DRAFT_PWS_Appendix_C_-_Report.pdf

PDF 45 KB Posted

Attached to
Household Goods (HHG) Relocation Services Federal contract opportunity
Solicitation number
HTC711-19-R-R004
Issued by
Department of Defense United States Transportation Command

About this file

This document contains required performance reports for a household goods relocation services contract. The contractor must submit monthly performance, volume, shipment lifecycle, claims, incident, quality assurance forecast schedule, expired storage, VISA preference, finance/billing, excess cost, and weight estimate accuracy reports. The performance report details key metrics from the statement of work. The volume report includes shipment data by category and storage location. The lifecycle report provides processing times. The claims report outlines claims data. The incident report establishes procedures for property damage. The quality assurance forecast schedule provides a 30-day shipment schedule. The expired storage and converted lot reports address late storage. The VISA preference report includes ocean booking information. The excess cost report identifies customers likely to exceed estimates. The weight estimate accuracy report evaluates estimate thresholds.

-DRAFT PWS Appendix C - Report.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Household Goods (HHG) Relocation Services, newest first.
File Type Posted
GHC_RFP_Questions_&_Answers,_Round_7.xlsx XLSX spreadsheet
Attachment_2_-_Pricing_Rate_Table,_Amend_03.xlsx XLSX spreadsheet
Attachment_7_-_RFP_Offeror_Information_Sheet,_Amend_02.docx DOCX document
Attachment_2_-_Pricing_Rate_Table,_Amend_02.xlsx XLSX spreadsheet
GHC_RFP_Questions_&_Answers,_Round_2.xlsx XLSX spreadsheet
Appendix_A_-_Transition_Phase-In_Phase-Out,_Amend_01.pdf PDF
Attachment_2_-_Pricing_Rate_Table,_Amend_01.xlsx XLSX spreadsheet
Appendix_E_-_Claims_and_Liability_Rules,_Amend_01.pdf PDF
Attachment_9_-_SB_Participation_Commitment_Document,_Amend_01.docx DOCX document
Attachment_5_-_Past_Performance_Questionnaire,_Amend_01.docx DOCX document
GHC_PreProposal_Conf_Slides.pdf PDF
Appendix_C(i)_-_Transit_Time_Tables.xlsx XLSX spreadsheet
Appendix_E_-_Claims_and_Liability_Rules.pdf PDF
Appendix_B_-_Required_Reports.pdf PDF
Attachment_2b_-_Non-Standard_Rate_Areas.pdf PDF
Appendix_J_-_NIST.SP.800-171_-_POAM.XLSX XLSX spreadsheet
Attachment_9_-_SB_Participation_Commitment_Document.docx DOCX document
Appendix_C_-_Transit_Times.pdf PDF
Attachment_2_-_Pricing_Rate_Table.xlsx XLSX spreadsheet
Attachment_1_-_Performance_Work_Statement.pdf PDF
Appendix_H__-_Form_Data_Elements.xlsx XLSX spreadsheet
Attachment_4_-_Award_Term_Plan.pdf PDF
Q&As_DRAFT_RFP__2.pdf PDF
Attachment_7_-_RFP_Offeror_Information_Sheet_-_DRAFT.docx DOCX document
Appendix_A_-_Transition_Plan_Requirements_-_DRAFT.pdf PDF
Appendix_J_-_NIST.SP.800-171_-_POAM_-_DRAFT.xlsx XLSX spreadsheet
Appendix_H_-_Form_Data_Elements_-_DRAFT.docx DOCX document
Appendix_B_-_Required_Reports_-_DRAFT.pdf PDF
Appendix_I_-_CUI_Requirements_Table_-_DRAFT.pdf PDF
Appendix_E_-_Claims_and_Liability_Rules_-DRAFT.pdf PDF
DRAFT_RFP_Industry_Q&As.pdf PDF
Appendix_G_-_EPA_Schedule_-_DRAFT.pdf PDF
GHC_-_Ind_Day_Questions_and_Answers.xlsx XLSX spreadsheet
Attachment_9_-_Small_Business_Participation_Commitment_Document.pdf PDF
Appendix_E_-_Claims_and_Liability_Rules.pdf PDF
Appendix_B_-_Required_Reports.pdf PDF
Attachment_2_-_Pricing_Template.xlsx XLSX spreadsheet
Attachment_5_-_Past_Performance_Questionnaire.pdf PDF
Attachment_9_-_Small_Business_Participation_Commitment_Document.pdf PDF
Attachment_4_-_Award_Term_Plan.pdf PDF
Industry_Day__2_1-on-1_Handout.pdf PDF
Industry_Day__2_General_Session_Slides.pptx PPTX presentation
DRAFT_PWS_Appendix_F_-_Transit_Times.pdf PDF
GHC_Industry_Day__2_Save_the_Date.DOCX DOCX document
2019.03.07_GHC_Industry_Day_General_Session_QA.pdf PDF
IndDayQs.xlsx XLSX spreadsheet
Agenda_2-19-19.xlsx XLSX spreadsheet
GHC_Industry_Day_Slides-15_Feb_2019.pptx PPTX presentation
Lambert_to_Drury.ppt PPT presentation
HHG_RFI_20181128.pdf PDF
Show all 50

Household Goods (HHG) Relocation Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT // ACQUISITION SENSITIVE INFORMATION

APPENDIX B: REQUIRED REPORTS

1.1.1.1. Performance Report. The contractor shall review performance for all key metrics contained within the Service Delivery Summary (Para. 2.0) of the Performance Work Statement with the government on a monthly basis.

1.1.1.2. Volume Report. The Volume Report shall include the total number of shipments in the contractor’s logistics pipeline by category (e.g. scheduled, in transit, in storage, delivered-no claim, claims in process, claim denied, etc.) along with hundred weight (CWT) of each. NTS:

In addition include the total number of shipments handled-in, stored, and handled-out along with hundred weight (CWT) of each for each month at each storage location. The contractor shall provide the ability to filter this report by all shipment data elements to include but not limited to origin & destination locations, branch of service, and on-time performance.

1.1.1.3. Shipment Lifecycle Report. The Lifecycle Report shall include the running annual mean, median, and standard deviation of: customer contact initiation cycle time from orders receipt (by contractor), counseling and shipment application from scheduling of counseling to completion of booking, booking to pick-up lead time (TSP lead time), transit time (by mileage or channel), time in storage-in-transit (SIT), claims submission cycle time (from delivery), claim resolution cycle time (from customer submission). The report shall also include percentage of on-time pick-ups, and deliveries.

1.1.1.4. Claims Report. Claims Report shall include number of claims submitted, dollar amounts requested, number of claims, number of claims settled (wholly), and number of claims (in whole or in part) denied by type from customers and military claims offices (MCO); amount of MCO recovery actions placed on the contractor; amount claimed, offered, paid, and denied for each claim; total number of claims denied or denied in part, summary of reasons for denial (by line item); and total number of outstanding claims. The report shall also reflect claim response (within 60 days of submission by customer), final determination, and payment processing times.

1.1.1.5. Incident Report. Contractor shall immediately notify the Program Management Office within 24 hours of all unusual occurrences including but not limited to fire (including water damage incident to a fire), flood, earthquake, tornado, hurricane, or any other similar type of occurrence, while in the care, custody or possession of contractor. Contractor shall submit a full written incident report detailing the particular facts to the Program Management Office, and customer no later than 5 days after initial discovery. Contractor shall submit a remediation plan which includes an initial assessment of loss and damage, steps taken for remediation, and a timeline for remediation completion to the Program Management Office, not later than 10 days after initial discovery. The contractor shall submit weekly status updates with determination of loss and damage, to include remediation efforts (with percent completed) of affected personal property, by name and Service, to the Program Management Office.

1.1.1.6. Quality Assurance Forecast Schedule Report. The contractor shall make available to the government on a daily basis a report containing the schedule for all shipments for the next 30 days being packed, picked up, or delivered for the purposes of dispatch planning of government quality assurance personnel. The report must contain all dates, and be filterable by installation, city, county, state; and it must contain the address location of the origin or destination activities to be observed.

1.1.1.7. Expired Storage Report/Converted Lot Report. Expired Storage Report shall include the following information for shipments in storage 45 days prior to entitlement expiration and shipments remaining in storage 45 days or more beyond entitlement: customer order number, last name, service, number of days beyond entitlement, record of all notification attempts and response received, date the file was provided to the COR, and pertinent information regarding communications with customer. The Converted Lot Report shall include total number of storage lots (temp or NTS) converted from Government expense to member expense, listed by Branch of Service. This report shall include the weight of the lot and storage amount due.

1.1.1.8. VISA Preference and U.S. Flag Compliance Report (Comprised of Ocean Booking /Foreign Flag Waiver Reports). The Ocean Booking Report shall include carrier, vessel, voyage number, booking number, departure and arrival dates, port of embarkation, port of debarkation, whether U.S. flag vessel is utilized, level of VISA preference used, and total number of unique service member shipments for each voyage. Foreign Flag Waiver Report shall include total number of shipments on a foreign flag vessel each month IAW PWS Para. 4.2 and shall include the following information: request date, RDD date, member’s name, turn-in/pick-up date, origin, destination, Port of Embarkation (POE) / Port of Debarkation (POD), shipping instruction number, vessel priority, ocean carrier, measurement tons, ocean freight, average M/T per shipment, average cost per shipment, percent of traffic per month, and MARAD remarks.

1.1.1.9. Finance / Billing Report.

1.1.1.10. Excess Cost Report. The excess cost report shall include information for all customers that the contractor has identified as having the potential for excess cost by branch of service, the reason(s) the customer was identified as having the potential to incur excess costs across all shipments on a travel order, and the estimated dollar amount of excess cost. The contractor shall provide this information to the government on a monthly basis. The contractor acknowledges that the provision of this information to the government does not constitute proper notification to individual customers on excess cost.

1.1.1.11. Weight Estimate Accuracy Report. The Weight Estimate Accuracy Report shall include a monthly summary of all actual shipment weights, categorized by whether or not they were within, below, or above the weight estimate threshold as specified in the PWS. The contractor shall identify, by region, the % of shipments that are above or below the threshold.

1.1.1.12. Customer Support Center Volume and Wait Time.

File details come from the government source that posted it. Updated .