ICE.pdf
PDF 205 KB Posted
- Solicitation number
- QQ-2026-111
- Issued by
- Collier County, Florida
About this file
This is an Independent Cost Estimate (ICE) document prepared by Collier County, Florida's Facilities Management Division for awning replacement services at the Vanderbilt Beach Parking Garage to address Hurricane Ian damage. The procurement involves replacement of canvas awnings on the west elevation (approximately 68 feet wide) at an estimated cost of $7,000 and the south elevation (approximately 29 feet wide) at an estimated cost of $4,000, along with framework tightening, securing, and adjustment at an estimated cost of $2,500. All canvas awnings must measure 153 inches to the wall plus 4 inches up the wall into the retainer strip and be fabricated in County Green color to meet current hurricane wind load requirements. The estimate was prepared on March 24, 2026, using in-house engineering estimates as the basis for the cost determination. Questions regarding the procurement were required to be submitted by April 7, 2026 at 12:00 PM, with quote responses due on April 14, 2026 at 3:00 PM through the Collier County Procurement Services Division Online Bidding System.
The total estimated contract value is $13,500, representing a Small Purchase procedure under the federal $50,000 threshold. The estimate was developed using in-house engineering and technical analysis by Michael Levy on March 24, 2026. Funding for this procurement is provided through federal and state grant programs, specifically FEMA Public Assistance funding for disaster relief, requiring compliance with all applicable federal regulations and prevailing wage requirements. Award will be made to the responsive vendor submitting the lowest quote, with firm pricing through September 30, 2026. Qualified contractors must be licensed as General Contractors or awning fabrication and installation specialists, possess all necessary business tax receipts and professional licenses, maintain comprehensive insurance coverage including workers' compensation and commercial general liability insurance with Collier County named as an additional insured, and comply with federal requirements including E-Verify enrollment and the Immigration Reform and Control Act.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Awning_replacement_at_the_Vanderbilt_Beach_Parking_Garage_–_Hurricane_Ian.pdf | ||
| Scope_-_Awning_replacement_at_the_Vanderbilt_Beach_Parking_Garage.docx | DOCX document | |
| ICE.pdf | ||
| FPP_FEMA_97.036_12.25.pdf | ||
| Insurance_Requirements_Template.docx | DOCX document | |
| MOP.pdf | ||
| PO_Terms_and_Conditions.pdf | ||
| Quick_Quotes_Instructions_Version_1_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLLIER COUNTY
For the Acquisition of Goods and Services Funded By Federal/State Grant Programs
Independent Cost Estimate PRUPOSE: In connection with every procurement action, except a micro-purchase, an Independent Cost Estimate (ICE) must be prepared in advance of receiving a quote, bid, or proposal. This is necessary because the ICE documentation:
• Ensures a clear basis for determining the benefits of the procurement;
• Provides essential procurement and financial planning information;
• Documents Federal compliance in a consistent manner; and,
• Provides a basis for the cost/price analysis.
Description of Procurement Date of Estimate
Total Estimated Price/Cost
Method: The above estimate is developed from: CHECK ALL THAT APPLY
Published catalogs or price lists (attach pertinent catalog of price list pages)
Recent prices for the same or similar item (identify contracts, purchase orders, sources, and additional helpful information (e.g. dates of award), and attach any pertinent documents
In-house Engineering or technical estimates (see details below or attach estimate).
Independent Third Party estimate developed by (attach estimate).
Other (specify):
Cost Estimate Details:
Cost of Standard Items
Product Cost ($/ea.)
Notes/Data Source Unit Freight Total
Cost of Services, Repairs, or Non-Standard Items Item / Task:
Materials Other Direct
Costs Labor
(rate, hours) Labor Class
Allocated Overhead SG&A Profit Total
PREPARED BY:
Name Date est. FY14 v. 3
Independent Cost Estimate Quantity Unit of Measure Estimate
New awning on the west side of the parking garage 1 LS $7,000.00 New awning on the south side of the parking garage 1 LS $4,000.00 Frame work (tighten, secure, and adjust of existing frame) 1 LS $2,500.00 Total $13,500.00
| ADPA184.tmp |
| 21-8101 Bid Schedule |
| ADPC69B.tmp |
| 21-8101 Bid Schedule |
| ADPD6F6.tmp |
| 21-8101 Bid Schedule |
| 2024-2400FM Hurricane Ian Restoration Project signs ICE backup.pdf |
| 21-81XX Bid Schedule |
| OPC.pdf |
| Sheet1 |
| OPC.pdf |
| Sheet1 |
| OPC.pdf |
| Sheet1 |
| OPC.pdf |
| Sheet1 |
| OPC.pdf |
| Sheet1 |
| OPC.pdf |
| Sheet1 |
| ICE.pdf |
| Sheet1 |
| Date of Estimate: 3/24/2026 |
| Description of Procurement: Awning replacement at the Vanderbilt Beach Parking Garage – Hurricane Ian |
| Total Estimated PriceCost: 13500 |
| Published catalogs or price lists attach pertinent catalog of price list pages: Off |
| Recent prices for the same or similar item identify contracts purchase orders sources and additional: Off |
| Inhouse Engineering or technical estimates see details below or attach estimate: On |
| Independent Third Party estimate developed by: Off |
| Third Party Name: |
| Other specify: Off |
| Othertext: |
| ProductRow1: |
| UnitRow1: |
| FreightRow1: |
| TotalRow1: |
| NotesData SourceRow1: |
| ProductRow2: see attached |
| UnitRow2: |
| FreightRow2: |
| TotalRow2: |
| NotesData SourceRow2: |
| ProductRow3: |
| UnitRow3: |
| FreightRow3: |
| TotalRow3: |
| NotesData SourceRow3: |
| ProductRow4: |
| UnitRow4: |
| FreightRow4: |
| TotalRow4: |
| NotesData SourceRow4: |
| Item Task: |
| MaterialsRow1: |
| Text1: |
| Text5: |
| Text9: |
| Text13: |
| SGARow1: |
| ProfitRow1: |
| TotalRow1_2: |
| MaterialsRow2: |
| Text2: |
| Text6: |
| Text10: |
| Text14: |
| SGARow2: |
| ProfitRow2: |
| TotalRow2_2: |
| MaterialsRow3: |
| Text3: |
| Text7: |
| Text11: |
| Text15: |
| SGARow3: |
| ProfitRow3: |
| TotalRow3_2: |
| MaterialsRow4: |
| Text4: |
| Text8: |
| Text12: |
| Text16: |
| SGARow4: |
| ProfitRow4: |
| TotalRow4_2: |
| Name_6: Michael Levy |
| Date_5: 3/24/2026 |
File details come from the government source that posted it. Updated .