A001.pdf

PDF 75 KB Posted

Attached to
Replacement of the American Canal Lining Lower Reach
Solicitation number
IBM14B0002
Issued by

About this file

Amendment A001

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE RATING

2. AMENDMENT/MODIFICATION NO.

A001

3. EFFECTIVE DATE

08/13/2014

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

IBWC_CODE

International Boundary and Water Commission

(IBWC)

USIBWC - ACQUISITIONS DIV

4171 NORTH MESA, STE. C100

EL PASO, TX 79902-1441

Laura A. Baker

NAME

915-832-4119

TEL.

laura.baker@ibwc.gov

EMAIL

6. ISSUED BY IBWC_CODE

International Boundary and Water Commission (IBWC)

USIBWC - ACQUISITIONS DIV

4171 NORTH MESA, STE. C100

EL PASO, TX 79902-1441

7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NO.

IBM14B0002

CONTACT DUNS

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

08/01/2014

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment;(b)By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.__1__X

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of Amendment A001 is as follows:

a. Correct the description for CLINs 003, 004, and 005. Reference Page 3 of this Amendment.

b. Correct Clause H.16 to change the word "levee" to "project".

c. Attach the sign-in sheet from the Pre-Bid Conference and Site Visit.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Laura A. Baker

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

IBM14B0002

Table of Contents

Section Description Page Number

H Special Contract Requirements H.16 Seeding and Maintenance Period H.16 Seeding and Maintenance Period

001 No Cost Receiving Line 30.00 0.00

30.00 EA

Doc Ref No: 4309S4021002

Delivery Date FOB:

Destination

002 Construction Improvements 1.00 0.00

1.00 LS

Doc Ref No: 4309S4021002 Delivery Date FOB:

Destination

003 Handling and Disposal of Contaminated Water 1.00 0.00

1.00 LS

Doc Ref No: 4309S4021002 Delivery Date FOB:

Destination

004 Handling and Disposal of Contaminated Soil 1.00 0.00

1.00 LS

Doc Ref No: 4309S4021002 Delivery Date FOB:

Destination

005 Structural Fill (excludes all other fill) 1.00 0.00

1.00 LS

Doc Ref No: 4309S4021002 Delivery Date FOB:

Destination

IBM14B0002

Line Item Summary

Solicitation Number:

IBM14B0002

Contract Number: Title: Replacement of American Canal Lining - Lower Reach

Date of Solicitation:

08/13/2014

Line Item No. Description Quantity Unit Unit Price Total Cost

Section H- Special Contract Requirements

Clause H.16 Seeding and Maintenance Period was deleted.

H.16 Seeding and Maintenance Period

All maintenance of seeding shall be completed within one hundred and eighty (180) calendar days of completion of all other project work. This period of 180 calendar days is included in the period of performance at Contract Clause 52.211-10.

File details come from the government source that posted it. Updated .