PWS_final_draft_5-5_(1).docx

DOCX document 84 KB Posted

Attached to
Industry Day DeCA Whole Facility Maintenance
Solicitation number
ID08140013
Issued by

View the file

Other files

File Type Posted
Industry_Day_Sign_In_Sheet.pdf PDF
Questions_and_responses.docx DOCX document
industry_day_presentation_5-14-14.pdf PDF
DeCA_Facilities_Support_Questionnaire_v1.doc DOC document
Draft_TI_Manual_2015_v1.docx DOCX document
DeCA_Facilities_Support_Questionnaire.doc DOC document
Draft_TI_Manual_2015.docx DOCX document
DFC_Map.jpg JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID0814xxxx DeCA Facility and Equipment Maintenance

Table Of Contents Solicitation Number XXXXXX Project ID ID0814xxxx

1.0 Standard Form (SF) 14493
1.1 PRICE SCHEDULE3
2.0 Performance Work Statement (PWS)4
2.1 INTRODUCTION AND BACKGROUND4
2.2. OBJECTIVES4
2.3. SERVICES4
2.3.1 Commissary Equipment in Place (CEIP)5
2.3.2After hours services5
2.3.3 Maintenance Types5
2.3.4 Minor Construction7
2.3.5 Financial Reporting8
2.3.6 Computerized Maintenance Management System (CMMS)-8
2.3.7 Government Technical instruction (TI) Tracking9
2.3.8 Maintenance Response and Call Center Operation10
2.3.9 Use and Servicing of Refrigerant11
2.3.10 Environmental controls11
2.3.11 Transition Period13
2.3.12 Phase Out – Continuity of Services13
2.3.13 Contractor Personnel14
2.3.14 Quality Control Plan17
2.3.15 Quality Assurance/Quality Assurance Surveillance Plan17
2.3.16 Performance Requirements and Responsibilities18
2.3.17 Suspension of Preventative Maintenance Services19
2.3.18 Contractor Liability19
2.3.19 Contract Closeout19
2.3.20 Past Performance Information Retrieval System (PPIRS)20
2.3.21 Sample Forms20
2.3.22 Equipment Identification and Operation and Maintenance Manuals20
2.3.23 Records20
2.4 Safety and Security21
2.4.1 Protection of Government Property21
2.4.2 Security21
2.4.3 Physical Security21
2.4.4 Homeland Security Presidential Directive 12 (HSPD-12)22
2.5 List of Appendices to this Performance Work Statement23
Appendix 1- Commissary Locations23
Appendix 2- Equipment List23
Appendix 3- Preventative Maintenance (PM) Tasks23
Appendix 4- Quality Assurance Surveillance Plan (QASP)23
Appendix 5- Performance Standards23
Appendix 6- Temp Standards23
Appendix 7- Refrigerant Log23
Appendix 8- Lamping23
Appendix 9- Safety and Environmental Management23
Appendix 10- Sample Forms23
Appendix 11 - OCC Breakdown23
Appendix 12- TI Manual23
Appendix 13- Roof Plan23
Appendix 14- Year Built24
Appendix 15- Financial Reporting24
Appendix 16- Refrigeration Alarm24
Appendix 17- Emergencies24
3.0 Contract Deliverables25
3.1 Contract Requirements List25
3.2 Place of Delivery27
3.3 Notice regarding late delivery27
4.0 Contract Administration Information27
4.1 Invoice Submission27
4.2 Invoice Requirements27
4.3 Contract Responsibilities27
4.4 ITSS Registration28
5.0 Contract Clauses28
6.0 Solicitation Provisions28
7.0 Instructions to Offerors and Evaluation Information29

1.0 Standard Form (SF) 1449

1.1 PRICE SCHEDULE

INSERT EXCEL Price Schedule or reference Oscar to review Price schedule from Deb

2.0 Performance Work Statement (PWS)

2.1 INTRODUCTION AND BACKGROUND

The General Services Administration (GSA) Federal Acquisition Service (FAS) Region 8, in support the Defense Commissary Agency (DeCA) issues this solicitation and resulting contract(s) to provide non-personal services as described in this performance based document. The Contractor will provide all labor, supplies, materials, and management to effectively perform the herein described services.

Defense Commissary Agency (DeCA) provides routine and mission-critical supermarket resources to support the military and military retired community both in the Continental United States (CONUS) and Outside CONUS (OCONUS) on a surcharge basis 7 days a week, 365 days a year. DeCA’s operational goal is to provide this service regardless of geographic location. DeCA facilities encompass mechanical, electrical, and electronic monitoring equipment necessary to provide continuous, redundant environmental support to mission-critical food supplies at each of its commissary sites (See Appendix 1. Commissary Locations). Because of the complexity and need for consistency of this support, dedicated maintenance, repair, engineering, and minor construction work is essential to ensure mission-critical food supplies remain constant and uninterrupted. This contract supplies facility maintenance and repair services to DeCA commissaries and distribution centers located in the continental United States to include Hawaii, Alaska, and U. S. possessions including Puerto and Guam.

The performance requirement of this contract is to provide an aggressive maintenance regiment to deliver food supplies to authorized customers in a cost effective manner while ensuring the individual stores minimizing non-disruptive sales operations. Contractor critical oversight during monthly Preventative Maintenance (PM) and experienced maintenance performance of monitoring equipment before failure occurs, reducing emergency actions and keeping each facility running in an energy efficient and cost effective manner is paramount.

2.2. OBJECTIVES

The purpose of this package and resulting contract is to identify and define all necessary maintenance and repair support services for total facility maintenance, commissary equipment in place, and minor construction for DeCA locations specified in Appendix 1. These contract(s) shall allow DeCA to obtain maintenance and repair support to conduct a variety of tasks quickly. The Contractor will be responsible for a wide variety of services necessary to provide a safe, sanitary, and sustainable environment for both patron shopping and DeCA operational personnel.

2.3. SERVICES

The Contractor shall be responsible for facility maintenance to include minor exterior preventative maintenance, unscheduled maintenance, and real property repair/replacement within a five foot perimeter to the exterior walls of a covered facility. Services may be required in excess of the five foot perimeter if the service directly affects the operations of the covered facility. As an example, sidewalks, curbs, or parking lots may be included if owned/maintained by DeCA and without such services provided, operation of the facility would be affected. The Contracting Officer (CO) shall approve any exceptions to the five foot perimeter by procedures in the Technical Instruction (TI) Manual (Appendix 12).

Services may also be required at other DeCA sites within CONUS identified as “potential future CONUS sites within its respective maintenance group” as listed in Appendix 1. A modification to the contract may add services at these sites within a Maintenance Group contract after pricing has been negotiated with the contractor for that Maintenance Group. A store/facility may be added to a contract awarded under this solicitation (on a limited basis). Fixed labor rates and other terms and conditions will apply to the added facility.

The contractor shall reduce the environmental impacts of work performed under this PWS by using, to the maximum extent, environmentally sound practices, processes, and products.

The term facilities maintenance refers to all permanently mounted equipment, real property and mobile non-real property equipment used to support DeCA operations. Commissary Equipment In Place (CEIP) refers to mobile non-real property equipment used to support Commissary operations. The following facility equipment and services are excluded unless specifically modified to the contract by the CO: copiers, computer equipment, telephones, telephone systems, fax machines, cash/checkout registers, checkout counters and scanners, and custodial/janitorial services.

2.3.1 Commissary Equipment in Place (CEIP)

CEIP is government owned equipment. CEIP will have a preventative maintenance (PM) component and an unscheduled maintenance component. Refer to Price Schedule for price requirements. All maintenance of all types for CEIP will be handled similarly to other maintenance as a TIs as defined in the TI Manual (Appendix 12) and Maintenance types in Para 2.3.3 below.

CEIP equipment is further define and services described for each facility in Appendix 2 Equipment Lists

2.3.2 After hours services

Services and support after normal business hours as noted herein are required as part of this contract. Both Contractor and Government shall provide primary and secondary contact information for after hour support at start of contract and shall update such information as needed for appropriate support. Contractor contact information shall be provided by the contractor to the GSA CO, GSA Project Manager (PM).

2.3.3 Maintenance Types

Services consist of Preventative Maintenance (PM) and Unscheduled Maintenance (UM).

Refer to Appendix 3- Preventative Maintenance (PM) Tasks for additional PM requirements.

1. Unscheduled Maintenance (UM) is further broken into five categories with various response times as follows:

a. Routine Maintenance Routine maintenance is the repair or replacement of any equipment items which support the day-to-day operation and maintenance infrastructure (and building envelope) for each of the DeCA facilities. Contractor will respond to the Contracting Officer’s Representative (COR), no later than seven (7) calendar days from receipt of maintenance request for diagnosis and repair.

The Contractor shall accept Routine Maintenance calls submitted through the Contractor’s proposed problem solution center (i.e. Call Center- see Section 2.3.8). Routine Maintenance will be performed during normal commissary duty hours and must be completed within (30) calendar days after approval. No overtime is authorized for routine maintenance calls.

The contractor shall provide at least 48 hours advance notice to the COR prior to start of such work to allow scheduling of any required security escorts, coordination with other Contractors, and advance notification to operational store personnel.

b. Priority Maintenance Priority Maintenance is the repair or replacement of common items that are critical to the safe and effective operation of the commissary, but do not meet the definition of an emergency. The Contractor shall accept designated Priority Maintenance calls in to the Call Center. The Contractor shall dispatch a service technician by 12:00 noon on the following business day and shall work continuously during normal duty hours on the Priority Maintenance until work completion. No overtime is authorized for Priority Maintenance services. If repair parts are not immediately available, the contractor shall notify store COR and Field Engineer to discuss work around plans to re-establish store infrastructure operations.

c. Emergency Maintenance Emergency maintenance is the repair or replacement of any subsystem or component parts of the facility infrastructure support systems in serious danger of complete failure. The Contractor shall accept designated Emergency Maintenance calls into the Call Center. The Contractor shall have a service technician onsite within 2 hours of receipt of notification/call and shall work continuously, on the Emergency Maintenance Task until work completion. If repair parts are not immediately available, the contractor shall notify the CO, COR, and Field Engineer to discuss work around plans to re-establish store infrastructure operations.

An emergency is designated by the Contracting Officer Representative (COR) if at least one or more of the following conditions exist:

· Imminent loss of perishable food supplies

· Damage to Commissary equipment

· Harm to commissary personnel or customers

d. Recommended Maintenance- Place holder to adjust this section with final definition Contractors that have completed annual equipment assessments (as required in Section 3.0- Contract Deliverables) shall create and post Recommended TI(s) per the TI Manual for all assessment recommended work. This is the only time a contractor may enter TIs not generated by the government. All other TI procedures remain the same, meaning no further work can commence until a appropriate government personnel have approved each individual TI per the TI Manual. Recommended TIs are to remain posted until the contractor is directed by the CO or COR to remove the TI. Recommended TI pricing is to remain valid for 90 days. TIs approved, with pricing older than 90 days, may be re-quoted before final approval and work is authorized.

e. Minor Construction Refer to Section 2.3.4 for details on Minor Construction

2.3.4 Minor Construction

Minor construction (which includes facilities and commercial renovation) in support of facilities maintenance for this contract will be submitted, reviewed, and solicited through the TI process. Refer to the TI Manual for details. Minor construction project shall include projects valued by the Independent Government Estimate (IGE) below $2.79M.

Construction ceilings shall be established by the government construction team using RS Means and other methods. The Contractor’s pricing shall be at or less than the construction ceiling set by the government construction team. It is strongly recommended that the Field Engineer COR and Contractor be provided any RS Means price evaluations used to establish the minor construction price ceilings. The GSA Construction Contracting Officer must establish a fair and reasonable minor construction price.

The GSA Contracting Officer will review all technical instructions to determine those TIs that are deemed to be construction. (See examples below). Such construction will be fulfilled under this contract by the contractor after the following steps have been followed.

1. CO makes a Construction Determination within 48 hours of receipt of the Field Engineer’s request by review a TI for service or construction.

2. If determined construction, the CO will email the Construction Determination and Construction Package to include the TI, Technical Analysis (TA), and Construction Determination Letter to GSA/Special Projects Division (SPD), DeCA Field Engineers and to the DeCA/Sustainment Division Business Manager.

3. After approval from DeCA, SPD shall contact the Contractor with a construction request for Task Order Price Proposal package. Contractor shall respond within 5 calendar days from receipt. Contractor may request additional proposal submittal time on a case by case basis.

4. Upon receipt of the Contractor's construction proposal the SPD CO/PM will perform a technical evaluation of the quotation and forward this recommendation to the DeCA Field Engineer for final review and approval.

Minor construction TIs determined to be emergencies or whose proposed value is at or above $10,000 shall require the contractor provide a detailed Cost Works minor construction estimate with the Contractor's proposal. Contractor pricing shall not exceed the SPD Construction CO’s established site specific construction price ceiling.

5: The SPD CO/PM shall submit the necessary documentation to DeCA/LEEF Sustainment for issuance of minor construction funding.

Example # 1: The replacement of a non-repairable sub-system component that requires more than 32 construction hours to complete.

Example # 2: Project scope is to renovate and replace the finishes in a common corridor. The effort required to execute the repair exceeds 32 hours, more than 200sq. ft. of painting services, and more than $2,000 of construction materials.

2.3.5 Financial Reporting

Provide real-time financial reporting of the data indicated in Appendix 15 “Financial Reporting”.

Contractor shall provide the data as prescribed in Appendix 15.

Weekly Financial Reporting - The contractor shall provide a weekly report to DeCA/LEEF as prescribed in Appendix 15, in Microsoft Excel format, sent via e-mail to CO and GSA PM containing the following information: Store number, Store name, TI (Technical Instruction) number, Call-In Date, Statement of Objective (48 characters max.), Priority, System, Diagnosis Fee, Proposal cost, Acceptance date, Acceptance amount, Total cost, Cancellation date, Completion date, and DD250 date, Object Class Code (See Appendix 11), and Solution comments (48 characters max.). All dates shall be DD/MM/YY format.

There shall be one line for each TI. Stored numbers shall always be designated DODDACs assigned to that site (see Appendix 1). Each TI will proceed through five or six stages of data entry depending on whether it is executed or canceled. Each report shall include all TIs completed during the current billing period and all pending TIs. If a TI is cancelled it shall be considered completed. When a TI is cancelled, the OCC code shall remain the same. TI number shall not contain any dashes.

Monthly Financial Reporting: The contractor shall provide a written monthly report to CO and DeCA/LEEF indicating preventative maintenance and unscheduled maintenance performed in the previous month by the tenth calendar day of the following month. See Section 3.0- Contract Deliverables.

2.3.6 Computerized Maintenance Management System (CMMS)-

Computerized Maintenance Management Systems (CMMS) is a contractor management program that performs functions in support of management and tracking of DeCA operations and maintenance activities. The contractor shall establish and have in operation a CMMS or similar/equivalent system upon award of the contract. Functionality and capabilities shall be commiserate with standard commercial facility maintenance industry requirements. The Contractor shall use the CMMS to identify, control, track, and schedule preventive maintenance work, service requests, and equipment inventory. The Contractor shall track historical maintenance and repair activities for each work order received during the performance of the Task Order. All work done by the Contractor shall be accomplished under a CMMS work order. Data in the CMMS under this contract shall be the property of the government and contractor shall provide data upon request to include at conclusion of this contract. The Contractor shall provide reports to the CO or designee as requested and in a format and media as requested.

· Work order generator, prioritization, and tracking by equipment

· Response/Call Center for action

· Historical tracking of all work orders generated which become sortable by equipment, date, person, vendor, responding etc.

· Tracking of scheduled and unscheduled maintenance activities

· Storing of all maintenance procedures by equipment

· Storing of all technical documentation or procedures

· Real-time reports of ongoing work activity

· Calendar- or run-time based preventative maintenance work order generation

· Capital and labor cost tracking by component as well as shortest, median, and longest times to close a work order by component

· Complete parts and materials inventory control

· PDA (Portable Data Access) interface to streamline input and work order generation (not required but desired)

· Outside service call/dispatch capabilities

· Multiple levels of access, such as, read only, write only and edit

· Coordination of data with Contractor system and Government TI system (See para 2.3.7)

· Add order/TI tracking numbers (store unique)- in TI Manual?

· Adjust these needed items to be inconjunction with 2.3.7 and DeCA/government needs.

2.3.7 Government Technical instruction (TI) Tracking

While the contractor is required to maintain a contractor owned CMMS (or like system) as noted in 2.3.6 above, the government will use government-furnished TI Tracking system for all locations under this contract. Currently this system is Electronic Project Manager (ePM). The Contractor shall use the Government-furnished ePM. The Contractor shall attend the ePM training provided by the government during the Transition Period or as needed and cooredinated with the CO.

A secure, web-based ePM system will be provided by the GSA to accommodate the information needs of all contract participants. The ePM system will be implemented at award and maintained continuously through completion of the period of performance. All communications among the major parties involved in the execution of TIs are to be captured and recorded in the ePM system. User licenses and training will be provided for all Government and contractor team members who will require access to the ePM system. The Contractor shall use the ePM system for all TIs associated with the contract.

Contractor shall use the ePM system to maintain a log of all Contractor submittals/deliverables and to manage the process of submittal/deliverable review and approval. Each submittal/deliverable will be checked for adequacy and completeness, and incomplete or inadequate submittals/deliverables will be referred back to the Contractor for further correction and resubmittal. Contractor shall follow up with the GSA CO to ensure timely responses.

Submittal/deliverable materials that are in electronic media form are to be uploaded to and transmitted among the involved parties via the ePM system. Submittals/deliverables involving materials that are not in electronic media form are to be recorded and tracked in the ePM system, with the materials transmitted by other expedited means. Scan and upload copies of approved paper-based materials to the ePM system whenever possible.

If any submittals/deliverables are processed by any means other than use of the ePM system, ensure that such submittals/deliverables are recorded and tracked in the ePM system, such that the ePM system will contain a complete record of all submittals/deliverables processed.

The Government will expedite the processing of submittals/deliverables to minimize approval times.

ePM system will also be used to formalize and secure the submission and approval process for of Technical Instructions (TIs). Contractor involved parties shall understand and agree to their respective roles, responsibilities, and timeliness requirements.

Contractor shall use the ePM system to maintain a log of all TIs. If any TIs are processed by any means other than use of the ePM system, ensure that such TIs are recorded and tracked in the ePM system, such that the ePM system will contain a complete record of all TIs submitted and the approval, cancellation, rejection, acceptance, and invoicing to provide a complete record of each TI processed. Refer to the TI Manual for guidance on how TIs are processed.

2.3.8 Maintenance Response and Call Center Operation

The Contractor shall establish and have in operation an in-house 24/7/365 Maintenance Response/Call Center upon initial award of the contract which will be fully operational for support of the requirements of this contract at the time the contractor takes over full operations. Contractors awarded more than one Maintenance Group contract may use the same call center for more than one maintenance group. Contractor systems must be capable of receiving automated alarm notifications as well as telephonic and electronic requests for emergency calls.

Contractor call processing will be broken into two distinct maintenance types, Emergency and all other Unscheduled (Priority, Routine, and Minor Construction). The Contractor shall provide Call Center services to properly categorize and record service call requests. DeCA LEEF field engineer approval is required before any routine calls can be dispatched (except for refrigerant leaks where the contractor may proceed to stop the leak(s) at the contractor’s expense).

The Maintenance Response/Call Center shall perform the following functions:

· Receive computer generated alert calls from assigned Commissaries

· Receive Commissary generated emergency calls from the COR

· Direct the necessary call responses to COR and Contractor personnel in the time frames specified in section 2.3.3.

· Call Center operations must be available 24/7/365

The Maintenance Response/Call Center shall have the following technical capabilities:

· Toll-free number

· 20 call receiving active cascade (hunt group random)

· Active call waiting for 19 calls (with cyclic response notification)

· Primary wired line with one wired backup line (no single point failure)

· Two backup cellular numbers on active cellular phones with 20 number cascades (no linkage to primary lines are necessary)

· Email backup broadband connectivity (separate wired line)

The Maintenance Response/Call Center shall be adequately staffed so that maximum wait time for calls to be answered is five minutes or less. The Contractor shall create call down lists for all Contractor supplied disciplines and Subcontractor disciplines to address all service categories used at all DeCA facility locations to which they are awarded (See Appendix 1).

2.3.9 Use and Servicing of Refrigerant

2.3.9.1 Preventative Maintenance

Refrigerant replacement is the sole responsibility of the Contractor. Refrigerant levels are expected to be maintained at the level for proper operation of all Product Refrigeration Systems, to include heat reclaim, under all operational circumstances. At a minimum, refrigeration rack system tanks shall be maintained at 30% of full. All refrigerant supplied must be factory virgin stock or recertified stock. Reclaimed refrigerant will not be utilized to charge equipment. When refrigerant loss is detected, search for leaks and repair in accordance with EPA/local Government requirements. The Contractor is to include the cost of all refrigerant, leak checking and leak repair in the monthly preventative maintenance price for each site.

2.3.9.2 Emergencies Responsibilities

Refrigerant replacement is the sole responsibility of the contractor (except for allowable exceptions in Section 2.3.9.3). Massive refrigeration mechanical system failures are included in this subsection. The government expects Preventative Maintenance to detect and repair the majority of these types of failures before they occur. Emergency repairs, costs to find and repair leaks, and replacement of lost refrigerant after a massive failure, are all at contractor’s expense (except for events covered by 2.3.9.3). Loss of refrigerant is at contractor’s expense and the contractor may immediately begin work to limit further refrigerant loss as opposed to waiting for government approval.

2.3.9.3 Government Incurred Refrigerant Loss

In the event of a refrigerant loss caused by Force Majeure or negligence on the part of the government, the Contractor may submit a request for equitable adjustment to the Contracting Officer for the labor and supply cost of refrigerant replacement.

2.3.9.4 Refrigerant Record Keeping

The Contractor is responsible for all refrigerant record keeping, reports, and log maintenance at the store with a separate record maintained for each piece of equipment, for items that can accept a charge of 50 lbs. or more of refrigerant. Contractor is responsible to incorporate changes to laws, regulations, and policies into their operations with refrigerant and is responsible for complying with updated law, regulations, policy, etc as applicable. See also Appendix 7 Refrigerant Log Book.

2.3.9.5 Disposal of Used Refrigerant

The Contractor is responsible for the removal and disposal of used refrigerant complying with all the relevant Clean Air Acts, EPA, and federal and local regulations.

2.3.9.6 Refrigerant updates and changes

New equipment may be added to this contract that uses updated refrigerant materials/supplies. Contractor is responsible for maintenance and operations of such new equipment and ensure continued compliance with applicable laws, regulations, policy, etc to maintain services under this contract.

2.3.10 Environmental controls

2.3.10.1 Conservation of Utilities.

Contractor shall use to the extent practicable, the safest and most environmentally friendly products and processes available. The Contractor shall be cognizant of and comply with all Federal, State, and Local laws and Regulations related to facility maintenance (i.e. permitting, inspection, testing and personnel safety; control of hazardous substances, certification) to include materials and associated systems used or removed in the performance of this contract. Contractor and shall comply with all such requirements, including record keeping. The Contractor shall comply with all Federal, State, and Local environmental and safety laws and regulations that relate to the maintenance and operation of equipment and systems within the scope of this Task Order. The Contractor will be responsible for any fines or penalties levied by any environmental or regulatory authority resulting from their action or inaction, (not actions or inactions from a third party or the government) and may be charged the cost as a performance deduction. In the event environmental laws/regulations change during the term of this contract, the Contractor is required to comply as such laws come into effect. The Contractor’s maintenance, operations, materials and processes shall use green products and processes to the extent practicable including, but not limited to products containing recycled content, environmentally sustainable products and services, bio-based products, and products and services that minimize the use of energy, water, and other resources.

The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions which preclude the waste of utilities, which shall include but not be limited to the following:

· Lights shall be used only in areas where and when work is actually being performed

· Utility conservation programs shall be established and improved upon, including replacement of older lighting systems with newer more efficient ones

· Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the Contractor or by Contractor employees unless authorized by the store COR.

· Water faucets or valves shall be turned off after the required usage has been accomplished.

2.3.10.2 Notification of Environmental Spills & Atmospheric Releases Communications and response actions regarding spills of hazardous material or waste shall be in accordance with the Commissary Site Spill Response Plan. It is the Contractor’s responsibility to obtain a copy of the Commissary Site Spill Response Plan which will be made available after award and during the Transition Period. The liability for the spill or release of such substances rests solely with the Contractor and its agent.

2.3.10.3 Material Storage and Use

The Contractor shall follow manufacturer's guidelines and professional/industry standards and recommendations for control of humidity, temperature, cleanliness, and materials handling and shall work with the Store/Facility COR to insure proper onsite storage and use of material. There will be no hazardous or flammable storage area provided neither on site nor at the facility/store by the government.

2.3.10.4 Hazard Communication

The Contractor shall provide all chemicals to ensure proper operation of covered equipment, including but not limited to water treatment chemicals, lubricants, and refrigerants. Our hazard evaluation has identified these types of chemicals as hazardous under OSHA's Hazard Communication Rule, 29 CFR 1910.1200. Consult Section 14 for the nature of the hazards. The Contractor shall compile and maintain a current set of Material Safety Data Sheets (MSDS) for all applicable materials, and shall comply with all of the requirements of the OSHA regulation. Other major federal environmental laws regulating responsibilities can be found under OSHA Hazard Communication 29CFR 1910.1200, SARA (TITLE III), PROPOSITION 65, CERCLA / Superfund 40CFR 117.302, Toxic Substances Control Act (TSCA), Status under appropriate law as indicated for FIFRA, FDA EPA USDA etc., Resource Conservation and Recovery Act (RCRA), The Federal Clean Air and Water Acts 40CFR 60 and 61 and 40Cr; 401.15 and 116. Any other regulations not listed, but which apply, are the responsibility of the Contractor.

2.3.11 Transition Period

The Contractor shall commence transition services within 30 days (Transition Period) prior to the Fully Operational period of the contract to assist transitioning between Contractors. The purpose of this period is to permit a transition that is seamless to the government and allow time for the new Contractor to assess the condition of the facilities, equipment, and maintenance work at the time of Contractor transition. Such assessment is described in Section XXX.

During the Transition Period the Contractor shall:

· Inspect the condition of all equipment and systems for which the Contractor will assume responsibility.

· Review work order history and validate the equipment inventory information is up-to-date

· Complete the government-furnished ePM Training

· Obtain facility access and security requirements (as needed)

· Update the preventive maintenance schedule. The new periodic maintenance schedule shall be based off of the last time PMs were performed.

· Submit deliverables as describe in Section 3.0-

· Call Center start up The Contractor will be allowed access to facilities to familiarize contractor staff with facility equipment, reporting, work scheduling and procedures after award and during the Transition Period. Contractor shall take care to minimize interference with the commissary employees or customers. Contractor shall make arrangements for access to Commissary facilities with the facility COR and CO. Access during Transition Period will be limited to the following categories of personnel: Contractor supervisory personnel, subcontractor lead personnel and Contractor foreman level personnel. Contractor foreman level personnel will be permitted access to observe facility operations, work flow, equipment handling, storage, parts inventory, safety and security procedures, etc. Transition period activities are included in the price of this contract and not priced separately.

The incoming Contractor will not perform or invoice for services until they take over full operations at the designated date by the CO. The incumbent contractor is responsible for PM until that date. The Government will provide an inventory of the status of all equipment and subsystems and the subsystems projected handover date from the incumbent contractor per store for review and use during the Transition Period.

2.3.12 Phase Out – Continuity of Services

If there is a change in the contract that prohibits continued performance by the contractor, or if the operation reverts to Government or a follow-on Contractor, the incumbent Contractor shall provide familiarization of on-going services during Phase Out. During the phase-out period, the incumbent will be fully responsible for operation of all maintenance functions as described in this contract.

The incumbent Contractor shall cooperate to the extent required to permit an orderly change over. For planning purposes, the Contractor shall assume a phase-out period of 30 days prior to contract expiration or end of period of performance. During this phase-out period, the Contractor shall:

· Be responsible for operation of all maintenance functions described herein

· Assist the CO or their designee and incoming Contractor for a seamless transition in operations and maintenance with no adverse effect on the government;

· Provide the Government and the successor Contractor with access to all records and official documentation (both hard copies and electronic as applicable) required by this contract;

· Provide access/training to the successor Contractor on methods of accessing and programming the building automation system (BAS) and other control systems; and

· Show the successor Contractor where all archived programs and systems literature are maintained.

· Turn over to the CO or their designee all keys and identification badges or cards.

· Coordinate and complete disposal, cleanup, and transfer of all materials according to applicable laws

· Provide all data records (database files, spreadsheets, etc.) relating to this task order to the overnment CO or designee.

· Validate that the equipment inventory information is up-to-date.

· Finalize all deliverables as described in Section 3.0- Contract Deliverables

· Perform a final check-out inspection to ensure that all Government Equipment listed in Appendix 2 (Commissary Equipment Lists) has been serviced according to Appendix 3 (Minimum Preventative Maintenance Task Requirements). The COR and the Contractor will perform the final check-out inspection as designated by the COR and in sufficient time to ensure all noted deficiencies are corrected prior to completion Phase Out period.

2.3.13 Contractor Personnel

2.3.13.1 Program Manager (PM)

The Contractor shall provide a Program Manager who will be responsible for the performance of all work and coordinate all work with the Store COR. The Program Manager and an equally qualified alternate shall be designated in writing by the contractor to have full authority to act on behalf of the company during contract performance. The Contractor shall provide contact information (i.e. phone number) of the PM and alternate PM for access within and outside of normal duty hours. The Contractor shall maintain a 24-hour telephone service for access to the PM or alternate PM. The Contractor’s Program Manager will not be the same person as the Area Service Manager.

The PM or Alternate PM shall be available at all times during normal duty hours. The PM shall also be available to respond to a government request within 30 minutes by telephone and within 2 hours after normal duty hours. Should the situation require an on-site presence, the PM shall be available within 24 hours CONUS to meet at the store/facility with Government personnel /COR to review the issue(s).

2.3.13.2 Contractor Employees

Contractor personnel shall present a neat appearance and be easily recognized. The Contractor shall furnish a uniform to their personnel that shall include, at a minimum, the company name, in font large enough to be read at a reasonable distance and placed in a visible area of the garment (i.e. chest area) on outer garments.

The Contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest, nor shall the Contractor employ any person who is an employee of the United States Armed Services, either military or civilian, unless such person seeks and receives approval in accordance with DoD 5500.7R (Joint Ethics Regulation). The Contractor shall not employ any person who is an employee of the United States Armed Services if such employment would be contrary to the policies contained in Air Force Instruction 64-106.

The Contractor is cautioned that off-duty active duty military personnel hired under this contract may be subject to permanent change of station (PCS), change in duty hours, or deployment. Military reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the Contractor’s ability to perform. The absence at any time shall not constitute an excuse for nonperformance under this contract.

The Contractor is prohibited from employing off-duty quality assurance evaluators (QAE’s) who are surveying any contracts/task orders/subtask orders awarded to the Contractor.

The Contractor shall be cautioned on hiring Foreign Nationals. Any Foreign National must first clear through the Foreign Disclosure Office on the site.

The contractor shall maintain satisfactory standards of an employee: competency, conduct, and integrity.

The Contractor shall provide qualified personnel with skills that permit performance of duties as detailed in this contract.

The Government will not pay training costs for replacement personnel or for the purpose of keeping Contractor employees abreast of advances in the state-of-the-art or for training of Contractor employees on equipment, computer languages, and computer operating systems that are available on the commercial market. The Contractor shall have full responsibility for keeping Contractor employees abreast of advances in the state-of-the-art.

2.3.13.3 Control of Contractor Employees

The selection, assignment, reassignment, transfer, supervision, management, and control of Contractor employees in performance of this contract shall be the responsibility and prerogative of the Contractor; however, the Contractor shall comply with the requirements set forth herein and in all regulations concerning conduct of employees as referenced herein. When the CO directs, the Contractor shall remove from performance of the contract, any person who is identified as a potential threat to the health, safety, security, or operational mission of the installation and its population.

Contractor personnel shall comply with directives pertaining to operation of privately owned vehicles on an installation (if applicable). Contractors must hand carry their vehicle registration, proof of emissions testing, proof of insurance, and valid driver’s license (as applicable) to Pass and Registration (Visitor’s Center) to obtain a base vehicle decal/pass (if applicable).

2.3.13.4 Site Maintenance Person (SMP)

The contractor shall make available a non-store specific Site Maintenance Person (SMP) to service multiple stores that are geographically grouped. The qualified personnel will be on site at store/facility periodically as a visible presence at the facility to take a proactive role in the maintenance of the stores assigned to them.

The SMP isactively looking for maintenance issues before they become mechanical failures and repair issues. Unscheduled Maintenance work beyond the scope of the SMP will be completed using the TI process. The Contractor will work proactively and will repair or replace failed facility components found. The limitations of the services are compatible to the capabilities stated below. The Contractor will develop work lists to be completed and will inform the Store COR of a proposed schedule. The SMP will be in direct contact with the store COR and will keep the COR apprised weekly of the upcoming schedule visits and work to be completed at each store. The cost of the service will be part of the Monthly Planned Maintenance cost.

The intent is to efficiently execute simple preventative maintenance actions and minor repairs quickly before they become larger problems and be on-site periodically to react to issues as they occur. Based on previous history and experience, it is expected that the SMP will have adequate tools to perform most small repairs. Small incidental materials (i.e. lubricants, caulking, screws, saw blades, etc.), costing less than $20.00 will not be charged. Any materials and specialty rental equipment used by the SMP, exceeding $20.00 in value or a series of small items used for a single repair exceeding $20.00 will be charged to the site under a separate TI for materials and equipment only (all SMP labor is accounted for in the monthly PM charge). An example, if the SMP repairs a leaky faucet and a washer valued at $1.98 is used, the cost is not reimbursable. If a new stem valve is required that costs $30.00, or if a series of small drain pipe fittings that cost in total more than $20.00 for a SINGLE repair, that cost will be charged under a TI for materials and equipment. The number and distribution strategy of SMP’s provided to perform services is at the offeror’s discretion. At a minimum, adequate SMP coverage must be provided to perform unscheduled small repairs over and above the minimum preventative maintenance requirements as described in the statement of work-one four or eight hour day every other week at smaller stores (less than 40,000 sq. ft.) and one four or eight hour day per week at larger stores (equal to or larger than 40,000 sq. ft.). All costs associated with the SMP to perform this work except materials exceeding $20.00 must be included in the firm fixed price proposal. At the offeror’s discretion, the same person who performs SMP work may also perform periodic preventative maintenance provided the SMP completes the SMP requirements at each scheduled SMP location.

Qualifications and skills required of the SMP include general handyman type work to include but not be limited to:

· General Plumbing: Fix plumbing leaks in water and sanitary pipes, replace faucets, valves and accessories, unclog waste water and condensate pipes, replace filters, fix water fountains and hangers or supports for fixtures. Replace automatic sensors in plumbing fixtures.

· General Maintenance: Replace filters in Ice machines. Replace and clean honeycombs in coolers. Check and replace drain pan for evaporators, repack glands in pumps. Fix doors; roll up doors, hinges, door closures and broken push-bars. Put sliding doors and roll-up doors on track if they go out of track. Repair or replace air curtains. Fix minor holes and cracks in building or caulking window.

· General Electrical: Replace lights when needed in coolers, freezers and other areas, sales floor, backrooms, and bathrooms; Replace electric breaker, outlets, and/or GFI. Check and make sure that the generator is operable.

· General Controls: Replace thermometers and sensors in coolers and freezers. Reset automatic door sensors

· Miscellaneous: Check and fix miscellaneous items like loose floor tile, kick plates, door bolts, door handles, damper in Air Handler Unit; grease roll up doors, replace valves, replace oven seals, replace locks for internal doors.

The SMP will coordinate with the store COR regarding status of all work. Work will be reports weekly and monthly as noted herein.

2.3.13.5 Area Service Manager

The Contractor shall provide an Area Service Manager (AM) who will be responsible for the performance of all work and coordinate all work with the COR. The Area Service Manager and an equally qualified alternate shall be designated in writing during the Transition Period by the contractor with full authority to act on behalf of the company. The Area Service Manager will not be the same person as the Program Manager. The Contractor shall provide contact information (i.e. phone number) of the AM or alternate for access 24/7. The Contractor shall maintain a 24-hour telephone service for access to the AM or the alternate AM.

2.3.14 Quality Control Plan

The contractor shall document the contractor's existing quality system in a Quality Control Plan (QCP) and provide the Government with a copy of the plan during the Transition Period.

The QCP shall be developed and submitted for approval to the CO or their designee prior to the end of the Transition Period. Upon approval, the Contractor shall implement the QCP to ensure compliance. The system of checklists, inspection methodology, and frequencies shall be documented by the Contractor. The Contractor shall maintain a local file of all quality control inspections conducted by the Contractor, including the corrective actions taken and submit copies of quality control inspections monthly in the Monthly Progress Report. All documentation shall be made available to the Government upon request during the term of the Contract. An acceptable QCP shall include, at a minimum, an effective corrective action program, lock combination plan, inspections by onsite supervisory personnel and/or by one or more qualified outside parties, work orders sampling methodology, and a program for verifying compliance with contract requirements.

2.3.15 Quality Assurance/Quality Assurance Surveillance Plan

The Government will conduct surveillance based on a Quality Assurance Surveillance Plan (QASP). Refer to Appendix 4.

There will be a Contracting Officers Representative (COR) assigned at each store/facility as well as a COR assigned at the DeCA Field Engineer (regional) level. A Quality surveillance representative (QSR) from DeCA HQ will be assigned to work through QASP issues with the CO and Contractor.

Contract Performance Contractor performance will be evaluated on the basis of the performance success or deficiencies, success or failure in meeting other contract requirements, and the Contractor’s record of correcting deficiencies when noted. While corrective actions will be noted, a record of significant performance deficiencies may lead to a performance evaluation that is less than satisfactory even if the Contractor takes corrective action.

Methods The use or nonuse of any quality assurance methods (e.g., a measurement and verification (M&V) program) by the Government will not constitute a waiver of or excuse from contract requirements. The Government may implement or change quality assurance measures at any time during the term of the contract.

Records and Files All records and files that this contract requires the Contractor to maintain shall be made readily accessible to Government representatives, including third party Contract inspectors, on request. All records and files utilized or generated during the course of the contract by the Contractor, including all standard operating procedures and building operating plans, shall become the property of the Government (this excludes contractor employee personnel files and company financial information).

Cooperation – Inspections The Contractor shall instruct all onsite personnel to cooperate with the Government or third party Contract inspector requests for records access and information. This includes answering honestly and comprehensively all questions related to performance of work. The Contractor shall provide personnel to enable inspectors, including third party Contract inspectors, to perform inspections.

Contract Performance Assessment Reporting System (CPARS) GSA uses CPARS or similar performance measuring system to formally evaluate Contractor performance. Evaluations are generally conducted annually or more frequently on or about the anniversary date of the award date and also at the end of the performance period.

2.3.16 Performance Requirements and Responsibilities

The contractor shall ensure all performance requirements as stated in the Appendix 5, “Performance Standards” are included as part of pricing. The Government acknowledges that the maintenance and responsibility for certain maintenance services may vary by site/store due to government jurisdiction (i.e. government personnel or other contractors may be responsible). One example may be that fire protection or locksmith services at some locations is the responsibility of the government.