Atch2_-_Schedule_of_Rates.xlsx
XLSX spreadsheet 156 KB Posted
- Attached to
- Mannheim, Germany S&RTS Federal contract opportunity
- Solicitation number
- HTC711-16-R-R020
About this file
Attachment 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch4_-_Invoicing_Instructions.pdf | ||
| HTC711-16-R-R020.pdf | ||
| Atch5_-_Addendums.pdf | ||
| Atch3_-_Info_Sheet.docx | DOCX document | |
| Atch1_-_Performance_Work_Statement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Comm Def and Spec
| HTC711-16-R-R020 |
| Attachment 2 |
| Commodity Definitions and Specifications |
| Commodity No. 1: General cargo. Includes all items, not described elsewhere in the schedule of rates, that do not exceed 10,000 lbs per ocean shipping unit. |
Commodity No. 01A: Unitized cargo. (Packed in triwalls, on skids or pallets), or units that measure less than 35 feet in the largest dimension, or at any item so packed as to be handled primarily by material handling equipment and weighing a minimum of 1,500 lbs each package.
Commodity No. 01B: Loose cargo. Includes unitized cargo, bagged and sacked products, canned goods, beverages, up to a maximum of 1,499 lbs each package.
Commodity No. 01C: Drums and barrels. Includes all drums and barrels with an individual capacity of 55 gallons and over.
Commodity No. 02: Household goods and baggage. Includes all individually owned household goods and baggage.
Commodity No. 03: Privately owned passenger vehicles (POVs). Includes all privately owned automobiles, motorcycles, vans, pick-ups, housetrailers and recreational vehicles.
Commodity No. 04: Special cargo heavy lifts. Includes items over 10,000 lbs or measure 35 feet or more in any dimension, except military vehicles, tracked and wheeled guns, POVs, seavans, milvans and aircraft unboxed.
Commodity No. 05: Military vehicles and trailers. Includes tracked or wheeled military vehicles, guns and trailers.
Commodity No. 06: Aircraft unboxed. Includes aircraft unboxed, whole aircraft or complete fuselages with or without engines.
Commodity No. 07: Ammunition, explosives, and other hazardous cargo. Includes all ammunition, explosives and other hazardous items except small arms ammunition.
Commodity No. 08: CONEX container, empty and full. Includes all Government owned metal reusable containers of 365 or 184 cubic feet. Outside dimensions are 8'6", 6'3", 6'10.5" and 4'4", 6', 6'10.5" respectively.
Commodity No. 09: Container, commercial and military, empty and full. Includes commercial and Government owned (or leased) shipping containers which are moved via ocean transportation without bogey wheels attached i.e. lifted on and off the ship.
Commodity No. 10: Small arms ammunition. Includes all small arms ammunition.
Long Ton (LT): 1 long ton equals 2,240 US pounds.
Load 1A
| HTC711-16-R-R020 | |
| Attachment 2 | STANDARD S&RTS CONTRACT RATE SCHEDULES |
SCHEDULE 1 A
| LOAD VESSEL | ||||||||||||||||
| Proces in Euro | ||||||||||||||||
| LOLO | RORO | |||||||||||||||
| M O V E | ||||||||||||||||
| UNIT | ||||||||||||||||
| OF | FROM LANDTRANSPORT | FROM BARGE | FROM QUAY/SHED | FROM QUAY/SHED | ||||||||||||
| MEASURE | ||||||||||||||||
| ESTIMATED | ESTIMATED | ESTIMATED | ESTIMATED | ESTIMATED | ESTIMATED | ESTIMATED | OPERATIONAL | ESTIMATED | ESTIMATED | TOW-AWAY | ESTIMATED | |||||
| C O M M O D I T Y | QUANTITY | RATE | TOTAL | QUANTITY | RATE | TOTAL | QUANTITY | RATE | TOTAL | QUANTITY | RATE | TOTAL | QUANTITY | RATE | TOTAL | |
| A | A | A | B | B | B | C | C | C | K | K | K | L | L | L | ||
| 01 GENERAL CARGO | ||||||||||||||||
| (MILST. Comm. 500 - 799, | ||||||||||||||||
| except Comm. 680 - 694) | ||||||||||||||||
| 01A Palletized or unitized cargo | L/T | 15 | 0 | 10 | 0 |
01B Loose cargo L/T 2 0 2 0
| 01C Cargo in drums or barrels with | L/T |
| individual capacity of 55 gallons and over |
| 02 HOUSEHOLD GOODS & BAGGAGE | |
| (MILST. Comm. 360 - 399) | L/T |
| 03 PRIVATELY OWNED PASS. VEHICLES |
| (MILST. Comm. 300 - 359) |
03A Up to 6,600 lbs EA
03B Over 6,600 lbs EA
| 04 SPECIAL CARGO & HEAVY LIFTS |
| (MILST. Comm. 800 - 863, |
| except 813 and 816) |
04A 10,000 - 16,500 lbs EA 10 0 5 0
04B 16,501 - 25,000 lbs EA 5 0 1 0
04C Over 25,000 lbs EA 2 0 1 0
| 05 MILITARY VEHICLES & TRAILERS |
| (wheeled or tracked) |
| (MILST. Comm. 813, 816, 864-899) |
05A 0 - 10 L/T EA 52 0 20 0 50 0 10 0
05B 10 - 40 L/T EA 28 0 10 0 50 0 10 0
05C over 40 L/T EA 1 0 5 0 10 0 5 0
| 06 AIRCRAFT UNBOXED | EA |
| (MILST. Comm. 900 - 999) |
| 07 AMMUNITION, EXPLOSIVES AND OTHER |
| HAZARDOUS CARGO |
| (MILST. Comm. 400 - 496) |
07A Palletized L/T
07B Non-palletized L/T
| 08 CONEX CONTAINER, EMPTY AND FULL | EA | 1 | 0 | 1 | 0 |
| (MILST. Comm. 690) |
| 09 CONTAINER, COMMERCIAL AND | |||||
| MILITARY, EMPTY AND FULL | EA | 10 | 0 | 10 | 0 |
| (MILST. Comm. 40X, 691 - 694) |
| 10 SMALL ARMS AMMUNITION | L/T | |||||
| (MILST. Comm. 680 - 689) | ||||||
| ESTIMATED TOTAL SCHEDULE 1 A | 0 | 0 | 0 | 0 | 0 |
Disch 1B
| HTC711-16-R-R020 | |
| Attachment 2 | STANDARD S&RTS CONTRACT RATE SCHEDULES |
SCHEDULE 1 B
| DISCHARGE VESSEL | ||||||||||||||||
| Prices in Euro | ||||||||||||||||
| LOLO | RORO | |||||||||||||||
| M O V E | ||||||||||||||||
| UNIT | ||||||||||||||||
| OF | TO LANDTRANSPORT | TO BARGE | TO QUAY/SHED | TO QUAY/SHED | ||||||||||||
| MEASURE | ||||||||||||||||
| ESTIMATED | ESTIMATED | ESTIMATED | ESTIMATED | ESTIMATED | ESTIMATED | ESTIMATED | OPERATIONAL | ESTIMATED | ESTIMATED | TOW-AWAY | ESTIMATED | |||||
| C O M M O D I T Y | QUANTITY | RATE | TOTAL | QUANTITY | RATE | TOTAL | QUANTITY | RATE | TOTAL | QUANTITY | RATE | TOTAL | QUANTITY | RATE | TOTAL | |
| A | A | A | B | B | B | C | C | C | K | K | K | L | L | L | ||
| 01 GENERAL CARGO | ||||||||||||||||
| (MILST. Comm. 500 - 799, | ||||||||||||||||
| except Comm. 680 - 694) | ||||||||||||||||
| 01A Palletized or unitized cargo | L/T | 15 | 0 | 15 | 0 |
01B Loose cargo L/T 2 0 2 0
| 01C Cargo in drums or barrels with | L/T |
| individual capacity of 55 gallons and over |
| 02 HOUSEHOLD GOODS & BAGGAGE | |
| (MILST. Comm. 360 - 399) | L/T |
| 03 PRIVATELY OWNED PASS. VEHICLES |
| (MILST. Comm. 300 - 359) |
03A Up to 6,600 lbs EA
03B Over 6,600 lbs EA
| 04 SPECIAL CARGO & HEAVY LIFTS |
| (MILST. Comm. 800 - 863, |
| except 813 and 816) |
04A 10,000 - 16,500 lbs EA 2 0 5 0
04B 16,501 - 25,000 lbs EA 1 0 1 0
04C Over 25,000 lbs EA 1 0 1 0
| 05 MILITARY VEHICLES & TRAILERS |
| (wheeled or tracked) |
| (MILST. Comm. 813, 816, 864-899) |
05A 0 - 10 L/T EA 20 0 10 0 20 0 10 0
05B 10 - 40 L/T EA 5 0 10 0 10 0 5 0
05C over 40 L/T EA 1 0 1 0 1 0 1 0
| 06 AIRCRAFT UNBOXED | EA |
| (MILST. Comm. 900 - 999) |
| 07 AMMUNITION, EXPLOSIVES AND OTHER |
| HAZARDOUS CARGO |
| (MILST. Comm. 400 - 496) |
07A Palletized L/T
07B Non-palletized L/T
| 08 CONEX CONTAINER, EMPTY AND FULL | EA | 1 | 0 | 1 | 0 |
| (MILST. Comm. 690) |
| 09 CONTAINER, COMMERCIAL AND | |||||
| MILITARY, EMPTY AND FULL | EA | 20 | 0 | 20 | 0 |
| (MILST. Comm. 40X, 691 - 694) |
| 10 SMALL ARMS AMMUNITION | L/T | |||||
| (MILST. Comm. 680 - 689) | ||||||
| ESTIMATED TOTAL SCHEDULE 1 B | 0 | 0 | 0 | 0 | 0 |
Receipt 1C
| HTC711-16-R-R020 | |
| Attachment 2 | STANDARD S&RTS CONTRACT RATE SCHEDULES |
SCHEDULE 1C
UNLOAD INLAND TRANSPORT (RECEIPT)
| LOLO | RORO | |||||||||||||||
| M O V E | ||||||||||||||||
| UNIT | FROM LAND- | FROM LAND- | FROM LAND- | FM LANDTRANS | FROM | |||||||||||
| OF | TRANSPORT | TRANSPORT | TRANSPORT | PORT/ BARGE TO | BARGE TO | |||||||||||
| MEASURE | TO QUAY | SHED | TO QUAY/SHED | QUAY/SHED | QUAY/SHED | |||||||||||
| ESTIMATED | ESTIMATED | ESTIMATED | ESTIMATED | ESTIMATED | OPERATIONAL | ESTIMATED | ESTIMATED | TOW AWAY | ESTIMATED | ESTIMATED | OPERATIONAL | ESTIMATED | ||||
| C O M M O D I T Y | QUANTITY | RATE | TOTAL | QUANTITY | RATE | TOTAL | QUANTITY | RATE | TOTAL | QUANTITY | RATE | TOTAL | QUANTITY | RATE | TOTAL | |
| A | A | A | B | B | B | G | G | G | L | L | L | M | M | M | ||
| 01 GENERAL CARGO | ||||||||||||||||
| (MILST. Comm. 500 - 799, | ||||||||||||||||
| except Comm. 680 - 694) | ||||||||||||||||
| 01A Palletized or unitized cargo | L/T | 10 | 0 | 1 | 0 |
01B Loose cargo L/T 5 0 1 0
| 01C Cargo in drums or barrels with | L/T |
| individual capacity of 55 gallons and over |
| 02 HOUSEHOLD GOODS & BAGGAGE | |
| (MILST. Comm. 360 - 399) | L/T |
| 03 PRIVATELY OWNED PASS. VEHICLES |
| (MILST. Comm. 300 - 359) |
03A Up to 6,600 lbs EA
03B Over 6,600 lbs EA
| 04 SPECIAL CARGO & HEAVY LIFTS |
| (MILST. Comm. 800 - 863, |
| except 813 and 816) |
04A 10,000 - 16,500 lbs EA 10 0 1 0
04B 16,501 - 25,000 lbs EA 5 0 1 0
04C Over 25,000 lbs EA 1 0 1 0
| 05 MILITARY VEHICLES & TRAILERS |
| (wheeled or tracked) |
| (MILST. Comm. 813, 816, 864-899) |
05A 0 - 10 L/T EA 53 0 1 0 19 0
05B 10 - 40 L/T EA 30 0 1 0 10 0
05C over 40 L/T EA 3 0 1 0 2 0
| 06 AIRCRAFT UNBOXED | EA |
| (MILST. Comm. 900 - 999) |
| 07 AMMUNITION, EXPLOSIVES AND OTHER |
| HAZARDOUS CARGO |
| (MILST. Comm. 400 - 496) |
07A Palletized L/T
07B Non-palletized L/T
| 08 CONEX CONTAINER, EMPTY AND FULL | EA | 1 | 0 | 1 | 0 |
| (MILST. Comm. 690) |
| 09 CONTAINER, COMMERCIAL AND | |||||
| MILITARY, EMPTY AND FULL | EA | 10 | 0 | 10 | 0 |
| (MILST. Comm. 40X, 691 - 694) |
| 10 SMALL ARMS AMMUNITION | L/T | ||||||
| (MILST. Comm. 680 - 689) | |||||||
| ESTIMATED TOTAL SCHEDULE 1 C | 0 | 0 | 0 | 0 | 0 | 0 |
Dispo 1D
| HTC711-16-R-R020 | |
| Attachment 2 | STANDARD S&RTS CONTRACT RATE SCHEDULES |
SCHEDULE 1D
LOAD INLAND TRANSPORT (DISPOSITION)
| LOLO | RORO | |||||||||||||||
| M O V E | ||||||||||||||||
| UNIT | FROM QUAY/ | FROM | FROM QUAY/ | FROM QUAY/ | FROM | |||||||||||
| OF | SHED TO | QUAY/SHED | SHED TO | SHED TO | QUAY/SHED | |||||||||||
| MEASURE | LANDTRANSPORT | TO BARGE | LANDTRANSPORT | LANDTRANSPORT | TO BARGE | |||||||||||
| ESTIMATED | ESTIMATED | ESTIMATED | ESTIMATED | ESTIMATED | OPERATIONAL | ESTIMATED | ESTIMATED | TOW AWAY | ESTIMATED | ESTIMATED | OPERATIONAL | ESTIMATED | ||||
| C O M M O D I T Y | QUANTITY | RATE | TOTAL | QUANTITY | RATE | TOTAL | QUANTITY | RATE | TOTAL | QUANTITY | RATE | TOTAL | QUANTITY | RATE | TOTAL | |
| A | A | A | C | C | C | F | F | F | L | L | L | R | R | R | ||
| 01 GENERAL CARGO | ||||||||||||||||
| (MILST. Comm. 500 - 799, | ||||||||||||||||
| except Comm. 680 - 694) | ||||||||||||||||
| 01A Palletized or unitized cargo | L/T | 15 | 0 |
01B Loose cargo L/T 2 0
| 01C Cargo in drums or barrels with |
| individual capacity of 55 gallons and over |
| 02 HOUSEHOLD GOODS & BAGGAGE | |
| (MILST. Comm. 360 - 399) | L/T |
| 03 PRIVATELY OWNED PASS. VEHICLES |
| (MILST. Comm. 300 - 359) |
03A Up to 6,600 lbs EA
03B Over 6,600 lbs EA
| 04 SPECIAL CARGO & HEAVY LIFTS |
| (MILST. Comm. 800 - 863, |
| except 813 and 816) |
04A 10,000 - 16,500 lbs EA 2 0
04B 16,501 - 25,000 lbs EA 1 0
04C Over 25,000 lbs EA 1 0
| 05 MILITARY VEHICLES & TRAILERS |
| (wheeled or tracked) |
| (MILST. Comm. 813, 816, 864-899) |
05A 0 - 10 L/T EA 20 0 10 0
05B 10 - 40 L/T EA 5 0 10 0
05C over 40 L/T EA 10 0 1 0
| 06 AIRCRAFT UNBOXED | EA |
| (MILST. Comm. 900 - 999) |
| 07 AMMUNITION, EXPLOSIVES AND OTHER |
| HAZARDOUS CARGO |
| (MILST. Comm. 400 - 496) |
07A Palletized L/T
07B Non-palletized L/T
| 08 CONEX CONTAINER, EMPTY AND FULL | EA | 1 | 0 |
| (MILST. Comm. 690) |
| 09 CONTAINER, COMMERCIAL AND | |||
| MILITARY, EMPTY AND FULL | EA | 20 | 0 |
| (MILST. Comm. 40X, 691 - 694) |
| 10 SMALL ARMS AMMUNITION | L/T | |||
| (MILST. Comm. 680 - 689) | ||||
| ESTIMATED TOTAL SCHEDULE 1 D | 0 | 0 | 0 |
Schedule 2 info
| Schedule 2 is for detention time. |
| Detention time occurs if we order labor for a fixed time to load / unload cargo from or to mode and the mode of transportation doesn't show up. |
| In that case we have to pay the detention fees, if the contractor has no other work for the ordered crew. |
| The minimum detention time is 15 minutes; however detention below 15 minutes will be compensated by the contractor. |
| The different tabs are for different working times, i.e. workdays, saturdays, sundays … |
| I highlighted this in the tabs so it is better visible. |
| The actual contractor is not charging theese items, but we do not know what the new contract brings. |
| Recommend leave them in until we have the offers from all bidders and remove once we know it is not required anymore, right before contract acquisition. |
SCHEDULE 2a
| HTC711-16-R-R020 | Attachment 2 | |
| STANDARD S&RTS CONTRACT |
SCHEDULE 2a
| DETENTION RATES APPLICABLE TO SERVICES COVERED BY COMMODITY RATES | ||
| Prices in Euro | ||
| W O R K D A Y ( A ) | ||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||
| SECOND SHIFT | ||||
| THIRD SHIFT | FOURTH SHIFT | |||
| HOUR | ||||
| HOUR |
C HOUR
E HOUR
G HOUR
G
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | |||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | |
| A | A | A | B | B | B | C | C | C | D | D | D | E | E | E | |||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| OVERTIME DIFFERENTIAL RATES APPLICABLE TO SERVICES COVERED BY COMMODITY RATES | ||
| Prices in Euro | ||
| W O R K D A Y ( A ) | ||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||||||||||||||||
| SECOND SHIFT | ||||||||||||||||||
| THIRD SHIFT | FOURTH SHIFT | |||||||||||||||||
| HOUR | HOUR | HOUR | HOUR | HOUR | ||||||||||||||
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | ||||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | ||
| F | F | F | G | G | G | H | H | H | I | I | I | K | K | K | ||||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| SHIFT DIFFERENTIAL RATES APPLICABLE TO SERVICES COVERED BY COMMODITY RATES | ||||||||||||||||||
| Prices in Euro | ||||||||||||||||||
| W O R K D A Y ( A ) | ||||||||||||||||||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||||||||||||||||
| SECOND SHIFT | ||||||||||||||||||
| THIRD SHIFT | FOURTH SHIFT | |||||||||||||||||
| HOUR | HOUR | HOUR | HOUR | HOUR | ||||||||||||||
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | ||||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | ||
| L | L | L | M | M | M | N | N | N | P | P | P | R | R | R | ||||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| 0.00 | ||||||||||||||||||
| Category 1 : Laborer: Stevedore |
Category 2 : Specialist: Foreman, Equipment Driver, Crane Operator
SCHEDULE 2b
STANDARD S&RTS CONTRACT
SCHEDULE 2b
| DETENTION RATES APPLICABLE TO SERVICES COVERED BY COMMODITY RATES | ||
| Prices in Euro | ||
| S A T U R D A Y ( B ) | ||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||
| SECOND SHIFT | ||||
| THIRD SHIFT | FOURTH SHIFT | |||
| HOUR | ||||
| HOUR |
C HOUR
E HOUR
G HOUR
G
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | |||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | |
| A | A | A | B | B | B | C | C | C | D | D | D | E | E | E | |||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| OVERTIME DIFFERENTIAL RATES APPLICABLE TO SERVICES COVERED BY COMMODITY RATES | ||
| Prices in Euro | ||
| S A T U R D A Y ( B ) | ||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||||||||||||||||
| SECOND SHIFT | ||||||||||||||||||
| THIRD SHIFT | FOURTH SHIFT | |||||||||||||||||
| HOUR | HOUR | HOUR | HOUR | HOUR | ||||||||||||||
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | ||||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | ||
| F | F | F | G | G | G | H | H | H | I | I | I | K | K | K | ||||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| SHIFT DIFFERENTIAL RATES APPLICABLE TO SERVICES COVERED BY COMMODITY RATES | ||||||||||||||||||
| Prices in Euro | ||||||||||||||||||
| S A T U R D A Y ( B ) | ||||||||||||||||||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||||||||||||||||
| SECOND SHIFT | ||||||||||||||||||
| THIRD SHIFT | FOURTH SHIFT | |||||||||||||||||
| HOUR | HOUR | HOUR | HOUR | HOUR | ||||||||||||||
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | ||||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | ||
| L | L | L | M | M | M | N | N | N | P | P | P | R | R | R | ||||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| 0.00 | ||||||||||||||||||
| Category 1 : Laborer: Stevedore |
Category 2 : Specialist: Foreman, Equipment Driver, Crane Operator
SCHEDULE 2c
STANDARD S&RTS CONTRACT
SCHEDULE 2c
| DETENTION RATES APPLICABLE TO SERVICES COVERED BY COMMODITY RATES | ||
| Prices in Euro | ||
| S U N D A Y ( C ) | ||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||
| SECOND SHIFT | ||||
| THIRD SHIFT | FOURTH SHIFT | |||
| HOUR | ||||
| HOUR |
C HOUR
E HOUR
G HOUR
G
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | |||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | |
| A | A | A | B | B | B | C | C | C | D | D | D | E | E | E | |||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||||
| OVERTIME DIFFERENTIAL RATES APPLICABLE TO SERVICES COVERED BY COMMODITY RATES | |||||||||||||||||
| Prices in Euro | |||||||||||||||||
| S U N D A Y ( C ) | |||||||||||||||||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||||||||||||||||
| SECOND SHIFT | ||||||||||||||||||
| THIRD SHIFT | FOURTH SHIFT | |||||||||||||||||
| HOUR | HOUR | HOUR | HOUR | HOUR | ||||||||||||||
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | ||||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | ||
| F | F | F | G | G | G | H | H | H | I | I | I | K | K | K | ||||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| SHIFT DIFFERENTIAL RATES APPLICABLE TO SERVICES COVERED BY COMMODITY RATES | ||||||||||||||||||
| Prices in Euro | ||||||||||||||||||
| S U N D A Y ( C ) | ||||||||||||||||||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||||||||||||||||
| SECOND SHIFT | ||||||||||||||||||
| THIRD SHIFT | FOURTH SHIFT | |||||||||||||||||
| HOUR | HOUR | HOUR | HOUR | HOUR | ||||||||||||||
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | ||||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | ||
| L | L | L | M | M | M | N | N | N | P | P | P | R | R | R | ||||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| 0.00 | ||||||||||||||||||
| Category 1 : Laborer: Stevedore |
Category 2 : Specialist: Foreman, Equipment Driver, Crane Operator
SCHEDULE 2d
STANDARD S&RTS CONTRACT
SCHEDULE 2d
| DETENTION RATES APPLICABLE TO SERVICES COVERED BY COMMODITY RATES | ||
| Prices in Euro | ||
| H O L I D A Y ( D ) | ||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||
| SECOND SHIFT | ||||
| THIRD SHIFT | FOURTH SHIFT | |||
| HOUR | ||||
| HOUR |
C HOUR
E HOUR
G HOUR
G
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | |||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | |
| A | A | A | B | B | B | C | C | C | D | D | D | E | E | E | |||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| OVERTIME DIFFERENTIAL RATES APPLICABLE TO SERVICES COVERED BY COMMODITY RATES | ||
| Prices in Euro | ||
| H O L I D A Y ( D ) | ||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||||||||||||||||
| SECOND SHIFT | ||||||||||||||||||
| THIRD SHIFT | FOURTH SHIFT | |||||||||||||||||
| HOUR | HOUR | HOUR | HOUR | HOUR | ||||||||||||||
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | ||||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | ||
| F | F | F | G | G | G | H | H | H | I | I | I | K | K | K | ||||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| SHIFT DIFFERENTIAL RATES APPLICABLE TO SERVICES COVERED BY COMMODITY RATES | ||||||||||||||||||
| Prices in Euro | ||||||||||||||||||
| H O L I D A Y ( D ) | ||||||||||||||||||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||||||||||||||||
| SECOND SHIFT | ||||||||||||||||||
| THIRD SHIFT | FOURTH SHIFT | |||||||||||||||||
| HOUR | HOUR | HOUR | HOUR | HOUR | ||||||||||||||
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | ||||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | ||
| L | L | L | M | M | M | N | N | N | P | P | P | R | R | R | ||||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| 0.00 | ||
| 0 | ||
| Category 1 : Laborer: Stevedore |
Category 2 : Specialist: Foreman, Equipment Driver, Crane Operator
Schedule 3 info
| Schedule 3 is for extra labor. |
| Extra labor occurs if the contractor has to do things that are not covered by the contract. |
| The minimum extra labor time is 15 minutes; however extra labor below 15 minutes will be compensated by the contractor. |
| This can be things like mounting or unmounting equipment from vehicles so they will fit onto mode of transportation. |
| This may also include making vehicles drivable, so they can be road driven to destination instead hiring a truck and contractor. |
| The different tabs are for different working times, i.e. workdays, saturdays, sundays … |
| I highlighted this in the tabs so it is better visible. |
| The actual contractor is not charging theese items, but we do not know what the new contract brings. |
| Recommend leave them in until we have the offers from all bidders and remove once we know it is not required anymore, right before contract acquisition. |
SCHEDULE 3a
STANDARD S&RTS CONTRACT
SCHEDULE 3a
| EXTRA LABOR RATES APPLICABLE TO SERVICES NOT COVERED BY COMMODITY RATES | ||
| Prices in Euro | ||
| W O R K D A Y ( A ) | ||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||
| SECOND SHIFT | ||||
| THIRD SHIFT | FOURTH SHIFT | |||
| HOUR | ||||
| HOUR |
C HOUR
E HOUR
G HOUR
G
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | |||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | |
| A | A | A | B | B | B | C | C | C | D | D | D | E | E | E | |||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| OVERTIME DIFFERENTIAL RATES APPLICABLE TO SERVICES NOT COVERED BY COMMODITY RATES | ||
| Prices in Euro | ||
| W O R K D A Y ( A ) | ||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||||||||||||||||
| SECOND SHIFT | ||||||||||||||||||
| THIRD SHIFT | FOURTH SHIFT | |||||||||||||||||
| HOUR | HOUR | HOUR | HOUR | HOUR | ||||||||||||||
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | ||||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | ||
| F | F | F | G | G | G | H | H | H | I | I | I | K | K | K | ||||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| SHIFT DIFFERENTIAL RATES APPLICABLE TO SERVICES NOT COVERED BY COMMODITY RATES | ||||||||||||||||||
| Prices in Euro | ||||||||||||||||||
| W O R K D A Y ( A ) | ||||||||||||||||||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||||||||||||||||
| SECOND SHIFT | ||||||||||||||||||
| THIRD SHIFT | FOURTH SHIFT | |||||||||||||||||
| HOUR | HOUR | HOUR | HOUR | HOUR | ||||||||||||||
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | ||||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | ||
| L | L | L | M | M | M | N | N | N | P | P | P | R | R | R | ||||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| 0.00 | ||||||||||||||||||
| Category 1 : Laborer: Stevedore |
Category 2 : Specialist: Foreman, Equipment Driver, Crane Operator
SCHEDULE 3b
STANDARD S&RTS CONTRACT
SCHEDULE 3b
| EXTRA LABOR RATES APPLICABLE TO SERVICES NOT COVERED BY COMMODITY RATES | ||
| Prices in Euro | ||
| S A T U R D A Y ( B ) | ||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||
| SECOND SHIFT | ||||
| THIRD SHIFT | FOURTH SHIFT | |||
| HOUR | ||||
| HOUR |
C HOUR
E HOUR
G HOUR
G
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | |||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | |
| A | A | A | B | B | B | C | C | C | D | D | D | E | E | E | |||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| OVERTIME DIFFERENTIAL RATES APPLICABLE TO SERVICES NOT COVERED BY COMMODITY RATES | ||
| Prices in Euro | ||
| S A T U R D A Y ( B ) | ||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||||||||||||||||
| SECOND SHIFT | ||||||||||||||||||
| THIRD SHIFT | FOURTH SHIFT | |||||||||||||||||
| HOUR | HOUR | HOUR | HOUR | HOUR | ||||||||||||||
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | ||||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | ||
| F | F | F | G | G | G | H | H | H | I | I | I | K | K | K | ||||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| SHIFT DIFFERENTIAL RATES APPLICABLE TO SERVICES NOT COVERED BY COMMODITY RATES | ||||||||||||||||||
| Prices in Euro | ||||||||||||||||||
| S A T U R D A Y ( B ) | ||||||||||||||||||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||||||||||||||||
| SECOND SHIFT | ||||||||||||||||||
| THIRD SHIFT | FOURTH SHIFT | |||||||||||||||||
| HOUR | HOUR | HOUR | HOUR | HOUR | ||||||||||||||
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | ||||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | ||
| L | L | L | M | M | M | N | N | N | P | P | P | R | R | R | ||||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| 0.00 | ||||||||||||||||||
| Category 1 : Laborer: Stevedore |
Category 2 : Specialist: Foreman, Equipment Driver, Crane Operator
SCHEDULE 3c
STANDARD S&RTS CONTRACT
SCHEDULE 3c
| EXTRA LABOR RATES APPLICABLE TO SERVICES NOT COVERED BY COMMODITY RATES | ||
| Prices in Euro | ||
| S U N D A Y ( C ) | ||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||
| SECOND SHIFT | ||||
| THIRD SHIFT | FOURTH SHIFT | |||
| HOUR | ||||
| HOUR |
C HOUR
E HOUR
G HOUR
G
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | |||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | |
| A | A | A | B | B | B | C | C | C | D | D | D | E | E | E | |||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| OVERTIME DIFFERENTIAL RATES APPLICABLE TO SERVICES NOT COVERED BY COMMODITY RATES | ||
| Prices in Euro | ||
| S U N D A Y ( C ) | ||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||||||||||||||||
| SECOND SHIFT | ||||||||||||||||||
| THIRD SHIFT | FOURTH SHIFT | |||||||||||||||||
| HOUR | HOUR | HOUR | HOUR | HOUR | ||||||||||||||
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | ||||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | ||
| F | F | F | G | G | G | H | H | H | I | I | I | K | K | K | ||||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| SHIFT DIFFERENTIAL RATES APPLICABLE TO SERVICES NOT COVERED BY COMMODITY RATES | ||||||||||||||||||
| Prices in Euro | ||||||||||||||||||
| S U N D A Y ( C ) | ||||||||||||||||||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||||||||||||||||
| SECOND SHIFT | ||||||||||||||||||
| THIRD SHIFT | FOURTH SHIFT | |||||||||||||||||
| HOUR | HOUR | HOUR | HOUR | HOUR | ||||||||||||||
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | ||||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | ||
| L | L | L | M | M | M | N | N | N | P | P | P | R | R | R | ||||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| 0.00 | ||||||||||||||||||
| Category 1 : Laborer: Stevedore |
Category 2 : Specialist: Foreman, Equipment Driver, Crane Operator
SCHEDULE 3d
STANDARD S&RTS CONTRACT
SCHEDULE 3d
| EXTRA LABOR RATES APPLICABLE TO SERVICES NOT COVERED BY COMMODITY RATES | ||
| Prices in Euro | ||
| H O L I D A Y ( D ) | ||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||
| SECOND SHIFT | ||||
| THIRD SHIFT | FOURTH SHIFT | |||
| HOUR | ||||
| HOUR |
C HOUR
E HOUR
G HOUR
G
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | |||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | |
| A | A | A | B | B | B | C | C | C | D | D | D | E | E | E | |||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | ||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| OVERTIME DIFFERENTIAL RATES APPLICABLE TO SERVICES NOT COVERED BY COMMODITY RATES | ||
| Prices in Euro | ||
| H O L I D A Y ( D ) | ||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||||||||||||||||
| SECOND SHIFT | ||||||||||||||||||
| THIRD SHIFT | FOURTH SHIFT | |||||||||||||||||
| HOUR | HOUR | HOUR | HOUR | HOUR | ||||||||||||||
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | ||||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | ||
| F | F | F | G | G | G | H | H | H | I | I | I | K | K | K | ||||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| SHIFT DIFFERENTIAL RATES APPLICABLE TO SERVICES NOT COVERED BY COMMODITY RATES | ||||||||||||||||||
| Prices in Euro | ||||||||||||||||||
| H O L I D A Y ( D ) | ||||||||||||||||||
| SHIFT |
| LABOR | DAY SHIFT | FIRST SHIFT | ||||||||||||||||
| SECOND SHIFT | ||||||||||||||||||
| THIRD SHIFT | FOURTH SHIFT | |||||||||||||||||
| HOUR | HOUR | HOUR | HOUR | HOUR | ||||||||||||||
| Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | Estimated | Unit | Estimated | ||||
| CAT | TYPE OF LABOR | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | quantity | price | total | ||
| L | L | L | M | M | M | N | N | N | P | P | P | R | R | R | ||||
| 1 | Laborer | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| 2 | Specialist | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | |||||||
| Estimated Cost | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||
| 0.00 | ||||||||||||||||||
| Category 1 : Laborer: Stevedore |
Category 2 : Specialist: Foreman, Equipment Driver, Crane Operator
SCHEDULE 4
STANDARD S&RTS CONTRACT
S C H E D U L E 4
| EQUIPMENT RENTAL ON EXTRA LABOR BASIS | |||||
| Prices in Euro | Prices in Euro | ||||
| TYPE | Estimated | ||||
| EQUIPMENT | TYPE OF EQUIPMENT | Quantity | Unit | Unit Price | Estimated cost |
| CODE | |||||
| 1 | Forklift up to 3 Tons | 5 | HR | 0 | |
| 5 | Forklift up to 5 Tons | 10 | HR | 0 |
52 Tug Master 1 HR 0
| Container handler/stacker | 10 | HR | 0 |
| 20 FT Container for Container Wall | 1 | PC/Mo | 0 |
| Note 1: | All equipment is with operator/driver and includes fuel, lubricants, and maintenance | |
| Note 2: | Equipment not listed above will be compensated on an out-of-pocket basis. | |
| Note 3: | Rates valid in dayshift on normal working days. | |
| Estimated total cost Schedule 4 | 0 |
SCHEDULE 6
STANDARD S&RTS CONTRACT
S C H E D U L E 6
| U T I L I Z A T I O N O F F A C I L I T I E S | ||||
| Prices in Euro | ||||
| Estimated | Unit | Unit Price | Estimated cost | |
| F A C I L I T I E S | Quantity |
| A | STERILE AREA FOR POVS | ||||
| B | OFFICE SPACE | ||||
| Specifications: | |||||
| Office Space and Cmd & Control | 12 month | mo | 0.00 € | MANNHEIM/GERMERSHEIM | |
| w/ electrical connections, furniture, adequate cleaning | |||||
| and use of appropriate sanitary installations | |||||
| C | OTHER: | ||||
| Specifications: | |||||
| 1. Portable Latrines | 29 days | day | 0.00 € | ||
| 2. Daily Cleaning of office space | 29 days | day | 0.00 € | ||
| 3. Trash collection per service (contingency missions) | 29 days | day | 0.00 € | ||
| 4. Guard Shack | 29 days | day | 0.00 € | ||
| 5. Illumination | 348 | hr | 0.00 € | ||
| 6. Portable Fence | 200 | Meter | 0.00 € | ||
| 7. Hand Held Radios | 2 | ea | 0.00 € | ||
| 8. Tarpaulins water-proof | 200 sqm | sqm | 0.00 € |
| 1 | two (2) telephones (international) | 2 month | ea | 0.00 € |
| 3 | two (2) telephone lines (data communication) | 2 month | ea | 0.00 € |
Estimated total cost Schedule 6 0.00 €
SCHEDULE 7
STANDARD S&RTS CONTRACT
SCHEDULE 7
| LUMBER AND RELATED SERVICES | |||||
| Prices in Euro | |||||
| A | LUMBER SUPPLIED BY CONTRACTOR | Estimated quantity | Unit | Unit Price | Estimated cost |
| a 10 X 10 cm | 20.00 | Meter | 0.00 | |
| b 10 X 15 cm | 20.00 | Meter | 0.00 | |
| c 15 X 15 cm | ||||
| d 15 X 20 cm | ||||
| e Plywood 9.5mmX122cmX244cm | ||||
| f Chockblocks | 200.00 | ea | 0.00 | |
| B | LUMBER RECLAMATION | |||
| C | SCRAP (lumber, crates, steel bands, etc. used in railcars | |||
| with export cargo) | ||||
| Costs for scrap lumber incl. supply of trashcontainer, dues | ||||
| and transport | ||||
| D | CONSTRUCTION OF CRATES AND CRATING MOTORCYCLES | |||
| E | LASHING MATERIAL- Payment for these items shall be on a cost reimbursement basis. 3rd party invoice must be submitted in accordance with PWS 5.8.1. | |||
| 3. Chain, 6 links. Breaking Load: 20 to. | ||||
| 4. Chain, 12 links. Breaking Load: 20 to. | ||||
| 5. Shackle, 3 to.. Breaking Load: 15 to. | ||||
| 6. Shackle, 4.7 to. (G-4161). Breaking Load: 28 to.. | ||||
| 7. Turnbuckle 1 1/8''. Breaking Load: 20 to. | ||||
| 8. Wire, 16 mm.. | ||||
| 9. Clips for Wire, 16 mm. | ||||
| 12. Nails, 5.5 x 160 | ||||
| 13. Polyesterline, white | ||||
| 14. Scotchtape, Nylon | ||||
| Estimated total cost Schedule 7 | 0.00 | |||
| Note: All lumber must be no less than 2 meters long bundled in bundles of the same size and length. | ||||
| Note: All nylon lashing must be bare internation test strength certificate and be no less than 8 meters long | ||||
| Note: All wood products must be free of bark and treated against insects. |
SCHEDULE 8
STANDARD S&RTS CONTRACT
S C H E D U L E 8
| M I S C E L L A N E O U S | ||||
| Prices in Euro | ||||
| A | Estimated Quantity | Unit | Unit Price | Estimated cost |
RESERVED
B VOLUME DISCOUNT
| a. From L/T to L/T | % |
| b. From L/T to L/T | % |
| c. From L/T to L/T | % |
| C | A. DISCOUNT FOR USE OF US GOVT | |
| SPONSORED PERSONNEL ASSISTING | % | |
| LOADING/DISCHARGE OF AIRCRAFT & VEHICLES* | ||
| B. DISCOUNT FOR COMMODITY 09, SCHEDULE | ||
| 1A & 1B, WHEN EMPTY | % |
| D | ADMINISTRATIVE CHARGES | |||
| % | ||||
| E | OUT-OF-POCKET EXPENSES | REIMBURSEMENT OF ACTUAL | 1100.00 | |
| COSTS DISBURSED AS | ||||
| SUBSTANTIATED BY THE | ||||
| SUBMISSION OF PAID | ||||
| INVOICES |
| F | MISCELLANEOUS SUPPORT SERVICES | |
| A. IMPORT CUSTOMS DOCUMENT | EA | |
| B. EXPORT CUSTOMS DOCUMENT | EA | |
| C. PROCESSING OF VESSEL MANIFEST/CARGO LOAD LIST | EA |
| 1100.00 | |
| Note 1: - To C A. "For tracked vehicles only". |
TOTAL ESTIMATE
| HTC711-16-R-R020 |
| Attachment 2 |
| New S&RTS Contract Number: | ||
| BASE PERIOD | 1ST OPTION PERIOD | 2ND OPTION PERIOD |
| STEVEDORING Mannheim, Germany | STEVEDORING Mannheim, Germany | STEVEDORING Mannheim, Germany |
Etimate totals Amount Etimate totals Amount Etimate totals Amount
| Schedule 1A | € 0.00 | Schedule 1A | € 0.00 | Schedule 1A | € 0.00 |
| Schedule 1B | € 0.00 | Schedule 1B | € 0.00 | Schedule 1B | € 0.00 |
| Schedule 1C | € 0.00 | Schedule 1C | € 0.00 | Schedule 1C | € 0.00 |
| Schedule 1D | € 0.00 | Schedule 1D | € 0.00 | Schedule 1D | € 0.00 |
| Schedule 2a | € 0.00 | Schedule 2a | € 0.00 | Schedule 2a | € 0.00 |
| Schedule 2b | € 0.00 | Schedule 2b | € 0.00 | Schedule 2b | € 0.00 |
| Schedule 2c | € 0.00 | Schedule 2c | € 0.00 | Schedule 2c | € 0.00 |
| Schedule 2d | € 0.00 | Schedule 2d | € 0.00 | Schedule 2d | € 0.00 |
| Schedule 3a | € 0.00 | Schedule 3a | € 0.00 | Schedule 3a | € 0.00 |
| Schedule 3b | € 0.00 | Schedule 3b | € 0.00 | Schedule 3b | € 0.00 |
| Schedule 3c | € 0.00 | Schedule 3c | € 0.00 | Schedule 3c | € 0.00 |
| Schedule 3d | € 0.00 | Schedule 3d | € 0.00 | Schedule 3d | € 0.00 |
| Schedule 4 | € 0.00 | Schedule 4 | € 0.00 | Schedule 4 | € 0.00 |
| Schedule 6 | € 0.00 | Schedule 6 | € 0.00 | Schedule 6 | € 0.00 |
| Schedule 7 | € 0.00 | Schedule 7 | € 0.00 | Schedule 7 | € 0.00 |
| Schedule 8 | € 1,100.00 | Schedule 8 | € 1,100.00 | Schedule 8 | € 1,100.00 |
TOTAL: € 1,100.00 TOTAL: € 1,100.00 TOTAL: € 1,100.00
| 3RD OPTION PERIOD | 4TH OPTION PERIOD | 6 MONTH extension OPTION PERIOD |
| STEVEDORING Mannheim, Germany | STEVEDORING Mannheim, Germany | STEVEDORING Mannheim, Germany |
Etimate totals Amount Etimate totals Amount Etimate totals Amount
| Schedule 1A | € 0.00 | Schedule 1A | € 0.00 | Schedule 1A | € 0.00 |
| Schedule 1B | € 0.00 | Schedule 1B | € 0.00 | Schedule 1B | € 0.00 |
| Schedule 1C | € 0.00 | Schedule 1C | € 0.00 | Schedule 1C | € 0.00 |
| Schedule 1D | € 0.00 | Schedule 1D | € 0.00 | Schedule 1D | € 0.00 |
| Schedule 2a | € 0.00 | Schedule 2a | € 0.00 | Schedule 2a | € 0.00 |
| Schedule 2b | € 0.00 | Schedule 2b | € 0.00 | Schedule 2b | € 0.00 |
| Schedule 2c | € 0.00 | Schedule 2c | € 0.00 | Schedule 2c | € 0.00 |
| Schedule 2d | € 0.00 | Schedule 2d | € 0.00 | Schedule 2d | € 0.00 |
| Schedule 3a | € 0.00 | Schedule 3a | € 0.00 | Schedule 3a | € 0.00 |
| Schedule 3b | € 0.00 | Schedule 3b | € 0.00 | Schedule 3b | € 0.00 |
| Schedule 3c | € 0.00 | Schedule 3c | € 0.00 | Schedule 3c | € 0.00 |
| Schedule 3d | € 0.00 | Schedule 3d | € 0.00 | Schedule 3d | € 0.00 |
| Schedule 4 | € 0.00 | Schedule 4 | € 0.00 | Schedule 4 | € 0.00 |
| Schedule 6 | € 0.00 | Schedule 6 | € 0.00 | Schedule 6 | € 0.00 |
| Schedule 7 | € 0.00 | Schedule 7 | € 0.00 | Schedule 7 | € 0.00 |
| Schedule 8 | € 1,100.00 | Schedule 8 | € 1,100.00 | Schedule 8 | € 550.00 |
| TOTAL: | € 1,100.00 | TOTAL: | € 1,100.00 | TOTAL: | € 550.00 |
| TOTAL VALUE: | € 6,050.00 |