This set of construction drawings and specifications is for the Huckleberry Campground Electrical Phase 2 project solicited by the Bureau of Land Management Idaho Region. The project involves upgrading electrical systems and installing new electrical infrastructure at the Huckleberry Campground in Calder, Idaho. Work includes replacing transformers and panels, installing new conduit and conductors, upgrading RV pedestals, and reconfiguring electrical site plans for various areas of the campground. Bidders should follow design plans for trenching details, equipment pads, and schedules for replacement components. The related solicitation is for offerors to provide all labor, materials, equipment and supervision to complete the electrical upgrades by replacing aging infrastructure with new transformers, panels, disconnects and distribution lines per the specifications. The solicitation number is 140L2623R0006 and responses are due on unspecified future date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Huckleberry_CG_Electrical_P2_R2_-_Prebid_tour_meeting_notes_0001.docx | DOCX document | |
| Sol_140L2623R0006_Amd_0001.pdf | ||
| Huckleberry_Addendum_R2.pdf | ||
| Sol_140L2623R0006.pdf | ||
| SF-24_Bid_Bond.pdf | ||
| Huckleberry_Specifications_20220510_R2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
HUCKLEBERRY CAMPGROUND ELECTRICAL
UPGRADES
INDEX OF DRAWINGS
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE
YOU DIG, GRADE, OR EXCAVATE FOR THE
MARKING OF UNDERGROUND MEMBER
UTILITIES
GENERAL
G001 COVER SHEET
CIVIL
C101 ELECTRICAL POWER LAYOUT PLAN
C501 DETAILS
ELECTRIAL
E101 E102 E103 E104 E105 E106 E201 E601 E602
PROJECT LOCATION SITE ACCESS
DESIGNERS
PROJECT VICINITY - CALDER, IDAHO
PROJECT
VICINITY
PROJECT
LOCATION
HUCKLEBERRY
CAMPGROUND
ELECTRICAL SITE PLAN - WEST
POWER PLAN
SCHEDULE 1 CAMPSITES 17-29
SCHEDULE 2 CAMPSITES 10-16
SCHEDULE 3 CAMPSITES 6-9
SCHEDULE 4 CAMPSITES 1-5
PANEL ELEVATIONS
ELECTRICAL ONE-LINE DIAGRAM
EXISTING DEMOLISH ELECTRICAL ONE-LINE DIGRAM
ST
. J
OE
R
IVE
R
H
IG
H W
AY
HIGHWAY
ST. JOE RIVER
BASE IMPROVEMENTS-CAMP SITES 30-39 NOTES:
1. CONDUCTORS SHALL BE RATED FOR DIRECT BURIAL AND BE ALUMINUM WHERE
INDICATED.
2. PROVIDE NEW TRENCH FOR 600V SERVICE WITH 1-3" PVC CONDUIT FOR
CONDUCTORS.
3. ELECTRICAL DISTRIBUTION WIRING SHALL BE BURIED WITH MINIMUM 24" COVER.
PROVIDE CONDUIT WHERE BURIED UNDER ROADWAYS AND AT ALL LOCATIONS
WHERE WIRING PENETRATES GROUND SURFACE. SEE SHEET E201 FOR TRENCH
DETAILS.
4. CUT AND ABANDON WIRES IN PLACE AT EXISTING RV PEDESTAL POWER, REMOVE
EXISTING WIRES AS NECESSARY.
5. MOUNT NEW RV PANEL PER MANUFACTURER'S INSTRUCTIONS. REPLACE EXISTING
4" BY 4" WOOD POST.
TRENCH DETAIL, SINGLE CONDUIT
PER DETAIL
LEGEND
NEW UG 240V LINE
NEW UG 600V LINE
EXISTING UG LINE
B E201
ELECTRICAL SITE PLAN - CAMP SITES 30-39 1
NEW PEDESTAL, TYP
PER ELEVATION
E101
CAMP SITE BRANCH LENGTHS
SITE NO. APPROX LENGTH (LF)
TF-5
FEEDERS 1790
30 190 31 140 32 210 33 240 34 295 35 260 36 200 37 120 38 175 39 205
INSTALL NEW TF-5 75 kVA
TRANSFORMER, NEW DISCONNECT
SWITCH, & NEW PANEL W1,
SEE DETAIL #3 THIS SHEET
DEMOLISH EXISTING DISCONNECT
SWITCH, EXISTING 'TF-5' 25KVA
TRANSFORMER, AND EXISTING
PANEL 'W1'. EXISTING WIRE TO BE
REMOVED OR ABANDONED IN
PLACE.
NEW 600V UG POWER DISTRIBUTION LINE
IN 1-3" CONDUIT WITH 2-#600 MCM AL &
1-#2/0 AWG GND AL.
TRENCH DETAIL, TYP FOR ALL
TRENCHING ACROSS ROADWAYS
B E201
W1 PANEL ELEVATION 3
NEW
PANEL
'W1'
NEW DSW-5, 200 AMP FUSIBLE
DISCONNECT SWITCH WITH 175 AMP
FUSE
NEW
TF-5
75 kVA
TO 167 KVA TRANSFORMER
VIA DSW-5A
EXISTING 4" X 4" WOOD POST
WITH CONCRETE FOOTER, TYP
EXISTING 1 5/8" X 1 5/8"
UNISTRUT CHANNEL, TYP
TF-1
NEW 167 kVA STEP-UP
TRANSFORMER
NEW ELECTRICAL SWITCHGEAR
LOCATION, PER ELEVATION
A E201
NEW 25'x10'x4' BERM FOR
ELECTRICAL EQUIPMENT
NEW 50/30/20 AMP PANEL,
SEE NOTE 5
NEW 4" X 6" X 6' TREATED
POST (SHARED WITH HOSE
BIBB) - SEE SITE PLANS
NEW 1" RGS CONDUIT
GRADE (SLOPE AWAY FROM
POST FOR 2 FEET)
1" X 4" X 8" WOOD ANCHOR
POWER PEDESTAL DETAIL 2
2' MIN EMBEDMENT
E101
E101 E101
EXISTING 2-2" HDPE CONDUIT RUN
EXISTING HANDHOLE
AND FEEDER RUNS
19543
01:58:16 PM 05-10-2022 (-04'00' GMT)
UTILITY TO TIE INTO EXISTING
UNDERGROUND SERVICE ENTRANCE
AND RE-ROUTE TO LOCATION OF
NEW UTILITY TRANSFORMER
BASE IMPROVEMENTS SHEET NOTES:
1. JUNCTION BOX TO BE LOCATED AT EXISTING GROUND
PENETRATIONS. NEW CONDUCTORS SHALL BE ROUTED FROM
RELOCATED PANELS AND CONNECTED TO EXISTING LINES
FOR DISTRIBUTION TO CAMP SITES AS SHOWN.
2. EXISTING DISTRIBUTION LINES STILL UTILIZED FOR CAMPSITE
POWER TO SITES SUPPLYING 50A AND 30A SERVICES.
3. CONDUCTOR TO NEW TRANSFORMER LOCATION TO BE
INSTALLED BY AVISTA. PROVIDE CONDUIT AT BERM FOR
GROUND PENETRATION.
4. UTILITY TRANSFORMER TO BE PROVIDED AND INSTALLED BY
AVISTA UTILITIES.
5. SIZE BREAKER AND CONDUCTORS FOR WELLHEAD
ACCORDING TO MANUFACTURER'S SPECIFICATIONS.
EXISTING DISTRIBUTION LINES, SEE NOTE 2.
UG MEDIUM VOLTAGE CABLE, SEE NOTE 3
NEW UTILITY TRANSFORMER, SEE NOTE 4.
TF-1
DSW-4A
DSW-5A
CT CABINET
METER
600V UG DISTRIBUTION IN 1-3" PVC
CONDUIT-TRENCH TO W1 PANEL
EXISTING UG 240V UTILITY
SERVICE ENTRANCE
4' HIGH BERM
EDGE OF BERM
FIELD LOCATE EXISTING HDPE FEEDER
RUNS. RELOCATE RUN TO NOT PASS
UNDER THE NEW BERM.
EXISTING PUMP HOUSE
Scale: NTS
E102
POWER PLAN: PUMP HOUSE AREA
A E201
E E201
DSW-2A
DSW-3A
TIE IN TO NEWLY RELOCATED
HDPE FEEDER LINES FOR
DSW-3A AND DSW-4A.
CONTINUE DSW-2A RUN AND TIE
INTO EXISTING HDPE FEEDER RUN
LEGEND
NEW UG 600V LINE
EXISTING UG LINE
NEW LINE FROM TRANSFORMER
TF-1 TO EXISTING 200A
DISCONNECT SWITCH, SW-0
(2) NEW LINES FROM NEW 800A DSW-1 TO
EXISTING 200A PANEL E2 AND EXISTING
PUMP HOUSE 100A DISCONNECT
1954301:59:22 PM 05-10-2022 (-04'00' GMT)
ST
. J
OE
R
IVE
R
H
IG
H W
AY
HIGHWAY
ST. JOE RIVER
EXISTING 2-2" HDPE CONDUIT
LINE, RUN NEW FEEDER, 2-#350
MCM, IN EXISTING CONDUIT
CAMP SITE BRANCH LENGTHS
SITE NO. APPROX LENGTH (LF)
TF-4
FEEDERS 1100
17 290
18 225
19 85
20 92
21 169
22 217
23 269
24 520
25 323
26 364
27 430 28 453 29 486
ELECTRICAL SITE PLAN - CAMP SITES 17-29 1
SCHEDULE 1: CAMP SITES 17-29 NOTES:
1. CONDUCTORS SHALL BE RATED FOR DIRECT BURIAL AND ALUMINUM WHERE
NOTED.
2. NEW 600V FEEDER SHALL RUN IN EXISTING 2" HDPE CONDUIT
3. ELECTRICAL DISTRIBUTION WIRING SHALL BE BURIED WITH MINIMUM 24" COVER.
PROVIDE CONDUIT WHERE BURIED UNDER ROADWAYS AND AT ALL LOCATIONS
WHERE WIRING PENETRATES GROUND SURFACE. SHEET E201 FOR TRENCH
DETAILS.
4. CUT AND ABANDON IN PLACE EXISTING RV PEDESTAL POWER, REMOVE EXISTING
WIRE AS NECESSARY.
5. MOUNT NEW RV PANEL PER MANUFACTURER'S INSTRUCTIONS. REPLACE EXISTING
4" BY 4" WOOD POST.
W2 PANEL ELEVATION 3
NEW
PANEL
'W2'
NEW DSW-4, 200 AMP FUSIBLE
DISCONNECT SWITCH WITH 175 AMP
FUSE
NEW
TF-4
75 kVA
TO 167 KVA TRANSFORMER VIA DSW-4A
EXISTING 4" X 4" WOOD POST
WITH CONCRETE FOOTER, TYP
EXISTING1 5/8" X 1 5/8"
UNISTRUT CHANNEL, TYP
NEW PEDESTAL, TYP
PER ELEVATION
E103
INSTALL NEW TF-4 75 kVA TRANSFORMER, NEW DISCONNECT SWITCH, & NEW PANEL W2, SEE DETAIL #3 ON THIS SHEET
DEMOLISH EXISTING DISCONNECT SWITCH,
EXISTING 'TF-4' 25KVA TRANSFORMER, AND
EXISTING PANEL 'W2'. REMOVE EXISTING WIRE
AND REUSE EXISTING HDPE CONDUIT RUN.
TF-1
NEW 167 kVA STEP-UP
TRANSFORMER NEW ELECTRICAL SWITCHGEAR
LOCATION, PER ELEVATION
A E201
NEW 50/30/20 AMP PANEL,
SEE NOTE 5
NEW 4" X 6" X 6' TREATED
POST (SHARED WITH HOSE
BIBB) - SEE SITE PLANS
NEW 1" RGS CONDUIT
GRADE (SLOPE AWAY FROM
POST FOR 2 FEET)
1" X 4" X 8" WOOD ANCHOR
POWER PEDESTAL DETAIL 2
2' MIN EMBEDMENT
E103
E103
E103
LEGEND
NEW UG 240V LINE
NEW UG 600V LINE
EXISTING UG LINE
1954301:59:34 PM 05-10-2022 (-04'00' GMT)
HIGHWAY
ST. JOE RIVER
EXISTING 4-2" HDPE CONDUIT LINE,
RUN NEW FEEDER, 2-#2/0 AWG, IN
EXISTING 2" HDPE CONDUIT
LEGEND
NEW UG 240V LINE
NEW UG 600V LINE
EXISTING UG LINE
CAMP SITE BRANCH LENGTHS
SITE NO. APPROX LENGTH (LF)
TF-3
FEEDERS 660
10 290
11 225
12 85
13 92
14 169
15 217
16 269
ELECTRICAL SITE PLAN - CAMP SITES 10-16 1
SCHEDULE 2: CAMP SITES 10-16 NOTES:
1. CONDUCTORS SHALL BE RATED FOR DIRECT BURIAL AND ALUMINUM WHERE
INDICATED.
2. NEW 600V FEEDER SHALL RUN IN EXISTING 2" HDPE CONDUIT
3. ELECTRICAL DISTRIBUTION WIRING SHALL BE BURIED WITH MINIMUM 24" COVER.
PROVIDE CONDUIT WHERE BURIED UNDER ROADWAYS AND AT ALL LOCATIONS
WHERE WIRING PENETRATES GROUND SURFACE. SHEET E201 FOR TRENCH
DETAILS.
4. CUT AND ABANDON IN PLACE EXISTING RV PEDESTAL POWER, REMOVE EXISTING
WIRING AS NECESSARY.
5. MOUNT NEW RV PANEL PER MANUFACTURER'S INSTRUCTIONS. REPLACE EXISTING
4" BY 4" WOOD POST.
E3 PANEL ELEVATION 2
EXIST.
PANEL
'E3'
NEW DSW-3, 200 AMP FUSIBLE
DISCONNECT SWITCH WITH 125 AMP
FUSE
NEW
TF-3
50 kVA
TO 167 KVA TRANSFORMER VIA DSW-3A
EXISTING 4" X 4" WOOD POST
WITH CONCRETE FOOTER, TYP
EXISTING1 5/8" X 1 5/8"
UNISTRUT CHANNEL, TYP
NEW PEDESTAL, TYP
PER ELEVATION
E104
INSTALL NEW 'TF-3' 50 kVA TRANSFORMER, NEW DISCONNECT SWITCH, & NEW PANEL E3, SEE DETAIL #3 ON THIS SHEET
DEMOLISH EXISTING DISCONNECT
SWITCH, EXISTING 'TF-3' 25KVA
TRANSFORMER, AND EXISTING
PANEL 'E3', REMOVE EXISTING
FEEDERS AND REUSE HDPE
CONDUIT RUN.
TF-1
NEW 167 kVA STEP-UP
TRANSFORMER NEW ELECTRICAL SWITCHGEAR
LOCATION, PER ELEVATION
A E201
NEW 50/30/20 AMP PANEL,
SEE NOTE 5
NEW 4" X 6" X 6' TREATED
POST (SHARED WITH HOSE
BIBB) - SEE SITE PLANS
NEW 1" RGS CONDUIT
GRADE (SLOPE AWAY FROM
POST FOR 2 FEET)
1" X 4" X 8" WOOD ANCHOR
POWER PEDESTAL DETAIL 3
EXISTING
OVERHEAD
UTILITY POLE
600V UGP FOR PANEL 'W1' AND
PANEL 'E3', SEE SHEET E101 FOR
INFORMATION
2' MIN EMBEDMENT
E104
E104
E104
NEW 600V FEEDER LINE FOR
PANEL 'W2' SEE SHEET E101
LEGEND
NEW UG 240V LINE
NEW UG 600V LINE
EXISTING UG LINE
ELECTRICAL SITE PLAN - CAMP SITES 6-9 1
SCHEDULE 3: CAMP SITES 6-9 NOTES:
1. REUSE EXISTING RUNS TO RV PADS.
2. REPLACE WOOD POST AND RV ELECTRICAL PEDESTAL
3. CONDUCTORS SHALL BE RATED FOR DIRECT BURIAL AND ALUMINUM WHERE
NOTED.
4. NEW ELECTRICAL DISTRIBUTION WIRING SHALL BE BURIED WITH MINIMUM 24"
COVER. PROVIDE CONDUIT WHERE BURIED UNDER ROADWAYS AND AT ALL
LOCATIONS WHERE WIRING PENETRATES GROUND SURFACE. SHEET E201 FOR
TRENCH DETAILS.
5. MOUNT NEW RV PANEL PER MANUFACTURER'S INSTRUCTIONS. REPLACE EXISTING
4" BY 4" WOOD POST.
E2 PANEL LAYOUT ELEVATION 2
NEW PEDESTAL
PER PEDESTAL DETAIL
SEE DETAIL 2 ON THIS SHEET
FOR E2 PANEL ELEVATION
DEMOLISH EXISTING 200A DISCONNECT
SWITCH, AND EXISTING 'TF-2' 75KVA
TRANSFORMER, UTILITY SHALL REMOVE
EXISTING CT CABINET AND METER.
TF-1
NEW 167 kVA STEP-UP
TRANSFORMER
NEW ELECTRICAL SWITCHGEAR
LOCATION, PER ELEVATION
A E201
TO
D
SW
-1
TO
W
ELLH
EAD
EXISTING 100 AMP
FUSIBLE DISCONNECT
WITH 100 AMP FUSE
TO
D
SW
-1
TO
R
V PAD
S
EXISTING PUMP
DISCONNECT
EXISTING ELECTRICAL SWITCHGEAR
SEE DETAIL E ON SHEET E201
EXISTING PUMP HOUSE
EXISTING UTILITY POWER TO BE REPLACED BY UTILITY AND
CONTINUED TO NEW UTILITY TRANSFORMER ON BERM.
E-2 PANEL,
EXISTING
NEW 50/30/20 AMP PANEL,
SEE NOTE 5
NEW 4" X 6" X 6' TREATED
POST (SHARED WITH HOSE
BIBB) - SEE SITE PLANS
NEW 1" RGS CONDUIT
GRADE (SLOPE AWAY FROM
POST FOR 2 FEET)
1" X 4" X 8" WOOD ANCHOR
POWER PEDESTAL DETAIL 3
E105
EXISTING 240V 50A
SERVICE LINES
2' MIN EMBEDMENT
E105
E105
E105
EXISTING SHED
LEGEND
NEW UG 240V LINE
NEW UG 600V LINE
EXISTING UG LINE
CAMP SITE BRANCH LENGTHS
SITE NO. APPROX LENGTH (LF)
1 320
2 240
3 236
ELECTRICAL SITE PLAN - CAMP SITES 1-5 1
SCHEDULE 4: CAMP SITES 1-5 NOTES:
1. CONDUCTORS SHALL BE RATED FOR DIRECT BURIAL AND ALUMINUM. WHERE
NOTED.
2. NEW 600V FEEDER SHALL RUN IN EXISTING 2" HDPE CONDUIT
3. ELECTRICAL DISTRIBUTION WIRING SHALL BE BURIED WITH MINIMUM 24" COVER.
PROVIDE CONDUIT WHERE BURIED UNDER ROADWAYS AND AT ALL LOCATIONS
WHERE WIRING PENETRATES GROUND SURFACE. SHEET E201 FOR TRENCH
DETAILS.
4. CUT AND ABANDON IN PLACE EXISTING RV PEDESTAL POWER, REMOVE EXISTING
WIRING AS NECESSARY.
5. MOUNT NEW RV PANEL PER MANUFACTURER'S INSTRUCTIONS. REPLACE EXISTING
4" BY 4" WOOD POST.
NEW PEDESTAL
PER PEDESTAL DETAIL
INSTALL NEW 'TF-2' 50 kVA TRANSFORMER, NEW DISCONNECT SWITCH, & EXIST. PANEL E1, SEE DETAIL #2 ON THIS SHEET
DEMOLISH EXISTING DISCONNECT
SWITCH, EXISTING 'TF-2' 25KVA
TRANSFORMER, AND FEEDERS.
REUSE EXISTING HDPE CONDUIT.
NEW ELECTRICAL SWITCHGEAR
LOCATION, PER ELEVATION
E E201
EXISTING ELECTRICAL SWITCHGEAR
EXISTING PUMP HOUSE
E1 PANEL ELEVATION 2
EXIST.
PANEL
'E1'
DSW-2, 200 AMP FUSIBLE DISCONNECT
SWITCH WITH 125 AMP FUSE
NEW
TF-2
50 kVA
TO 167 KVA TRANSFORMER
EXISTING 4" X 4" WOOD POST
WITH CONCRETE FOOTER, TYP
EXISTING1 5/8" X 1 5/8"
UNISTRUT CHANNEL, TYP
NEW 50/30/20 AMP PANEL,
SEE NOTE 5
NEW 4" X 6" X 6' TREATED
POST (SHARED WITH HOSE
BIBB) - SEE SITE PLANS
NEW 1" RGS CONDUIT
GRADE (SLOPE AWAY FROM
POST FOR 2 FEET)
1" X 4" X 8" WOOD ANCHOR
POWER PEDESTAL DETAIL 3
EXISTING 240V 50A
SERVICE LINES. REUSE
EXISTING CONDUCTORS
2' MIN EMBEDMENT
E106
E106 E106
4" M
IN
" 12" MAX.
6" MIN.
12" MAX.
6" MIN. 6" MIN.
12" MAX.
AS
D
IR
EC
TE
D
B Y
TH
E
EN
G
IN
EE
R
4" M
IN
12" MAX.
6" MIN. 12
FINAL BACKFILL
CONDUIT ZONE
BEDDING
ASPHALT MAT
M
IN
. C O
VE
R
" U
TI
LI
TY
SATISFACTORY SOILS,
GRANULAR MATERIAL
O R
R
EC
O M
M
EN
D
ED
B Y
SO
IL
S R
EP
O
R T
AS
D
IR
EC
TE
D
B Y
TH
E
EN
G
IN
EE
R
SATISFACTORY SOILS, NATIVE
GRANULAR MATERIAL
WARNING TAPE
WARNING TAPE
3" UNTREATED BASE, WELL
GRADED, 1" MINUS AGGREGATE
IMPORTED AGGREGATE BACKFILL IN AREAS OF
EXCESSIVE GROUND WATER OR POOR SUBGRADE
MATERIAL WHERE DIRECTED BY THE ENGINEER OR
NATIVE OVER-EXCAVATED AND RECOMPACTED MATERIAL
REJECT SAND OR SELECT 3/4" MINUS GRANULAR
EXCAVATED MATERIAL OR IMPORTED BEDDING
COARSE BACKFILL
3" ROAD ASPHALT MAT
TO MATCH EXISTINGEXISTING GRADE
DSW-1
800 AMP
FUSIBLE
DISCONNECT
WITH 800
AMP FUSE
DSW-5A, 200 AMP FUSIBLE
DISCONNECT SWITCH WITH
175 AMP FUSE
TF-1,
167 kVA
Scale: NTS A
E201
BASE IMPROVEMENT-MAIN ELECTRICAL SWITCHGEAR ELEVATION
GENERAL NOTES:
1. CONDUITS SHOWN AT DIFFERING ELEVATIONS FOR CLARITY. ALL WIRING SHALL BE DIRECT BURIED WITH A
MINIMUM OF 24" COVER.
2. DSW-2A AND DSW-3A SHALL BE MOUNTED ON OTHER SIDE OF STRUCTURE BEHIND DSW-5A, AND DSW-4A
3. CURRENT TRANSFORMER (CT) ENCLOSURE SHALL HAVE REMOVABLE HINGE DOOR WITH SEALING AND LOCKING PROVISIONS AND SHALL BE NEMA 3R, ANSI 61 GRAY. CURRENT TRANSFORMER TO BE INSTALLED IN
ENCLOSURE BY UTILITY.
4. INSTALL METER SOCKET AS SHOWN. UTILITY TO PROVIDE METER WHEN SERVICE IS INSTALLED.
5. PROVIDE TRANSFORMER PAD. DIMENSIONS BELOW SHOW MINIMUM SIZES, BUT PAD SHOULD EXTEND 4" PAST
EQUIPMENT EDGE.
GROUND ROD
PROVIDE DOUBLE LUGS AT
SECONDARY TAPS
2" CAPPED RIGID STEEL POST
WITH CONCRETE FOOTER, TYP
1 5/8" X 1 5/8"
UNISTRUT CHANNEL
(TYP)
TO
P
U M
P H
O U
SE
S
W
IT
C H
TO
P
AN
EL
'E 2'
NEW UTILTITY TRANSFORMER,
SIZED AND INSTALLED BY
AVISTA UTILITIES
EDGE OF BERM
CT CABINET,
SEE NOTE 3
METER SOCKET,
SEE NOTE 4
3'-81 8"
MIN,
TYP
6' MAX,
TYP
D E201
CONCRETE PAD
PER DETAIL
PRIMARY SIDE CONDUIT AND
CONDUCTOR TO BE INSTALLED
BY AVISTA UTILITIES
CONDUIT AND CONDUCTOR TO
BE INSTALLED BY CONTRACTOR
Scale: NTS B
E201
SINGLE PIPE/CONDUIT TRENCH DETAILS
3"
TYP.
3'-4"
(SEE NOTE 5)
3' (S
EE
N
O
TE
3'-4"
(SEE NOTE 5)
Scale: NTS D
E201
BASE IMPROVEMENT 167 KVA TRANSFORMER PAD ELEVATION
TO
D
SW
-1
TO
W
ELLH
EAD
EXISTING 100 AMP
FUSIBLE DISCONNECT
WITH 100 AMP FUSE FOR
PUMP HOUSE
6' MAX,
TYP
TO
D
SW
-1
TO CAMP SITES 6-9
EXISTING 600V
DISTRIBUTION LINE
EXISTING PUMP
DISCONNECT
E-2 PANEL,
EXISTING
EXISTING 200 AMP FUSIBLE
DISCONNECT SWITCH WITH 200 AMP
FUSE, SW-0, TO CONTINUE FEED TO
SWITCHES SW-2, SW-3, AND SW-4
Scale: NTS E
E201
EXISTING PUMP ELECTRICAL EQUIPMENT ELEVATION
PUMP HOUSE WALL
FINISHED GRADE
DSW-4A, 200 AMP FUSIBLE
DISCONNECT SWITCH WITH
175 AMP FUSE
TO PANEL 'W2'
TO PANEL 'W1'
5" MIN
6" MIN
#4 BARS @ 12" O.C. EACH WAY
(TYP)
2" TYP
3" TYP
BACKFILL NOTES:
1. BACKFILL IN LAYERS THAT DO NOT EXCEED 6 INCHES IN COMPACTED DEPTH. COMPACT WITH VIBRATORY PLATE COMPACTOR OR OTHER SUITABLE EQUIPMENT AS APPROVED BY THE
CONTRACTING OFFICER. ENSURE OPTIMUM MOISTURE CONTENT OF BACKFILL MATERIALS. COMPACT EACH LAYER UNTIL THERE IS NO VISIBLE EVIDENCE OF FURTHER CONSOLIDATION.
2. FOR TRENCH SEGMENTS THAT ARE OUTSIDE OF PAVED SURFACING BY A MINIMUM OF 4', ONCE BACKFILL AND COMPACTION ARE COMPLETED FOR A MINIMUM OF 12" ABOVE THE TOP OF THE CONDUIT OR WIRES, THE DEPTH OF BACKFILL LAYERS MAY BE INCREASED UP TO 12" LOOSE DEPTH.
3. THE CONTRACTOR SHALL GIVE THE CONTRACTING OFFICER A MINIMUM OF 24 HOURS ADVANCED NOTICE BEFORE BEGINNING THE BACKFILLING OF TRENCHES UNDER OR WITHIN 4' PAVED
SURFACING.
ASPHALT CONCRETE PATCHING NOTES:
1. SUBMIT A IDAHO STATE TRANSPORTATION DEPARTMENT JOB MIX FORMULA FOR HOT OR WARM MIX ASPHALT APPROVED WITHIN THE PAST 12 MONTHS FOR APPROVAL AT LEAST 30 DAYS
BEFORE PRODUCTION OF ASPHALT CONCRETE.
2. EXTEND THE REPAIR AREA A MINIMUM OF 12" BEYOND THE LIMITS OF THE TRENCH, 36" MINIMUM LENGTH LONGITUDINAL TO THE ROAD.
3. PATCH AREAS SHALL BE SAWCUT PERPENDICULAR TO THE ROAD. CUTS SHALL BE STRAIGHT, CLEAN AND CONTINUOUS FOR FULL LENGTH. APPLY A TACK COAT TO THE EDGES OF THE PATCH
AREA.
4. PLACE ASPHALT CONCRETE MIX ON A DRY, UNFROZEN SURFACE WHEN THE AIR TEMPERATURE IN THE SHADE IS ABOVE 35° FAHRENHEIT AND RISING, AND IN ACCORDANCE WITH THE MINIMUM
LAY-DOWN TEMPERATURE FOR THE APPROVED JOB MIX FORMULA.
5. PLACE AND COMPACT ASPHALT CONCRETE PAVEMENT TO ENSURE THE PATCHED SURFACE MATCHES THE SAME GRADE AS THE ADJACENT SURFACES. COMPACT WITH VIBRATORY STEEL
DRUM ROLLER SUITABLE FOR THE SIZE OF THE PATCH.
TO
FT-1
1954301:59:35 PM 05-10-2022 (-04'00' GMT)
NOTES:
1. PROVIDE ALL NEW BREAKERS (FEEDER AND BRACH)
FOR ALL RV PADS AND PANELS. INCLUDE PRICE
WITHIN OPTION BIDS.
2. ALL RV PEDESTAL CONDUCTORS SHALL BE
ALUMINUM.
3. EXISTING CIRCUITS RETAINED AND REUSED SHOWN
IN TABLE "EXISTING CIRCUITS RETAINED AND
RESUED" ON RIGHT.
240V
600V
0A
EXISTING
100A
DISCONNECT
0A
, 1
A F
U
SE
600V
120/240V 75 kVA, NEMA 4
SITE 17
SITE 18
SITE 19
SITE 20
SITE 34
SITE 35
SITE 36
SITE 37
SITE 38
SITE 39
0A
, 1
A
FU
SE
SITE 10
NEW PANEL 'E3'
240V, 400A 3W, 1PH, 42CKS
NEMA 4
SITE 11
SITE 12
SITE 13
SITE 14
SITE 15
SITE 16
0A
, 1
A
FU
SE
SITE 4
PANEL 'E1'
(EXISTING)
SITE 1
SITE 2
SITE 3
SITE 5
SITE 6
PANEL 'E2'
(EXISTING,
MOVED TO NEW
PUMP HOUSE
WALL)
SITE 7
SITE 8
SITE 9
167 kVA
TO PUMP HOUSE
0A
N
EW
0A
N
EW 25
0A
N
EW
0A
14.4kV
120/240V 167 kVA
0A
, 1
A
FU
SE
SITE 30
NEW PANEL 'W1'
240V, 400A 3W, 1PH, 42CKS
NEMA 4
SITE 31
SITE 32
SITE 33
N
EW 25
0A
75 kVA, NEMA 4
50A
50A
NEW PANEL 'W2'
240V, 400A, 3W, 1PH, 42CKS
NEMA 4
50A
50A
600V
120/240V
50A
50A
50A
50A
50A
50A
PROVIDED BY UTILITY
PROVIDED BY CONTRACTOR
200A, 175A FUSE
600V
120/240V 50 kVA, NEMA 4
600V
120/240V 50 kVA, NEMA 4
DSW-5A
D
SW
-1
D
SW
-2
D
SW
-3
D
SW
-4
D
SW
-5
NEW 'TF-5' NEW 'TF-4'
NEW 'TF-3' NEW 'TF-2'
TF-1
CT
CABINET
METER BASE,
METER PROVIDED
BY UTILITY
Scale: NTS
E601
ONE-LINE DIAGRAM
SYMBOL
EXISTING CONDUCTOR/COMPONENT
NEW CONDUCTOR/COMPONENT
FUSED DISCONNECT SWITCH
TRANSFORMER
BREAKER
50/30/20 AMP COMBINATION PEDESTAL
ONE LINE DEVICES
SWITCH
JUNCTION BOX
CURRENT TRANSFORMER
TRANSFORMER
ABBREVIATIONS
SW
JB
CT
TF
3-#4 & 1-#6 GND
3-#3 & 1-#6 GND
ELECTRICAL TRANSFORMER SCHEDULE
ITEM
NO.
SIZE
(KVA) DESCRIPTION VOLTAGE
TF-1 167 PAD MOUNTED TRANSFORMER W/ NEMA 4 ENCLOSURE 240/600
TF-2 50 PAD MOUNTED TRANSFORMER W/ NEMA 4 ENCLOSURE 600/240
TF-3 50 PAD MOUNTED TRANSFORMER W/ NEMA 4 ENCLOSURE 600/240
TF-4 75 PAD MOUNTED TRANSFORMER W/ NEMA 4 ENCLOSURE 600/240
TF-5 75 PAD MOUNTED TRANSFORMER W/ NEMA 4 ENCLOSURE 600/240
200A, 125A FUSE
DSW-2A
50A
50A
50A
50A
50A
50A
50A
50A
50A
50A 50A
50A
50A
50A
50A
50A
50A
50A
50A
50A
50A
50A
50A
SITE 21
SITE 22
SITE 23
50A
50A
50A
50A
50A
50A
SITE 24
SITE 25
SITE 26
SITE 27
SITE 28
SITE 29
3-#3 & 1-#6 GND
3-#2 & 1-#6 GND
3-#1 & 1-#6 GND
3-#1 & 1-#6 GND
3-#3 & 1-#6 GND
3-#6 & 1-#6 GND
3-#3 & 1-#6 GND
3-#2 & 1-#6 GND
3-#1/0 & 1-#6 GND
3-#1 & 1-#6 GND
3-#2 & 1-#6 GND
3-#3 & 1-#6 GND
3-#4 & 1-#6 GND
3-#3 & 1-#6 GND
3-#4 & 1-#6 GND
3-#1 & 1-#6 GND
3-#2 & 1-#6 GND
3-#4 & 1-#6 GND
REUSE EXISTING
REUSE EXISTING
REUSE EXISTING
REUSE EXISTING
REUSE EXISTING
REUSE EXISTING
3-#3/0 & 1-#4 GND3-#1 & 1-#6 GND
3-#2 & 1-#6 GND
3-#6 & 1-#6 GND
3-#6 & 1-#6 GND
3-#3 & 1-#6 GND
3-#2 & 1-#6 GND
3-#1 & 1-#6 GND
3-#1 & 1-#6 GND
3-#1/0 & 1-#6 GND
3-#2/0 & 1-#4 GND
3-#2/0 & 1-#4 GND
3-#2/0 & 1-#4 GND
200A, 175A FUSE
DSW-4A
3-#350 MCM AL & 1-#2 GND AL
6-#250 MCM AL & 2-#1 GND AL3-#350 MCM AL & 1-#2 GND AL
3-#250 MCM AL & 1-#4 GND AL
2-#600 MCM AL & 1-#2/0 GND AL
2-#300 MCM AL & 1-#2 GND AL
2-#2/0 AWG AL & 1-#1 GND AL
2-#2/0 AWG AL & 1-#4 AWG GND AL
3-#3/0 AL & 1-#4 GND AL
8-#30 MCM AL & 4-#3/0 GND AL
200A, 125A FUSE
DSW-3A
SCHEDULE 1
SCHEDULE 2
SCHEDULE3
SCHEDULE 4
BASE IMPROVEMENTS
SEE NOTE 3
SEE NOTE 3
SEE NOTE 3
SEE NOTE 3
SEE NOTE 3
R
EV
IS
ED
S H
EE
T
1/
/2
BC
PR
OFESS IONAL ENGINEER
D A R R E L L D E A
N
L
I C E N S E D
STA T E OF I DA HO
19543 Darrell Dean Digitally signed by Darrell Dean
Date: 2023.01.17 17:08:43 -05'00'
NOTES:
1. SEE SHEET E601 FOR NEW SINGLE LINE.
2. SEE SHEET E601 NOTE 3, FOR EXISTING CIRCUITS IN EACH PANEL THAT ARE RETAINED AND
REUSED.
240V
600V
0A
100A
A
600V
120/240V 25 kVA
SITE 17
SITE 18
SITE 19
SITE 20
SITE 34
SITE 35
SITE 36
SITE 37
SITE 38
SITE 39
A
SITE 10
PANEL 'E3'
SITE 11
SITE 12
SITE 13
SITE 14
SITE 15
SITE 16
A
SITE 4
PANEL 'E1'
SITE 1
SITE 2
SITE 3
SITE 5
SITE 6
PANEL 'E2'
SITE 7
SITE 8
SITE 9
75 kVA
TO PUMP HOUSE
0A
0A
0A
0A
14.4kV
120/240V 67 kVA
A
SITE 30
PANEL 'W1'
SITE 31
SITE 32
SITE 33
0A
25 kVA
50A
PANEL 'W2'
600V
120/240V
50A
50A
50A
50A
50A
50A600V
120/240V 25 kVA
600V
120/240V 25 kVA
SW
-2
SW
-3
SW
-4
SW
-5
'TF-5' 'TF-4'
'TF-3' 'TF-2'
TF-1
CT
CABINET
METER BASE,
METER PROVIDED
BY UTILITY
Scale: NTS
EXISTING DEMOLISH ONE-LINE DIAGRAM
SYMBOL
EXISTING CONDUCTOR/COMPONENT
NEW CONDUCTOR/COMPONENT
FUSED DISCONNECT SWITCH
TRANSFORMER
BREAKER
30/20 AMP COMBINATION PEDESTAL
50/30/20 AMP COMBINATION PEDESTAL
DEMOLISHED EQUIPMENT
ONE LINE DEVICES
SWITCH
JUNCTION BOX
CURRENT TRANSFORMER
TRANSFORMER
ABBREVIATIONS
SW
JB
CT
TF
SITE 21
SITE 22
SITE 23
SITE 24
SITE 25
SITE 26
SITE 27
SITE 28
SITE 29
0A
30A
30A
30A 30A
30A
30A
30A
30A
30A
30A30A
30A
30A
30A
30A
30A
30A30A
30A
30A
30A
30A
30A
30A
30A
30A
30A
30A
30A
30A
30A
30A
30A
-4
P
EL
S
'T kVA
E 1
A
SIT
30A
IT
0A
S
0A
TE
TE
0A
S
0A
TE
0A
SI
0A
E
SIT 9
A W
0V
PA
0V
'W
TE
F-4 A
SI 8
TE
A
SIT
E 2
A
SIT
A
E 2
E 2
TE
30A
A
S
TE
A
S 28
TE
SCHEDULE 2
SCHEDULE 3
BASE IMPROVMENTS
R
EV
IS
ED
S H
EE
T
/0 2/
BC
R
EV
IS
ED
W O
R D
IN
G
5/
/2
BC
R
EV
IS
ED
W O
R D
IN
G
1/
/2
BC
PR
OFESS IONAL ENGINEER
D A R R E L L D E A
N
L
I C E N S E D
STA T E OF I DA HO
19543 Darrell Dean
Digitally signed by Darrell Dean Date: 2023.01.17 17:08:57 -05'00'
SCHEDULE 1
SCHEDULE 4
| Huckleberry _Drawings_20220510_new.pdf |
| DO#34 Huckleberry Update_Final CD_Drawings_20230117_Rev 4 |
File details come from the government source that posted it. Updated .