ID06180011_SF1449_Exhibit_03_Staffing_Matrix_08152018.xls

XLS spreadsheet 70 KB Posted

Attached to
Defense Language Institute Foreign Language Center (DLIFLC) Psychometric Analysis
Solicitation number
ID6180011
Issued by

About this file

Not Listed

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Example

STAFF MATRIX EXAMPLE
List the type of personnel proposed, by Specific Task, within the PWS. Include the hours proposed per labor category. If the solicitation contains options, a matrix is required for each period of performance.
Begin with the second tab, identified as "Staff Matrix Base", to create your matrix for the base year. When applicable, prepare tabs Option 1 and 2 for submission. All cells highlited in YELLOW on this sheet are your responsibility on the subsequent sheets
What is the baseline of hours used for a FTE?1920
PWS Specific TasksHours Per
Labor Category
CLINTask NamePMMAIMAIISMATotal
0001Prepare and submit reports2020
0002Bi-weekly VTCs5120134200459
0003Draft Doctrine and Concepts515001505
0004Staff and Revise Doctrine1020002010
0005Battle Rhythm213001302
0006Collect Lessons Learned5400405
0
0
0
0
0
0
Base Period Totals472120134340005701
Labor Categories*
PM=Program Manager (non-SCA)
MAI=Military Analyst I (non-SCA)
MAII= Military Analyst II (non-SCA)
SMA=Senior Military Analyst (non-SCA)
* indicate if SCA applicable

&RID06180011

Exhibit 03

Staff Matrix Base

STAFF MATRIX BASE PERIOD
List the type of personnel proposed, by Specific Task, within the PWS. Include the hours proposed per labor category. If the solicitation contains options, a matrix is required for each period of performance.
What is the baseline of hours used for a FTE?
PWS Specific TasksHours Per
Labor Category
CLINTask NameTotal
0001Psychometric Analysis – Examinee Responses to Multiple Choice Test Item (MCT) Pools0
0002Psychometric Analysis – Examinee Responses to Constructed Response Test Item (CRT) Pools0
0003Psychometric Analysis – Standard Setting Study Panel Recommendations to Multiple Choice Test Item (MCT) Pools0
0004Psychometric Analysis – Standard Setting Study Panel Recommendations to Constructed Response Test Item (CRT) Pool0
0
Note: List pertinent subtasks under each CLIN if appropriate0
0
0
0
0
0
0
Base Period Totals000000
Labor CategoriesLabor Categories

Staff Matrix Option 1

STAFF MATRIX OPTION PERIOD 1
List the type of personnel proposed, by Specific Task, within the PWS. Include the hours proposed per labor category. If the solicitation contains options, a matrix is required for each period of performance.
What is the baseline of hours used for a FTE?
PWS Specific TasksHours Per
Labor Category
CLINTask NameTotal
1001Psychometric Analysis – Examinee Responses to Multiple Choice Test Item (MCT) Pools0
1002Psychometric Analysis – Examinee Responses to Constructed Response Test Item (CRT) Pools0
1003Psychometric Analysis – Standard Setting Study Panel Recommendations to Multiple Choice Test Item (MCT) Pools0
1004Psychometric Analysis – Standard Setting Study Panel Recommendations to Constructed Response Test Item (CRT) Pool0
0
Note: List pertinent subtasks under each CLIN if appropriate0
0
0
0
0
0
0
Base Period Totals000000
Labor CategoriesLabor Categories

Staff Matrix Option 2

STAFF MATRIX OPTION PERIOD 2
List the type of personnel proposed, by Specific Task within the PWS. Include the hours proposed per labor category. If the solicitation contains options, a matrix is required for each period of performance.
What is the baseline of hours used for a FTE?
PWS Specific TasksHours Per
Labor Category
CLINTask NameTotal
2001Psychometric Analysis – Examinee Responses to Multiple Choice Test Item (MCT) Pools0
2002Psychometric Analysis – Examinee Responses to Constructed Response Test Item (CRT) Pools0
2003Psychometric Analysis – Standard Setting Study Panel Recommendations to Multiple Choice Test Item (MCT) Pools0
2004Psychometric Analysis – Standard Setting Study Panel Recommendations to Constructed Response Test Item (CRT) Pool0
0
Note: List pertinent subtasks under each CLIN if appropriate0
0
0
0
0
0
0
Base Period Totals000000
Labor CategoriesLabor Categories

File details come from the government source that posted it.