ID07180011_QASP_FINAL_4Oct2018.pdf

PDF 72 KB Posted

Attached to
Trainer Developer II Federal contract opportunity
Solicitation number
ID07180011
Issued by
GSA Federal Acquisition Service

About this file

This document outlines a federal contract opportunity for trainer developer services. The General Services Administration intends to issue an indefinite delivery, indefinite quantity contract to provide information technology and engineering support services to the 502nd Trainer Development Squadron at Joint Base San Antonio Fort Sam Houston. Services will include research, design, development, fabrication, and maintenance of simulation and training systems across various domains including flying, ground, sea, and technical training. Deliverables will include classroom training aids, static and powered mockup trainers, and multi-platform simulation devices. The primary period of performance is a five year ordering period beginning in March 2019 at contractor facilities and government locations in the United States and overseas. The solicitation number is ID07180011 and will utilize NAICS code 541512 with a $27.5 million size standard. The phase one request for proposals is due by September 2018 and will be evaluated through a two-phase competitive process.

Updated QASP 4 Oct 2014

View the file

Other files for this federal contract opportunity

Other files attached to Trainer Developer II, newest first.
File Type Posted
ID07180011_Questions_and_Answers_Final.pdf PDF
Revised_Attachment_6_GSA_Form_527.pdf PDF
ID07180011_PWS_FINAL_4Oct2018.pdf PDF
Attachment_5_Consent_To__Purchase_Form.xlsx XLSX spreadsheet
Attachment_9_Subcontracting_Plan_Template.doc DOC document
Attachment_3_Labor_Category_Descriptions.doc DOC document
Attachment_1_Pricing_Spreadsheet.xlsx XLSX spreadsheet
Attachment_4_PWS_Security_Attachment.pdf PDF
Attachment_2_Historical_Information.docx DOCX document
Attachment_10_Past_Performance_Reference_Information_Sheet.docx DOCX document
Attachment_7_Past_Performance_Questionnaire_Form.docx DOCX document
ID07180011_Solicitation_7.9.2018.pdf PDF
Attachment_8_Tax_Liability_Letter.docx DOCX document
Attachment_6_GSA_Form_527.pdf PDF
ID07180011_RFP_First_Step_READ_ME_FIRST.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID07180011

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

1. Purpose

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

• What will be monitored?

• How monitoring will take place.

• Who will conduct the monitoring?

• How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a ―living document‖ and the Government may review and revise it on a regular basis.

However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

The following FAR clause applies: 52.212-4(a) .

2. Government Roles and Responsibilities

The following personnel shall oversee and coordinate surveillance activities.

• Contracting Officer (CO) - The GSA CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

• Project Manager (PM) - The PM acts as an acquisition consultant and serves as liaison between your customer organization and their requesting program office, as well as liaison between your customer organization and the GSA supporting contracting office.

• Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the CO, the COR shall provide documentation to the CO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the CO for action.

The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract.

• Program

Manager - TBD

Telephone: TBD

Email: TBD

3. Performance Standards

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

The Performance Requirements Summary, Section C.17, Table 2 in the Performance Work Statement, includes performance standards. The Government shall use these standards to determine contractor performance.

List of Deliverables and the Performance Requirements Summary

Required Deliverables/Re ports

Required Due

Date

PLANNED

FREQUENCY

PWS

Ref.

Performance Threshold

Method of Review and

Approval of Deliverables

Program Management Plan

30 days after contract award

Once after contract award

C.5

100% Compliance/On-time delivery

COR assessment of work

Quality Control Plan

30 days after contract award

C.5 and C.9 delivery

COR assessment of work

ACA

Execution

30 days after contract award

C.16 delivery

COR assessment of work

Release of Claims

Due fifteen (15) calendar days of final payment.

15 days after final payment, G.2 and

G.10

100% Timely/Accurate Delivery

COR and/or CO/PM assessment

4. Frequency of Measurement

The COR/PM shall take annual measurements. During the task order performance, the PM and COR shall analyze whether the negotiated frequency of measurement is appropriate for the work being performed and may increase/decrease frequency accordingly.

Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance. The QASP shall be incorporated as a separate document attached to this PWS.

Contract Performance Evaluation: In accordance with FAR 42.1502, the Government will record past performance information for acquisitions over $150,000 utilizing the Contractor Performance Assessment Reporting System (CPARS). The CPARS process allows contractors to view and comment on the Government's evaluation of the contractor's performance before it is finalized. Once the contractor‘s past performance evaluation is finalized in CPARS it will be transmitted into the Past Performance Information Retrieval System (PPIRS).

Contractors are required to register in the CPARS, so contractors may review and comment on past performance reports submitted through the CPARS.

CPARS https://www.cpars.csd.disa.mil/ PPIRS http://www.ppirs.gov https://www.cpars.csd.disa/ http://www.ppirs.gov/

ID07180011
2. Government Roles and Responsibilities
3. Performance Standards
List of Deliverables and the Performance Requirements Summary

File details come from the government source that posted it. Updated .