Huckleberry_Addendum_R2.pdf

PDF 118 KB Posted

Attached to
HUCKLEBERRY CAMPGROUND ELECTRICAL PHASE 2 Federal contract opportunity
Solicitation number
140L2623R0006
Issued by
Department of the Interior Bureau of Land Management Idaho Region

About this file

This addendum clarifies the scope of work for the Huckleberry Campground Electrical Phase 2 federal contract opportunity. The base improvements have been completed under a previous contract, and this contract only includes Schedules 1 through 4 as indicated in the drawings. Bid items 2 through 4 also relate to the base improvements that were previously completed. When work commences, the entire campground will close to allow scheduled work to be accomplished in parallel. The contractor must horizontally bore below all paved segments to install conduits without disturbing the asphalt roads and spurs. References to Options 1 through 4 in the specifications and drawings now refer to Schedules 1 through 4. The related federal contract opportunity is solicitation number 140L2623R0006 for Huckleberry Campground Electrical Phase 2 from the Department of the Interior Bureau of Land Management Idaho Region.

View the file

Other files for this federal contract opportunity

Other files attached to HUCKLEBERRY CAMPGROUND ELECTRICAL PHASE 2, newest first.
File Type Posted
Huckleberry_CG_Electrical_P2_R2_-_Prebid_tour_meeting_notes_0001.docx DOCX document
Sol_140L2623R0006_Amd_0001.pdf PDF
SF-24_Bid_Bond.pdf PDF
Huckleberry_Drawings_01_18_2023_R2.pdf PDF
Huckleberry_Specifications_20220510_R2.pdf PDF
Sol_140L2623R0006.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum to Huckleberry Campground Electrical Upgrades Phase 2

Drawings Package clarification:

1. The Base Improvements as indicated on the drawings have been completed under a previous contract. The work under this contract only includes Schedule 1-4 improvements as indicated on the drawings.

Specifications Package clarification:

1. 012000 – Unit Prices and Schedule of Values – 3.2 SUMMARY OF BID ITEMS: Bid Items 2-4 for the Base Improvements were completed under a previous contract. The work under this contract only includes Schedule 1-4 improvements as indicated in Bid Items 1 and 5-8.

When work commences on site, the entire campground will be closed to allow for schedule work to be accomplished in parallel.

Contractor shall horizontally bore to install the conduits below all paved segments crossed, approximately 30 places, i.e. no disturbance of the AC paved roads and spurs will be allowed.

Any references to Options 1 – 4 in the specifications or drawings now refer to Schedules 1 – 4.