Attachment_2_____SOW_for_Waste_Water_Plant_dtd_18Dec2016.pdf

PDF 66 KB Posted

Attached to
Water Facility Operator Federal contract opportunity
Solicitation number
HUMF4D3D16250AU01
Issued by
Department of the Air Force Space Command

About this file

Attachment 2 SOW for Waste Water Plant dtd 18Dec2016

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

for

WATER TREATMENT PLANT OPERATOR

at

VANDENBERG AIR FORCE BASE, CALIFORNIA

18 December 2016

1.0 Background

1.1 Back in March 2015 the State Water Resources Control Board reclassified wastewater treatment plants that specified the minimum certification requirements and operators certification levels from that specifies the minimum certification requirements for the operations personnel at a Grade Level II to Grade Level III. With these reclassification changes made by the State, Vandenberg didn’t have any wastewater operators qualified to meet the new requirements. So the need for an outside contractor to manage the operations of the two wastewater treatment package plants exists.

2.0 Scope

2.1 Scope of work for Vandenberg AFB, 30 Civil Engineer Squadron is to provide operation and maintenance and oversight activities in accordance with the State of California requirements for wastewater treatment plants.

2.2 The contractor will provide a qualified Grade 3 Operator certified by the State Water Resources Control Board (SWRCB) to perform weekly onsite review of wastewater treatment plants.

2.3 Contractor/Operator will meet with the assigned staff to review the logs, previous control lab tests, and make adjustments to the operation of the facility if/when necessary to insure continued efficient operation. Operator will physically check the facilities and be responsible to personally make, or oversee wastewater plant operators in operational adjustments.

2.4 Contractor/Operator will need to be available in case of emergency with a response time of (typically within 2-hours of notification). Civil Engineering will provide a 24-hour emergency answer service.

3.0 Period of Performance

The period of performance is 04Jan2017 through 03Jan2018.

4.0 Requirements

4.1 Contractor/Operator will collect and transport control samples as deemed appropriate to maintain operational control, and perform various onsite processes and testing as required in maintaining treatment plant operations.

4.2 Contractor/Operator will verify proper operation of all pumps, motors, blowers, and alarm systems related to the treatment plant.

4.3 Contractor/Operator is to notify Wastewater staff of any process problems, equipment failures, or anticipated issues associated with the facilities operation.

4.4 Contractor/Operator is to submit a monthly operations report detailing the previous month’s activities related to the operational changes, and any recommendations related to the plants.

4.5 Contractor/Operator should be able to be able to respond via telephone/email to any questions as necessary related to plant performances etc.

STATEMENT OF WORK
for
Water Treatment Plant Operator
at
VANDENBERG AIR FORCE BASE, CALIFORNIA