2024.01.23 QA Master Log .xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Air Terminal and Ground Handling Services, Gimhae and Kunsan Korea
Solicitation number
HTC711-24-Q-C002
Issued by

About this file

This document contains a master log of questions and answers related to solicitation number HTC711-24-Q-C002 for Air Terminal and Ground Handling Services at Kunsan AB and Gimhae ROKAF Korea. The solicitation is a request for quotes to provide services including passenger and baggage handling, aircraft loading and unloading, aircraft servicing, and transportation. The incumbent contractor's staffing levels and positions are considered proprietary. A prime contractor without a facility clearance can subcontract to a company holding the required clearance. Page count exclusions are specified, and the cover page is not included in the page count. Appendices relate to performance work statements for the CASA and Bogota locations.

View the file

Other files

File Type Posted
Korea Pre Quote Conference.pptx PPTX presentation
HTC711-24-Q-C002 Amend 0001.pdf PDF
Korea Pre-Quote Conference Minutes.pdf PDF
HTC711-24-Q-C002 RFQ.pdf PDF
Atch 1- GIMHAE PWS 2023.07.12.docx DOCX document
Atch 3 - DD254 KOREA SOLICITATION.pdf PDF
Atch 2 - KUNSAN PWS 2023.07.12.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question #Par. RefQuick ReferenceQuestionDateGovernment Answer
1PWS Page 2, Para 1.1.1.2RFQ

There are multiple instances in this procurement that refer it as an RFP and an RFQ.

Question: Is this procurement being processed as a Request for Proposal, or Quote?This is a Request for Quotes (RFQ). The verbiage in the Instructions to Offerors has been revised, but we cannot modify language in FAR/DFARS clauses.
2PWS Page 2, Para 1.1.6RFQIn order to submit a compliant bid in terms of FAR 52.212-2 and the required staffing plan, how many people are on the current contract?Information is proprietary to the current contract owner.
3PWS Page 3, Para. 1.2.4.1RFQWith respect to question two (2) above, are all the positions at both sites currently filled/staffed?Information is proprietary to the current contract owner.
4PWS Page 3, Para 1.2.5Facility ClearanceQuestion: Can a prime without a facility clearance sub to a company with the required clearance?Prime contractors with a valid FCL are able to bring in subcontractors without an FCL, but Prime contractors without an FCL are not able to bring on subcontractors with a valid FCL just to meet the FCL requirements.
5N/ARFQThe USG excludes the cover page from the page count; however, they did not address a table of contents and/or list of acronyms.
Question: Does the USG require these items, and/or would they be excluded from the page count?The cover page is not included in the page count, all other pages will be included.
6N/A
7RFQ
8SF 1449
9Atch 1 CASA PWS, Section 1.4 Funds Handling
10Atch 1 CASA PWS, Para 1.7.3
11Atch 1 CASA PWS/Atch 2 Bogota PWS appendix C-1
12Atch 1 CASA PWS, Para 1
13Appendix D/CASA PWS
14Appendix C/CASA PWS
15Atch 1 CASA PWS, Para 1
16Atch 1 CASA PWS, Para. 1.7.7.2
17Atch 1 CASA PWS, Para 3.1 & 3.2
18Atch 2 Bogata PWS
19Atch 2 Bogata PWS, Para 1
20Atch 2 Bogata PWS, Para 1
21Atch 2 Bogata PWS, Para 1
22
23
24
25
26
27
28
29
30