Various Parks locations - Hurricane Ian repairs
Solicitation number
QQ-2025-043
Issued by
Collier County, Florida

About this file

This is an Independent Cost Estimate (ICE) document prepared by Collier County for hurricane repair projects funded by federal or state grant programs. The document covers repairs at three specific park locations: Golden Gate Community Center's Wheels Park observation tower, East Naples Community Park's gate, and Vineyards Community Park's pavilion soffit, all related to damages from Hurricane Ian. The total estimated project cost is $38,250.00, with a specific breakdown of $16,750.00 for the three repair tasks, each priced between $1,750.00 and $7,500.00. The estimate was prepared on 02/20/25 by Felicia Kirby-Jacobs and is scheduled to be finalized on 05/28/25.

The cost estimate was developed using in-house engineering or technical estimates, as indicated by the checked methodology box. The procurement action follows federal compliance requirements, ensuring a clear basis for determining procurement benefits, providing essential financial planning information, and establishing a foundation for cost/price analysis. The document uses a standard template for tracking cost details, including sections for standard and non-standard items, with space to document materials, labor, overhead, and profit calculations. The specific repairs are categorized as lump sum (LS) tasks, with each location receiving a distinct unit price for the required hurricane damage restoration work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COLLIER COUNTY

For the Acquisition of Goods and Services Funded By Federal/State Grant Programs

Independent Cost Estimate PRUPOSE: In connection with every procurement action, except a micro-purchase, an Independent Cost Estimate (ICE) must be prepared in advance of receiving a quote, bid, or proposal. This is necessary because the ICE documentation:

• Ensures a clear basis for determining the benefits of the procurement;

• Provides essential procurement and financial planning information;

• Documents Federal compliance in a consistent manner; and,

• Provides a basis for the cost/price analysis.

Description of Procurement Date of Estimate

Total Estimated Price/Cost

Method: The above estimate is developed from: CHECK ALL THAT APPLY

Published catalogs or price lists (attach pertinent catalog of price list pages)

Recent prices for the same or similar item (identify contracts, purchase orders, sources, and additional helpful information (e.g. dates of award), and attach any pertinent documents

In-house Engineering or technical estimates (see details below or attach estimate).

Independent Third Party estimate developed by (attach estimate).

Other (specify):

Cost Estimate Details:

Cost of Standard Items

Product Cost ($/ea.)

Notes/Data Source Unit Freight Total

Cost of Services, Repairs, or Non-Standard Items Item / Task:

Materials Other Direct

Costs Labor

(rate, hours) Labor Class

Allocated Overhead SG&A Profit Total

PREPARED BY:

Name Date est. FY14 v. 3

Various Parks locations - Hurricane Ian repairs - OPC

Scope Description Unit Qty Unit Price Total Base Bid

LS 1 $7,500.00 $7,500.00

LS 1 $1,750.00 $1,750.00

LS 1 $7,500.00 $7,500.00

Golden Gate Community Center - Wheels Park observation tower Golden East Naples Community Park - Repair gate Vineyards Community Park - Pavilion soffit repair

Total $16.750.00

ADPA184.tmp
21-8101 Bid Schedule
ADPC69B.tmp
21-8101 Bid Schedule
ADPD6F6.tmp
21-8101 Bid Schedule
2024-2400FM Hurricane Ian Restoration Project signs ICE backup.pdf
21-81XX Bid Schedule
OPC.pdf
Sheet1
OPC.pdf
Sheet1
OPC.pdf
Sheet1
Date of Estimate: 2/20/25
Description of Procurement: Various Parks locations - Hurricane Ian Repairs
Total Estimated PriceCost: 38250
Published catalogs or price lists attach pertinent catalog of price list pages: Off
Recent prices for the same or similar item identify contracts purchase orders sources and additional: Off
Inhouse Engineering or technical estimates see details below or attach estimate: On
Independent Third Party estimate developed by: Off
Third Party Name:
Other specify: Off
Othertext:
ProductRow1: see attached
UnitRow1:
FreightRow1:
TotalRow1:
NotesData SourceRow1:
ProductRow2:
UnitRow2:
FreightRow2:
TotalRow2:
NotesData SourceRow2:
ProductRow3:
UnitRow3:
FreightRow3:
TotalRow3:
NotesData SourceRow3:
ProductRow4:
UnitRow4:
FreightRow4:
TotalRow4:
NotesData SourceRow4:
Item Task:
MaterialsRow1:
Text1:
Text5:
Text9:
Text13:
SGARow1:
ProfitRow1:
TotalRow1_2:
MaterialsRow2:
Text2:
Text6:
Text10:
Text14:
SGARow2:
ProfitRow2:
TotalRow2_2:
MaterialsRow3:
Text3:
Text7:
Text11:
Text15:
SGARow3:
ProfitRow3:
TotalRow3_2:
MaterialsRow4:
Text4:
Text8:
Text12:
Text16:
SGARow4:
ProfitRow4:
TotalRow4_2:
Name_6: Felicia Kirby - Jacobs
Date_5: 5/28/25