Attachment_4_-_Technical_Worksheet.docx
DOCX document 33 KB Posted
- Attached to
- PNW S&RTS Federal contract opportunity
- Solicitation number
- HTC711-19-R-R012
About this file
This document is a technical evaluation worksheet for solicitation number HTC711-19-R-R012 to provide stevedoring and related terminal services at ports in the Pacific Northwest region. Offerors are required to describe their capabilities to provide all necessary labor, equipment, and facilities to handle multiple classes of supply and vessels at the ports of Tacoma, Olympia, Grays Harbor, and Everett within required timeframes. Capabilities must be demonstrated for loading and discharging, receipt and disposition, stuffing and unstuffing, and tally and checking operations. Offerors must also describe how they will provide the required office space, open storage, warehouse storage, and staging areas. The solicitation is issued by the Department of Defense United States Transportation Command to support its strategic sealift readiness program.
Technical Worksheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A_Part_2.pdf | ||
| HTC711-19-R-R012_0006.pdf | ||
| HTC71119RR012-0005.pdf | ||
| HTC71119RR012.pdf | ||
| Attachment_1_-_PWS_9-20-19.pdf | ||
| HTC71119RR012-0004.pdf | ||
| QA_PNW_S&RTS.pdf | ||
| Attachment_2_-_SoR_9-27-19.xlsx | XLSX spreadsheet | |
| HTC71119RR012-0003.pdf | ||
| 0002.pdf | ||
| Amend_1_-_SF30.pdf | ||
| Amend_1_-_Solicitation.pdf | ||
| Attachment_1_-_PWS_8-19-19.pdf | ||
| Attachment_5_-_SB_Subcontracting_Plan.doc | DOC document | |
| RFP_letter.docx | DOCX document | |
| Attachment_3_-_RFP_Information_Sheet_.docx | DOCX document | |
| Attachment_2_-_SOR_8-19-19.xlsx | XLSX spreadsheet | |
| HTC71119RR012.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP Attachment 4 - HTC71119RR012 Source Selection Information – See FAR 2.101 and 3.104
TECHNICAL WORKSHEET PROPOSAL
Pacific Northwest S&RTS
Instructions:
· When completing this technical evaluation worksheet, the offeror shall assume the Government has no prior knowledge of the offeror’s experience.
· The proposal shall not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet each item in the worksheet in accordance with the PWS. Statements that the offeror understands, can or will comply with the PWS; statements paraphrasing the PWS or parts thereof; flowcharts simply listing activities related to performance of the PWS; and phrases such as “standard procedures will be employed” or “well known techniques will be used,” etc., without a description of how services will be performed shall be considered unacceptable.
· The entire submission of this Technical Worksheet shall not exceed 25 pages (a single-side is equal to 1-page).
· If more than 25 pages are received, only the first 25 pages will be evaluated and all other pages will be removed and therefore not evaluated.
· Documentary evidence (photos) and Material Handling Equipment (MHE) lists will not count against the page limits.
· Failure to complete this document in its entirety or failure to attach all requested documentation may result in the offeror’s proposal being ineligible for award.
MHE, Labor, and Overall Management of Operations A. Describe your capability to provide all labor (including labor during a shortage due to competing requirements) and equipment necessary to handle multiple classes of supply and multiple vessels while conducting stevedoring operations within required timeframes at all port locations listed in the requirement. As an attachment to this worksheet, provide a list of all MHE in your inventory at each port. Include any equipment which is currently in your inventory and any equipment that you have the ability to provide for this requirement. If you do not currently have certain equipment, explain how you will obtain it if required.
(1) Port of Tacoma:
Click here to enter text.
(2) Port of Olympia:
Click here to enter text.
(3) Port of Grays Harbor:
Click here to enter text.
(4) Port of Everett
Click here to enter text.
Stevedoring Services
B. Describe your capabilities to successfully conduct stevedoring & related terminal services without damage and in accordance with stow plans and applicable safety regulations, to include:
(1) Loading and Discharging
(2) Receipt and Disposition
(3) Stuffing and Unstuffing
(4) Tally & Checking
Facilities
C. Describe your capability to provide all Facilities required in the PWS, to include:
(1) Office Space
Click here to enter text.
(2) Open Storage
Click here to enter text.
(3) Warehouse Storage Click here to enter text.
(4) Staging Area
File details come from the government source that posted it. Updated .