ICE.pdf

PDF 205 KB Posted

Attached to
Awning replacement at the Vanderbilt Beach Parking Garage – Hurricane Ian
Solicitation number
QQ-2026-111
Issued by
Collier County, Florida

About this file

This is an Independent Cost Estimate (ICE) prepared by Collier County, Florida for the acquisition of goods and services funded by federal and state grant programs. The procurement relates to awning replacement at the Vanderbilt Beach Parking Garage, specifically addressing Hurricane Ian restoration needs. The project encompasses three main work items: installation of a new awning on the west side of the parking garage, installation of a new awning on the south side of the parking garage, and framework repairs involving tightening, securing, and adjustment of existing structural elements. All items are quoted on a lump-sum basis with quantities of one for each component.

The total estimated price for the complete project is $13,500.00, comprised of $7,000.00 for the west awning, $4,000.00 for the south awning, and $2,500.00 for framework repairs. The estimate was prepared on March 24, 2026, by Michael Levy using in-house engineering and technical estimates as the methodology. The ICE documentation serves to establish a clear basis for procurement planning, provide essential financial planning information, demonstrate federal compliance, and establish a foundation for cost and price analysis in the competitive bidding process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COLLIER COUNTY

For the Acquisition of Goods and Services Funded By Federal/State Grant Programs

Independent Cost Estimate PRUPOSE: In connection with every procurement action, except a micro-purchase, an Independent Cost Estimate (ICE) must be prepared in advance of receiving a quote, bid, or proposal. This is necessary because the ICE documentation:

• Ensures a clear basis for determining the benefits of the procurement;

• Provides essential procurement and financial planning information;

• Documents Federal compliance in a consistent manner; and,

• Provides a basis for the cost/price analysis.

Description of Procurement Date of Estimate

Total Estimated Price/Cost

Method: The above estimate is developed from: CHECK ALL THAT APPLY

Published catalogs or price lists (attach pertinent catalog of price list pages)

Recent prices for the same or similar item (identify contracts, purchase orders, sources, and additional helpful information (e.g. dates of award), and attach any pertinent documents

In-house Engineering or technical estimates (see details below or attach estimate).

Independent Third Party estimate developed by (attach estimate).

Other (specify):

Cost Estimate Details:

Cost of Standard Items

Product Cost ($/ea.)

Notes/Data Source Unit Freight Total

Cost of Services, Repairs, or Non-Standard Items Item / Task:

Materials Other Direct

Costs Labor

(rate, hours) Labor Class

Allocated Overhead SG&A Profit Total

PREPARED BY:

Name Date est. FY14 v. 3

Independent Cost Estimate Quantity Unit of Measure Estimate

New awning on the west side of the parking garage 1 LS $7,000.00 New awning on the south side of the parking garage 1 LS $4,000.00 Frame work (tighten, secure, and adjust of existing frame) 1 LS $2,500.00 Total $13,500.00

ADPA184.tmp
21-8101 Bid Schedule
ADPC69B.tmp
21-8101 Bid Schedule
ADPD6F6.tmp
21-8101 Bid Schedule
2024-2400FM Hurricane Ian Restoration Project signs ICE backup.pdf
21-81XX Bid Schedule
OPC.pdf
Sheet1
OPC.pdf
Sheet1
OPC.pdf
Sheet1
OPC.pdf
Sheet1
OPC.pdf
Sheet1
OPC.pdf
Sheet1
ICE.pdf
Sheet1
Date of Estimate: 3/24/2026
Description of Procurement: Awning replacement at the Vanderbilt Beach Parking Garage – Hurricane Ian
Total Estimated PriceCost: 13500
Published catalogs or price lists attach pertinent catalog of price list pages: Off
Recent prices for the same or similar item identify contracts purchase orders sources and additional: Off
Inhouse Engineering or technical estimates see details below or attach estimate: On
Independent Third Party estimate developed by: Off
Third Party Name:
Other specify: Off
Othertext:
ProductRow1:
UnitRow1:
FreightRow1:
TotalRow1:
NotesData SourceRow1:
ProductRow2: see attached
UnitRow2:
FreightRow2:
TotalRow2:
NotesData SourceRow2:
ProductRow3:
UnitRow3:
FreightRow3:
TotalRow3:
NotesData SourceRow3:
ProductRow4:
UnitRow4:
FreightRow4:
TotalRow4:
NotesData SourceRow4:
Item Task:
MaterialsRow1:
Text1:
Text5:
Text9:
Text13:
SGARow1:
ProfitRow1:
TotalRow1_2:
MaterialsRow2:
Text2:
Text6:
Text10:
Text14:
SGARow2:
ProfitRow2:
TotalRow2_2:
MaterialsRow3:
Text3:
Text7:
Text11:
Text15:
SGARow3:
ProfitRow3:
TotalRow3_2:
MaterialsRow4:
Text4:
Text8:
Text12:
Text16:
SGARow4:
ProfitRow4:
TotalRow4_2:
Name_6: Michael Levy
Date_5: 3/24/2026