ID07200050 Performance Work Statement Dated 26 Jan 2021_FINAL.pdf
PDF 798 KB Posted
- Solicitation number
- ID07200050
About this file
This is a performance work statement for the disassembly, transport, and reassembly of portions of one B-52H aircraft. The contractor shall provide personnel, equipment, supplies, facilities, transportation, and other items to disassemble, transport, and reassemble the fuselage and left wing of a B-52H aircraft to the Boeing Hi Bay facility in Oklahoma City, OK. The right wing and horizontal stabilizer will be transported either to Wichita, KS or back to AMARG in Tucson, AZ. The contractor must coordinate the disassembly at AMARG in Tucson, AZ by February, transport parts to designated locations, and complete reassembly in Oklahoma City by the end of the eight-month period of performance. The performance work statement provides detailed requirements and specifications for completing each step of the process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ID07200050_AMENDMENT 2.pdf | ||
| ID07200050_AMENDMENT 2_updated.pdf | ||
| ID07200050-Amendment 1.docx | DOCX document | |
| ID07200050_FBO_QUESTIONS AND ANSWERS.pdf | ||
| ID07200050_Combined Synopsis_Instructions.pdf | ||
| ID07200050 Attachment 3 Airplane Diagrams.xlsx | XLSX spreadsheet | |
| ID07200050 Attachment 5 - Pricing Spreadsheet.xlsx | XLSX spreadsheet | |
| ID07200050 Attachment 3 Plat Map.pptx | PPTX presentation |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
B-52H Aircraft 61-0009 Disassemble, Transport, and Reassemble
Air Force Lifecycle Management Command (AFLCMC) B-52H CERP Branch (WBDC)
Tinker AFB, OK
Date: 26 January 2021
General Information
1. GENERAL INFORMATION: This Performance Work Statement outlines the requirements to provide a Firm Fixed Price (FFP) Performance Based contract for the disassembly, transport, and reassembly of portions of one (1) B-52H Aircraft 61-0009.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the B-52H Aircraft 61-0009 Disassemble, Transport, and Reassemble as defined in this
Performance Work Statement except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
1.2 Background: The project goal is to move the fuselage and left wing of USAF B-52H tail number 61-
0009 to the Boeing Hi Bay facility (currently under construction) located at the Boeing Campus in
Oklahoma City, OK. The reassembled fuselage and left wing are to be used as a static mockup for development of current and future modifications associated with B-52 aircraft. The B-52H, 61-0009, is currently stored at the 309th Aerospace Maintenance and Generation Group (AMARG) at Davis-Monthan
AFB, AZ. The aircraft will be disassembled and the parts transported to new locations cited in this PWS.
The fuselage and left wing will be relocated to Oklahoma City, OK. The right wing and horizontal stabilizer will be relocated to option 1, Wichita, KS or option 2 AMARG Tucson, AZ.
1.3 Non-Personal Services: This contract is a non-personal services contract as defined by FAR Subpart
37.101. Contractor personnel rendering services under this contract are not subject to supervision or control by Government personnel. The Contractor shall be responsible for the supervision of the
Contractor employees. The Contractor shall generate reports and other deliverables as specified by the
PWS.
2.0 REQUIREMENTS DETAILS:
2.1 Objectives:
The Government intends to award a non-severable Firm Fixed Price (FFP) contract with a period of performance of 6 months from the date of award. The schedule and contract line item numbering for this requirement is as follows:
1. February contract award.
2. Contractor shall provide a Project Master Schedule, to include receiving aircraft from AMARG, disassembly, delivery, and reassembly for Government review and approval within 10 business days of award (see Performance Requirements Summary, Attachment 2)
3. Contractor takes possession of aircraft from AMARG on date identified in the approved schedule and relocates to secure worksite off of the Government facility.
• Begins disassembly
• Begins transportation preparations
• Inventory management
4. Contractor shall provide detailed mounting plans for mounting the aircraft structure in the Boeing Hi
Bay facility located in Oklahoma City within 60 days of contract award for Government approval. (See
Performance Requirements Summary, Attachment 2)
5. Contractor shall transport aircraft parts as described in “Table 1: Program Requirement”
6. Completion of transportation of the Left Wing and Fuselage will be on a Government approved date.
7. Reposition the Left Wing and Fuselage into the Boeing Hi Bay facility on a Government coordinated date.
8. Assemble and mount the Left Wing and Fuselage on Government approved support system.
9. Project completion at the Boeing Hi Bay facility Oklahoma City, OK within the contract period of performance.
10. The Contractor shall complete all other transportation events identified in “Table 1: Program
Requirement” on Government approved dates within the contract period of performance.
2.2 Scope:
The scope of this effort includes:
• Disassemble (2) wings and (1) horizontal stabilizer from (1) B-52H aircraft 61-0009.
• Prepare, transport and deliver right wing assembly and horizontal stabilizer to destination in “Table 1:
Program Requirement”.
• Prepare, transport, and deliver fuselage, center and left wing assembly to destination in “Table 1: Program
Requirement”.
• Accept any miscellaneous components on pallets or in the aircraft to identify and properly package, route, and ship components to destination/disposal as identified in “Table 1: Program Requirement”.
• Reassemble fuselage and wing assembly.
• Fabricate mounts and mount assembled fixture with left wing within designated building in “Table 1:
Program Requirement”. See “Attachment 3, Plat Mat” for more information on the delivery/installation area for more detailed information regarding the surroundings.
2.3 Specific Tasks: The Government requires tasks to be completed in accordance with Section 4 of this
PWS as listed below.
2.4 Deliverables: Deliverables will be specified by the Government. Format and delivery schedule will be outlined in the Deliverable Schedule (Attachment 2/Technical Exhibit 2 – Deliverables Schedule). All deliverables shall be timely, accurate, legible, and complete. When a deliverable is scheduled on a Federal
Holiday, the deliverable will become due the next working day following the holiday.
2.5 Period of Performance: The period of performance shall be for eight (8) months.
2.6 Place of Performance: See Section 4 Table 1.
When work is performed at the Boeing Campus building, Boeing will provide the Contractor access as needed. The Contractor shall coordinate a mutually agreeable delivery and work schedule with appropriate
Boeing or Government personnel.
The Contractor shall coordinate a mutually agreeable delivery schedule with McFarland Research and
Development Wichita, KS for the delivery/unloading of components transported using Option 1.
The Contractor shall coordinate a mutually agreeable work schedule with AMARG for aircraft acceptance and any work that will need to be accomplished at their location.
The Contractor shall coordinate a mutually agreeable work schedule with the private storage facility for delivery and any work that will be accomplished at their location.
2.7 Quality Assurance (QA): The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). See Attachment 4. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
2.8 Federal Holidays:
The following Federal holidays are observed by the Government and affect the Contractor’s ability to access Government’s facilities or Government personnel.
• New Year’s Day: January 1st
• Martin Luther King’s Birthday: 3rd Monday in January
• President’s Day: 3rd Monday in February
• Memorial Day: Last Monday in May
• Independence Day: July 4th
• Labor Day: 1st Monday in September
• Columbus Day: 2nd Monday in October
• Veterans Day: November 11th
• Thanksgiving Day: 4th Thursday in November
• Christmas: December 25th (and possibly the day after or before, depending on an executive order)
• NOTE: The Contractor shall not direct bill for holidays, sick days, vacation, etc.; these costs are included in the FULLY BURDENED FFP awarded contract rates.
In addition to the days designated as holidays, the Government may also observe the following days:
• Any day designated by Federal Statute; Executive Order; or President’s Proclamation
2.9 Type of Contract: The Government intends to award a Firm Fixed Price (FFP) contract.
2.10 Security Requirements:
While at Government locations, the Contractor shall comply with local security procedures, policies, and provide appropriate visitor data. The Contractor shall safeguard all Government property.
2.10.1 Registration of Vehicles
All Contractor employees’ vehicles used for the performance of this contract shall comply with all local, state, and federal regulations. Additionally, any pass shall be surrendered to Security Forces upon demand to positively identify a person’s need to be on a federal installation.
2.10.2 Government Security Procedures
While at Government locations, the Contractor shall comply with the USAFSAM Visitor Security procedures and policies, and provide appropriate visitor data, in addition to complying with all local, state, and Federal safety guidelines.
• NOTE: Security Requirements and Visitors Policy will be provided upon contract award.
2.10.3 Homeland Security Presidential Directive-12 (HSPD-12)
HSPD-12 was issued to implement the policy of the United States to enhance security, increase
Government efficiency, reduce identity fraud, and protect personal privacy by establishing a mandatory, Government-wide standard for secure and reliable forms of identification issued by the Federal
Government to its employees and contractors (including contractor employees). Under this directive, the heads of executive departments and agencies are required to implement programs to ensure that identification issued by their departments and agencies to Federal employees and contractors meets the
Standard. This policy can be found at the following website:
https://www.dhs.gov/homeland-security-presidential-directive-12 (click on HSPD 12 Full Text)
2.10.4 Federal Information Security Management Act (FISMA) Compliance:
All information technology that transmits, processes, stores, or displays Department of Defense information must be secured, assessed, and authorized in accordance with the Risk Management Framework and
Department of Defense Instruction 8510.01, dated March 12, 2016.
• NOTE: This requirement must be met on any procurement, IT, PS, etc., where the Contractor will have access to Government electronic information. In order to satisfy this requirement, GSA provides the
FISMA point of contact for the client agency that is responsible for maintaining their annual FISMA accreditation and certification. Agency official for FISMA compliance below:
POC name Michael Holford
Office symbol AFLCMC
Address Tinker AFB
City, State, Zip Oklahoma City, OK
Email address michael.holford@us.af.mil
Telephone number 405-736-3508
2.11 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with
Federal Acquisition Regulation Subpart 42.5. The contracting officer, GSA PM, Contracting Officer's
Representative (COR), and other Government personnel, as appropriate, may meet periodically with the
Contractor to review the Contractor's performance. At these meetings the contracting officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
2.12 Contracting Officer Representative (COR): The COR monitors all technical aspects of the contract and assists in contract administration. The COR will be identified by separate letter. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract.
2.13 Identification of Contractor Employees: All contract personnel attending meetings, answering
Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as Contractors. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
2.14 RESERVED
2.15 RESERVED
2.16 Contents of the 30 day Written Report
https://www.dhs.gov/homeland-security-presidential-directive-12
The 30 day written report shall include the following:
a. Inspect the condition of all equipment, systems, including GFE and GFP for which the Contractor will assume responsibility.
b. Review work order history and equipment inventory information.
c. Status of all open work orders.
d. Status and update of any preventive maintenance schedules. The new periodic maintenance schedules shall be based off of the last time PMs were performed if applicable.
e. Updated deficiency list report including an itemized plan for correcting each deficiency.
f. Plan for transition of software and licenses.
g. Plan for preservation and transition of all records, reports, and documents (both hard copy and electronic) that were drafted or used in the performance of this contract.
h. Plan for coordination and complete disposal, cleanup, and transfer of all materials according to applicable laws.
i. Plan to show awardee where all archived programs and systems literature are maintained and how they are used.
2.17 Deficiency List Completion and Withholding of Final Payment: The Government may create a deficiency list of unmet Contractual requirements at or near the time of termination of the contract. The
Government may employ the services of another Contractor in the development of the list and upon completion provide the Contractor with a copy of work not completed, to include the monetary value the
Government has assigned for each item. The Government retains sole discretion over whether to charge the
Contractor for the monetary value of the list in whole or in part or to request corrections by the Contractor.
If the Government elects to request corrections by the Contractor, the Contractor shall have until the end of the contract period to perform such corrections and may invoice for funds withheld on acceptance of the corrections by the Government. Nothing in this Section shall be construed to limit the Contractor’s liability or restrict the Government from reporting unsatisfactory or problematic performance by the Contactor.
2.18 Government Furnished Equipment (GFE)/Government Furnished Property (GFP):
The following will be provided as Government Furnished Property (GFP) for this effort:
• B-52H Aircraft tail number 61-0009
• Technical data
If additional GFP/GFE is required, the Contractor shall forward a request to the Government at least thirty
(30) days before the need date. A modification to the contract and a receipt listing equipment will be used to account for equipment transfer. All GFP or GFE shall be returned, shipped to a government facility, or included as part of the final deliverable, upon completion of the effort.
A Government Property Management Plan shall be active, current and in force at all times during the performance period of this task. The Government Property Management Plan shall be submitted within thirty (30) days after award and within five (5) days if any changes are made. Government property shall be reported in the Contractor’s Progress, Status and Management Report. See the incorporated Government
Property Clause (FAR Part 45) for additional requirements.
2.19 Government Furnished Information
The Government will provide Government-furnished information (GFI) (e.g., technical data, applicable documents, plans, regulations, specifications, etc.) in support of this task. The Government expressly reserves the right to add, delete, or modify at its exclusive discretion any access rights at any time during contract performance, based upon what in the Government’s judgment is necessary to most effectively and efficiently perform the mission.
The Government will provide the Contractor with access to all computer and network hardware and software necessary to fulfill the requirements of this task. The Contractors shall ensure that all GFI provided for their use shall be secured. All training materials, policies, procedures, timelines, electronic work products and/or other documentation, created in support of this task and/or provided by the
Government are the property of the Government.
2.20 Contractor Employee Guidelines
The Contractor shall not employ persons on this contract if such employees are identified to the Contractor by the client representative as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
3.0 SPECIAL TERMS AND CONDITIONS/REQUIREMENTS
3.1 Personal Services
The client has determined that use of a GSA contract to satisfy this requirement is in the best interest of the
Government, economic and other factors considered, and this contract is not being used to procure personal services prohibited by the FAR Part 37.104 titled “Personal services contract”.
To counter the circumstances that infer personal services and to preserve the non-personal nature of the contract, the contractor shall adhere to the following guidelines in the performance of the task:
• Contractor provides for direct supervision of all contract employees assigned to the task.
• Refrain from discussing the issues such as skill levels and hours, salaries, cost and funding data, or administrative and personnel matters affecting contractor employees with the client.
• Ensure close communication/coordination with the GSA PM, reporting problems to the PM as they occur
(not waiting for a monthly meeting).
• Do not permit Government officials to interview potential contractor employees, discuss individual performance, approve leave or work scheduling of contractor employees, terminate contractor employees, assist contractor employees in doing their jobs or obtain assistance from the contractor in doing
Government job.
• Do not assign contractor personnel to work under direct Government supervision.
• Maintain a professional distance from Government employees.
• Provide contractor employees with badges, if appropriate, identifying them as contractors.
• Ensure proper communications with the Government (technical discussion and Government surveillance is okay, but the Government cannot tell the contractor how to do the job).
• Assign a task leader to the contract. The task leader or alternate should be the only one who accepts tasking from the assigned Government point of contact or alternative.
• The Government has the right to reject the finished product or result and this does not constitute personal services.
• When travel is required for the performance on a task, the contractor personnel are only to travel as directed by their contract management.
3.2 Privacy Act
Work on this project may require that personnel have access to Privacy Information. Personnel shall adhere to the Privacy Act, Title 5 of the U.S. Code, Section 552a and applicable agency rules and regulations.
3.3 Unilateral Modifications for Funds Management
The standard verbiage in FAR 52.212-4 (c), which is the paragraph titled “Changes,” relating to “Contract
Terms and Conditions – Commercial Items Clause” which states: “Changes to the terms and conditions of this contract may be made only by written agreement of the parties,” is hereby tailored to allow unilateral modifications to be issued after award of this task to obligate funding (if applicable). The acceptance of the task award by the Contractor constitutes written agreement of both parties that all future modifications issued for the obligation of funding will be issued by the GSA Contracting Officer unilaterally. The
Contractor has responsibility for funds monitoring and tracking so by acceptance of this change, the
Contractor is agreeing to obtain in a timely manner the unilateral modifications from ITSS for the purpose of ensuring that funding totals are not exceeded and to ensure the Contractor’s responsibility for tracking and reporting deficits in funding can be accomplished per the terms of the PWS.
3.4 Organizational Conflict of Interest (OCI)
• The guidelines and procedures of FAR Subpart 9.5 and GSAM Subpart 509.5, Organizational and Consultant Conflicts of Interest, and FAR Part 3 and GSAM
Part 3, Improper Business Practices and Personal Conflicts of Interest, will be used in identifying and resolving any issues of a conflict of interest under this contract.
• In the event that this contract requires activity that would create an actual or potential conflict of interest, the Contractor shall immediately notify the Contracting Officer of the conflict, submit a plan for mitigation, and not commence work until specifically notified by the Contracting Officer to proceed; or, identify the conflict and recommend to the Contracting Officer an alternate approach to avoid the conflict. The
Contractor shall not contract with Government prime Contractors or first-tier subcontractors in such a way as to create an OCI. Offerors are required to disclose any existing or potential OCIs in their proposal as well as submit an OCI Mitigation Plan proposing measures to avoid, mitigate or neutralize identifies OCIs
(Reference Appendix A and Appendix B).
• Definitions: “Contractor” means the person, firm, unincorporated association, joint venture, partnership, or corporation that is a party to this contract. “Contractor and its affiliates” and “Contractor or its affiliates” refers to the Contractor, its chief executives, directors, officers, subsidiaries, affiliates, subcontractors at any tier, and consultants and any joint venture involving the Contractor, any entity into or with which the
Contractor subsequently merges or affiliates, or any other successor or assignee of the Contractor.
• An “OCI” exists when the nature of the work to be performed under a proposed ordering activity contract, without some restriction on ordering activities by the Contractor and its affiliates, may either (i) result in an unfair competitive advantage to the Contractor or its affiliates or (ii) impair the Contractor’s or its affiliates’ objectivity in performing contract work.
• To avoid an organizational or financial conflict of interest and to avoid prejudicing the best interests of the ordering activity, ordering activities may place restrictions on the Contractors, its affiliates, chief executives, directors, subsidiaries and subcontractors at any tier when placing orders against schedule contracts. Such restrictions shall be consistent with FAR 9.505 and shall be designed to avoid, neutralize, or mitigate OCIs that might otherwise exist in situations stated in FAR 9.505. Examples of situations which may require restrictions are provided at FAR 9.508.
3.5 Protests
Pursuant to FAR 16.505 (a) (10) (i) no protest is authorized in connection with the issuance or proposed issuance of an order under a task-order contract or delivery-order contract, except for (A) a protest on the grounds that the order increases the scope, period of performance, maximum value of the contract; or (B) a protest of an order valued in excess of $10 million.
4. SPECIFIC TASKS:
The Contractor shall complete the following tasks in support of this effort:
Task 1: take possession of B-52H Aircraft 61-0009 aircraft and tow to place of disassembly
• Task 2: Disassemble the B-52H Aircraft 61-0009 to meet requirements outlined in Sections “5.2
Component” and “5.3 Modifications/Tasks Required before Relocation” and prepare the fuselage for transport.
• Task 3: Transport of the B-52H Aircraft 61-0009 to its new location as outlined in “Table 1: Program
Requirement”
• Task 4: Store the B-52H Aircraft 61-0009 as necessary.
• Task 5: Deliver the B-52H Aircraft 61-0009.
• Task 6: Reassemble the B-52H Aircraft 61-0009.
Task 7: Transport right wing and horizontal stabilizer to new location as outlined in “Table 1: Program
Requirement”
4.1 Program Requirements
The Contractor shall disassemble, transport, deliver, and reassemble parts of one (1) B-52H
61-0009 as described in “Table 1: Program Requirement and Sections 4.2 Component” and 4.3
Modifications/Tasks Required before Relocation
Table 1: Program Requirement
Quantity Description Locations
1 B-52H fuselage as described in Sections “5.2 Component” and
“5.3 Modifications/
Tasks Required before
Relocation”.
Boeing High Bay Facility
Bldg. 84-301
Oklahoma City, OK
1 B-52H left wing as described in Sections “5.2 Component” and
“5.3 Modifications/ Tasks
Required before
Relocation”.
Boeing High Bay Facility
Bldg. 84-301
Oklahoma City, OK
1 B-52H right wing as described in Sections “5.2
Component” and
“5.3 Modifications/ Tasks
Required before
Relocation”.
Option 1. McFarland
Research and Development
Wichita, KS
Option 2. AMARG Tucson
AZ.
1 B-52H horizontal stabilizer as described in Sections “5.2
Component” and
“5.3 Modifications/
Tasks Required before
Relocation”.
Option 1. McFarland
Research and Development
Wichita, KS
Option 2. Return to AMARG
Tucson AZ.
A/R Miscellaneous components See Distribution Listing
The Contractor shall plan and manage daily operations and activities associated with this requirement to provide an effective and acceptable process. The Contractor shall employ effective management of tools and methods to assure control of cost, schedule, and performance. The Contractor shall provide technical support to the program office throughout the duration of this effort and beyond with post-installation support. Post installation support includes, but is not limited to: development of engineering and technical data, response to requests for technical assistance, and development of technical alternatives to remedy
Government-identified issues. As needed, the Contractor shall conduct, support, or participate in program management and technical reviews, meetings, and conferences to ensure effective and efficient project execution.
The Contractor shall be responsible for storage, staging, and deployment of any equipment and materials provided as part of this project, unless otherwise mutually agreed upon by the Government and the
Contractor. The Contractor shall submit a Contractor’s Progress, Status and Management Report monthly.
(A001, DI-MGMT-80227).
4.2 Component
1. Specifications of the Government provided B-52H 61-0009 to be relocated are:
i. Fuselage section
ii. Main landing gears and wing tip gears
iii. Left wing with all flight controls and surfaces
iv. Right wing with all flight controls and surfaces
v. Horizontal stabilizer
2. Items that have been previously removed from the Government provided B-52H 61-0009 are:
4.3 Modifications/Tasks Required before Relocation
Given the following specifications, the Contractor shall prepare the Government furnished B-52H 61-0009 aircraft for transportation per the following:
1. The Contractor will take possession of the B-52H 61-0009 as GFE/GFP at the designated AMARG gate and be responsible for towing the aircraft to a secure location to perform the disassembly.
2. The Contractor is responsible for coordination of traffic control and/or escorts as required with all state and local authorities.
3. The Contractor is responsible for any and all permits and route planning.
4. The Contractor shall provide all necessary ground handling equipment to ensure protection of personnel and aircraft.
5. The Contractor shall ensure OSHA standard safety practices are followed.
6. The Contractor shall comply with all United States Air Force (USAF), local, and Environmental
Protection Agency regulations for disposal of hazardous fluids and materials.
7. The Contractor shall ensure proper fixtures, jacks, and other devices are employed to maintain safe weight and balance configurations during the teardown process.
8. The Contractor shall ensure any remaining fuel tanks have been defueled, de-puddled, purged, and vented.
9. The Contractor shall test the internal atmosphere of any remaining fuel tanks to ensure the atmosphere is below explosive limits.
10. The Contractor shall remove external preservation material, panels, and doors as necessary to gain access to disassembly and cut areas. Access panels and doors removed when aircraft is disassembled shall be reinstalled after components have been separated from main aircraft assembly.
11. The Contractor shall contact designated COR before any cutting is done on the aircraft for these operations.
12. The Contractor shall ensure all furnishings are either properly secured or packaged for shipment.
13. Use of USAF Technical Orders (TOs) is not required but are identified in this PWS to help provide guidance for disassembly, mounting, reassembly, airframe structure information, and any hazards associated with systems and components.
• NOTE: Technical guidance and documentation may be provided by the B-52H Systems Program Office by request. Contact the COR for acquiring procedure/ assistance in acquiring B-52H Technical Order guidance.
14. Hardware removed for disassembly is permitted to be reused on aircraft provided it has not been damaged beyond intent of use.
15. The Contractor is responsible to obtain the hardware used to reassemble the B-52H. Only approved hardware for use on the B-52H may be used for reassembly of the aircraft and components. For exceptions due to unavailability or long lead times, contact the COR.
16. The Contractor shall disassemble the aircraft as defined below. Items removed from the aircraft and identified on a save list will have further instruction on their disposition. Order of operations may vary as needed to safely disassemble the aircraft.
i. Aircraft stabilization and jack points are identified in TO 1B-52H-3-1, Figure 14-4.
ii. Contractor has the option to remove main landing gear (TO 1B-52H-3-1, Section 12.1 and TO 1B-
52H-10JG-4) or use aircraft landing gear to facilitate movement of fuselage into high bay at final destination. If landing gear is removed, Contractor shall fabricate a suitable mounting structure to support and move the aircraft.
iii. Disconnect and cap off (leak proof removable cap/seal) the following:
• Hydraulic lines (TO 1B-52H-2-6JG-1 and TO 1B-52H-2-6JG-2)
• Fuel lines (TO 1B-52H-2-5JG-1)
• Pneumatic lines (TO 1B-52H-2-3JG-1)
iv. Disconnect, cap and stow all wiring trays (TO 1B-52H-2-23 and TO 1-1A-14).
• NOTE: Wrap cut cable ends to prevent cable fraying, loop ends and secure cables in wing or airframe cavities as required.
v. Remove wing assembly per guidance below:
• Remove all wing to body fairings P/N 5-41748-302 and 301 and disconnect all lines, cables, and wiring routed between wing and aircraft body.
• Jack aircraft to relieve all loads from the wing to fuselage attaching structure (TO 1B-52H-2-2GA-1, TO
B-52H-2-2JG-4 and TO 1B-52H-3-1). Remove forward and aft wing (milk bottle) pins.
• Remove entire wing assembly (left, right, and center) as one unit from fuselage.
• Fabricate fixture(s) to stabilize the aircraft fuselage section 41 to section 43 with the wing assembly removed from fuselage. This shall prevent damage of the fuselage during transportation or further jacking done with wing section removed.
• With entire wing assembly at ground level, disassemble the RH wing from the center wing box at BL55.
Retain BL55 wing splices with right wing assembly.
• Maintain center wing section with left wing assembly.
• Cap and cover all open cavities of the wing sections, ducts, fuel lines.
• Remove wing assembly.
vi. Remove or close Main Landing Gear doors (TO 1B-52H-10JG-6) to facilitate overland transportation of aircraft.
vii. Remove horizontal stabilizer per guidance below:
• Stabilize aircraft using jack points and limits (TO 1B-52H-3-1, Figure 14-4).
• Add jack at BS 1894.
• Remove lower body section 48 (P/N 25-3047) for access to remove horizontal stabilizer.
• Fabricate a fixture to stabilize the aircraft sections forward and aft of section 48 with the horizontal removed. This fixture shall remain with the aircraft for transportation of fuselage if lower section 48 not installed.
• Lower section 48 shall be reassembled on airframe. Reassembling is optional at disassembly location or final aircraft fuselage relocation point.
• Disconnect and remove stabilizer trim mechanism and horizontal stabilizer hinge pin assembly (TO 1B-
52H- 3-1).
17. The Contractor shall construct closeouts to cover openings that are a result of disassembly.
18. The Contractor shall be responsible for providing appropriate transportation and direction for safely loading and unloading the aircraft sections.
19. The Contractor shall transport the B-52H aircraft fuselage and left wing from Tucson, AZ and place it in building 84-301, Boeing High Bay in Oklahoma City, OK.
20. The Contractor shall transport the B-52H right wing, right wing flight controls, and horizontal stabilizer to Option 1: McFarland’s Research and Development in Wichita, KS. or Option 2: AMARG in Tucson AZ.
21. The Contractor will reassemble all parts/components required for reassembly effort that were shipped to
Oklahoma City.
i. Reassemble partial wing assembly and fuselage.
• Install “milk bottle” pins (TO 1B-52H-36).
• Install Left Hand wing to body fairings P/N 5-41748-30X
• Do not install Right Hand to body fairings.
22. The Contractor shall ensure that structural integrity is maintained throughout the disassembly, shipment, and reassembly processes.
23. The Contractor shall foam fill all tires.
24. The Contractor is responsible for all mounting structure in the high bay facility as follows:
i. The Contractor shall fabricate and install floor-mounting support.
ii. Stationary yet removable mounting shall be under the landing gear axle and under the wing tip landing gear struts so the fuselage lowest body point is at a minimum height of 52 inches from the floor.
Recommend steel mounting platforms.
iii. Material used for the mounting of the aircraft must be protected from deterioration and corrosion.
iv. Aircraft fuselage or tires will not contact floor with the added weight of engine struts and engines.
v. Floor mounting shall be sufficient size to distribute aircraft weights on concrete floor (estimated 6 inch thick 3500 PSI rating).
vi. Floor mount shall be minimized to allow access around aircraft as much as possible and not create a tripping hazard.
vii. Floor mounts (fuselage and wing tip) shall be fixed to concrete to prevent accidental movement yet be removable from these points by floor lift/pallet jack if required.
viii. Additional variable mounting stands may be required at wing jack points to stabilize and carry LH wing weight. Stands shall be removable, operated mechanically (no pneumatic or hydraulic allowed), and not permanently fixed to the concrete floor. (Recommend constructing jack pads and installing them at jack points of the left wing for mounting stands. Leave jack pads installed at each location with or without stand/support). Determination of the need for extra support will be made by the Government upon final installation.
25. The Contractor shall consult with, and obtain approval from the GSA Contracting Officer (CO) and the
Government, COR prior to any deviation, substitution, or change in the listed requirements. In the event the
Contractor encounters problems that may prevent or delay the execution of this effort, the Contractor shall immediately notify the COR.
26. The Contractor shall re-assemble the B-52H Aircraft 61-0009 fuselage, left wing, and associated components as required to restore the fuselage and left wing assembly to the original dimensions and structural specifications. Aircraft structural integrity must be maintained as designed.
27. The Contractor shall identify all miscellaneous components removed or provided from AMARG and verify if the item will fall in one of these directives:
i. Item identified as part of Right Hand wing assembly. (See listing for PN identifications). Item shall be packaged and shipped to destination for RH wing assembly.
ii. Item identified as part of Left Hand wing assembly. Item shall be shipped to destination of B-52H and
LH wing.
28. Items damaged and destroyed during removal process (bolts, cut items, wires, cables, tubing, preservation materials, covers, etc.) shall be properly disposed of to prevent any environmental hazards.
29. If contractor cannot identify a component all identifying numbers shall be recorded, the place found and pictures of the item shall be provided to the COR for directive of disposition of the part.
30. The Contractor shall provide a list of all removed and discarded components. (CDRL A002)
31. The Contractor shall contact the COR for disposition/turn-in instructions of all items that are removed to facilitate disassembly and not needed for reassembly of the affected area(s).
4.4 Storage of Fuselage
If delivery of the B-52H Aircraft 61-0009 occurs before April 2021 and before the building modification is completed, the Contractor may store the aircraft in the Boeing parking lot outside of the delivery location.
Upon delivery for storage, the Contractor shall secure the doors and external parts of the aircraft for security.
4.5 Delivery Instructions/Transport
The Contractor shall transport the B-52H Aircraft 61-0009 fuselage and left wing from Tucson, AZ and place them in the Hi Bay facility building 84-301 located on at the Boeing Campus in Oklahoma City, OK.
The Contractor shall coordinate the transportation date and estimated arrival time with the COR.
Consideration has to be taken in account of local base high traffic times and avoid any safety impacts.
• Option 1.The Contractor shall transport the B-52H right wing and horizontal stabilizer and deliver to
McFarland Research and Development in Wichita, KS.
• Option 2. The Contractor shall return the B-52H right wing and horizontal stabilizer to AMARG, Tucson
AZ.
The Contractor shall provide aircraft escorts, and coordinate with appropriate local officials, for assistance in escorting and traffic control prior to movement. The Contractor shall transport the B-52H Aircraft 61-
0009 segments on a Government approved time and date.
No export license will be needed for this effort. Early delivery of equipment is authorized with prior approval from the COR.
Before coordinating delivery, the Contractor shall reference the attached plat map for final site delivery
(See Attachment 4).
4.5.1 Freight Security
The Contractor shall secure all transportation loads to prevent collateral damage in the event of a mishap.
4.5.2 Special Considerations
The Contractor will consult with, and obtain approval from, the Government Program Manager prior to any deviation, substitution or change in the listed requirements. In the event the Contractor encounters problems that may prevent or delay the execution of this effort, the Contractor will immediately call the
Government Program Manager.
The Contractor shall provide all labor, material, tools, equipment, supervision, transportation, permits, cranes, and related materials necessary to execute this effort. The final destination of aircraft may require preparation of the transportation route, such as the removal of roadway signs and other obstructions, and possible re-positioning of overhead electrical/telephone lines. If re-positioning of overhead electrical/telephone lines is required, the effort must be coordinated with the appropriate agencies and contractors prior to moving the fuselage.
The Contractor shall be responsible for the removal, and/or replacement, and re-installation of any removed fence section or component (per industry standard). The Contractor shall protect the work site from damage during the execution of this effort, and restore the site to pre-work conditions (fence, site, and landscape) once the relocation of the fuselage is complete. The Contractor shall take photos to document pre and post work environmental conditions for comparison and acceptance.
The Contractor shall comply with all United States Air Force, Local and Environmental Protection Agency regulations for disposal of fluids.
4.6 Installation and Assembly
The Contractor shall re-assemble the fuselage to its modified dimensions and specifications.
Aircraft structural and systems integrity must be maintained.
The Contractor shall insulate bare ends of electrical wiring that has to be cut in the disassembly process.
The Contractor shall plug or cap all dissembled/cut fuel/hydraulic lines.
4.7 Acceptance Testing
Acceptance testing will be in the form of a visual inspection performed by a Government representative or a Government assignee. The Contractor shall coordinate the inspection and acceptance with the
Government.
4.8 Repair Services
Additional repair services to the B-52H Aircraft 61-0009, beyond what is required to accomplish the configuration outlined in this PWS are not required for this effort.
4.9 Training
No training is required as a part of this effort.
4.10 Travel
The Contractor shall perform the required travel necessary to support the execution of this effort.
4.11 Warranty
The Contractor shall provide warranty terms which are included in the delivered firm-fixed price for the items/quantities incorporated into the (i.e., no separately priced warranty), which shall be submitted to the
Government in response to this RFP. The Contractor shall transfer all warranties to the Government.
The Contractor shall repair any damage that occurs during the transportation of the B-52H to the final destinations as outlined in Table 1 above. The Contractor shall repair any property damages or aircraft damage that occurs during the project. Any damage repairs made to the aircraft will be solely at the
Contractor’s expense with no reimbursement by the Government unless authorized in advance.
5.0 INVOICING/PROCEDURES FOR PAYMENT
5.1 Electronically Posting Invoice Documents
The Contractor shall electronically transmit/submit invoices and supporting documentation for invoices through the GSA web-based procurement system, through the Central Invoice Service (CIS), the Contractor shall submit invoices electronically by logging into the ASSIST portal (https://portal.fas.gsa.gov), navigating to the appropriate order, and creating the invoice for that order. This is the only acceptable means for invoice submissions.
No paper invoices shall be accepted. For additional assistance contact the ASSIST Helpdesk at 877-472-
4877.
5.2 Invoicing Instructions Based on Order Type
Invoicing for non-severable orders shall be submitted in accordance with the pricing spreadsheet / CLIN structure. Line Items 0001 through 0004 are FFP and 0005 is reimbursable. Line Items 0001 – 0005 may only be invoiced for the full amount of the event/line item upon completion of that event/line item and acceptance of the event/line item by the Government. No partial invoices will be accepted.
5.3 Content of Invoice
The contractor’s invoice shall be submitted monthly for work performed the prior month. The contractor may invoice only for the hours, travel and unique services ordered by GSA and actually used in direct support of the client representative’s project. The invoice shall be submitted on official letterhead and shall include the following information at a minimum.
GSA contract number
Contract ACT Number
Prompt Payment Discount
Remittance Address
Period of Performance for Billing Period
Point of Contact and Phone Number
Invoice Amount
ODCs as separate line item
5.4 Receiving/Client Agency’s Acceptance
The client agency must accept the services and/or products provided under the terms of the contract.
The client agency will accept and certify services electronically via GSA’s electronic Web- Based Order
Processing System, currently ITSS, by accepting the Acceptance Document generated by the contractor.
Electronic acceptance of the invoice by the CR is considered concurrence and acceptance of services.
The client agency may also generate a hard copy acceptance document.
Regardless, of the method of acceptance the contractor shall seek acceptance and electronically post the acceptance document in GSA’s electronic Web-based Order Processing System, currently ITSS. (Written acceptances will be posted as an attachment along with any other supporting documentation.) After acceptance of the invoice by the client agency, the Contractor shall submit a proper invoice to GSA
Finance not later than five (5) workdays after acceptance by the Government of the product, service, and/or cost item. In the absence of Government acceptance within thirty (30) days, the contractor shall submit an invoice.
The acceptance of the authorized client agency representative (which is normally the COR) is REQUIRED prior to the approval of payment for any invoiced submitted.
If the required documentation including, (A) the customer’s signed written acceptance OR (B) the customer’s electronic acceptance, is not received within fifteen (15) calendar days from the date the invoice was submitted to GSA Finance, the invoice may be rejected in whole or in part as determined by the
Government.
5.5 Final Invoice
Invoices for final payment must be so identified and submitted within sixty (60) days from task performance completion and no further charges are to be billed. A copy of the written acceptance of task completion must be attached to final invoices. The Contractor shall request from GSA an extension for final invoices that may exceed the sixty (60) day time frame. No rates in this contract shall be contingent upon finalized rates, as this is not a forward pricing rate agreement contract. All rates herein shall be FFP rates. No indirect rates or profit shall be allowed on travel.
The Contractor shall submit the final invoice timely.
The Government reserves the right to require certification by a GSA COR before payment is processed.
5.6 Closeout Procedures
The Contractor shall submit a final invoice within sixty (60) calendar days after the end of the contract’s performance period. All invoices shall be received within this period. The Contracting Officer shall not extend the period of performance or the invoice submittal period to wait on subcontractors to bill the prime contractor. All rates are negotiated at the time of award and the contractor shall control and account for all time by their own personnel and their subcontractor to allow for timely billing in accordance with the terms expressed in this section. After the final invoice has been paid the Contractor shall furnish a completed and signed Release of Claims form to the Contracting Officer. This release of claims is due within fifteen (15) calendar days of final payment.
5.7 Unilateral Closeout Modifications
FAR clause 52.212-4(c) is hereby amended as follows: The Government reserves the right to issue unilateral close out modifications to close out commercial contractual agreements, after the contractor has acknowledged the order is closed and that no further liability exists on behalf of the parties. The
Government also reserves the right under the unilateral close out modification to deobligate money after full payment has been made to the contractor for their services/materials under this order.
6.0 CONTRACT PERFORMANCE EVALUATION
Effective January 15, 2019, the Past Performance Information Retrieval System (PPIRS.gov) was officially retired to conclude its merger with the Contract Performance Assessment Reporting System (CPARS.gov).
As a result, the PPIRS name appears only in the FAR; CPARS.gov is now the official source for past performance information.
In accordance with FAR 42.15, the Government will provide and record past performance information for acquisitions over the simplified acquisition threshold utilizing CPARS.gov. The CPARS process allows the contractor to view and comment on the Government’s evaluation of the contractor’s performance.
The Contractor is required to register in CPARS, so that the Contractor may review and comment on past performance reports submitted through CPARS.
CPARS https://www.cpars.gov/
7.0 OTHER CONSIDERATIONS
Accomplishment of all work included in this PWS may require the Contractor to coordinate with and work cohesively with other contractors on site. The Contractor shall work with all other onsite contractors to develop work schedules that will ensure all work under this task is completed by the specified ultimate completion date in the most efficient manner possible. The Contractor shall arrange their crew’s schedule and perform this work so as not to interfere with operations of the Government and the operations of other contractors. The Government is not responsible for, nor is it responsible for paying for, delays caused by a lack of coordination with other contractors or subcontractors. The Government will not pay for delays or other damages due to lack of coordination with other onsite contractors and subcontractors.
https://www.cpars.gov/
If the Contracting Officer determines that the contractor is failing to coordinate his work with the work of other contractors as directed, he/she may upon written notice:
• Withhold any payment otherwise due hereunder until his/her directions are complied with by the
Contractor.
• Direct others to perform portions of the contract and charge cost of work to contract amount.
• Terminate any and all portions of contract for his failure to perform in accordance with contract.
Failure to work cooperatively and cohesively with other contractors on site will result in the occurrence being documented on the Contractor’s Performance Assessment Report, which could have a negative impact on winning future work where Past Performance is an evaluation factor.
The Contracting Officer may consider time extensions and equitable adjustments only if he/ she can determine the delays effecting the ultimate completion date were solely caused by the Government.
8.0 THIRD PARTY SCHEDULE DELAYS
GSA does not warrant and cannot guarantee that the site will remain free from interference by third parties, with whom the Government has no contractual relationship.
Only delays determined to be caused by the Government that affect the contractor’s ability to complete the contract work on time will be considered for time extensions and equitable adjustments.
9.0 PWS ATTACHMENT AND APPENDIX LIST
Attachment 1: Contract Clauses
Attachment 2: CDRL’s/Deliverables
Attachment 3: Plat Map and Airplane Diagrams
Attachment 4: Quality and Assurance Surveillance Plan (QASP)
Attachment 5: Pricing Spreadsheet
Appendix A:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .