RFIs_Questions__and_Answers_from_Solicitation.pdf
PDF 8 KB Posted
- Attached to
- Water Facility Operator Federal contract opportunity
- Solicitation number
- HUMF4D3D16250AU01
About this file
RFIs Questions and Answers from Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_3______Wage_Determinations_--_Water_Facility_Operator.pdf | ||
| Revised_Attachment_1______Combined_Synopsis_--_Solicitation_dtd19Dec2016rev.docx | DOCX document | |
| Attachment_2_____SOW_for_Waste_Water_Plant_dtd_18Dec2016.pdf | ||
| Attachment_4_RFQ_--_Water_Facility_Operator_dtd_19Dec2016.xlsx | XLSX spreadsheet | |
| RFIs_Questions__and_Answers_from_Solicitation____2.docx | DOCX document | |
| RFIs_Questions__and_Answers_from_Solicitation.pdf | ||
| Revised_Attachment_1______Combined_Synopsis_--_Solicitaton.docx | DOCX document | |
| Attachment_1______Combined_Synopsis_--_Solicitaton.docx | DOCX document | |
| Attachment_2_____SOW_for_Waste_Water_Plant_dtd_18Dec2016.pdf | ||
| Attachment_4______RFQ_--_Water_Facility_Operator.xlsx | XLSX spreadsheet | |
| Attachment_3______Wage_Determinations_--_Water_Facility_Operator.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor’s Request for Information (RFI) Contract #: Vandenberg Air Force Base Task Order #: F4D3D16250AU01 Title: Wastewater Treatment Plant Grade III Operator, Contract Contractor:
Question # Contractor Question/Government Response
Question: 1- Were these tasks (Grade Level II) previously performed on a contract and if so what was the contract number?
Response: Tasked not performed by Grade Level II in the last contract. The required tasked to be performed is spelled out in PWS 4.0 Requirements.
Question: 2- Who is responsible for the costs associated to the analytical testing of the control samples obtained in item 4.1 of the SOW?
Response: Since Water Fuels System Maintenance (WFSM) does not have a certified/licensed Wastewater Grade III operator, all analytical requirements are done by the contractor/operator and paid for by the Government.
Question: Is it the Contracting Offices intention that the Contractor/Operator be on-site weekly (Mon - Fri) to oversee these operations and duties or is the Contractor/Operator to be on-site a minimum of 1-2 days (or however long necessary to fulfill the requirements of 4.1 - 4.4?
Response: However long necessary to fulfill the requirements of the PWS.
CHARLES L. GILL
Contracting Officer