Attachment 1 - PNW Performance Work Statement_Amendment 3.pdf

PDF 854 KB Posted

Attached to
S&RTS, Pacific Northwest (PNW) Federal contract opportunity
Solicitation number
HTC71125RE120
Issued by
Department of Defense United States Transportation Command

About this file

This Performance Work Statement (PWS) details a military logistics contract for Stevedoring and Related Terminal Services (S&RTS) at Pacific Northwest ports. The contract, issued by the Military Surface Deployment and Distribution Command (MSDDC), requires comprehensive cargo handling services for Defense Transportation System shipments at ports in Washington and Oregon, including Tacoma, Everett, Olympia, Grays Harbor, and Portland.

The contractor will manage a wide range of military cargo operations, including handling vehicles, containers, aircraft, breakbulk cargo, and hazardous materials weighing up to 150,000 pounds. Services include loading/unloading vessels, cargo staging, documentation, warehouse management, and transportation across multiple ports. The contract demands 24/7 operational capability, with requirements for specialized equipment, trained personnel, safety protocols, and the ability to simultaneously manage multiple vessel operations. Operational focus is on "Safety, Efficiency, and Customer Service", with specific performance standards for cargo handling, documentation, and mission support for military deployment and distribution activities.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HTC711-25-R-E120

PERFORMANCE WORK STATEMENT

STEVEDORING AND RELATED TERMINAL SERVICES

PACIFIC NORTHWEST (PNW)

PORT OF TACOMA, PORT OF OLYMPIA, PORT OF GRAYS HARBOR, PORT OF

EVERETT & OTHER COMMERCIAL PORT FACILITIES THROUGHOUT THE

PUGET SOUND & COLUMBIA RIVER AND

PORT OF PORTLAND

Military Operations Terminal

833rd Transportation Battalion Joint Base Lewis-McChord (JBLM) Washington as of 13 May 2025

Stevedoring & Related Terminal Services

Performance Work Statement

TABLE OF CONTENTS

Section Topic Page

1.0 Background & Scope 2

2.0 General Security Requirements 4

3.0 General Safety Requirements 7

4.0 General Contract Administration 10

5.0 General Contractor Requirements 28

6.0 Terminal Specific Requirements 52

Deliverable Table 62 Contract Performance Requirements Summary (PRS) Table 69 Appendix A Regulations, Publications, & Forms 73 Appendix B Glossary of Terms 78 Appendix C Payment Instructions 91 Appendix D List of Acronyms & Abbreviations 95 Appendix E Foreign Entity Vetting 97

1. BACKGROUND AND SCOPE

1.1 Background. The Military Surface Deployment and Distribution Command (MSDDC), headquartered at Scott AFB, IL is an operational-level Army force designated by the Secretary of the Army (SECARMY) as the Army Service Component Command (ASCC) of the United States Transportation Command (USTRANSCOM) and a major subordinate command of Army Material Command (AMC). MSDDC is responsible for providing coordination worldwide for origin to destination surface traffic management support; coordinates surface and multimodal transportation contracted functions for all Department of Defense (DoD), and other U.S.

Government entities, as authorized, and designated multinational and interagency elements.

Since its establishment in 1965, MSDDC has played a vital role in our nation’s defense by providing support to our warfighters to every war, major contingency, training exercise and humanitarian relief operations where our Military forces are needed and deployed.

1.2 Scope of Service. Provide Stevedoring and Related Terminal Services (S&RTS) handling the import and export of Defense Transportation System (DTS) sponsored and non-sponsored cargo through the Pacific Northwest (PNW) Ports of Tacoma, Everett, Olympia, Grays Harbor, Washington and Port of Portland, Oregon. These five strategic Northwestern seaports are located where the Pacific Ocean meets the mouth of the Puget Sound River and the Port of Portland, Oregon. All tasks shall be completed per requirements stated throughout this Performance Work Statement (PWS) and in a manner consistent with “Safety, Efficiency, and Customer Service in Mind”.

1.2.1 S&RTS services will cover the full spectrum of managing US military cargo (e.g.

containers, vehicles, breakbulk, and rotary or fixed wing aircraft) transiting through the PNW.

Operational tasks shall include, but are not limited to “all” stevedoring and longshoring services required to manage vessel operationscargo management (staged, prep, and onward moved), intra port transfers, vessel prep, documentation (tallying & checking), and warehousing/storage of dunnage & tiedown materials.

1.2.1.1 Contracted services shall include the capability to work multiple vessel(s) and vessel decks simultaneously, primarily through the Port of Tacoma, as well as the capability to provide S&RTS at other designated area port/terminals, in Washington/Oregon and in conjunction with operations at/within those ports/terminals as described in this PWS’s area of responsibility (AOR) 24-hours a day, seven (7) days per week, and 365 days per year. (See section 6 for geographical location).

1.2.1.2 Military cargo will consist of military wheeled/tracked vehicles and aircraft up to 150,000lbs, shipping containerized/flat racked breakbulk cargo, all sizes and configured shipping containers (non-explosive), all classes of hazardous materials, as well as sensitive, priority, and/or other general Department of Defense (DoD) cargo being imported/exported on ocean going vessels, Common-User Land Transportation (CULT) commercial over the road (OTO) trucks, and rail services.

1.2.1.3 The Contractor shall provide all Contractor Furnished Equipment (CFE), Material Handling Equipment (MHE), gear, tools, materials, supplies, supervision/management, transportation, and sufficient amounts of qualified general and skilled stevedores, longshoremen, drivers, crane operators, warehousemen, and tallymen needed to satisfy the full scope of S&RTS required to perform all requirements for this contract for which the U.S.

Government (USG) will compensate the Contractor at the applicable commodity rate, per the designated Schedule of Rates (SOR).

1.2.2 All services in accordance with (IAW) this PWS shall require approval from the Contracting Officer (CO) or their appointed Contracting Officer’s Representative (COR) and Ordering Officer (OO). The Contractor shall obtain written approval from the COR/OO for all services (vessel/terminal operations) provided, for which a Task Order will be issued. The Contractor shall assume “all expenses” for any work performed outside of ordered services or without written authorization from the COR/OO.

**NOTE: Subsequent reference to the COR/OO throughout the PWS will also assume the Alternate Contracting Officer’s Representative (ACOR) or Alternate Ordering Officer (AOO) as well, unless otherwise specified.

2. GENERAL SECURITY REQUIREMENTS.

2.1 General security requirements of the Contractor defined within this section. Additional duties and requirements specific to the particular terminal(s) within the scope of this contract are further defined in Section 6.2 - Port - Terminal Specific Requirements (Security).

2.2 The overall classification of work associated with this contract is UNCLASSIFIED.

Personnel assigned to this contract will not require access to Non-Secure Internet Protocol Router Network (NIPRNet) applications or UNCLASSIFIED Government systems and therefore are not authorized to obtain a Common Access Card (CAC) or Alternative Smart Card Logon (ASCL) tokens.

2.3 Ground Rules and Constraints.

2.3.1 Personnel Screening. The Contractor shall ensure all employees (to include any subcontractors) working with or on this contract, must meet U.S. Government guidelines regarding employment by screening all employees for indications of criminal, terrorism, or threat-related activity or alliances detrimental to the United States of America (USA).

2.3.1.1 The Contractor shall not employ any person under this contract associated to or convicted of any of these suspicions or offenses (listed above) or who presents any unfavorable behaviors or is simultaneously an employee of the US Government (USG). Employees or subcontracted employees refusing screening shall result in denial of applicant’s employment associated to this contract. If employment or continued employment of any Contractor employee/subcontractor is prejudicial to or presents a conflict of interest or endangers the security of the USG, the Contractor shall make the necessary change(s) to remove those employee/subcontractors from working, interacting or engaging with US personnel associated to managing this contract.

2.3.1.2 Completed Screening. Once the screening process is completed, the results will be submitted to the 833rd Transportation Battalion for review/vetting through the 596th Transportation Brigade, S-2 to ensure investigative and clearance requirements are obtained before the start date of the contract. Any further derogatory information found may result in access being denied. Screening will be completed prior to any badge issuance. Screening maintains compliance with enhanced force protection measures through document examination, verification, biographical, and security interviews. Applicants denied access due to derogatory information may file an appeal to the Contracting Officer and 596th Transportation Brigade for review.

2.3.2 Persons Excluded from the Premises. The Contractor shall not allow any person(s) banned by any authority from the premises to have access to terminal facilities, equipment, or other material related to Government operations.

2.3.3 Persons with Restricted Duties. The Contractor shall not allow a person restricted by any authority from certain equipment or areas to operate that equipment or enter areas as designated by the COR.

2.3.4 Military Base Access. The Contractor shall be required to enter and work on US Government military installations. The Contractor shall be responsible for its employees to include sub-contractors and CFE/MHE and will comply with access and control procedures, subject to background checks, personal and vehicle inspections. Contractor personnel that are not cleared, or those who refuse to comply with access/control procedures will be denied entry. The Contractor shall be responsible for its CFE/MHE. The USG will not be liable for compensation to the Contractor and will hold the Contractor liable for performance delays caused due to shortages of personnel or CFE/MHE denied entry.

2.3.4.1 Contractor personnel shall read and comply with applicable DoD security regulations, policies, and procedures for access to installations and facilities.

2.3.4.2 The Contractor shall comply with all requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to the Contractor’s failure to comply with the applicable port, facility or Installation Access Control processing requirements.

2.3.5 Derogatory Information. If the Government notifies the Contractor that employment of any Contractor employee is prejudicial to the interests or endangers the security of the United States of America, the Contractor shall remove and bar that person from military operations.

This includes security deviations/incidents and credible derogatory information on contract members during the course of the contract period. The Contractor receiving award of this contract shall make any changes necessary in the appointment(s) will immediately be escorted off the premises.

2.3.6 Operations Security (OPSEC). The Contractor shall comply with DoD Directive 5205.02, Army Regulation 530-1, and the requiring activity OPSEC program. Failure to comply with the OPSEC directives shall be identified as adequate cause for removal of a Contractor employee from performance on this contract/task order and may be considered for appropriate legal action. The Contractor shall ensure Contractor employees as described in 2.3.6.1 will complete Level I OPSEC training within thirty (30) calendar days of start of employee performance on this contract and annually thereafter. The Contractor shall maintain all OPSEC training records and shall provide copies to the COR upon request.

2.3.6.1 The Contractor shall submit to the CO a list of points of contact who can respond to Government activities to provide expert assistance in answering questions, exchanging information, and resolving problems including at least one primary and alternate point of contact available for urgent matters on a 24-hour basis, 7 days a week. The Contractor shall provide this list within one calendar week of contract award, and at the time of award. Should there be any intervening changes to the list, the Contractor will advise of any changes within one calendar week of any such change.

2.3.7 Threat Related Incidents. Persons employed by the USG will report threat-related incidents, behavioral indicators, and other matters of Counterintelligence (CI) interest specified in AR 381-12, Chapter 3, to the Facility Security Officer, the nearest Military CI Office, the Federal Bureau of Investigation, or the Defense Counterintelligence and Security Agency.

2.3.8 Vendor Threat Mitigation. The Contractor shall submit a semi-annual report to the CO for each first-tier foreign transportation service provider, operating as a separate legal entity, contracting directly with Contractor or its commonly owned legal affiliate, which has employees who may have physical contact with USG shipments in the ordinary course of contract performance. See Appendix E for further instruction for this requirement. Compensation for services defined in this paragraph are included in all commodity rates established in the SOR.

2.3.9 Vehicle Identification. The Contractor shall obtain installation/port access clearance for any vehicles used in performance of this contract. The Contractor shall submit a comprehensive list of vehicles required during the duration of this contract immediately upon award to the COR in order to obtain access clearance. The list shall identify vehicle type, license plate, and owner/ company name. Personal Owned Vehicles (POV) shall not be authorized entry in and around USG equipment unless identified as official vehicles critical to the success of the mission. When submission of a new vehicle is necessary, only substitutions are acceptable to maintain a reasonable number of cleared vehicles authorized entry.

2.3.10 Security Regulation. Security Regulation Guidance found at https://www.esd.whs.mil/dd/. Select under “DOD Issuances” the following DOD Instructions and Manuals.

2.4 Privacy Information. The Contractor and COR/ACOR must ensure all personnel information collected, maintained, used or disseminated is relevant and necessary to accomplish the contract. The Contractor will collect information to the greatest extent practicable directly from and inform the individual of the reason collection of the information is required; authority for collection; who and for what purpose; whether disclosure is mandatory or voluntary; and the impact of not providing the information. The Contractor and COR/ACOR will establish appropriate administrative, technical and physical safeguards, for protection of paper, documentation involved, to ensure security of records and prevent compromise or misuse during storage, transfer, or use, including transiting authorized alternative worksites. Privacy information collected must comply with DoD and Army Privacy Act regulations, whichever is more stringent.

2.5 Badges. All permanent and temporary personnel hired directly or indirectly by the Contractor performing work under this contract, shall have in their possession, and display when required, a current Worker's Identification Badge issued by each port where military operations are being performed. The Contractor’s management shall ensure compliance with this requirement.

2.5.1 Upon termination or completion of this contract, the Contractor shall surrender all Government supplies, materials, and equipment to the COR. In addition, the Contractor shall turn in any security badges to the COR on the last day of the contract or upon any termination/reassignment of any employee or subcontractor.

2.6 Cyber Security. The services designated under this contract are “operationally critical support” as defined in Defense Federal Acquisition Regulation Supplement (DFARS) 252-204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.

3. GENERAL SAFETY REQUIREMENTS

3.1 General Safety Requirements of the Contractor are defined within this section.

Additional duties and requirements specific to the particular terminal(s) within the scope of this contract are further defined in Section 6.3 – Port-Terminal Specific Requirements (Safety). FAR 52.236-13(a) and Alternate 1(f) apply.

http://www.esd.whs.mil/dd/

3.2 Enforcing and Monitoring Safety. The Contractor shall comply with, enforce, and monitor applicable USG safety and fire regulations. The COR will log any discrepancies within the defined quality performance process. The Contactor shall establish and maintain an effective and comprehensive safety program. The Contractor shall acquire, maintain, and require the use of safety equipment, personal protective equipment (PPE) (29 CFR 1917.91-95/1918.101-106) and devices necessary to protect employees at all times while working military operations at PNW, i.e., terminals, railhead/spurs, commercial truck yards, and on all vessel(s) laden with military vehicle/equipment.

3.2.1 Safety Program Manager. The Contractor shall provide as part of its management staff, a dedicated Safety Program Manager (SPM) and/or alternates as needed for each operation. The Contractor shall ensure the SPM is accessible and on site to observe all USG operations, contractor personnel to include sub-contractors to ensure the Contractor’s safety practices are monitored, damage/injury is investigated, and make corrections when deviations or departures from safety are observed.

3.2.2 Accident Prevention/Safety Program. The Contractor shall provide to the COR within two (2) calendar days of contract award date, their written plan for accident prevention/safety program, for port/terminal operations at PNW ports, per Federal Acquisition Regulations (52.236-13 Accident Prevention), and DA PAM 385-10.

3.2.3 Safety Stop. The USG reserves the right to call “safety stop” of the Contractor’s operations when/if the Safety Officer, COR, or other USG representatives observes or reports unsafe practices, safety infractions or safety violation(s); whereas harm to life, damage to property, or unsafe practices are present/possible. The COR shall inform the contractor to “stop work” directing the contractor to “stand-by”. The Contractor’s operations shall not resume until all practices, infractions or violations have been addressed and corrected and/or revises their methods of operation to correct the safety issue and bring together all personnel for a safety briefing to the Safety Officer or their representative satisfaction. The USG will not compensate the Contractor for any time spent on “stand-by” or lost time incurred due to safety violation/infraction. The USG may hold the Contractor liable for any costs incurred to the USG, resulting from operations halted due to the Contractor’s unsafe practice or violation and all safety violation/infraction shall be documented.

3.2.4 Safe Working Load Lift Trucks and Cranes. The Contractor shall adhere to local authority and Occupational Safety and Health Administration (OSHA) and DoD standards for “safe working load” for all Contractor Furnished Equipment & Material Handling Equipment (CFE/MHE), to include all cranes (ship or shore). The Contractor shall adhere to all safety requirements when lifting cargo. The Contractor shall ensure all CFE/MHE drivers/operators are Powered Industrial Truck (PIT) certified. Only trained and competent operators shall be permitted to operate a powered industrial truck. All PIT operators must be trained and certified by their organizations [29 CFR 1910.178(l)] and have in their possession a PIT card. The PIT card shall designate all CFE/MHE that drivers/operators are trained to operate [29 CFR 1910.178(l)(6)]. Crane Operators shall be certified to meet OSHA standards [29 CFR 1926.1427]. The COR or other designated USG personnel at their discretion may stop any/all drivers/operators that are trained on the equipment they are operating.

3.2.5 Personal Protective Equipment (PPE) Safety/Hazard Analysis. The Contractor shall ensure all Contractor personnel, to include its subcontractors, have and/or wear proper PPE. The Contractor shall provide a Safety/Hazard analysis to the COR a that defines the proper PPE that is required to be used and/or worn when engaged in terminal or port operations. The safety/hazard analysis shall be provided to the COR within two (2) calendar days of contract award, whereas the COR and Safety Officer will monitor and report PPE usage based on the Safety/Hazard analysis. The Contractor shall provide to the COR within two (2) calendar days a new/updated Safety/Hazard analysis if/when changes in operational scope occur.

3.3 Contractor Safety Briefings. The Contractor shall, as part of all commodity and extra labor operations, conduct and document safety briefings for all workers by name prior to all vessel, terminal service/operations and at each shift change. The Contractor shall provide a mandatory safety briefing to new personnel as they are added. The Contractor shall conduct safety briefings with the presence of a MSDDC USG representative. The COR or MSDDC Safety Officer may also participate in these briefings. The Safety/Hazard analysis should be the basis for safety brief content, see FAR 52.236 (f)(1) for guidance. The Contractor shall conduct safety briefings in the English language and language understood by the labor/workers.

3.4 USG Safety Briefing. The USG, at its discretion, may conduct additional safety briefings when necessary and per local Commander’s guidance. The USG’s safety briefing may include information from above or other necessary Command-related information or additional safety concerns. Compensation (unless for safety violations) for the Contractor’s labor shall be placed on stand-by time and compensated per Schedule 2 of the Schedule of Rates (SOR). No compensation shall be made to the Contractor for “safety stop/violations”.

3.5 Reporting Accidents, Injuries and Damage

3.5.1 Reportable Accident, Injuries or Damage Reporting. The USG requires reporting of any situations that result in injury or death to any personnel, or damage to USG cargo or commercial property. The Contractor shall immediately notify the COR of any incident and/or accident that results in injury or death to any personnel, damage to USG cargo, commercial property, during or arising from performance under this contract. The Contractor shall submit accident investigation reports to the COR and USG Safety Officer as mandated in Reporting Timeline Requirements listed below.

3.5.1.1 The Contractor shall submit documentation to the COR verifying the qualifications and task training for each employee involved in the incident/accident.

3.5.1.2 The Contractor shall submit all maintenance records for CFE/MHE involved in any accident or incident involving injury.

3.5.1.3 The Contractor shall assist the USG during any incident and/or accident investigation.

3.5.2 Preserve Critical Evidence. the Contractor shall secure the accident location and preserve critical evidence. The Contractor shall allow USG personnel access to the location, all evidence, and all Contractor-employee witnesses, to include operators involved in the accident.

The Contractor shall ensure that operations do not resume until cleared by the COR, MSDDC

Safety Officer, and local authorities.

3.5.3 Reporting Timelines and Requirements

3.5.3.1 Within 8 Hours: Accident Information required from Contractor of incident if severe damage to equipment, hospitalization of employees, or loss of life:

• Date and time of incident

• Location of incident

• Brief synopsis of the accident, to include injured personnel, equipment damaged and description of activity during the incident

• Supervisor name and contact information

• List of employees involved or who witnessed the incident

• Extent of injuries and if medical treatment was administered

3.5.3.2 Within 24 hours: Accident Information required from Contractor

• Information from 3.5.3.1

• Status of injured personnel

• Pictures of affected equipment

• Training certificates/licenses for personnel involved in incident

• Maintenance records of equipment involved in incidents

3.5.3.3 Within 30 Calendar Days (or sooner if investigation is complete) Information required from Contractor

• Findings identifying the root cause(s) of the accident

• Corrective actions taken to prevent recurrence

• Follow-on status of any injuries from 24-hour status

• Final incident report from Contractor’s safety representative to COR

3.6 Posted Speed Limits. The Contractor shall enforce all posted port speed limits for all vehicle traffic per local port directives. The USG has further defined vehicle speed limits as follows for Military vessel/terminal operations at all piers/terminals/ports, (unless further defined) the maximum speed limits for vehicle(s) shall be inside a vessel, on vessel ramps, and/or dock/pier is <5 MPH (walking speed), maximum speed limits within staging areas, is <10 MPH or less, and for roadways to/from staging to vessel the maximum speed limit shall be 10 MPH, for CFE/MHE speed limit is 10 MPH or <5 MPH on vessels.

3.7 Vehicle Safety. During all operations, the Contractor shall not, leave any vehicle (military or commercial) unattended when the engine is running, or if breaks are not operational.

3.7.1 Military vehicles/trailers with air braking systems that have been determined to be inoperable (i.e., air system have been compromised, brakes have been caged or considered freewheeling) shall not, be left unattended. Vehicles in this condition must be labeled clearly on all sides “NO BRAKES.” Vehicles parked in staging lots shall have all wheels or tracks chocked blocked and trailers shall remain attached to its prime mover or if orphaned have hand brakes set or wheels chocked blocked.

3.7.2 Fire Extinguisher & First Aid Kit. The Contractor shall provide and ensure all CFE/MHE used in military operation shall have mounted fire extinguishers and First Aid Kits with an up-to-date inspection sticker/documentation and inspected monthly.

3.8 Vessel Safety. During vessel operations, the Contractor shall not let vehicles remain idle across watertight door areas. Maintain only one vehicle at a time, moving on vessel ramps, and test vehicle brakes before moving any vehicle.

3.8.1 The Contractor shall provide ramp guards stationed at all vessel ramps in use to direct traffic, monitor foot traffic, and alert personnel when vehicles are traversing ramps, all ramp guards shall have whistles and flashlights in addition to PPE. Compensation for services defined in this paragraph are included in all commodity rates established in the SOR.

4 GENERAL CONTRACT ADMINISTRATION

4.1 General contract administration defined within this section. Additional duties and requirements specific to the particular terminal(s) within the scope of this contract further defined in Section 6.0 –Port - Terminal Specific Requirements (administration).

4.1.1 Port Licensing and Permits. The Contractor or its named Subcontractor shall possess a valid and current Business License (BL) issued in the state of Washington/Oregon. As well as a work permit issued by the applicable Washington Port Authorities (WPA) & Oregon Port Authority (OPA) as evidence the Contractor or its named Subcontractor(s) has the legal right to work in/at the ports of the PNW or other named port locations (see Section 6 of geographical locations). The Contractor shall provide documentation/copies (Prime and Subcontractor(s)) to the CO for record within two (2) calendar days of the date the contract was awarded.

4.1.1.1 Subcontractors. The Contractor shall require all Subcontractors to include subcontracted laborers, to comply with all applicable regulatory requirements of this contract.

The Contractor shall include a clause in each applicable subcontract to require Subcontractor's cooperation and assistance in accident reporting and investigation.

** NOTE: Subsequent references to the Contractor shall imply it acting as the “prime” and their “employees”, or “subcontracted laborers”, or others acting on behalf of the prime Contractor unless otherwise specified.

4.1.2 Union Agreements and Port Tariffs. The Contractor shall submit, not later than (NLT) two (2) calendar days of contract award date to the CO/COR, the current Collective Bargaining Agreement (CBA) i.e., Pacific Coast Longshore Contract Document (PCLCD) for the International Longshore & Warehouse Union (ILWU), and Pacific Maritime Association (PMA), and current year published port tariff for the Ports of Tacoma, Everett, Olympia, Grays Harbor, and Portland. The Contractor shall also furnish updated information about specific changes to union contracts, wage increases, local work rules, and CBAs, charges/fees affecting USG cargo operations IAW the performance of this contract as they become available.

4.1.2.1 Pacific Maritime Association (PMA) Cargo Assessments Charges/Fees. The Contractor shall include PMA charge/fees in addition to the base commodity rate. PMA tonnage and container assessments shall be the responsibility of the Contractor and added to each commodity rate for the following: per TEU container (commodity 25/45) and the tonnage per designated weight class (commodity 60, 61, 67).

4.1.2.2 The USG will not pay for or reimburse the Contractor for usage of port staging/storage free time, customs duties, taxes, and similar charges for which no services are received, or the USG is exempt. The USG will only pay port tariffs fees/charges where the USG has requested, approved, and received those services. If the Contractor pays a tax, duty, customs fee, excise fee/tax, inspection fee, bond, or the like for which the USG is exempt, the Contractor is not entitled to reimbursement.

4.1.3 Contract Managers. The Contractor shall provide a Contract Manager(s) and at least two (2) alternates as part of their supervision that shall be responsible for the performance level of all services rendered. The Contractor shall provide telephone numbers for each of the contract manager(s) and their alternates where these individuals may be contacted during and after duty hours. The contract manager(s) shall have demonstrated experience in directing and managing longshoring and stevedoring operations. The contract manager(s) and their alternates must be able to understand, read, write, and speak the English language and other language understood by its subcontracted labor/workers as necessary.

4.1.3.1 Contract manager(s) and alternates shall have full authority to act and make financial decision on behalf of the Contractor on all matters pertaining to the performance of services under this contract.

4.1.4 Multiple Work Sites. During the performance period of this contract, the Contractor shall work simultaneous cargo handling operations, at multiple work sites, to include, but not limited to, working vessel(s) operations (working multiple decks simultaneously).The Contractor shall have their contract manager(s) or alternates present at each work site and accessible to the COR, at all times. At any other time (i.e., outside cargo operations) the contract manager(s) or designated alternate(s) shall be available to the COR by telephone.

4.1.4.1 The contract manager and alternates shall meet as necessary with the COR to discuss contract performance or other problem areas or issues.

4.1.4.2 The Contractor shall not remove or replace the contract manager or their alternates without informing the COR.

4.2 Ordering Services. The Contractor and COR/OO shall agree ordering services shall include daily cut-off time(s) for ordering all S&RTS. Procedures for ordering services shall be provided within two (2) calendar days of contract award date. Otherwise stated elsewhere, the USG shall order services NLT 1400hrs for 0800hrs start times for the next day or 1400hrs for 1800hrs start times for the same day. Example: Order services on Monday at 1400hrs for Tuesday morning 0800hrs start time, Monday start times shall be ordered on Friday.

All S&RTS performed IAW this PWS will be ordered using a Task Order (TO) system. TO’s will be assigned a TO number by G8 and then issued by an appointed OO to the Contractor and IAW Appendix C, Payment, Ordering, and Invoice Instructions, any work performed prior to an issued numbered TO will be at the expense of the Contractor.

4.2.1 Task Orders. All services shall be identified by the COR and conveyed to an appointed OO. The OO will develop an initial TO as soon as practicable and prior to the start date & time for each day S&RTS are ordered. The OO will provide an “initial” TO. The initial TO will identify all commodity, man-hour, and miscellaneous materials or associated services agreed upon between the COR and the Contractor.

4.2.1.1 Vessel TOs will be separated by “load and/or discharge” for all known vessel work, whereas all Terminal work shall be ordered by the day, or Documented by Week (DocWeek).

DocWeek shall be Sunday thru Saturday. Any work performed prior to the OO issuing a numbered TO will be at the expense of the Contractor.

4.2.1.2 The Contractor has the sole responsibility to order all labor for the required TO work in sufficient quantities and classes to meet the agreed upon productivity levels and completion timelines. Should the Contractor misjudge the commodity work completion timeline and advises the COR/OO to order services for the next day, and commodity work completes prior to next day’s start time, the contractor shall be liable for all personnel, and any guaranteed time at its expense.

4.2.2 Cancellation of Services. Cancelation of services shall include daily cut off time(s) for canceling all S&RTS. Procedures for canceling services shall be provided within two (2) calendar days of contract award date. Unless otherwise stated elsewhere, the USG will and the Contractor shall agree, ordered services shall be canceled NLT 1700hrs the same day as ordered for 0800hrs start time the next day, or at 0700hrs the next day for 1300hrs start times the same day. Example: Services ordered on Monday at 1400hrs for Tuesday morning 0800hrs start time, may be canceled at or before 1700hrs the same day as ordered.

4.2.2.1 The COR/OO will notify the Contractor verbally or by telephone to cancel services followed by written email/memo or other communications, stating that services are/will to be canceled on or before which the USG may cancel ordered services and/or equipment free of charge and without liability of any kind. The USG will not compensate the Contractor for services ordered and then canceled on or before established cut off times.

4.2.2.2 If Contractor personnel arrive at the work site at the scheduled order time and services are cancelled due to circumstances beyond the control of the USG, the Contractor shall receive minimum guaranteed time for all classes of labor verified by the COR/OO. Contractor personnel arriving at the work site are not notified in a timely manner by the Contractor those services were cancelled; the Contractor shall be responsible for compensation of those personnel at its own expense and is not entitled to reimbursement.

4.2.3 Verbal Request. Reserved.

4.2.4 Reconciliation and Validation. The goal of the 833rd TB is to reconcile, complete, and process invoices and close all task orders within 21 calendar days of the completion of each TO.

The COR/OO shall determine, and the Contractor shall agree to reconcile and settle all TO’s within a set timeline and provide an invoice to the COR for payment. The Contractor’s failure to reconcile TOs within the below perimeters will result, with the USG finalizing TOs based on its documented evidence of the Contractor’s performance, whereas the Contractor shall agree/accept the USG’s “final TO” for invoicing.

4.2.4.1 The COR/OO and the Contractor shall reconcile all services ordered/rendered within seven (7) calendar days reviewing all supporting documentation (logbook, tally sheets, time sheets, and written requests) completing the TO for (vessel or dock week) ordered services. The COR will provide the Contractor the MSDDC Form MT288 capturing (if applicable) detention time, standby time, and extra labor (XL), for each class of labor and CFE/MHE used in conjunction with commodity work. The Contractor and COR shall agree by signing (digital or wet signature) the MT288.

4.2.4.2 Once reconciled, the OO will within seven (7) calendar days or when practicable after large operations, finalize each TO accounting for actual Contractor performance per MT- 288.

The OO will submit a “final TO” to MSDDC G8 for validation. Once validated and dated, the OO will forward the validated TO to the Contractor. The Contractor shall then invoice the USG.

The Contractor shall submit their invoice for payment to the COR for certification. If information on the invoice is found to be incorrect/correct, the COR will either return the invoice back to the Contractor to correct or will validate and certify the Contractor’s invoice and submit to G8 for payment processing within (7) calendar days.

** NOTE** Any certified invoice summited, dated prior to “G8 validation date” will be returned, G8 will not process invoices for payment dated prior to its validation date and will return invoice to the COR. The Contractor will have to re-issue a corrected invoice for processing/payment. The USG shall not be held liable for accrued interest payments to the Contractor.

4.3 Out-of-Pocket (OOP) Expenses. OOP expenses involve the reimbursement of actual invoiced cost made by the Contractor to a third-party vendor, supplier, subcontractor or port tariff for additional supplies, materials, facility support services, or other services sourced on behalf of the USG.

4.3.1 Vendor Invoice or Receipt. The Contractor shall substantiate all OOP expenses by submitting the paid vendor invoice and itemized receipts to the COR/OO during reconciliation.

OOP expenses will be ordered and reimbursed only for mission related services, supplies, or materials identified by the COR/OO and ordered by written request to be added to or pre-ordered on the task order template.

4.3.1.1 Items purchased/rented shall be identified on the TO template (MISC. Tab) form by the OO and certified as necessary by the COR. The Contractor’s invoice for miscellaneous expenses shall detail each service or supply, the rate per unit, number of units, and total extended price, accompanied by the vendor(s) receipt/invoice as substantiating documentation. The USG will not reimburse for any miscellaneous OOP expenses without all substantiating documentation (vendor itemized receipts/invoices) attached. For miscellaneous supplies and durable goods not listed under a specific schedule of rates (SOR), compensation shall be reimbursed via OOP expense.

4.3.2 Three (3) Written Estimates. The Contractor shall provide to the COR/OO three (3) written estimates for all additional services, materials, supplies, or rental equipment prior to the purchase or its rental for COR/OO approval. OOP expenses do not include expenses inherent to performing S&RTS commodity work. OOP expenses are for the purpose of purchasing (as needed) new supplies or non-durable goods on behalf of the USG.

4.3.2.1 The Contractor shall obtain written approval from COR/OO prior to the purchase of all goods and services considered. The COR shall seek CO approval of all OOP expenses exceeding $3,500.00.

4.3.2.2 The Contractor shall provide 3PL/subcontracted services that include, but are not limited, to agricultural vehicle or container pressure-washing services, pest and vegetation control, security services, vehicle or aviation fuel services, and specialized rental equipment. The USG will reimburse the Contractor for actual costs incurred (vendor invoice and receipts required), for any transportation, surcharges, and expenses associated with furnishing ordered materials, equipment, supplies, and/or subcontracted services.

4.3.2.3 The USG may source specialized materials or subcontracted vendors to support mission readiness. The Contractor shall procure materials or services on its behalf.

4.4 Military Training. The USG reserves the right to support or conduct military port operations training, either scheduled or unscheduled.

4.4.1 The USG will inform the Contractor NLT 48 hours prior to any scheduled training event or as soon as planning develops.

4.4.1.1 During these training events, the USG may utilize U.S. Military or USG civilian personnel for loading and discharging the entire or parts of a vessel and/or conduct routine terminal or other port operations or any part of those operations thereof.

4.4.1.2 The Contractor shall not receive any compensation for cargo handling conducted by the Military during these training events, unless commodity, extra labor, equipment rental, or other facility support services were ordered by the COR/OO, whereby the USG will then compensate the Contractor per established rates in the SOR.

4.4.2 In addition to the above, the Government reserves the right to use skilled military drivers to operate, load, and discharge normal or specialized, unique military vehicles and equipment at any time when determined by the COR. When military drivers are utilized the Contractor shall provide other designated support labor and equipment for all other stevedore related work (example: lashing, unlashing, or towing cargo) associated to that military operated cargo. The Government shall compensate the Contractor at man-hour rates for only those designated as support for those pieces of cargo operated by military drivers and commodity rates shall apply for all other cargo handled by the Contractor without Government assistance as established in the SOR.

4.5 Commodity Rates. The Contractor shall provide an all-encompassing commodity rate for each commodity type listed below, for each commodity schedule listed in the SOR (see Appendix B) e.g., commodity rates shall include all of the below but not limited to the following:

(see requirements throughout the PWS).

• Management, Supervision, Safety Manager, Environmental Compliance Officer, or other non-subcontracted personnel.

• All planning activities.

• Contracted Services Reporting: Administrative and contract data and requested reports for all services provided.

• All directly employed or subcontracted Stevedores, Longshoremen, tallymen, and warehousemen i.e., all Classes of labor, Foreman, Supercargo, general labor, Skilled labor I, II, & III, Skilled drivers, crane operator, gearman, mechanics, carpenters, (not all-inclusive personnel list).

• All employee administrative cost for fringe benefits, guaranteed overtime, travel, or other cost associated to the Pacific Maritime Association (PMA) Cargo Assessments

• Contractor Furnished Equipment (CFE), Material Handling equipment (MHE) and its driver/operator, gear, mechanics tools (manual & air), shop equipment, rigging, spreader bars, slings, wire rope, hooks, shackles, straps, and Military style slave cables.

• Ground transportation: i.e., trucks, van, ATV, buses, vehicles, contact maintenance vehicle(s) and tow vehicle(s).

• Materials and miscellaneous supplies (PPE, safety devises, safety cones, dunnage, POL, fuel, and hazardous collection and/or cleanup supplies).

• Lashing & Unlashing

• Cargo accountability, cargo inspections, cargo and lashing inspections for vessel.

• Tallying & Checking services (i.e., runners, scanning, documentation, vessel foot printing, and timekeeping).

• Cargo management towing, stacking, stripping, contact maintenance, safety/environmental

• Housekeeping (e.g., vessel, and facilities).

4.5.1 The following is a list by commodity number, and category and examples of vehicle, containers, breakbulk or aircraft they represent (not an all-inclusive list).

• Commodity 35 – Aircraft. Rotary or fixed wing

• Commodity 40 – Breakbulk. Field maintenance units M7-FRS or multiple stacked flat racks, skid mounted generators, or loaded 463l pallets etc.

• Commodity 44 – Containers - Non- Explosive, less than twenty foot in length (i.e., ISUs, Bicons, Tricons, Quadcons).

• Commodity 45 – Containers - Non- Explosive - 20’and 40’ lengths or multiple knuckled, >TEU containers configured into Twenty/forty Foot Units (TEU).

• Commodity 60, 61, and 67 – Vehicles and Trailers - Classified by weight class.

4.5.2 Commodity Pricing. The USG shall compensate the Contractor for each single vehicle, trailer, container, or aircraft the Contractor handles. The Unit of Measure (UOM) shall be i.e., EACH (EA) for single pieces e.g. (Containers, Vehicles, Orphaned trailers, and/or Aircraft).

Commodity category (35, 44, 45, 60, 61, 67) - EA), plus the PMA assessment charge/fee (short-ton (tonnage) and per container fee) shall be included in each payable commodity. Prime vehicles/trailer combinations will be considered one piece. For breakbulk (BB) Cargo the UOM used is “Measurement Ton (MTON)” Breakbulk commodity (40) - MTON), BB secondary loaded, nested, or stacked on cargo beds or trailer will be considered part of prime vehicle/trailer and counted as part of the prime vehicle or trailer. Stacked/bundled flat racks shall be counted as one piece.

4.5.2.1 Each commodity further divided by handling method, (lift, Roll, Tow) shall infer loading or discharge:

• Lift-On/Lift-Off (LO/LO) - Cargo lifted on/off any conveyance (vessel, truck, or railcar) by cranes of all types or rigged top/reach stacker.

• Roll-On/Roll-off (RO/RO) - Vehicles driven, running, or moving under its own power with trailers pulled by its prime mover - Containers, breakbulk, loaded or discharged by

CFE/MHE (MAFI/bomb cart).

• Tow-On/Tow-Off (TO/TO) - Inoperable vehicles or orphaned trailers pulled by

CFE/MHE towed on/off any conveyance or (vessel, truck, or railcar).

4.5.2.2 The USG will not interfere with any method the Contractor chooses to dray, move or lift any USG cargo; however, the Contractor shall be responsible for using proper methods of draying, lifting, or towing vehicles/trailers and general cargo as stated elsewhere in this PWS, military standards per Army Regulation (AR), or Modal Instructions (MI). The USGs preferred and most efficient method of loading or discharging vehicles is by driving them under its own power. The USG will not compensate the Contractor for loading/discharging cargo for other than by the intended commodity method (e.g. lifting operable vehicles in lew of driving them or separating a trailer from its prime mover) unless approved by the MSC/COR. The Contractor shall be fully responsible and held liable for all damages caused by its personnel for negligence due to improper handling methods.

4.5.2.3 Exceptions to Commodity Rates. The USG will make exceptions to compensating the contractor per commodity rates for cargo shipments received, for which no commodity rate(s) are established. The USG will compensate the Contractor to handle cargo per Extra Labor (XL) and Equipment Rental Rates (EQR) rates (if needed) as established in (Schedules 2 & 4) of the SOR. If the COR determines it is necessary to establish additional commodity rates, the COR will communicate to the CO the need for a modification to the Schedule of Rates for the remaining period of performance of this contract.

4.5.2.4 Commodity rates are intended as a one-time payment for movement of cargo, (e.g., from its staged location (point of rest), moved to the final point of stow onboard the vessel, “or” from the stowed location onboard the vessel to its designated final point of rest per the USG’s staging plan. Other than for tallying & checking cargo, cargo consolidation, stopping the flow of cargo from staging to vesselor from vessel staging is for the convenience of the Contractor and at the contractor’s expense. The USG will not pay additional costs associated with double handling USG cargo unless requested and approved by the COR/OO in advance.

4.5.3 Measurement Ton Calculations. The USG will calculate Measurement Ton (MTON)using cargo dimensional data; Length, Width, and Height divided by forty (40) cubic feet. Example: Dimensional measurements of (L) 240in (W) 96in (H) 96in divided by 1728 then divided by 40 equals 32 MTON. This would look like 240” multiplied by 96” multiplied by 96” equals 2,211,840 cubic inches divided by 1728” (cubic inches in one cubic foot) divided by 40 cubic foot. The final product would equal 32 MTON (rounded to two decimal points).

4.5.4 All military operations shall be performed during regular workday/week schedules IAW hours of operations (Section 6.4 below); however, the Contractor shall stand ready and willing to provide and support S&RTS 24hrs per day, 7 days per week, and 365 days per year.

4.6 TABLE 1— Cargo Handling (Services) Operations.

**NOTE: The USG refers to the following cargo handling table (as definitions); the table does not define each as separate billable item(s). Example: Schedule 1A1 - Loading Vessel. Loading cargo on a vessel will inherently include prepping the vessel for loading, moving cargo from its staged place of rest.This includes but is not limited to driving, towing, or draying the cargo aboard the vessel, stowing that cargo in its designated stow location, securing the cargo (lashing), and providing documentation, foot printing, tally & checking, and correcting any lashing deficiency per chief mates lashing inspections, vessel housekeeping, debris removal, and reconciling the operation with the COR/OO.

4.6.1 TABLE 1

Operation Definition

Loading The act of moving cargo from its staged place of rest to a conveyance (vessel, truck or rail).

Discharge The act of unloading cargo from a conveyance (vessel, truck or rail) to a designated final place of rest.

Lashing and Un-lashing (only)

The act of providing only lashing or unlashing (tie-down) of cargo aboard a vessel and/or rail.

Stuffing The act of loading/moving cargo from its place of rest loaded in/on a Container Roll-Out Platform CROP, shipping container, or onto flat rack(s).

Unstuffing The act of unloading cargo from a Container Roll-Out Platform CROP, shipping container, or flat rack(s). to its final place of rest.

Stripping The act of discharging cargo from trailers, flatbeds, mobile loading platform MAFI’s, to its final place of rest.

4.7 Guaranteed Time, Stand-by Time, and Detention.

4.7.1 Documented Evidence. The Contractor shall provide to the COR all approved documentation (time sheets, hatch logs or logbook) as evidence justifying detention time, stand-by time, guaranteed time, or overtime, at the end of each shift wherein the work is compared to the USG Timekeeper’s logbook/records for completion of the MSDDC Form 288 for approval of compensation. The Contractor shall obtain COR/OO written pre-approval to work in all conditions specified under Detention time, Stand-by time, Guaranteed time, Overtime, or Extra Labor . Failure to follow the above shall preclude compensation except with CO approval.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .