HVAC_PWS_Solicitation.pdf
PDF 177 KB Posted
- Solicitation number
- 75H70626Q00139
About this file
This Performance Work Statement (PWS) establishes requirements for HVAC preventive maintenance, inspection, testing, troubleshooting, emergency response, controls support, and reporting services at Fort Yates Hospital in North Dakota and Youth Regional Treatment Center in South Dakota. The Indian Health Service is the contracting federal agency. The contract has a base year of 12 months with four option years. The Contractor must maintain air handling units, rooftop units, boilers, chillers, condensing units, pumps, VAV boxes, split systems, filters, and Johnson Controls Metasys building automation systems at both facilities. Work hours are 8:00 AM to 5:00 PM, Monday through Friday, with weekend and after-hours work available upon request. The Contractor must provide qualified HVAC technicians, controls technicians, supervisory personnel, and an onsite superintendent while any work is being performed unless prior approval from the Contracting Officer's Representative (COR) is granted.
Key performance standards include 100% inventory verification within 30 days of award, preventive maintenance completion at 95% on-time performance at required frequencies, emergency response within 4 hours for Fort Yates and 24 hours for the Youth Regional Treatment Center, and service report submission within 5 business days. All materials must be submitted to the COR for approval prior to ordering. The Contractor is responsible for material receipt, offloading, and storage at the facilities. Deliverables include equipment inventory validation reports, annual PM schedules, service reports, BAS backup reports, deficiency reports, annual summary reports, and closeout documentation. Invoicing is processed through the Invoice Payment Platform (IPP). Contractors engaging in work on the Standing Rock Indian Reservation must comply with Tribal Employment Rights Office (TERO) requirements, including a 2.5% fee on the total contract price and $250 annual work permits per employee.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
HVAC PREVENTIVE MAINTENANCE SERVICES
Fort Yates Hospital (ND) and Youth Regional Treatment Center (SD)
1. General Information This PWS establishes performance-based requirements for HVAC preventive maintenance, inspection, testing, troubleshooting, emergency response, controls support, and reporting services. The Contractor shall provide all management, supervision, labor, materials, tools, transportation, equipment, and incidental services necessary to perform the requirements.
2. Background The Indian Health Service requires contractor support to maintain HVAC systems and building automation systems serving healthcare and residential treatment facilities.
Services shall support reliable operations, regulatory compliance, patient safety, occupant comfort, and equipment longevity.
3. Scope The Contractor shall maintain air handling units, rooftop units, boilers, chillers, condensing units, pumps, VAV boxes, split systems, filters, and Johnson Controls Metasys building automation systems located at both facilities. Equipment inventories shall be validated after award.
4. Applicable Documents IHS A/E Design Manual; FGI Guidelines; NFPA 70; NFPA 99; NFPA 101; ASHRAE 170;
ASHRAE Fundamentals; manufacturer O&M manuals; and all applicable federal, state, local, and tribal requirements.
5. Period of Performance Base Year of 12 months with four (4) option years.
6. Contractor Requirements Provide qualified HVAC technicians, controls technicians, and supervisory personnel.
Maintain licenses, certifications, insurance, and safety programs required by law.
Superintendent. The prime contractor shall have an onsite superintendent for this project while any and all work is being performed unless prior approval is granted from the COR.
Construction Materials and Storage
1. All materials shall be stored and handled according the manufacturers’ recommendations.
2. All materials shall be submitted to the COR prior to ordering, for approval by the project engineer.
3. The contractor(s) shall be present and on site to receive all construction material, equipment, or products. IHS staff will not be present, responsible, nor receive, or provide any type of offloading equipment for construction materials, products, or equipment. It is solely the contractor(s) responsibility to properly receive any and all construction equipment, products, and materials on site.
4. The contractor(s) shall provide their own means of storing any and all construction materials, products, or equipment required for installation. IHS staff will not be responsible or provide any means of storing construction material, products, or equipment before or during construction. All material, products, or equipment remain the contractor(s) property until the project has been deemed substantially completed by all parties.
7. Performance Requirements Summary (PRS)
Required Service Performance Standard
AQL Government Surveillance
Inventory Verification
Inventory and PM schedule submitted within 30 days.
100% COR review
Preventive Maintenance
PM completed at required frequencies.
95% on-time Reports/inspection
Emergency Response
Respond within 4 hrs Fort Yates; 24 hrs YRTC.
100% Service logs
BAS Support Backups, diagnostics and reporting completed.
100% Report review
Documentation Service reports submitted within 5 business days.
100% COR review
8. Preventive Maintenance Services The Contractor shall perform manufacturer-recommended maintenance and all inspections, testing, cleaning, calibration, lubrication, filter replacement, operational checks, seasonal start-up activities, combustion analysis, coil cleaning, BAS verification, and equipment condition assessments required to maintain equipment reliability.
The work hours shall be 8:00am – 5:00pm, Monday – Friday. Weekends and after hours work may be available upon request.
9. Emergency Service The Contractor shall provide emergency troubleshooting and diagnostic services. Repair recommendations shall include root cause, parts required, labor estimate, and replacement recommendations when equipment is beyond economical repair.
10. Deliverables Equipment inventory validation; PM schedule; service reports; BAS backup reports;
deficiency reports; annual summary report; and closeout documentation. (see table below)
Deliverable Description Due Date/Frequency Format Government Acceptance
Equipment Inventory Validation Report
Verify and update HVAC equipment inventory, including equipment identification, location, manufacturer, model number, and condition assessment.
Within 30 calendar days after award and updated as needed.
Electronic (PDF/Excel)
COR review and approval
Preventive Maintenance (PM) Schedule
Detailed annual PM schedule identifying equipment, maintenance tasks, and planned service dates based on manufacturer recommendations.
Within 30 calendar days after award;
updated annually.
Electronic (PDF/Excel)
COR review and approval
Service Reports
Documentation of all maintenance, inspections, testing, repairs, and corrective actions performed during each site visit.
Within 5 business days after each service visit.
Electronic PDF COR review and acceptance
BAS Backup Reports
Documentation verifying successful backup of Metasys/BAS databases, controllers, servers, and configuration files.
Annually, and after significant system changes.
Electronic PDF COR review and acceptance
Deficiency Reports
Identification of equipment deficiencies, operational concerns, code issues, safety concerns, and
Within 5 business days of discovery.
Electronic PDF COR review and
Deliverable Description Due Date/Frequency Format Government Acceptance recommended corrective actions. acceptance
Annual Summary Report
Summary of all maintenance activities, equipment performance trends, deficiencies, emergency service calls, recommended repairs, and lifecycle replacement recommendations.
Annually, no later than 30 days before contract anniversary date.
Electronic PDF COR review and acceptance
Closeout Documentation
Complete record of inventories, PM reports, BAS backups, equipment status, outstanding deficiencies, and all contract deliverables.
Within 30 calendar days after contract completion.
Electronic PDF and one hard copy (if requested)
COR final acceptance
11. Quality Control The Contractor shall maintain a quality control program ensuring compliance with all performance standards and documenting corrective actions.
12. Government Surveillance The Government will utilize inspection, report review, customer complaints, performance metrics, and random verification of completed services.
13. Security and Safety Contractor personnel shall comply with facility access procedures, infection control requirements, life safety requirements, lockout/tagout procedures, and all OSHA requirements.
Occupancy of Government Facilities. The contractor shall be responsible for properly informing the COR of any condition which would jeopardize the building or its contents, such as loss of heat, air conditioning, danger of pipes freezing, loss of electrical power, water, sewer or loss of building security.
Contractor personnel will wear identification and be accompanied by IHS staff in all patient areas.
14. Place of Performance Fort Yates Hospital, Fort Yates, North Dakota and Youth Regional Treatment Center, Wakpala, South Dakota.
15. Invoicing Invoicing under this order shall be processed through the Invoice Payment Platform (IPP), located at www.ipp.gov.
IPP is a secure, web-based electronic invoicing system provided by the U.S. Department of the Treasury's Bureau of the Fiscal Service, in partnership with the Federal Reserve Bank of St. Louis (FRSTL). The Office of Management and Budget (OMB) M-15-19 Memorandum "Improving Government Efficiency and Saving Taxpayer Dollars Through Electronic Invoicing" directs Federal agencies to adopt electronic invoicing as the primary means to disburse payment to vendors.
If your organization is not currently utilizing IPP, following award of an order, your organization will be automatically enrolled by IHS. Your company's IPP POC will be determined by the information listed in your SAM.gov account, and will receive two e-mails from the Bureau of Fiscal Service, one with a username and one with a temporary password.
Please ensure your SAM.gov information is up to date.
If you are currently enrolled in IPP, either from a previous award with IHS or another Federal Agency utilizing IPP- you may use your existing IPP credentials for this order.
If you require assistance registering or IPP account access, please contact the IPP Helpdesk at (866) 973-3131 (M-F 8AM to 6PM ET), or IPPCustomerSupport@fiscal.treasury.gov
16. Contract Administration Only the Contracting Officer may modify contract requirements. The COR may monitor performance but may not alter scope, schedule, or price.
In no event shall any of the following be effective or binding on the Government or imputed to the Contracting Officer with respect to this contract:
1. An understanding or agreement between the Contractor and anyone other than the Contracting Officer;
2. A purported modification or change order issued by anyone other than the Contracting Officer;
3. A promise by anyone other than the Contracting Officer to provide additional funding or make payments; or
4. An order, direction, consent, or permission from anyone other than the Contracting Officer to:
a. Incur costs in excess of a specified estimated cost, allotment of funds, or other ceiling; or
b. Expend hours in excess of a specified level of effort.
http://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov
17. Tribal Requirements
1. The Contractor and all subcontractors engaging in work on the Standing Rock
Indian Reservation will be required to comply with the Indian preference and Indian preference program requirements administered by the Standing Rock Sioux Tribe Tribal Employment Rights Office (TERO).
2. Before commencing work, contractors and sub-contractors are required to submit an acceptable “Compliance Agreement” to the TERO office. Copies of this form can be obtained from the TERO office. Typical requirements of TERO include a fee of 2.5% on the total contract price, and submission of weekly certified payroll reports to TERO.
3. Additionally, the rules and regulations of the TERO Ordinance require that no person who is not a local Indian shall be employed by a covered employer until a work permit has been obtained for them from TERO. The annual work permit fee for each employee is $250.00.
4. Contractors are strongly encouraged to contact the TERO office at (701) 854-7295 for an explanation of tribal requirements. Other fees may apply.
Appendix A – Bid Schedule
Appendix A – Equipment Categories AHUs, RTUs, Boilers, Chillers, Condensing Units, Pumps, VAV Boxes, Split Systems, Filters, BAS/Metasys Controls and associated components at both facilities.
| PERFORMANCE WORK STATEMENT (PWS) HVAC PREVENTIVE MAINTENANCE SERVICES Fort Yates Hospital (ND) and Youth Regional Treatment Center (SD) |
| 1. General Information |
| 2. Background |
| 3. Scope |
| 4. Applicable Documents |
| 5. Period of Performance |
| 6. Contractor Requirements |
| 7. Performance Requirements Summary (PRS) |
| 8. Preventive Maintenance Services |
| 9. Emergency Service |
| 10. Deliverables |
| 11. Quality Control |
| 12. Government Surveillance |
| 13. Security and Safety |
| 14. Place of Performance |
| 15. Invoicing |
| 16. Contract Administration |
| 17. Tribal Requirements |
| Appendix A – Bid Schedule |
| Appendix A – Equipment Categories |
File details come from the government source that posted it. Updated .