Questions_and_Answers.docx
DOCX document 180 KB Posted
- Attached to
- Architect-Engineering Services IDIQ Federal contract opportunity
- Solicitation number
- IBM17R0004
About this file
Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_II.docx | DOCX document | |
| J.02_Revised_Evaluation_Factors_for_IDIQ_Services.pdf | ||
| IBM17R0004_M001_A&E_IDIQ.pdf | ||
| IBM17R0004_A&E_IDIQ.pdf | ||
| J.01_FY18_IDIQ_A-E_Services_SOW.pdf | ||
| J.02_Evaluation_Factors_for_IDIQ_Services.pdf | ||
| J.03_SF330-16a.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section
I.
| Source Document/Page |
| Question |
| 1 |
| Combined Synopsis / Solicitation; General |
| How soon with the government respond to questions? Response time is two to three weeks. |
| 2 |
| Combined Synopsis / Solicitation; General |
| Please confirm that multiple awards will be made for this IDIQ and provide the expected number of awards. Multiple awards will be made but difficult to provide the expected number now which will depend on the project priority and availability of funds in future. |
| 3 |
| Combined Synopsis / Solicitation; General |
| Does the IBWC have a preference or requirement that the printed copies of the proposal be published single-sided or on double-sided pages? Double sided, Refer to FAR Clause 52.204-4 |
| 4 |
| Combined Synopsis / Solicitation; General |
| Is there an overall page limit for the entire proposal? There is no overall page limit but the evaluation will be based on the Merit Factors stated in J.02 Evaluation Factors document. |
| 5 |
| Combined Synopsis / Solicitation; General |
| For the statement that reads - "Offerors are required to conform with FAR 52.219-9 regarding the requirement for a subcontracting plan on the part of the work to be subcontracted," - please identify what the overall small business participation goals or requirements are for this contract and the goals/requirements for each small business category. Subcontracting plans will be in accordance with FAR 19.7 |
| 6 |
| Combined Synopsis / Solicitation; General |
| Is a small business subcontracting plan required with the submittal? |
Yes, subcontracting plan is required for all proposed subcontractors which can be put in a separate Tab after the Merit Factors.
| 7 |
| Combined Synopsis / Solicitation; Special Requirements: |
| For the statement that reads - "Contractors must be able to coordinate with the Republic of Mexico and perform work within the States of Tamaulipas, Nuevo Leon, Coahuila, Chihuahua, Sonora, and Baja California for international projects," - please clarify if we are required to include firms or individuals that are licensed in Mexico and also identify which work categories of work will be performed in Mexico. Is it considered a benefit to include a Mexican National Architect and/or Engineer as part of the team with this submittal? |
This statement is to let the contractors know that the work will have to be coordinated in a foreign environment with different language and work culture. There is no preference for Mexican Firms, Mexican National Architect or Engineers.
| 8 |
| Combined Synopsis / Solicitation; Submit Proposals |
| For the statement that reads - "SF 330's must also be submitted for all proposed subcontractors," - please confirm that this phrase only applies to the SF 330 Part II, and that their resumes (Section E) and projects (Section F) and that these can be incorporated into the Offeror's (prime's) submittal. |
The quoted statement applies to both Part I and Part II of SF 330s; proposed subcontractor’s information needs to be incorporated into the Offeror’s submittal.
| 9 |
| Combined Synopsis / Solicitation; Submit Proposals |
| Please clarify the minimum and maximum number of projects that are required to be submitted for Section F of the SF 330. |
There are no minimum or maximum number of projects for Section F of the SF 330, rather a representative suite of projects to be listed here to demonstrate firm’s qualifications.
| 10 |
| Evaluation Factors, Instructions, Page 1 Of 5 |
| Please clarify the expectation for the SF 330 and the Additional Factors (Merit Factors 1 - 5) in terms of location of material to be presented. There is some question about whether BOTH a full SF 330 Part I - Sections A through H is required, and if a repetition of some of the material is requested in Merit Factors 1, 2, and 3; or, is the requirement to include all the Merit Factors in Section H or collectively in an appendix to SF 330. |
A full SF 330 with both Part I and Part II (all the sections filled in) followed by the Merit Factors in separate Tabs is required.
| 11 |
| Evaluation Factors, Instructions, Page 1 Of 5 |
| Is the requirement that we submit one binder containing the SF 330 and a separate binder containing the Merit Factors? Or, should all the SF330 Sections and Merit Factors be included in one binder. If the Merit Factors are required to be included in the same binder with the SF330, where in the sequence should the Merit Factors be included? Only one binder is required; Merit Factors needs to be included with separate Tabs after Part II of SF 330. |
| 12 |
| Evaluation Factors, Instructions, Page 1 Of 5 |
| Please clarify whether Merit Factor 1, which states on page one that "each Offeror shall submit a maximum of one page response per Item under each category." Given that there are 9 categories and each category has multiple subcategories, is the Government requesting 9 pages which addresses the categories, or 33 pages which covers all of the subcategories. |
Thirty-three (33) pages will cover all of the Items within each Category.
| 13 |
| Evaluation Factors, Instructions, Item 1, Page 1 Of 5 |
| The requirement is that all responses shall be in 12 point, Times New Roman Font. Does this also apply to tables and graphs, or - can we provide tables and graphics with text that is smaller or with different fonts provided they are still easy to read? |
12 point, Times New Roman Font applies to all texts excluding tables and graphics. Tables and graphics can be presented with smaller or different font texts provided they are easy to read.
| 14 |
| Evaluation Factors, Instructions, Item 2, Page 1 Of 5 |
| Are the projects (1 pages each) requested in Merit Factor 1, replacing Section F of the SF 330? Or is the requirement to provide separate and/or redundant projects under a Separate Merit Factor 1 Tab? |
No, Section F of the SF330 will show firm’s qualifications and capabilities. A separate Merit Factor 1 Tab will show the specific projects as per evaluation criteria of Merit Factor 1.
| 15 |
| Evaluation Factors, Instructions, Item 5, Page 1 Of 5 |
| Please confirm the order of the tabs anticipated for the submittal. Typically, we would have tabs for SF 330 Part I, Sections A-C, Section D, Section E, Section F, Section G, and Section H. Part II's would follow. Where then do the Merit Factors fit in, and does the designation of separated by tabs apply? |
Please provide the information for Merit Factors in separate Tabs after Part II of SF 330.
| 16 |
| Evaluation Factors, Instructions, Evaluation Scoring, Page 1 Of 5 |
| The evaluation and scoring criteria states that the information that will be evaluated and scored is limited to that which will be provided under each Merit Factor. How will the other information provided in the various SF330 sections be considered, scored or used in the evaluation of proposals? The reason this is asked is because there are several statements that note that - "additional information submitted other than what is requested as part of the information required under each Merit Factor will not be read and evaluated." |
SF 330 will show the firm’s qualifications and capabilities which will be referred to while evaluating the Merit factors. Additional information here refers to extra information beyond the page limit specified in the evaluation of each Merit Factor.
| 17 |
| Evaluation Factors, Instructions, Page 1 Of 5 |
| Are the projects requested in Merit Factor 2, replacing Section F of the SF 330? Or is the requirement to provide separate and/or redundant projects under a Separate Merit Factor 2 Tab? |
No, Section F of SF330 will show the firm’s general capability. For Merit Factor 2, projects need to be listed/described in a separate Merit Factor 2 Tab.
| 18 |
| Evaluation Factors, Instructions, Page 1 Of 5 |
| In Merit Factor 2, please clarify the term "Provide a list of projects performed during the last 5 years …" The term "list of projects" appears to be at odds with the statement that the "description of work shall not exceed ten lines." |
The “description of work shall not exceed ten (10) lines” is related only to Merit Factor 2, 1(g).
| 19 |
| Evaluation Factors, Merit Factor 2, Item 1 On Page 3 Of 5 |
| The requirement for Merit Factor 2, which states - "Provide a list of projects performed during the last five (5) years similar in nature to the work described for each Category under Merit Factor 1. For Categories 1 through 5, a maximum of five (5) projects per Category shall be listed. For Categories 6 through 9, a maximum of two (2) projects per Category shall be listed." Given that there are 21 subcategories under categories 1 to 5, is the Government requesting a maximum of 5 projects for each subcategory for a total maximum of 105 projects? Also, for categories 6 to 9, which have a total of 12 subcategories, is the Government requesting a maximum of 2 projects for each subcategory for a total maximum of 24 projects? or, do these requirements apply to the main categories only, which would then require a maximum of 25 projects under categories 6 to 9 and a maximum of 8 projects under categories 6 to 9? |
The maximum applies to the Category, not Item, therefore, a maximum of twenty five (25) projects for Categories 1 through 5, and maximum of eight (8) projects for Categories 6 through 9 are required.
| 20 |
| Evaluation Factors, Merit Factor 2, Item 2 On Page 4 Of 5 |
| Please confirm that the statement "Provide one (1) example, for each Category 1 through 9 above, of past performance in quality of work, cost controls, compliance with performance schedules, and managerial abilities, demonstrating timely completion, reasons for any modifications to contract, and difficulties or issues with contract and resolution to each," really means that the Government is expecting a total of nine 1/2 page write-ups and that each write-up must cover the four major headings of (1) quality of work (2) cost control (3) compliance with performance schedules and (4) managerial abilities. |
Yes, as stated in Merit Factor 2, Item 2 on Page 4 of 5; however, two examples (2) can be included in one (1) page, reducing the total number of pages submitted.
| 21 |
| Evaluation Factors, Merit Factor 2, Item 3 On Page 4 Of 5 |
| Is there a minimum number of awards that is expected to be submitted under this requirement? Proposals will be evaluated on the projects performed during the last five (5) years. |
| 22 |
| Evaluation Factors, Merit Factor 3, Item 1 On Page 4 Of 5 |
| Are resumes required to be included as part of the response for Merit Factor 3? If yes, where should these resumes be included - in Section E of the SF330, or in a separate appendix? Resumes are included in SF 330s for Merit Factor 3. |
| 23 |
| Evaluation Factors, Merit Factor 3, Item 1 On Page 4 Of 5 |
| For Merit Factor 3 - do the 20 key disciplines represent the only resumes being requested? If we include resumes for other professionals in other relevant disciplines, will these be evaluated? These twenty (20) key disciplines are suffice to provide information discussing qualified professionals in Offeror’s organization at this time; however selected IDIQ contractors have to provide list of specific qualified employee for each task order in future. |
| 24 |
| Evaluation Factors, Merit Factor 3, Item 1 On Page 4 Of 5 |
| Does the government want resumes for Key Personnel to appear in Section E of the SF 330, and to replicate those same key personnel in Merit Factor 3? Resumes will be included in Section E of the SF 330. Merit Factor 3 does not require resumes, only brief discussion of qualified professionals. |
| 25 |
| Evaluation Factors, Merit Factor 3, Item 1 On Page 4 Of 5 |
| Please clarify the statement "The Offeror shall not exceed 2 pages in length" as it pertains to Merit Factor 3 and the 20 categories listed. Is the requirement that the entire write-up for the response to Merit Factor 3 not exceed 2 pages or is the requirement no more than 2 pages for each category, for a total maximum of 40 pages? “2 pages in length” is a typo; maximum twelve (12) pages can be included for the Merit Factor 3. |
| 26 |
| Evaluation Factors, Merit Factor 3, Item 1 On Page 4 Of 5 |
| Please clarify the governments expectation for the position of "Multi-Disciplined Security Specialist". Which of the following areas of work is required for this category - controlled site access, cyber security, facility hardening / ATFP, RAM analysis of government facilities and sites, video surveillance, or exterior intrusion alarms? Primarily physical security to secure a federal facility. |
| 27 |
| Evaluation Factors, Merit Factor 3, Item 1 On Page 4 Of 5 |
| Should Offeror's include Fire Protection Engineering as part of the team resources? Not required. |
| 28 |
| Evaluation Factors, Merit Factor 3, Item 1 On Page 4 Of 5 |
| How much hazardous waste work is anticipated under this program? It can’t be determined at this time because the work will depend on future project site. |
II.
1. The J.02_Evaluation_Factors_for_IDIQ_Services.pdf references “the last page” for a sample response for format, but I was unable to locate this sample document.
Please disregard this sentence; sample response will not be provided as filling in instructions are provided with SF 330. The various sections of SF 330 and Merit Factors document need to be separated by Tabs to help during reviewing and evaluating process.
2. Typically, we develop a joint SF330, Part I, which includes all subcontractor information, but we do include a Part II for each subcontractor. Is this the expected response for this submittal as well?
Yes.
3. Are registrations/certifications required for the cost engineer and network/communications engineer?
Merit Factor 3 requires to provide information discussing qualified professional who are certified and highly trained in various disciplines listed in J.02 Evaluation Factors including cost engineer and network/communications engineer.
4. Any chance of an extension due to Memorial Day as many folks will take time off around the holiday?
Due 9 June 2017.
III.
1. How will the SF330 Section of Offeror’s submittals be scored?
While evaluating the Merit Factors, the reviewers will also refer to contents in SF 330.
a) Will SF330 Section E Resumes be scored as part of Merit Factor 3 - Professional Qualifications Necessary for Satisfactory Performance of A-E Services? If not, please identify how SF330 Section E Resumes will be evaluated.
Merit Factor 3 will include discussion of qualified professionals in the 20 key disciplines. The reviewer will refer back to SF 330 Section E resumes during reviewing process.
b) Will SF330 Section F Projects be scored as part of Merit Factors 1 and/or 2? If not, please identify how SF330 Section F Projects will be evaluated.
Suite of projects listed in Section F will provide Offeror’s qualification; these projects can also be part of Merit Factors description. During evaluation, the reviewers will refer back to the complete SF 330.
2. Please confirm that offeror’s projects shown in the SF330 Section F may include IDIQ contracts as well as individual Task Orders or stand-alone contracts.
Yes.
3. Please clarify whether the responses to Evaluation Factors are to be provided separate from the SF330 submittal (in its own binder) or if the responses to Evaluation Factors should be included as part of the SF330 Section H (included in the SF 330 binder)?
Merit Factors separated by Tabs can be placed after the Part II of SF 330 within the same binder.
4. If the responses to the Evaluation Factors are to be provided in a binder separate from the SF 330, please confirm the number of binders to be provided for the Evaluation Factor submittal. Is one binder required (as indicated in Item 6), or should five binders be provided (similar to the SF330 submittal requirement)?
One three ring binder is sufficient to include the SF 330, followed by the Merit Factors separated by Tabs.
5. What information is supposed to be included on the digital copy on CD? Just the SF330, or also the response to the Evaluation Factors?
Everything provided in the three ring binder needs to be included on CD.
6. What type of information is requested or recommended to be included in Section H of the SF330 submittal?
Any additional information not included in other sections of SF 330 or Merit Factors can be included in Section H to help the reviewer understand offeror’s capabilities.
IV.
1. Are bidders required to provide a Small Business Subcontracting Plan per FAR 52.219-9 as part of our proposal submission?
Yes, it needs to be placed after the Merit Factors separated by a Tab.
2. Are bidders required to provide a completed Section K- Representations, Certifications, and Other Statements of Offerors or Respondents as part of our proposal submission?
Section K.01 needs to be included in a separate Tab named “Additional Information”.
3. Are bidders required to provide a completed Section L.01 as part of our proposal submission?
Section L.01 needs to be included in a separate Tab named “Additional Information”.
4. In Section M.01 of the Solicitation document, Merit Factor 5 is identified as Internal Projects. However, Attachment J.02 Evaluation Factors, indicates that Merit Factor 5 is Firm’s location and knowledge of the locality. Please clarify.
Section M.01 of solicitation changed to match Attachment J.02.
5. Regarding Attachment J.02 Evaluation Factors:
a. Please confirm the reference to the 12 point, Times New Roman applies only to the additional information portion of our submission.
12 point, Times New Roman Font applies to all texts excluding tables and graphics. Tables and graphics can be presented with smaller or different font texts provided they are easy to read.
b. Given the large amount of required information that must be provided within the specified page limits, may bidders use 10 point for tables and graphics?
Yes, as stated in answer to question 5a as long as it is easy to read.
c. Page 1 indicates that a format of sample responses is provided on the last page. However, none were provided. Please provide a format of sample responses to ensure our responses are provided in the format that will be evaluated.
Please disregard this sentence; sample response will not be provided as filling in instructions are provided with SF 330. The various sections of SF 330 and Merit Factors document need to be separated by Tabs to help during reviewing and evaluating process.
6. RFP Documents refer to three sections for this proposal: 1) SF 330; 2) Merit Factor Responses; and 3) Volume I. Can you please confirm the order of the requested sections in the binder?
There is no preferred order as long as sections are separated by Tabs and a Table of Contents is provided at the beginning.
V.
| RFI# |
| RFQ/RFP Section/Page (Reference) |
| Questions |
| 1 |
| FBO, page 1: Response date |
| With Monday 29 May being Memorial Day, request IBWC delay the response date to Friday 2 June 2017. This will allow time for firms to make delivery of proposals without losing several days caused by the holiday. |
Change due date to 9 June 2017.
| 2 |
| FBO, Page 2, Submit Proposals |
| Section states: "SF 330's must also be submitted for all proposed subcontractors." Did you mean to request the SF-330 Part IIs for all subcontractors, or is this a request for something else? Please clarify what is needed. |
The quoted statement applies to both Part I and Part II of SF 330s; proposed subcontractor’s information needs to be incorporated into the Offeror’s submittal.
| 3 |
| IBM17R0004_AE_IDIQ_050417 (SF252) |
| Was the SF252 released for contract awareness only, or do you require specific sections from the SF252 to be submitted along with the SF330? If the latter, please specify what action to take. |
SF 252 is required with proposal.
VI.
1. Will USIBWC accept the org chart as an 11x17 size and if so, will it count as 2 pages?
Use 8.5 inch X 11.0 inch size paper for all your responses.
2. Do the font and margin requirements apply to all SF330 sections or just the five Merit Factors?
The font and margin requirements apply to both SF 330 as well as Merit Factors. However for tables and graphics, smaller font size can be used as long as it is easy to read.
3. Would the USIBWC consider a smaller and/or different font other than 12 pt Times New Roman acceptable for tables and exhibits?
For tables and graphics, smaller font size can be used as long as it is easy to read.
4. The RFP states that SF 330's must also be submitted for all proposed subcontractors. Does USIBWC expect a SF330 Part I and II for all subs or just a Part II for each subcontractor?
Please provide the subcontractor’s information in both Part I and Part II of SF 330 along with the Offeror’s information.
5. Is there a backlog of projects for the new contract and if so, what is the magnitude of the projects expected in the first year of the contract?
Number of projects expected can’t be determined now as it depends on project priority and availability of funds.
6. Does the USIBWC expect to see offerors identify geotechnical testing subcontractors under this contract?
Yes, if you plan on subcontracting these services.