Units. Septic tanks, cesspools, pit privies, aerobic treatment plants, and seepage pit that are no longer in use shall be completely pumped. The floor and walls shall be cracked or crumbled so that the tank will not hold water, and the tank shall be filled with sand or soil. If the tank is removed from the ground, the excavation shall be filled with soil.”
The contractor shall comply with the provisions of 730ILCS 605/1 requiring protective covering or fencing on or about dangerous excavations which states:
“Any person, corporation or partnership which either owns, or maintains, or uses, or abandons any open well, cesspool, cistern, quarry, recharging basin, catch basin, sump, excavation for the erection of any building structure or excavation created by the razing or removal of any building structure without covering or surrounding such installation with protective fencing, is guilty of a misdemeanor, and upon conviction thereof shall be fined not more than $200, or imprisoned for not more than 60 days, or both. The provisions of this Act shall not apply during the course of repair, construction, removal or filling of any of the structures or conditions herein described while any workman is present at the location thereof either performing services thereon or as a watchman to guard such location.”
The Contractor is advised to inspect the septic tank locations prior to bidding, as no additional compensation will be allowed for the filler material of these septic tanks, and their sizes and types may vary. The Contractor shall also remove all accessories (pipes, lids, concrete pads and related items) above the tanks.
This work will be paid for at the contract unit price per each for FILLING EXISTING SEPTIC TANK and shall include all labor, material and equipment necessary.
GEOTECHNICAL FABRIC FOR GROUND STABILIZATION
This item shall consist of the installation of geotechnical fabric at the locations noted in the plans in accordance with the applicable portions of Section 210 of the Standard Specifications.
At locations where both this item and FILTER FABRIC are noted at the same layer in the plans, this item shall be placed in a layer directly underneath the layer of the FILTER FABRIC.
GRADING AND SHAPING DITCHES
This work shall consist of grading and shaping existing ditches at locations shown on the plans and as specified herein. If not usable on the site, all surplus, unstable and unsuitable material shall be disposed of according to Article 202.03 of the Standard Specifications for Road and Bridge Construction in Illinois.
This work shall be measured for payment in feet along the centerline of the ditch. Disposal of debris material removed from the ditch during the cleaning process shall not be measured for payment.
MINOR SIGN COMPLETE
This item shall consist of furnishing signs, posts, framing, hardware and related items in accordance with the details noted in the plans and in accordance with Sections 720 and 730 of the Standard Specifications. The sign members shall be fiberglass reinforced recycled plastic.
The color for the posts, timber, and signs framing shall be submitted to the IDNR Regional Engineer for approval prior to fabrication. Verbiage for the signs shall be coordinated with IDNR Regional Engineer prior to ordering the signs. The sign panels shall be supplied by the manufacturer in accordance with the details in the plans, the directions of IDNR personnel, and the Standard Specifications.
The cost of all the labor, materials and equipment necessary to complete the work as indicated in this Special Provision and the details in the plans shall be included in the contract unit price per Each for MINOR SIGN COMPLETE.
PCC AUTOMATIC BATCHING EQUIPMENT
Effective: April 23, 2010 Revised: August 1, 2023
Portland cement concrete provided shall be produced from batch plants that conform to the requirements of Article 1103.03 (a) and (b) of the Standard Specifications for Road and Bridge Construction. Semi-automatic batching will not be allowed.
Plants shall have computerized batching interfaced with a printer. IDOT Producer Number, IDOT Concrete Material Code, batch weights, aggregate mixtures, water added, amount of each admixture or additive, and percent variance from design shall be printed for each batch. The ticket shall state the actual water-cement ratio as batched, and the amount of water that can be added to the batch without exceeding the maximum water-cement ratio. Truck delivery tickets will still be required as per Article 1020.11 (a)(7) of the Standard Specifications.
PCC QMP ELECTRONIC REPORT SUBMITTALS
Effective: January 13, 2022
The Contractor’s QC personnel shall be responsible for electronically submitting the following reports to the Department: PRO and IND data for BMPR MI654 "Air, Slump, & Quantity"; PRO data for BMPR MI655 "PCC Strength"; and PRO data for BMPR MI504 "Field/Lab Gradation".
The format for the electronic submittals will be the "QMP" reporting program which will be provided by the Department. Microsoft Office 2007 or newer is required for this program which must be provided by the Contractor.
PERIMETER EROSION BARRIER, (SPECIAL)
This item shall consist of furnishing and installing the materials necessary to provide a perimeter erosion barrier in accordance with Section 280 of the Standard Specifications, this special provision, and as shown on the plans.
Revise Article 208.04(b) of the Standard Specifications to eliminate the use of silt fence as follows:
Perimeter Erosion Barrier. This system consists of a continuous barrier placed adjacent to an area of construction to intercept a sheet flow of water borne silt and sediment and prevent it from leaving the construction area. The barrier shall be constructed with rolled excelsior or urethane foam/geotextiles.
This work will be paid for at the contract unit price per Foot for PERIMETER EROSION BARRIER (SPECIAL), which price shall include all labor, materials, and equipment necessary to complete the work as specified above.
PIPE CULVERTS, CLASS C, TYPE 1
This item shall consist of the provision and installation of pipe culverts class C, in accordance with Section 542 of the Standard Specifications and this special provision. These culverts shall be smooth wall PVC in accordance with Article 1040.03 (a) of the Standard Specifications.
This work will be paid for at the contract unit price per Foot for PIPE CULVERTS, CLASS C, TYPE 1, of the size noted in the plans, which price shall include all labor, materials, and equipment needed to complete the work as specified above.
PRECAST CONCRETE PARKING BLOCK
This work shall consist of furnishing and installing precast concrete parking blocks at the locations noted in the plans and in accordance with details in the plans and this special provision. The block shall be machine made with 3,500 psi concrete and reinforced with two #3 deformed steel bars. Dowel holes shall be cast in the block to receive two #6 deformed steel bar pins 36” in length that shall be driven through the holes provided in the parking blocks into the new asphalt surface or through drilled holes in a concrete or asphalt surface to be 1” below the top of the parking block, to hold the parking blocks in place. The new pins and the drilling of the holes for the pins shall not be paid for separately but shall be considered incidental to this pay item.
This work will be paid for at the contract unit price per Each for PRECAST CONCRETE PARKING BLOCK. This price shall include all labor, equipment and material needed to complete the work as specified above and as shown in the plans.
REMOVE AND REINSTALL PARKING BLOCKS
This work shall consist of the careful removal of the parking blocks and the reinstallation of parking blocks that are in satisfactory condition or disposal of the parking blocks, at the locations noted in the plans and in accordance with this special provision. The steel pins that anchor the existing parking blocks may be pulled out, cut flush or driven into the ground to be flush with the existing adjacent asphalt surface.
Upon reinstallation, new #6 rebar steel pins 36” in length shall be driven through the existing holes in the parking blocks into a new asphalt surface or through drilled holes in a concrete or asphalt surface to be 1” below the top of the parking block, to hold the parking blocks in place. The new pins shall not be paid for separately but shall be considered incidental to this pay item. If the existing parking blocks are damaged, they shall be disposed of according to Article 440.06 of the Standard Specifications.
The costs involved with removing, storing, and reinstalling or disposal of the parking blocks shall be considered incidental to the contract unit price per Each for REMOVE AND REINSTALL PARKING BLOCKS. This price shall include all labor, equipment and material needed to complete the work as specified above and as shown in the plans.
REMOVE EXISTING PARKING BLOCKS
This work shall consist of the removal and disposal of precast concrete parking blocks and the steel pins that anchor the existing parking blocks. The Contractor shall remove parking blocks at locations as shown in the plans. The parking blocks shall be disposed of in accordance with Article 202.03 of the Standard Specifications.
This work shall be paid for at the contract unit price per EACH for REMOVE EXISTING PARKING
BLOCKS
STONE DUMPED RIPRAP, CLASS A3
This item shall consist of the furnishing and installing the riprap at the locations indicated on the plans in accordance…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .