Abstract Spreadsheet.xls
XLS spreadsheet 49 KB Posted
- Attached to
- RECOVERY - Urban Levee Remediation Rio Grande and Cibolo Creek from Station 10+00 to 453+00, Presidio, TX
- Solicitation number
- IBM10B0009
About this file
Presidio Abstract of bidders for previous solicitation IBM09B0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract Spreadsheet.xls | XLS spreadsheet | |
| Presidio 100 Tech Memo-Geotech Appendix 20100602.pdf | ||
| Presidio question and response.doc | DOC document | |
| Presidio Levee Specs 02.35.27 20100803.pdf | ||
| IBM10B0009 A004.pdf | ||
| IBM10B0009 A003.pdf | ||
| additional questions acq.doc | DOC document | |
| IBM10B0009 A002.pdf | ||
| pre-bid attendees.pdf | ||
| IBM10B0009 A001.pdf | ||
| IBWC 117.pdf | ||
| IBM10B0009.pdf | ||
| IBWC 110.pdf | ||
| davisbacon.txt | TXT text file | |
| sf28.pdf | ||
| IBWC 116.pdf | ||
| sf24_f.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Abstract
| Solicitation | IBM09B0001 | Construct - Presidio Levee System Emergency Remediation | ||||||||||
| Contract Line Item No. (CLIN) | BID ITEM | Unit | Estimated Quantity | MDA | SHS | LICON ENGINEERING | ||||||
| Division No. | Item No. | Desd Code | Description | Unit Price | Estimated Amount | Unit Price | Estimated Amount | Unit Price | Estimated Amount | |||
| $0.00 | $0.00 | $0.00 | ||||||||||
| 1 | Temp Erosion Control (Silt Fence) | LF | 3,000.00 | $1.39 | $4,170.00 | $2.63 | $7,890.00 | $5.95 | $17,850.00 | |||
| 2 | Temp Erosion Control (Const Exit/Entr) | SY | 312.00 | $103.89 | $32,413.68 | $21.33 | $6,654.96 | $64.86 | $20,236.32 | |||
| 3 | Mobilization / Demobilization | LS | 1.00 | $150,708.90 | $150,708.90 | $223,100.00 | $223,100.00 | $487,956.70 | $487,956.70 | |||
| 4 | Seeding (Perm) | SY | 4,000.00 | $1.65 | $6,600.00 | $2.43 | $9,720.00 | $5.05 | $20,200.00 | |||
| 5 | Vegetative Watering (MG ≈ 1,000 Gallons) | MG | 8.00 | $1,206.00 | $9,648.00 | $325.00 | $2,600.00 | $1,060.50 | $8,484.00 | |||
| 6 | Slurry Trench (cut-off wall) | LF | 3,000.00 | $461.85 | $1,385,550.00 | $442.25 | $1,326,750.00 | $583.77 | $1,751,310.00 | |||
| 7 | Rip Rap (rock) | CY | 1,422.00 | $41.87 | 59,539.14 | $181.95 | $258,732.90 | $132.21 | $188,002.62 | |||
| 8 | Geotextile Fabric | SY | 2,134.00 | $4.30 | 9,176.20 | $4.64 | $9,901.76 | $6.93 | $14,788.62 | |||
| TOTAL BID 1-8 | 1,657,805.92 | $1,845,349.62 | $2,508,828.26 | |||||||||
| Line Item 9-16 Alternate Bid Items | ||||||||||||
| 9 | Temp Erosion Control (Silt Fence) | LF | 3000.00 | $1.39 | $4,170.00 | $2.02 | $6,060.00 | $5.95 | $17,850.00 | |||
| 10 | Temp Erosion Control (Const Exit/Entr) | SY | 312.00 | $103.89 | $32,413.68 | $16.41 | $5,119.92 | $64.86 | $20,236.32 | |||
| 11 | Mobilzation/Demobilization | LS | 1.00 | $159,620.19 | $159,620.19 | $132,000.00 | $132,000.00 | $406,339.46 | $406,339.46 | |||
| 12 | Seeding (Perm) | SY | 2669.00 | $1.65 | $4,403.85 | $1.87 | $4,991.03 | $5.05 | $13,478.45 | |||
| 13 | Vegetation Watering (MG ≈ 1,000 Gallons) | MG | 5.30 | $1,206.00 | $6,391.80 | $250.00 | $1,325.00 | $1,060.50 | $5,620.65 | |||
| 14 | Geosynthetic Membrane (cut-of-wall) | SF | 210,000 | $7.08 | $1,486,800.00 | $41.64 | $8,744,400.00 | $15.47 | $3,248,700.00 | |||
| 15 | Rip Rap (rock) | CY | 1,422.00 | $41.87 | $59,539.14 | $129.20 | $183,722.40 | $132.21 | $188,002.62 | |||
| 16 | GeoTextile fabric | SY | 667.00 | $4.30 | $2,868.10 | $5.83 | $3,888.61 | $6.93 | $4,622.31 | |||
| TOTAL BID 9-16 | $5,071,818.60 | $12,772,206.20 | $3,904,849.81 |
Public
| Solicitation | IBM09B0005 | RECOVERY - Construct Main Floodway Improvements | ||||||||||||||||
| Contract Line Item No. (CLIN) | BID ITEM | Unit | Estimated Quantity | Longhorn Excavators, Inc. | Phillips & Jordan Inc. | Foremost Paving | Nordic Industries | Ballenger Construction Co. | Lakeshore Engineering | |||||||||
| Division No. | Item No. | Desd Code | Description | Unit Price | Estimated Amount | Unit Price | Estimated Amount | Unit Price | Estimated Amount | Unit Price | Estimated Amount | Unit Price | Estimated Amount | Unit Price | Estimated Amount | |||
| Division 01 - General Requirements | ||||||||||||||||||
| 001-026 | Line Items No Longer Valid | OZ | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| 026 | 01 | 57 | 01 | Temp Erosion Control (Silt Fence) | LF | 253,589 | $2.34 | $593,398.26 | $6.60 | $1,673,687.40 | $2.35 | $595,934.15 | $3.00 | $760,767.00 | $2.18 | $552,824.02 | $0.00 | $0.00 |
| 027 | 1 | 57 | 02 | Temp Erosion Control (Const Exit/Entr) | SY | 1,871 | $22.20 | $41,536.20 | $110.00 | $205,810.00 | $50.00 | $93,550.00 | $70.00 | $130,970.00 | $37.82 | $70,761.22 | $26.10 | $48,833.10 |
| 028 | 1 | 70 | 01 | Mobilization / Demobilization | LS | 1 | $679,269.00 | $679,269.00 | $1,168,000.00 | $1,168,000.00 | $2,200,000.00 | $2,200,000.00 | $3,500,000.00 | $3,500,000.00 | $924,163.67 | $924,163.67 | $1,563,781.00 | $1,563,781.00 |
| Division 02 - Existing Conditions | ||||||||||||||||||
| 029 | 02 | 91 | 10 | Remove / Relocate Fence | LF | 2,190 | $6.69 | $14,651.10 | $130.25 | $285,247.50 | $25.00 | $54,750.00 | $25.00 | $54,750.00 | $8.40 | $18,396.00 | $38.20 | $83,658.00 |
| Division 31 / 33 - Grading | ||||||||||||||||||
| 030 | 31 | 11 | 10 | Prep Right of Way (STA ≈ EA) | EA | 1,282 | $570.00 | $731,002.20 | $260.75 | $334,401.45 | $900.00 | $1,154,214.00 | $2,700.00 | $3,462,642.00 | $718.86 | $921,909.20 | $506.20 | $649,181.25 |
| 031 | 31 | 14 | 01 | Remove / Stockpile (Exist Gravel) (CD ≈ CY) | CD | 22,271 | $6.69 | $148,992.99 | $11.80 | $262,797.80 | $9.60 | $213,801.60 | $0.50 | $11,135.50 | $10.00 | $222,710.00 | $4.80 | $106,900.80 |
| 032 | 31 | 14 | 02 | Remove / Stockpile (Exist Topsoil) (6 IN) | CD | 119,699.0 | $2.40 | $287,277.60 | $2.45 | $293,262.55 | $6.00 | $718,194.00 | $0.25 | $29,924.75 | $3.33 | $398,597.67 | $7.20 | $861,832.80 |
| 033 | 31 | 92 | 01 | Seeding (Perm) | SY | 708,006 | $0.30 | $212,401.80 | $0.41 | $290,282.46 | $0.23 | $162,841.38 | $0.35 | $247,802.10 | $0.21 | $148,681.26 | $0.50 | $354,003.00 |
| 034 | 31 | 92 | 02 | Vegetative Watering (MG ≈ 1,000 Gallons) | MG | 2,249 | $36.00 | $80,964.00 | $103.50 | $232,771.50 | $25.00 | $56,225.00 | $25.00 | $56,225.00 | $145.85 | $328,016.65 | $595.50 | $1,339,279.50 |
| 035 | 31 | 92 | 3 | Seeding (Temp) | SY | 417,451 | $0.21 | $87,664.71 | $0.36 | $150,282.36 | $0.23 | $96,013.73 | $0.30 | $125,235.30 | $0.19 | $79,315.69 | $0.40 | $166,980.40 |
| Division 35 - Waterway / Marine | ||||||||||||||||||
| 036 | 35 | 41 | 1 | Raise Levee (Bench Excavation) | CD | 377,142 | $2.49 | 939,083.58 | $3.55 | $1,338,854.10 | $1.75 | $659,998.50 | $1.00 | $377,142.00 | $4.32 | $1,629,253.44 | $9.00 | $3,394,278.00 |
| 037 | 35 | 41 | 2 | Raise Levee (Embankment) | CD | 783,807 | $8.10 | 6,348,836.70 | $9.35 | $7,328,595.45 | $12.00 | $9,405,684.00 | $19.40 | $15,205,855.80 | $8.49 | $6,654,521.43 | $13.20 | $10,346,252.40 |
| 038 | 35 | 41 | 3 | Raise Levee (Topsoil) | CD | 117,929 | $2.70 | 318,408.30 | $2.30 | $271,236.70 | $8.75 | $1,031,878.75 | $0.35 | $41,275.15 | $5.95 | $701,677.55 | $12.00 | $1,415,148.00 |
| Division 50 - Roadway Construction | 19.4 | |||||||||||||||||
| 039 | 50 | 11 | 02 | Roadway Embank (Access Road) | CD | 205,627 | $8.40 | $1,727,266.80 | $9.05 | $1,860,924.35 | $9.40 | $1,932,893.80 | $25.00 | $5,140,675.00 | $8.00 | $1,645,016.00 | $10.80 | $2,220,771.60 |
| 040 | 50 | 12 | 01 | Roadway Excavation | CD | 246 | $6.69 | $1,645.74 | $384.50 | $94,587.00 | $5.00 | $1,230.00 | $25.00 | $6,150.00 | $17.36 | $4,270.56 | $60.00 | $14,760.00 |
| 041 | 50 | 20 | 01 | Roadway Flexbase (TY E GR 4) | CD | 49,778 | $21.63 | $1,076,698.14 | $23.80 | $1,184,716.40 | $25.50 | $1,269,339.00 | $5.00 | $248,890.00 | $27.96 | $1,391,792.88 | $26.30 | $1,309,161.40 |
| 042 | 50 | 21 | 01 | Prime Oil (MC-30) | GL | 452 | $6.30 | $2,847.60 | $6.05 | $2,734.60 | $5.10 | $2,305.20 | $200.00 | $90,400.00 | $8.70 | $3,932.40 | $18.00 | $8,136.00 |
| 043 | 50 | 25 | 01 | Hot Mix ASPH Surf (2 IN) | TN | 488 | $142.20 | $69,393.60 | $100.00 | $48,800.00 | $150.00 | $73,200.00 | $600.00 | $292,800.00 | $97.10 | $47,384.80 | $125.10 | $61,048.80 |
| Division 60 - Structures | ||||||||||||||||||
| 044 | 60 | 34 | 1 | Roadway Approach Slab | CD | 451 | $329.70 | $148,694.70 | $495.00 | $223,245.00 | $600.00 | $270,600.00 | $150.00 | $67,650.00 | $609.21 | $274,753.71 | $953.00 | $429,803.00 |
| 045 | 60 | 64 | 18 | RC Pipe (CL V) (18 IN) | LF | 18 | $85.50 | $1,539.00 | $88.00 | $1,584.00 | $200.00 | $3,600.00 | $250.00 | $4,500.00 | $71.08 | $1,279.44 | $334.00 | $6,012.00 |
| 046 | 60 | 64 | 20 | RC Pipe (CL V) (20 IN) | LF | 42 | $110.40 | $4,636.80 | $110.00 | $4,620.00 | $180.00 | $7,560.00 | $4,000.00 | $168,000.00 | $68.53 | $2,878.26 | $298.00 | $12,516.00 |
| 047 | 60 | 60 | 20 | Gatewell (Adj) (4x4 w/o platform) | EA | 25 | $4,120.20 | $103,005.00 | $5,280.00 | $132,000.00 | $12,000.00 | $300,000.00 | $7,000.00 | $175,000.00 | $4,038.02 | $100,950.50 | $4,764.00 | $119,100.00 |
| 048 | 60 | 65 | 24 | Gatewell (Adj) (12x7 w/o platform) | EA | 2 | $6,180.00 | $12,360.00 | $10,780.00 | $21,560.00 | $13,000.00 | $26,000.00 | $4,000.00 | $8,000.00 | $3,986.08 | $7,972.16 | $5,955.00 | $11,910.00 |
| 049 | 60 | 65 | 26 | Gatewell (Adj) (5x5 w/platform) | EA | 1 | $4,120.20 | $4,120.20 | $9,460.00 | $9,460.00 | $12,000.00 | $12,000.00 | $4,000.00 | $4,000.00 | $4,232.28 | $4,232.28 | $5,360.00 | $5,360.00 |
| 050 | 60 | 65 | 28 | Gatewell (Adj) (5x4 w/platform) | EA | 2 | $4,635.00 | $9,270.00 | $8,580.00 | $17,160.00 | $12,000.00 | $24,000.00 | $4,000.00 | $8,000.00 | $4,757.77 | $9,515.54 | $5,360.00 | $10,720.00 |
| 051 | 60 | 65 | 29 | Gatewell (Adj) (6x5 w/platform) | EA | 7 | $5,150.10 | $36,050.70 | $9,790.00 | $68,530.00 | $12,000.00 | $84,000.00 | $4,000.00 | $28,000.00 | $4,559.58 | $31,917.06 | $5,955.00 | $41,685.00 |
| 052 | 60 | 65 | 34 | Gatewell (Adj) (4x4 w/platform) | EA | 2 | $4,120.20 | $8,240.40 | $7,700.00 | $15,400.00 | $12,000.00 | $24,000.00 | $6,000.00 | $12,000.00 | $4,569.44 | $9,138.88 | $5,360.00 | $10,720.00 |
| 053 | 60 | 65 | 35 | Gatewell (Adj) (8x6 w/platform) | EA | 1 | $6,180.00 | $6,180.00 | $11,000.00 | $11,000.00 | $13,000.00 | $13,000.00 | $7,000.00 | $7,000.00 | $4,569.21 | $4,569.21 | $5,955.00 | $5,955.00 |
| 054 | 60 | 65 | 36 | Gatewell (Adj) (10x6 w/platform) | EA | 1 | $8,240.10 | $8,240.10 | $12,100.00 | $12,100.00 | $15,000.00 | $15,000.00 | $1,000.00 | $1,000.00 | $4,569.21 | $4,569.21 | $7,146.00 | $7,146.00 |
| 055 | 60 | 66 | 40 | Conc Hdwll (Raise) | EA | 2 | $3,090.00 | $6,180.00 | $4,400.00 | $8,800.00 | $6,000.00 | $12,000.00 | $1,000.00 | $2,000.00 | $8,100.77 | $16,201.54 | $5,955.00 | $11,910.00 |
| 056 | 60 | 66 | 40 | Conc Hdwll (Raise) | EA | 2 | $3,605.10 | $7,210.20 | $4,400.00 | $8,800.00 | $6,000.00 | $12,000.00 | $500.00 | $1,000.00 | $8,100.77 | $16,201.54 | $5,955.00 | $11,910.00 |
| 057 | 60 | 67 | 1 | Slop End Treat (18 IN) | EA | 3 | $927.00 | $2,781.00 | $17,670.00 | $53,010.00 | $1,500.00 | $4,500.00 | $800.00 | $2,400.00 | $777.65 | $2,332.95 | $1,787.00 | $5,361.00 |
| 058 | 60 | 67 | 2 | Slope End Treat (24 IN) | EA | 6 | $1,545.00 | $9,270.00 | $5,409.00 | $32,454.00 | $1,700.00 | $10,200.00 | $1,500.00 | $9,000.00 | $979.82 | $5,878.92 | $1,787.00 | $10,722.00 |
| 059 | 60 | 67 | 3 | Slope End Treat (30 IN) | EA | 1 | $1,751.10 | $1,751.10 | $26,620.00 | $26,620.00 | $2,500.00 | $2,500.00 | $1,000.00 | $1,000.00 | $2,099.81 | $2,099.81 | $2,144.00 | $2,144.00 |
| 060 | 60 | 68 | 20 | Sluice Gate | EA | 2 | $3,090.00 | $6,180.00 | $700.00 | $1,400.00 | $3,500.00 | $7,000.00 | $1,250.00 | $2,500.00 | $6,715.16 | $13,430.32 | $4,169.00 | $8,338.00 |
| 061 | 60 | 68 | 21 | Sluice Gate (Refurb) (18 IN) | EA | 1 | $2,060.10 | $2,060.10 | $8,800.00 | $8,800.00 | $4,500.00 | $4,500.00 | $1,500.00 | $1,500.00 | $28,291.19 | $28,291.19 | $4,169.00 | $4,169.00 |
| 062 | 60 | 68 | 23 | Sluice Gate (Refurb) (24 IN) | EA | 3 | $2,060.10 | $6,180.30 | $9,900.00 | $29,700.00 | $5,500.00 | $16,500.00 | $100.00 | $300.00 | $9,512.61 | $28,537.83 | $4,169.00 | $12,507.00 |
| 063 | 60 | 68 | 36 | Sluice Gate Parts (Handwheel) (8-16 IN) | EA | 1 | $3,605.10 | $3,605.10 | $550.00 | $550.00 | $1,500.00 | $1,500.00 | $100.00 | $100.00 | $389.61 | $389.61 | $4,169.00 | $4,169.00 |
| 064 | 60 | 68 | 37 | Sluice Gate Parts (Handwheel) (18-24 IN) | EA | 5 | $618.00 | $3,090.00 | $500.00 | $2,500.00 | $1,500.00 | $7,500.00 | $100.00 | $500.00 | $411.18 | $2,055.90 | $4,169.00 | $20,845.00 |
| 065 | 60 | 68 | 38 | Sluice Gate Parts (Handwheel) (3'x3') | EA | 1 | $721.20 | $721.20 | $550.00 | $550.00 | $1,500.00 | $1,500.00 | $100.00 | $100.00 | $636.26 | $636.26 | $4,169.00 | $4,169.00 |
| 066 | 60 | 68 | 39 | Sluice Gate Parts (Handwheel) (4'x4') | EA | 1 | $927.00 | $927.00 | $550.00 | $550.00 | $1,500.00 | $1,500.00 | $100.00 | $100.00 | $636.26 | $636.26 | $4,169.00 | $4,169.00 |
| 067 | 60 | 68 | 40 | Sluice Gate Parts (Stem) (16-34 IN) | EA | 2 | $1,854.00 | $3,708.00 | $1,650.00 | $3,300.00 | $1,200.00 | $2,400.00 | $500.00 | $1,000.00 | $470.48 | $940.96 | $4,169.00 | $8,338.00 |
| 068 | 60 | 68 | 42 | Sluice Gate Parts (Stem) (3'x3') | EA | 1 | $1,442.10 | $1,442.10 | $1,650.00 | $1,650.00 | $1,200.00 | $1,200.00 | $500.00 | $500.00 | $680.73 | $680.73 | $4,169.00 | $4,169.00 |
| 069 | 60 | 68 | 43 | Sluice Gate Parts (Stem) (4x4) | EA | 2 | $1,545.00 | $3,090.00 | $1,650.00 | $3,300.00 | $1,200.00 | $2,400.00 | $500.00 | $1,000.00 | $680.73 | $1,361.46 | $4,169.00 | $8,338.00 |
| 070 | 60 | 68 | 45 | Sluice Gate Parts (Rails) (8-15 IN) | EA | 1 | $2,060.10 | $2,060.10 | $2,200.00 | $2,200.00 | $2,500.00 | $2,500.00 | $500.00 | $500.00 | $1,278.24 | $1,278.24 | $4,169.00 | $4,169.00 |
| 071 | 60 | 68 | 46 | Sluice Gate Parts (Rails) (16-53 IN) | EA | 1 | $2,884.20 | $2,884.20 | $3,300.00 | $3,300.00 | $2,500.00 | $2,500.00 | $500.00 | $500.00 | $1,758.05 | $1,758.05 | $4,169.00 | $4,169.00 |
| 072 | 60 | 68 | 60 | Sluice Gate Parts (Thrust Collar) | EA | 1 | $515.10 | $515.10 | $2,200.00 | $2,200.00 | $3,000.00 | $3,000.00 | $500.00 | $500.00 | $1,152.62 | $1,152.62 | $4,169.00 | $4,169.00 |
| 073 | 60 | 68 | 90 | Sluice Gate (Lube) | EA | 6 | $381.00 | $2,286.00 | $2,200.00 | $13,200.00 | $1,000.00 | $6,000.00 | $500.00 | $3,000.00 | $35.66 | $213.96 | $4,169.00 | $25,014.00 |
| 074 | 60 | 71 | 10 | Gatewell Grate (Replace +/or Install) | EA | 43 | $1,339.20 | $57,585.60 | $3,300.00 | $141,900.00 | $1,500.00 | $64,500.00 | $500.00 | $21,500.00 | $2,466.42 | $106,056.06 | $5,657.10 | $243,255.30 |
| 075 | 60 | 80 | 2 | Auto Flood Gate, Paved Road 3'x150' | EA | 3 | $856,510.20 | $2,569,530.60 | $102,700.00 | $308,100.00 | $660,000.00 | $1,980,000.00 | $1,000,000.00 | $3,000,000.00 | $1,010,979.24 | $3,032,937.72 | $4,824.00 | $14,472.00 |
| 076 | 60 | 80 | 3 | Auto Flood Gate, Paved Road 3'x 200' | EA | 1 | $889,000.20 | $889,000.20 | $1,323,000.00 | $1,323,000.00 | $980,000.00 | $980,000.00 | $1,300,000.00 | $1,300,000.00 | $1,337,196.10 | $1,337,196.10 | $6,432.00 | $6,432.00 |
| 077 | 60 | 80 | 5 | Auto Flood Gate, Paved Road 3'x300' | EA | 1 | $1,683,600.00 | $1,683,600.00 | $1,835,000.00 | $1,835,000.00 | $1,130,000.00 | $1,130,000.00 | $1,700,000.00 | $1,700,000.00 | $1,942,239.82 | $1,942,239.82 | $8,039.00 | $8,039.00 |
| 078 | 60 | 98 | 0 | Clean Exisat Structure | EA | 55 | $1,236.00 | $67,980.00 | $1,320.00 | $72,600.00 | $3,000.00 | $165,000.00 | $1,000.00 | $55,000.00 | $2,171.36 | $119,424.80 | $2,382.00 | $131,010.00 |
| Division 90 - Miscellaneous | ||||||||||||||||||
| 079 | 90 | 79 | 0 | Vehicular Gate | EA | 32 | $4,120.20 | $131,846.40 | $5,411.00 | $173,152.00 | $5,500.00 | $176,000.00 | $4,000.00 | $128,000.00 | $1,575.00 | $50,400.00 | $4,168.40 | $133,388.80 |
| Total Bid Amount | $19,169,159.52 | $21,600,286.62 | $25,098,513.11 | $36,497,789.60 | $22,907,333.34 | $25,300,309.15 |
Sheet3
File details come from the government source that posted it. Updated .