Truman Lake Station Drainage Replacement Federal contract opportunity
Solicitation number
W912DQ22B1015
Issued by
Department of the Army Corps of Engineers Engineering District Kansas City

About this file

This document provides details on a federal contract opportunity from the Department of the Army Corps of Engineers Engineering District Kansas City. The solicitation number is W912DQ22B1015 and seeks bids to replace the drainage system at Truman Lake Station. Bids for the Truman Lake Station Drainage Replacement contract are due on September 7, 2022. The opportunity description indicates the enclosed solicitation pertains to replacing an existing drainage system but provides no further information on requirements, pricing terms, incumbent contractors, or other salient details.

View the file

Other files for this federal contract opportunity

Other files attached to Truman Lake Station Drainage Replacement, newest first.
File Type Posted
HST OF 1419A.pdf PDF
B.08.04 Solicitation Amendment 03.pdf PDF
B.08.04 Solicitation Amendment 02.pdf PDF
B.08.04 Revised Appx B - Existing PLC IO.pdf PDF
B.08.04 Solicitation Amendment 01.pdf PDF
B.07.01 Site Visit Sign in.pdf PDF
HST Drain Pump Specs.PDF PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

US Army Corps of Engineers ®

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

File Path:

Plot Date:

R:\d0272376\486909_DrainPump_Replacement_MM_RVT20_E.rvt

7/20/2022 12:19:03 PM

G-001

C O

VE

R

S H

EE

T

AN

D

IN

D

EX

H

AR

R Y

S

TR

U M

AN

D

AM

A

N D

R

ES

ER

VO

IR

KA

N

SA

S C

IT

Y

D

IS

TR

IC

T B.

B R

AC

K

J.

L

O C

KW

O

O D

T.

S

W

AN

SO

N

T.

S

W

AN

SO

N

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

KANSAS CITY DISTRICT

POWERHOUSE UNWATERING AND STATION

DRAINAGE PUMPS

HARRY S TRUMAN DAM AND RESERVOIR

SEE COVER PAGE

SEE COVER PAGE

AUGUST 2022

486909

VOL #

PRODUCTION DATA 4PRODUCTION DATA 3

AUGUST 2022 - RTA SUBMITTAL

AU

G

U

ST

-R

TA

S

U

BM

IT

TA

L

E.

2T

H S

TR

EE

T

KA

N

SA

S C

IT

Y, M O

VOLUME:

AN

SI

D

GENERAL

Sheet Number Sheet Name

G-001 COVER SHEET AND INDEX

ELECTRICAL

Sheet Number Sheet Name

E-001 ELECTRICAL LEGEND

ED100 ELECTRICAL DEMOLITION PLAN EL. 658

ED101 POWERHOUSE UNWATERING SYSTEM DEMOLITION PLAN

ED900 REFERENCE PHOTOS EXISTING EQUIPMENT

ED901 REFERENCE PHOTOS EXISTING EQUIPMENT

E-100 POWER PLAN EL. 658.0

E-101 POWERHOUSE STATION DRAINAGE AND UNWATERING SYSTEM

E-400 MCC7P ELEVATION & NEW PUMP CONTROL PANEL LAYOUT

E-601 TRUMAN PP STATION DRAINAGE AND UNWATERING PUMPS ONE-LINE

DIAGRAM

MECHANICAL

Sheet Number Sheet Name

MD100 MECHANICAL PLAN EL. 658.0 DEMOLITION

MD101 MECHANICAL PLAN EL. 640.0 DEMOLITION

MD102 MECHANICAL PLAN EL. 592.0 DEMOLITION

MD103 POWERHOUSE UNWATERING SYSTEM DEMOLITION PLAN

M-100 MECHANICAL PLAN EL. 658.0

M-101 MECHANICAL PLAN EL. 640.0

M-102 MECHANICAL PLAN EL. 592.0

M-103 POWERHOUSE UNWATERING SYSTEM & PUMP SCHEDULE

M-500 HST STA DRAIN SUMP DIVING - DWG 1

M-501 HST STA DRAIN SUMP DIVING - DWG 2

M-502 HST STA DRAIN SUMP DIVING - DWG 3

M-503 HST STA DRAIN SUMP DIVING - DWG 4

M-504 HST STA DRAIN SUMP DIVING - DWG 5

M-505 HST STA DRAIN SUMP DIVING - DWG 6

M-506 HST STA DRAIN SUMP DIVING - PHOTOS

GENERAL SHEET NOTES

1. EXISTING PIPES, PUMPS, AND VALVES SHOWN IN SHADED, CROSS-

HATCHED REGION SHALL BE REMOVED.

SHEET KEYNOTES

1 GATE VALVE OPERATORS (MOTORIZED AND MANUAL TYPE) TO

BE REMOVED AND KEPT FOR RE-USE. STORAGE WILL BE

PROVIDED ONSITE, COORDINATE WITH POWER PLANT STAFF AND

USACE.

2 EXISTING PUMPS TO BE REMOVED.

3 EXISTING OIL SKIMMER TO REMAIN. MAY BE REMOVED DURING

WORK TO FACILITATE ACCESS.

4 EXISTING 36"x30" ACCESS HATCH; COVERED BY HATCH.

5 EXISTING CONCRETE PENETRATIONS.

SHEET LEGEND

D-X PUMP DISCHARGE VALVE

U-X UNWATERING HEADER VALVE

DEMOLISH

P-1 P-2

D-1 D-2

D3 D-4 D-5

P-3

P-4 P-5

1 1

1 1

1 1

2 2

2 2

U-2 U-3

U-1

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

MD100

M

EC

H

AN

IC

AL

P

LA

N E

L.

.0

D

EM

O

LI

TI

O

N

H

AR

R Y

S.

T

R U

M

AN

D

AM

A N

D R

ES

ER

VO

IR

KA

N

SA

S

C

IT

Y D

IS

TR

IC

T

W . M

AN

N

ER

C . D

AV

IS

W . C

U N

N

IN

G H

AM

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

, F Y-

_H

ST

_P

W R

_U N

W _S

TA

_M

P_ rv t

E.

2T H

S

TR

EE

T

KA

N

SA

S

C

IT

Y, M

O

AN

SI

D

SCALE: NTSA1 MECHANICAL PLAN EL. 658.0

2 3 4 4

P-1 P-2 P-3 P-4 P-5

D-1 D-2

D-3 D-4 D-5

CHEK VALVE

CHEK VALVE

CHEK VALVE

PIPE SUPPORT

PIPE SUPPORT

PIPE SUPPORT

AIR BLOW-OUT

AIR BLOW-OUT

5 5

5 5 5

GENERAL SHEET NOTES

1. EXISTING PIPES, PUMPS, AND VALVES SHOWN IN SHADED, CROSS-

HATCHED REGION SHALL BE REMOVED.

2. CHECK AND GATE VALVE TO REMAIN UNLESS CONTRACT OPTION

IS SELECTED.

SHEET KEYNOTES

1 STATION UNWATERING & DRAINAGE DISCHARGE PIPE. PIPE IS

EMBEDED IN CONCRETE UNTIL IT DISCHARGES INTO DRAFT TUBE

SLOT AND IS PRESSURIZED TO THE TRAILRACE ELEVATION.

2 8" STATION DRAINAGE DISCHARGE HEADER EMBEDED IN

CONCRETE TO REMAIN FOR RE-USE WITH NEW PIPE & FITTINGS.

SEE NOTE 2

3 6" STATION DRAINAGE DISCHARGE HEADER EMBEDED IN

CONCRETE TO REMAIN FOR RE-USE WITH NEW PIPE & FITTINGS.

SEE NOTE 2

4 12" STATION DRAINAGE DISCHARGE HEADER EMBEDED IN

CONCRETE TO REMAIN FOR RE-USE WITH NEW PIPE & FITTINGS.

SEE NOTE 2

5 EXISTING CONCRETE PENETRATIONS.

6 EXISTING 30"x36" ACCESS HATCH; COVERED BY GRATE.

SHEET LEGEND

D-X PUMP DISCHARGE VALVE

U-X UNWATERING HEADER VALVE

DEMOLISH

DEMOLISH IF CONTRACT OPTION IS SELECTED

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

MD101

M

EC

H

AN

IC

AL

P

LA

N E

L.

.0

D

EM

O

LI

TI

O

N

H

AR

R Y

S.

T

R U

M

AN

D

AM

A N

D R

ES

ER

VO

IR

KA

N

SA

S

C

IT

Y D

IS

TR

IC

T

W . M

AN

N

ER

C . D

AV

IS

T.

S

W

AN

SO

N

W . C

U N

N

IN

G H

AM

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

, F Y-

_H

ST

_P

W R

_U N

W _S

TA

_M

P_ rv t

E.

2T H

S

TR

EE

T

KA

N

SA

S

C

IT

Y, M

O

AN

SI

NTSA1 EL. 640.0 DEMOLITION PLAN

1 1

P-1 P-2

P-3

P-4 P-5

SD-1

5 5

U-1 U-2 U-3

GENERAL SHEET NOTES

1. EXISTING PIPES, PUMPS, AND VALVES SHOWN IN SHADED, CROSS-

HATCHED REGION SHALL BE REMOVED.

SHEET KEYNOTES

1 GALLERY DRAINAGE PUMP DISCHARGE THROUGH FLAP GATE

2 STATION DRAINAGE SUMP PIT OVERFLOW HEADER, WITH

FLAPGATE ON DISCHARGE SIDE

3 STATION DRAINAGE SUMP PIT DRAIN PIPE. SD-1 AND EXPOSED

ACCOMPANYING PIPE UP TO IMBEDED HEADER TO BE REMOVED

4 CATWALK AND LADDER TO BE LEFT IN PLACE (ELEVATION 600)

5 12" EMBEDDED UNWATERING HEADER; TO BE LEFT IN PLACE FOR

USE WITH NEW VALVES

SHEET LEGEND

U-X UNWATERING HEADER VALVE

SD-X STATION DRAINAGE SUMP PIT DRAINAGE VALVE

DEMOLISH

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

MD102

M

EC

H

AN

IC

AL

P

LA

N E

L.

.0

D

EM

O

LI

TI

O

N

H

AR

R Y

S.

T

R U

M

AN

D

AM

A N

D R

ES

ER

VO

IR

KA

N

SA

S

C

IT

Y D

IS

TR

IC

T

W . M

AN

N

ER

C . D

AV

IS

T.

S

W

AN

SO

N

W . C

U N

N

IN

G H

AM

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

, F Y-

_H

ST

_P

W R

_U N

W _S

TA

_M

P_ rv t

E.

2T H

S

TR

EE

T

KA

N

SA

S

C

IT

Y, M

O

AN

SI

NTSA1 EL. 592.0 DEMOLITION PLAN

1. EXISTING PIPES, PUMPS, AND VALVES SHOWN IN SHADED,

CROSS-HATCHED REGION SHALL BE REMOVED.

SHEET KEYNOTES

1 DRAINAGE LINE OF DEMARCATION; EXISTING PIPE, FITTINGS AND

VALVES BEFORE THIS POINT (LEFT) SHALL BE REMOVED.

AFTER THIS POINT (RIGHT) EXISTING PIPE, FITTINGS AND VALVES

SHALL BE DEMOLISHED TO THE EMBEDDED HEADER ONLY IF

CONTRACT OPTION IS SELECTED.

2 DEWATERING LINE OF DEMARCATION; EXISTING PIPE, FITTINGS

AND VALVES BEFORE THIS POINT (RIGHT) SHALL BE REMOVED.

AFTER THIS POINT (LEFT) THE EXISTING PIPE, FITTINGS AND

VALVES SHALL BE PRESERVED FOR RE-USE.

3 VALVE OPORATORS SHALL BE REMOVED AND PRESERVED FOR

REUSE.

4 DEMO COMPRESSED AIR LINE DOWNSTREAM OF VALVES.

VALVES TO REMAIN TO MAINTAIN SYSTEM PRESSUREIZATION.

SHEET LEGEND SHEET LEGEND (CONT.)

WATER

GATE VALVE (NORMALLY OPEN)

GATE VALVE (NORMALLY CLOSED)

CHECK VALVE

MOTOR OPERATED VALVE (FLOOR STAND)

GEARED VALVE (FLOOR STAND)

M

G

STAND MOUNTED VALVE (HAND WHEEL)

VALVE EXTENSION STEM

STATION COMPRESSED AIR LINE

PIPE IMBEDDED IN CONCRETE

DEMOLISH

DEMOLISH IF CONTRACT OPTION IS SELECTED

A

D-1 D-3 D-4

D-1

FV-2

SD-1

U-1

FV-1

U-2

VV1 THRU 6

M A-

3-

B

M A-

U-3

1 2

550 GPM

STATION

DRAINAGE

PUMPS

8" DRAFT TUBE VENT

TO ATMOSPHERE

BLOCKOUT FOR

FUTURE VENT VALVE

IF REQURIED

D-2

D-2

D-3 M M G G M

4 5

U-1 U-2

550 GPM AUXILIARY

UNWATERING PUMP

2500 GPM AUXILIARY

UNWATERING PUMP

MA-102 MA-101

D-4 D-5 U-3

D-5

6"

" P

U M

P C

O

LU

M N

M A-

VENT TO ATMOSPHERE

EL. 682.0

EL. 677.0 MAX. T.W.

EL. 677.0 MAX T.W. GEN.

EL. 660.4 MAX T.W. GEN.

EL. 660. 0 MAX T.W.

PUMP

EL. 656.0 MAX T.W.

PUMP

EL. 645.0 EXTREME MIN

T.W.

M DTU-1 THRU 6

CL EL. 642.0

DRAFT

TUBE

EL. 595.0

12" MUD VALVE

12" DRAFT TUBE DRAIN

CL EL. 591.0

EL. 583.5

EL. 582.0

PRESSURE TRANSMITTER MOUNTED AT EL. 584.0

STOPS BOTH UNWATERING PUMPS AT EL. 588.0

EL. 578.5

EL. 576.0

UNWATERING SUMP TRANSDUCER

MOUNTED AT EL. 576.5

12" OVERFLOW TO UNWATERING SUMP CL EL. 592.5

EL. 582.0

STATION SUMP TRANSDUCER MOUNTED EL. 583.43

12" INTAKE DRAIN HEADER

EL. CL 601.5

EL. 605.0

VALVE PIT

M

MA-106-1 THRU 6

MA-107-1 THRU 6

DRAFT

TUBE

CL RUNNER

SERVICE GATE

SLOT

INTAKE

AUX. DRAIN

ONE PER

UNIT

PUMPING

FLOW

GENERATING

EL. 603.5

12" UNIT INTAKE

DRAIN ONE EACH

WATER PASSAGE

LOW POINT DRAIN

ONE PER WATER

PASSAGE

T.W. GAGE

WELL

BLOWOUT

IU-1 THRU 6

A

A

A A

A A

A

A

A

6"

6"

10"

14"

12"

16"

A

AA

A

EL. 658.0

1 1 1

2 2

3 3 3

3 3 3 3 3

6" 12"

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

MD103

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

S

YS

TE

M

D

EM

O

LI

TI

O

N P

LA

N

H

AR

R Y

S.

T

R U

M

AN

D

AM

A N

D R

ES

ER

VO

IR

KA

N

SA

S

C

IT

Y D

IS

TR

IC

T

W . M

AN

N

ER

C . D

AV

IS

W . C

U N

N

IN

G H

AM

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

, F Y-

_H

ST

_P

W R

_U N

W _S

TA

_M

P_ rv t

E.

2T H

S

TR

EE

T

KA

N

SA

S

C

IT

Y, M

O

AN

SI

SCALE: NTSA1 POWERHOUSE UNWATERING SYSTEM

1. FIELD VERIFY ALL DIMENSIONS AND MEASUREMENTS.

2. VALVE OPORATORS ARE RE-USED, EXISTING MOTORIZED AND

MANUAL TYPE VALVE OPORATORS.

SHEET KEYNOTES

1 EXISTING PUMP OPENING FROM REMOVED STATION DRAINAGE

PUMP; APPROX. 1.3' DIA.

2 EXISTING PUMP OPENING FROM REMOVED STATION

DEWATERING PUMP; APPROX. 2.55' DIA.

3 EXISTING CONCRETE PENETRATIONS.

4 MINIMALLY ENLARGE THE EXISTING "MATERIAL HATCH" AT EL.

658 AND THE CORRESPONDING OPENING ON EL. 640 TO ALLOW

NEW PUMPS TO PASS THROUGH.

SHEET LEGEND

D-X PUMP DISCHARGE VALVE

U-X UNWATERING HEADER VALVE

D-1 D-2

D-3 D-4 D-5

U-2 U-3

U-1

1 1 1 2 2

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

M-100

M

EC

H

AN

IC

AL

P

LA

N E

L.

.0

H

AR

R Y

S.

T

R U

M

AN

D

AM

A N

D R

ES

ER

VO

IR

KA

N

SA

S

C

IT

Y D

IS

TR

IC

T

W . M

AN

N

ER

C . D

AV

IS

T.

S

W

AN

SO

N

W . C

U N

N

IN

G H

AM

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

, F Y-

_H

ST

_P

W R

_U N

W _S

TA

_M

P_ rv t

E.

2T H

S

TR

EE

T

KA

N

SA

S

C

IT

Y, M

O

AN

SI

SCALE: NTSA1 MECHANICAL PLAN EL. 658.0

D-1 D-2

D-3 D-4 D-5

PIPE SUPPORT

PIPE SUPPORT

PIPE SUPPORT

12" 12"

6"

8"

6"

6" 6" 6"

12" 12"

SLIP JOINT

SLIP JOINT

SLIP JOINT

3 3

3 3

GENERAL SHEET NOTES

1. FIELD VERIFY ALL DIMENSIONS AND MEASUREMENTS.

2. VALVES AND FITTINGS SHALL BE PROPERLY SIZED FOR THE PIPE

IT IS CONNECTED TO.

SHEET KEYNOTES

1 CONNECT NEW PIPE & FITTINGS TO EXISTING DRAINAGE PIPE

HEADER.

2 CONNECT NEW GATE VALVE TO EXISITNG VALVE OPORATOR.

3 EXISTING CONCRETE PENETRATION.

4 MINIMALLY ENLARGE THE EXISTING 30"x36" "MATERIAL HATCH" AT

EL. 640 AND THE CORRESPONDING OPENING ON EL. 658 TO

ALLOW NEW PUMPS TO PASS THROUGH.

SHEET LEGEND

D-X PUMP DISCHARGE VALVE

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

M-101

M

EC

H

AN

IC

AL

P

LA

N E

L.

.0

H

AR

R Y

S.

T

R U

M

AN

D

AM

A N

D R

ES

ER

VO

IR

KA

N

SA

S

C

IT

Y D

IS

TR

IC

T

W . M

AN

N

ER

C . D

AV

IS

T.

S

W

AN

SO

N

W . C

U N

N

IN

G H

AM

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

, F Y-

_H

ST

_P

W R

_U N

W _S

TA

_M

P_ rv t

E.

2T H

S

TR

EE

T

KA

N

SA

S

C

IT

Y, M

O

AN

SI

NTSA1 MECHANICAL PLAN EL.640

1. FIELD VERIFY ALL DIMENSIONS AND MEASUREMENTS.

SHEET KEYNOTES

1 GALLERY DRAINAGE PUMP DISCHARGE FLAP GATES TO REMAIN.

2 STATION DRAINAGE SUMP PIT OVERFLOW HEADER, WITH

FLAPGATE ON DISCHARGE SIDE; TO BE LEFT IN PLACE.

3 STATION DRAINAGE SUMP PIT DRAIN PIPE. NEW 4" GATE VALVE

SD-1 TO BE PIPED TO IMBEDED HEADER, WITH DISCHARGE INTO

P-3'S SUMP PIT

4 CATWALK AND LADDER TO BE LEFT IN PLACE.

5 12" UNWATERING HEADER EMBEDDED IN CONCRETE; CONNECT

TO NEW VALVES AND PIPEWORK.

SHEET LEGEND

SD-X STATION DRAINAGE SUMP PIT DRAINAGE VALVE

U-X UNWATERING HEADER VALVE

1 1

P-1 P-2

P-3

P-4 P-5

3 4

5 5

U-2 U-3

SD-1

12" 12"

12"

12"12"

U-1

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

M-102

M

EC

H

AN

IC

AL

P

LA

N E

L.

.0

H

AR

R Y

S.

T

R U

M

AN

D

AM

A N

D R

ES

ER

VO

IR

KA

N

SA

S

C

IT

Y D

IS

TR

IC

T

W . M

AN

N

ER

C . D

AV

IS

T.

S

W

AN

SO

N

W . C

U N

N

IN

G H

AM

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

, F Y-

_H

ST

_P

W R

_U N

W _S

TA

_M

P_ rv t

E.

2T H

S

TR

EE

T

KA

N

SA

S

C

IT

Y, M

O

AN

SI

NTSA1 MECHANICAL PLAN EL.592

D-3 D-4

D-1

FV-2

SD-1

U-1

FV-1

U-2

M A-

8-

TH

R U

M A-

U-3

550 GPM

STATION

DRAINAGE

PUMPS

D-2

D-2

D-3 M M G G M

U-1 U-2

550 GPM AUXILIARY

UNWATERING PUMP

2500 GPM AUXILIARY

UNWATERING PUMP

D-4 D-5 U-3

D-5

6"

M A-

BULK HEAD

SLOT

TRASHRACK

SLOT

VENT TO ATMOSPHERE

EL. 682.0

EL. 677.0 MAX. T.W.

EL. 677.0 MAX T.W. GEN.

EL. 660.4 MAX T.W. GEN.

EL. 660. 0 MAX T.W.

PUMP

EL. 656.0 MAX T.W.

PUMP

EL. 645.0 EXTREME MIN

T.W.

M DTU-1 THRU 6

CL EL. 642.0

DRAFT

TUBE

EL. 595.0

12" DRAFT TUBE DRAIN

CL EL. 591.0

EL. 583.5

EL. 582.0

EL. 578.5

EL. 576.0

START AUX. UNWATERING PUMP EL. 592.0

HLA EL. 595.5

START P5 EL. 595.1

START P4 EL. 595.0

EMERGENCY EL. 600.0

12" OVERFLOW TO UNWATERING SUMP CL EL. 592.5

STATION EMERGENCY HLA EL. 592.0

HLA EL. 591.0

LAG PUMP START EL. 590.0

LEAD PUMP START EL. 589.0

PUMP STOP EL. 586.5

EL. 582.0

STOP AUX. UNWATERING PUMP EL. 588.0

A

6" 8"

6"

10" 14"

12" 16"

EL. 658.0

P-1 P-2

P-3

6"

6"

P-4 P-5

3 3 3 33

4 4 4

6 6

6 6

7 7 7 7 7

GENERAL SHEET NOTES

1. FIELD VERIFY ALL DIMENSIONS AND MEASUREMENTS.

SHEET KEYNOTES

1 SUBMERSIBLE STATION DRAINAGE SUBMERSIBLE PUMPS

2 SUBMERSIBLE DEWATERING PUMPS

3 CONTRACTOR TO PROVIDE NEW COUPLING AND CHECK VALVE

4 LINE OF DEMARCATION; NEW PIPE SHALL TIE INTO EXISTING PIPE

HEADER, OR EXISTING GATE VALVE, DEPENDING ON CONTRACT

OPTION.

5 FLAP VALVE FV-2 IS BELOW THE WATER LINE AND WILL BE

SUBMERGED.

6 NEW CHECK VALVE ON PUMP DISCHARGE.

7 RISER CLAMP AND WALL SUPPORT SHOULD BE SURRICENT TO

CARRY THE WEIGHT OF THE PIPE AND WATER AS WELL AS

DYNAMIC FLUID LOADS.

SHEET LEGEND SHEET LEGEND (CONT.)

WATER

GATE VALVE (NORMALLY OPEN)

GATE VALVE (NORMALLY CLOSED)

CHECK VALVE

MOTOR OPERATED VALVE (FLOOR STAND)

GEARED VALVE (FLOOR STAND)

M

G

FLOOR STAND MOUNTED VALVE (HAND WHEEL)

VALVE EXTENSION STEM

STATION COMPRESSED AIR LINE

PIPE IMBEDDED IN CONCRETE

A

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

M-103

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

S

YS

TE

M

P

U M

P

SC

H

ED

U

LE

H

AR

R Y

S.

T

R U

M

AN

D

AM

A N

D R

ES

ER

VO

IR

KA

N

SA

S

C

IT

Y D

IS

TR

IC

T

W . M

AN

N

ER

C . D

AV

IS

T.

S

W

AN

SO

N

W . C

U N

N

IN

G H

AM

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

, F Y-

_H

ST

_P

W R

_U N

W _S

TA

_M

P_ rv t

E.

2T H

S

TR

EE

T

KA

N

SA

S

C

IT

Y, M

O

AN

SI

D

SCALE: NTSA1 POWERHOUSE UNWATERING SYSTEM

EL. 658.0

1 1

2 2

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

M-500

H

ST

S

TA

D R

AI

N

S U

M P

D

IV

IN

G

D

W G

H

AR

R Y

S.

T

R U

M

AN

D

AM

A N

D R

ES

ER

VO

IR

KA

N

SA

S

C

IT

Y D

IS

TR

IC

T

W . M

AN

N

ER

C . D

AV

IS

T.

S

W

AN

SO

N

W . C

U N

N

IN

G H

AM

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

, F Y-

_H

ST

_P

W R

_U N

W _S

TA

_M

P_ rv t

E.

2T H

S

TR

EE

T

KA

N

SA

S

C

IT

Y, M

O

AN

SI

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

M-501

H

ST

S

TA

D R

AI

N

S U

M P

D

IV

IN

G

D

W G

H

AR

R Y

S.

T

R U

M

AN

D

AM

A N

D R

ES

ER

VO

IR

KA

N

SA

S

C

IT

Y D

IS

TR

IC

T

W . M

AN

N

ER

C . D

AV

IS

T.

S

W

AN

SO

N

W . C

U N

N

IN

G H

AM

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

, F Y-

_H

ST

_P

W R

_U N

W _S

TA

_M

P_ rv t

E.

2T H

S

TR

EE

T

KA

N

SA

S

C

IT

Y, M

O

AN

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

M-502

H

ST

S

TA

D R

AI

N

S U

M P

D

IV

IN

G

D

W G

H

AR

R Y

S.

T

R U

M

AN

D

AM

A N

D R

ES

ER

VO

IR

KA

N

SA

S

C

IT

Y D

IS

TR

IC

T

W . M

AN

N

ER

C . D

AV

IS

T.

S

W

AN

SO

N

W . C

U N

N

IN

G H

AM

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

, F Y-

_H

ST

_P

W R

_U N

W _S

TA

_M

P_ rv t

E.

2T H

S

TR

EE

T

KA

N

SA

S

C

IT

Y, M

O

AN

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

M-503

H

ST

S

TA

D R

AI

N

S U

M P

D

IV

IN

G

D

W G

H

AR

R Y

S.

T

R U

M

AN

D

AM

A N

D R

ES

ER

VO

IR

KA

N

SA

S

C

IT

Y D

IS

TR

IC

T

D es ig ne r

Au th or

T.

S

W

AN

SO

N

C he ck er

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

, F Y-

_H

ST

_P

W R

_U N

W _S

TA

_M

P_ rv t

E.

2T H

S

TR

EE

T

KA

N

SA

S

C

IT

Y, M

O

AN

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

M-504

H

ST

S

TA

D R

AI

N

S U

M P

D

IV

IN

G

D

W G

H

AR

R Y

S.

T

R U

M

AN

D

AM

A N

D R

ES

ER

VO

IR

KA

N

SA

S

C

IT

Y D

IS

TR

IC

T

W . M

AN

N

ER

C . D

AV

IS

T.

S

W

AN

SO

N

W . C

U N

N

IN

G H

AM

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

, F Y-

_H

ST

_P

W R

_U N

W _S

TA

_M

P_ rv t

E.

2T H

S

TR

EE

T

KA

N

SA

S

C

IT

Y, M

O

AN

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

M-505

H

ST

S

TA

D R

AI

N

S U

M P

D

IV

IN

G

D

W G

H

AR

R Y

S.

T

R U

M

AN

D

AM

A N

D R

ES

ER

VO

IR

KA

N

SA

S

C

IT

Y D

IS

TR

IC

T

W . M

AN

N

ER

C . D

AV

IS

T.

S

W

AN

SO

N

W . C

U N

N

IN

G H

AM

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

, F Y-

_H

ST

_P

W R

_U N

W _S

TA

_M

P_ rv t

E.

2T H

S

TR

EE

T

KA

N

SA

S

C

IT

Y, M

O

AN

PHOTO #1: DOWNSTREAM SIDE OF POWER PLANT SHOWING DRAFT TUBE GANTRY

CRANE, BULKHEADS AND ACCESS

PHOTO #2: ACCESS TO DRAFT TUBE ACCESS DECK LOOKING AT

UNIT 1 DRAFT TUBE BULKHEADS CLOSE TO GATE

PHOTO #3: ENTRY TO DRAFT TUBE DECK SHOWING UNIT 1 DRAFT TUBE

BULKHEADS

NOTE: BULKHEADS FOR UNIT 1 WILL BE DEPLOYED PRIOR TO DIVER ENTRY.

PHOTO #4: ACCESS TO DRAFT TUBE ACCESS DECK LOOKING

TOWARD ENTRY GATE WITH UNIT 1 DRAFT TUBE BULKHEAD ON DECK PHOTO #5: VIEW LOOKING TOWARD ENTRY AND UNIT 1

NOTE: BULKHEADS FOR UNIT 1 WILL BE IN THE SLOT PRIOR TO THE DIVE

PHOTO #6: BUBBLER IN DRAFT TUBE ACCESS FOR

WATER QUALITY

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

M-506

H

ST

S

TA

D R

AI

N

S U

M P

D

IV

IN

G

PH

O

TO

S

H

AR

R Y

S.

T

R U

M

AN

D

AM

A N

D R

ES

ER

VO

IR

KA

N

SA

S

C

IT

Y D

IS

TR

IC

T

W . M

AN

N

ER

C . D

AV

IS

T.

S

W

AN

SO

N

W . C

U N

N

IN

G H

AM

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

, F Y-

_H

ST

_P

W R

_U N

W _S

TA

_M

P_ rv t

E.

2T H

S

TR

EE

T

KA

N

SA

S

C

IT

Y, M

O

AN

A AMPS

AC ABOVE COUNTER

AF AMPS FRAME

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHU AIR HANDLING UNIT

AT AMP TRIP - USED IN CONJUNCTION WITH "AF" OR "NF"

ATS AUTOMATIC TRANSFER SWITCH

BFG BELOW FINISHED GRADE

BMS BALANCED MAGNETIC SWITCH

C CONDUIT

C AT DEVICE INDICATES CEILING MOUNTED DEVICE

CATV CABLE TELEVISION

CCTV AT DEVICE INDICATES CLOSED CIRCUIT TV SYSTEM

CKT CIRCUIT

COR CONTRACTING OFFICER REPRESENTATIVE

CRU COMPUTER ROOM UNIT

CUH CABINET UNIT HEATER

D AT DEVICE INDICATES DATA SYSTEM

DCP DEVICE CIRCUIT PROTECTION

DDC DIRECT DIGITAL CONTROL SYSTEM

DM DIGITAL METER

DP DISTRIBUTION PANEL

DPP DISTRIBUTION POWER PANEL

DPST DOUBLE POLE SINGLE THROW / MECHANISM

EWC ELECTRIC WATER COOLER

EX AT DEVICE INDICATES DEVICE IS EXISTING

EXP EXPLOSION PROOF

FACP FIRE ALARM CONTROL PANEL

FCU FAN COIL UNIT

FHC FRACTIONAL HORSEPOWER CONTROLLER

FMC FLEXIBLE METAL CONDUIT

FS FUSIBLE SWITCH

FVNR FULL VOLTAGE NON-REVERSING

FVR FULL VOLTAGE REVERSING

G REPRESENTS GND CONDUCTOR IN CKT IDENTIFICATION

GF GROUND FAULT CIRCUIT INTERUPT PROTECTED OUTLET

GFCI GROUND FAULT CIRCUIT INTERUPTER

GFI GROUND FAULT INTERUPT

GFIP GROUND FAULT INTERUPT PROTECTION

GFGI GOVERNMENT FURNISHED, GOVERNMENT INSTALL

GND GROUND

GP GENERAL PURPOSE

HH HAND HOLE

HOA HAND-OFF-AUTO

HP HORSEPOWER

IAW IN ACCORDANCE WITH

IDS INTRUSION DETECTION SYSTEM

JB JUNCTION BOX

KVA KILOVOLT AMPS

LFMC LIQUID TIGHT FLEXIBLE METAL CONDUIT

LC LIGHTING CONTACTOR

LCE LIGHTING CONTACTOR EMERGENCY

LP LIGHTING PANEL

LPS LIGHTNING PROTECTION SYSTEM

LTS LIGHTS

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MGB MAIN POWER GROUND BAR

MH MANHOLE

MS MANUAL STARTING SWITCH

MSB MAIN SWITCH BOARD

NF NOT FUSED / NON-FUSIBLE SWITCH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

OC ON CENTER

OSP OUTSIDE PLANT (TELECOMMUNICATIONS)

PIMS PASSIVE INFRARED MOTION SENSOR

PNLB PANELBOARD

PP POWER PANEL

PWCP PRE-WIRED CONTROL PANEL

RECP RECEPTACLE

REL RELAY

RGS RIGID GALVANIZED STEEL CONDUIT

SLP SECURITY LOCAL PANEL

SP SECURITY PANEL

SPD SURGE PROTECTION DEVICE

SPDT SINGLE POLE DOUBLE THROW

SPST SINGLE POLE SINGLE THROW

SW SWITCH

SWBD SWITCHBOARD

TGB TELECOMMUNICATIONS GROUND BAR

TMGB TELECOMMUNICATIONS MAIN GROUND BAR

TSOA TACTICAL SCIF OPERATION AREA

UC UNDER COUNTER

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

UPS UNITERRUPTIBLE POWER SUPPLY

V VOLTS

VA VOLT-AMPS

W WATTS

WP WEATHERPROOF (NEMA 3R UNO)

XFMR TRANSFORMER

XP AT DEVICE INDICATES EXPLOSION PROOF DEVICE

ABBREVIATIONS DISCRIPTION

XX-X-X

GENERAL SYMBOLS

SYMBOL

KEYED NOTE

MECHANICAL EQUIPMENT TAG, RE: MECHANICAL

SCHEDULED FEEDER

ELECTRICAL ABBREVIATIONS

SYMBOL DISCRIPTION

LIGHTNING PROTECTION AND GROUNDING SYMBOLS

ELECTRICAL SYMBOL LEGENDS

AIR TERMINAL, SIZE PER SPECIFICATION

BONDING TO BUILDING STEEL

MAIN ROOF MOUNTED LIGHTNING CONDUCTOR

TEST WELL LOCATION

GROUND ROD

GROUND BAR

SYMBOL

ONE-LINE DIAGRAM SYMBOLS

DISCRIPTION

DM

GROUND

DIGITAL MULTI-METER

POTENTIAL TRANSFORMER

CURRENT TRANSFORMER

THERMAL MAGNETIC CIRCUIT BREAKER

60/3 INDICATES 60 AMP RATING, 3 POLE

SWITCH. SIZE AND RATINGS AS LISTED.

30/3P INDICATES 30 AMP RATING, 3 POLE

FUSE. TRIP RATING AS INDICATED

IN-LINE FUSE DEVICE

THERMAL OVERLOAD DEVICE

SURGE PROTECTION DEVICESPD

NORMALLY OPEN CONTACT

NORMALLY CLOSED CONTACT

PUSHBUTTON NORMALLY OPEN

PUSHBUTTON NORMALLY CLOSED

C2 CONTACTOR COIL

TOGGLE SWITCH

HAND-OFF-AUTO SELECTOR SWITCH

TRANSFORMER. RATINGS AS INDICATED

GENERATOR

SHUNT TRIP COIL

GROUND CONDUCTOR RUN

SPECIFIC BONDING POINT SHOWN IN PLANS FOR

CLARIFICATION

SYMBOL DISCRIPTION

GENERAL AND POWER SYMBOLS

NEMA 5-20 SIMPLEX RECEPTACLE

NOT ALL SYMBOLS SHOWN ON THIS SHEET

APPEAR ON THE OTHER ELECTRICAL DRAWINGS.

1. ALL FEATURES OF ELECTRICAL WORK AND INSTALLATION SHALL BE IN

ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE (NFPA 70).

2. FOR CONFLICTS BETWEEN THE SPECIFICATION AND THE DRAWINGS,

FOLLOW THE SPECIFICATION. WHERE THE DRAWINGS EXCEED

REQUIREMENTS OF THE SPECIFICATION, FOLLOW THE DRAWINGS.

GENERAL PROJECT NOTES

G

ST

X

X

NEMA 5-20 DUPLEX RECEPTACLE. TYPICAL FOR ALL,

RECEPTACLE U.N.O.

MOUNT GFCI DUPLEX RECEPTACLE 6" ABOVE COUNTER

AC

GFCI DUPLEX RECEPTACLE.

GFCI

DUPLEX RECEPTACLE DEDICATED FOR TELEVISION

LOCATION.TV

GFCI DUPLEX RECEPTACLE WITH WEATHERPROOF IN-USE

COVER.WP

CEILING MOUNTED RECEPTACLE

C

TRIPLEX RECEPTACLE

DOUBLE DUPLEX RECEPTACLE

SPLIT WIRED DUPLEX RECEPTACLE

SPECIAL PURPOSE RECEPTACLE

SPECIAL PURPOSE RECEPTACLE, WALL MOUTNED.

FLUSH MOUNTED RECEPTACLE IN FLOOR. SYMBOL

IDENTIFIES RECEPTACLE TYPE. "X" DESIGNATION

DETERMINESSPECIFIC SCHEDULED REQUIREMENTS ARE

PROVIDED.

X

ACTIVE INSERTS IN FLUSH MOUNTED CAST IN PLACE

POWER AND TELECOMMUNICATIONS BOX. IF MULTIPLE

CIRCUITS ARE INDICATED PROVIDE ONE TO EACH

DUPLEX RECEPTACLE.

SINGLE POLE SWITCH. LOWER CHARACTER LETTERS

INDICATE SWITCH LEG. TYPICAL FOR ALL SWITCHES.X

DOUBLE POLE SWITCH (DPST)2

THREE WAY SWITCH (SPDT)3

FOUR WAY SWITCH4

MOTION SENSOR SWITCH, SINGLE POLEMS

D DIMMER SWITCH, SINGLE POLE

KEYED SWITCHK

FAN CONTROL SWITCH. PROVIDE SWITCH & WIRING

PER CEILING FAN MANUFACTURER REQUIREMENTSF

M

ELECTRIC MOTOR

480V-208/ 120V INTERIOR PAD MOUNTED TRANSFORMER.

SEE ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

"LDP" IDENTIFIES PANEL SERVED.

TLDP

SURFACE MOUNTED PANELBOARD WITH GROUND BUS

FLUSH MOUNTED PANELBOARD WITH GROUND BUS

COMBINATION STARTER/DISCONNECT SWITCH

DISCONNECT SWITCH. "X" INDICATES SIZE. "Y" INDICATES

FUSE SIZE. NO "Y" SUBSCRIPT INDICATES NON FUSED.

Y X

FULL VOLTAGE MOTOR SWITCH

FRACTIONAL HORSEPOWER CONTROLLER

VARIABLE FREQUENCY DRIVEVFD

PRE-WIRED CONTROL PANEL

THERMOSTAT (SEE "M" SHEETS)T

AUXILARY RELAYR

PANIC / EMERGENCY SHUT-OFF BUTTON

WALL MOUNTED JUNCTION BOXJ

CEILING MOUNTED JUNCTION BOX.J

ACTIVE INSERT SPECIFICALY DESIGNED FOR RAISED

FLOOR APPLICATION.

PWCP

AI

AIR

SYMBOL DISCRIPTION

LIGHTING SYMBOLS

SYMBOL DISCRIPTION

SPECIAL SYMBOLS

BRANCH CIRCUIT HOME RUN

CONDUIT TURNING UP

CONDUIT TURNING DOWN

CONDUIT ROUTED OVERHEADOR

CIRCUIT IDENTIFICATION

L21-1A

SWITCH LEG, WHEN APPLICABLE

PANEL POSITION(S)

PANEL DESIGNATION:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

File Path:

Plot Date:

R:\d0272376\486909_DrainPump_Replacement_MM_RVT20_E.rvt

7/20/2022 12:11:35 PM

E-001

EL

EC

TR

IC

AL

L

EG

EN

D

H

AR

R Y

S

TR

U M

AN

D

AM

A

N D

R

ES

ER

VO

IR

KA

N

SA

S C

IT

Y

D

IS

TR

IC

T B.

B R

AC

K

J.

L

O C

KW

O

O D

T.

S

W

AN

SO

N

T.

S

W

AN

SO

N

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

PRODUCTION DATA 4PRODUCTION DATA 3

AU

G

U

ST

-R

TA

S

U

BM

IT

TA

L

E.

2T

H S

TR

EE

T

KA

N

SA

S C

IT

Y, M O

AN

1. ALL EXISTING ELECTRICAL COMPONENTS ASSOCIATED WITH

PUMPS AND VALVES SHOWN IN SHADED CROSS-HATCHED

REGION SHALL BE COMPLETELY REMOVED UNO.

2. DIMENSIONS SHOWN SHOULD BE ACCURATE WITHIN +- 1/2".

CONTRACTOR TO FIELD VERIFY.

3. REMOVE ANY EXISTING CONDUIT TO AND IN SUMP AREAS, NOT

ALREADY IDENTIFIED FOR REMOVAL, THAT ARE NOT BEING

UTILIZED BY LIGHTING OR RECEPTACLES OR MECHANICAL

EQUIPMENT IN THE SUMPS. VERIFY WITH USACE. THIS WILL BE

MINIMAL EFFORT.

4. PLUG HOLES IN WALLS AND FLOORS OF EXISTING EQUIPMENT

TO BE REMOVED. COORDINATE WITH USACE.

SHEET KEYNOTES

1. AGAR TECHNOLOGIES AIR/ALARM, OIL, WATER EQUIPMENT TO BE

REMOVED AND TURNED OVER TO USACE. ALARM BELL ABOVE

TO REMAIN AS IS.

2. UNWATERING PUMP TO INTAKE GATE VALVE TO BE

TEMPORARILY REMOVED, STORED, AND REINSTALLED.

3. UNWATERING PUMP TO DRAFT TUBE GATE VALVE TO BE

TEMPORARILY REMOVED, STORED, AND REINSTALLED.

4. UNWATERING PUMP TO SUMP PIT GATE VALVE TO BE

TEMPORARILY REMOVED, STORED, AND REINSTALLED.

5. EXISTING FLOOR OPENING.

6. EXISTING PUMPS TO BE REMOVED.

7. EXISTING OIL SKIMMER TO REMAIN.

8. SEE REFERENCE PHOTOS D1 AND D3 ON SHEET ED900.

9. SEE REFERENCE PHOTOS D6 AND D8 ON SHEET ED900.

10. SEE REFERENCE PHOTOS A1 & A4 ON SHEET ED900.

11. SEE REFERENCE PHOTOS D8, A1, A3, & A6 ON SHEET ED901.

12. CONCRETE WALL

13. EXISTING FLOOR OPENING USED FOR OIL SKIMMER.

SHEET LEGEND

D-X PUMP DISCHARGE VALVE

U-X UNWATERING HEADER VALVE

DEMOLISH

XX

ED90X

REFRENCE PHOTO DETAIL CALLOUT.

SEE DETAIL INDICATED.

P-1 P-2

D-1 D-2

D3 D-4 D-5

P-3

P-4 P-5

2 3

6 6

6 6

13 5

U-2 U-3

U-1

TOP OF PEDASTAL MCC7P

D5

ED900

D1

ED901

D3

ED901

A6

ED900

8 9 10

14"

6'

30" 8"

88"

16'-3"

8-

1/ 2"

3'

4"

3'-6"

2'

-1 /2

69" 75" 41"

5"

'-6

/2

6'-7 1/2"

17-1/2'

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

File Path:

Plot Date:

R:\d0272376\486909_DrainPump_Replacement_MM_RVT20_E.rvt

7/20/2022 12:12:34 PM

ED100

EL

EC

TR

IC

AL

D

EM

O

LI

TI

O N

P

LA

N E

L.

H

AR

R Y

S

TR

U M

AN

D

AM

A

N D

R

ES

ER

VO

IR

KA

N

SA

S C

IT

Y

D

IS

TR

IC

T B.

B R

AC

K

J.

L

O C

KW

O

O D

T.

S

W

AN

SO

N

J.

J

ES

TI

LA

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

PRODUCTION DATA 4PRODUCTION DATA 3

AU

G

U

ST

-R

TA

S

U

BM

IT

TA

L

E.

2T

H S

TR

EE

T

KA

N

SA

S C

IT

Y, M O

AN

SI

SCALE: NTSA1 ELECTRICAL DEMOLITION PLAN EL. 658.0

1. ALL EXISTING ELECTRICAL COMPONENTS ASSOCIATED WITH

PUMPS AND VALVES SHOWN IN SHADED CROSS-HATCHED

REGION SHALL BE COMPLETELY REMOVED.

2. ANY ELECTRICAL EQUIPMENT NOT SHOWN ON THIS SHEET FOR

DEMOLITION BUT SHOWN ON MECHANICAL DEMOLITION SHEETS

TO BE REMOVED MUST BE DEMOLISHED UNO.

3. FOR ALL PIPING, VALVE, AND OTHER MECHANCIAL EQUIPMENT

REMOVAL, SEE MECHANCIAL DEMOLITION PLANS.

SHEET KEYNOTES SHEET LEGEND SHEET LEGEND (CONT.)

WATER

GATE VALVE (NORMALLY OPEN)

GATE VALVE (NORMALLY CLOSED)

CHECK VALVE

MOTOR OPERATED VALVE (FLOOR STAND)

GEARED VALVE (FLOOR STAND)

M

G

STAND MOUNTED VALVE (HAND WHEEL)

VALVE EXTENSION STEM

STATION COMPRESSED AIR LINE

PIPE IMBEDDED IN CONCRETE

DEMOLISH

PRESSURE TRANSDUCER CABLING

A

C

D-1 D-3 D-4

D-1

FV-2

SD-1

U-1

FV-1

U-2

PUMP

PLC

M A-

8-

TH

R U

M A-

3-

B

M A-

U-3

P-1 P-2

20 HP

STATION

DRAINAGE

PUMP

MOTORS

D-2

D-2

D-3 M M G G M

P-3 P-4 P-5

U-1 U-2

20 HP AUXILIARY

PUMP MOTOR

50 HP UNWATERING

PUMP MOTORS

MA-102 MA-101

D-4 D-5 U-3

D-5

6" PUMP

COLUMN

" P

U M

P C

O

LU

M N

M A-

SLEEVE THROUGH

D.T. PIER FOR

EXTENSION STEM

GRATED INLET ON

BOTH SIDES OF

PIER

BULK HEAD

SLOT

TRASHRACK

SLOT

VENT TO ATMOSPHERE

EL. 682.0

EL. 677.0 MAX. T.W.

EL. 677.0 MAX T.W. GEN.

EL. 660.4 MAX T.W. GEN.

EL. 660. 0 MAX T.W.

PUMP

EL. 656.0 MAX T.W.

PUMP

EL. 645.0 EXTREME MIN

T.W.

C

M DTU-1 THRU 6

VALVE OPERATOR

BLOCKOUT

CL EL. 642.0

DRAFT

TUBE

EL. 595.0

12" MUD VALVE

12" DRAFT TUBE DRAIN

CL EL. 591.0

EL. 583.5

EL. 582.0

HEADER PRESSURE TRANSMITTER MOUNTED AT EL. 584.0

STOPS BOTH UNWATERING PUMPS AT EL. 588.0

EL. 578.5

EL. 576.0

UNWATERING SUMP PRESSURE

TRANSDUCER MOUNTED AT EL. 576.5

START AUX. UNWATERING PUMP EL. 592.0

HLA EL. 595.5

START P5 EL. 595.1

START P4 EL. 595.0

EMERGENCY EL. 600.0

12" OVERFLOW TO UNWATERING SUMP CL EL. 592.5

STATION EMERGENCY HLA EL. 592.0

HLA EL. 591.0

LAG PUMP START EL. 590.0

LEAD PUMP START EL. 589.0

PUMP STOP EL. 586.5

CL FIRST STAGE IMPELLERS E. 584

EL. 582.0

STATION SUMP 4-20mA PRESSURE TRANSDUCERS MOUNTED EL. 583.5

STOP AUX. UNWATERING PUMP EL. 588.0

T.W. GAGE

WELL

BLOWOUT

A

A

A A

A A

A

A

C C

C

CC

C

A

6" 8" 6"

10"

14"

12" 16"

AA

A

C

C

C C

C

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

File Path:

Plot Date:

R:\d0272376\486909_DrainPump_Replacement_MM_RVT20_E.rvt

7/20/2022 12:12:40 PM

ED101

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

S

YS

TE

M

D

EM

O

LI

TI

O

N P

LA

N

H

AR

R Y

S

TR

U M

AN

D

AM

A

N D

R

ES

ER

VO

IR

KA

N

SA

S C

IT

Y

D

IS

TR

IC

T B.

B R

AC

K

J.

L

O C

KW

O

O D

T.

S

W

AN

SO

N

J.

J

ES

TI

LA

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

PRODUCTION DATA 4PRODUCTION DATA 3

AU

G

U

ST

-R

TA

S

U

BM

IT

TA

L

E.

2T

H S

TR

EE

T

KA

N

SA

S C

IT

Y, M O

AN

SI

SCALE: NTSA1 POWERHOUSE UNWATERING SYSTEM

REMOVE AGAR OIL BOX AND TURN OVER TO USACE.ALARM BELL TO REMAIN.

.S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

File Path:

Plot Date:

R:\d0272376\486909_DrainPump_Replacement_MM_RVT20_E.rvt

7/20/2022 12:13:10 PM

ED900

R

EF

ER

EN

C E

PH

O

TO

S

EX

IS

TI

N

G E

Q U

IP

M

EN

T

H

AR

R Y

S

TR

U M

AN

D

AM

A

N D

R

ES

ER

VO

IR

KA

N

SA

S C

IT

Y

D

IS

TR

IC

T B.

B R

AC

K

J.

L

O C

KW

O

O D

T.

S

W

AN

SO

N

J.

J

ES

TI

LA

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

PRODUCTION DATA 4PRODUCTION DATA 3

AU

G

U

ST

-R

TA

S

U

BM

IT

TA

L

E.

2T

H S

TR

EE

T

KA

N

SA

S C

IT

Y, M O

AN

SI

D

NTSD1 EXTERIOR UPS/OUTLET BOX

NTSD3 INTERIOR UPS/OUTLET BOX

NTSD6 EXTERIOR CONTROLS CABINET

NTSD8 INTERIOR CONTROLS CABINET

NTSA6 EXISTING CONTROL EQUIPMENT

NTSA1 EXTERIOR TERMINAL BOX CABINET

NTSA4 INTERIOR TERMINAL BOX CABINET

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

File Path:

Plot Date:

R:\d0272376\486909_DrainPump_Replacement_MM_RVT20_E.rvt

7/20/2022 12:13:51 PM

ED901

R

EF

ER

EN

C E

PH

O

TO

S

EX

IS

TI

N

G E

Q U

IP

M

EN

T

H

AR

R Y

S

TR

U M

AN

D

AM

A

N D

R

ES

ER

VO

IR

KA

N

SA

S C

IT

Y

D

IS

TR

IC

T B.

B R

AC

K

J.

L

O C

KW

O

O D

T.

S

W

AN

SO

N

J.

J

ES

TI

LA

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

PRODUCTION DATA 4PRODUCTION DATA 3

AU

G

U

ST

-R

TA

S

U

BM

IT

TA

L

E.

2T

H S

TR

EE

T

KA

N

SA

S C

IT

Y, M O

AN

SI

D

NTSD1 PIC_0772

NTSD3 PIC_0767

NTSD5 EXISTING MCC7P

NTSD8 MCC7P BUCKET FRONT

NTSA1 MCC7P BUCKET SIDE

NTSA3 MCC7P BUS BARS

NTSA6 MCC7P BUCKET REAR

1. USE ONLY RIGID METAL CONDUIT (RMC). CONTRACTOR

REQUIRED TO PROVIDE NECESSARY SUPPORTS FOR MOUNTING

CONDUIT, ENCLOSURES, ETC. TO WALLS TO PROVIDE A

COMPLETE INSTALLATION IN ACCORDANCE WITH NFPA 70.

PROVIDE GALVANIZED SUPPORTS, UNISTRUT, ETC. PROVIDE

STAINLESS STEEL SCREWS, BOLTS, ETC.

2. DIMENSIONS SHOWN SHOULD BE ACCURATE WITHIN +- 1/2".

CONTRACTOR TO FIELD VERIFY.

3. SEE E-601 FOR ONE-LINE DIAGRAM.

4. PRESSURE TRANSDUCER CONDUIT NOT SHOWN. CONTRACTOR

TO SIZE AND PROVIDE 1 LARGE RMC CONDUIT FOR ALL

PRESSURE TRANSDUCER AND FLOAT CABLES ONCE EXITING THE

SUMPS AND ROUTING OVER TO THE CONTROL PANELS.

COORDINATE ROUTING WITH USACE.

SHEET KEYNOTES

1 EXISTING PUMP OPENING FROM REMOVED STATION DRAINAGE

PUMP; APPROX. 1.3' DIA.

2 EXISTING PUMP OPENING FROM REMOVED STATION

DEWATERING PUMP; APPROX. 2.55' DIA.

3 EXISTING CONCRETE PENETRATIONS.

4 EXISTING SUMP PIT ACCESS HATCHES.

5 PULL BOXES AS REQUIRED. NO MORE THAN FOUR 90'S.

SHEET LEGEND

D-X PUMP DISCHARGE VALVE

U-X UNWATERING HEADER VALVE

D-1 D-2

D-3 D-4 D-5

U-2 U-3

U-1

1 1 1 2 2

MCC7P

PUMP CONTROL PANEL #1 LOCATION.

CONTRACTOR TO SIZE PANEL.

PUMP CONTROL PANEL #2 LOCATION.

CONTRACTOR TO SIZE PANEL.

TOP OF PEDASTAL

STATION DRAINAGE PUMP #1 MOTOR

DISCONNECT WITH AUXILIARY BREAK

BEFORE BREAK CONTACT TO ASD.

PROVIDE SEPERATE RMC CONDUIT

TO EACH PUMP MOTOR DISCONNECT

SWITCH, TYPICAL

PROVIDE SUBMERSIBLE CABLING

FROM PUMP MOTOR DISCONNECT TO

PUMP MOTOR IN ACCORDANCE WITH

THE SPECIFICATIONS AND

MANUFACTURER'S REQUIREMENTS.

SECURE CABLE DOWN WALL AND TO

TOP OF FLOOR OVER TO PUMP

MOTOR; USACE TO COVER CABLING

WITH FLOOR TRACK. TYPICAL.

88" 30"

6' 14"

8' -1

/2

3' 3'-6"

'-1

/2

69" 75" 41"

5"

'-6

/2

6'-7 1/2"

8"

4"

STATION DRAINAGE PUMP #2 MOTOR

DISCONNECT WITH AUXILIARY BREAK

BEFORE BREAK CONTACT TO ASD.

UNWATERING AUXILIARY PUMP #3

MOTOR DISCONNECT WITH

AUXILIARY BREAK BEFORE BREAK

CONTACT TO ASD.

UNWATERING PUMP #4 MOTOR

DISCONNECT WITH AUXILIARY BREAK

BEFORE BREAK CONTACT TO ASD.

UNWATERING PUMP #5 MOTOR

DISCONNECT WITH AUXILIARY BREAK

BEFORE BREAK CONTACT TO ASD.

16' - 3"

30"

17 1/2'

5 5

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

File Path:

Plot Date:

R:\d0272376\486909_DrainPump_Replacement_MM_RVT20_E.rvt

7/20/2022 12:11:46 PM

E-100

PO

W

ER

P

LA

N

E L.

.0

H

AR

R Y

S

TR

U M

AN

D

AM

A

N D

R

ES

ER

VO

IR

KA

N

SA

S C

IT

Y

D

IS

TR

IC

T B.

B R

AC

K

J.

L

O C

KW

O

O D

T.

S

W

AN

SO

N

J.

J

ES

TI

LA

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

PRODUCTION DATA 4PRODUCTION DATA 3

AU

G

U

ST

-R

TA

S

U

BM

IT

TA

L

E.

2T

H S

TR

EE

T

KA

N

SA

S C

IT

Y, M O

AN

SI

SCALE: NTSA1 POWER PLAN EL. 658.0

D-3 D-4

D-1

SD-1

U-1

FV-1

U-2

TO

PUMP

PLC'S

M A-

3-

B

M A-

U-3

550 GPM

STATION

DRAINAGE

PUMPS

D-2

D-2

D-3 M M G G M

U-1 U-2

550 GPM

AUXILIARY

UNWATERING

PUMP

2500 GPM

UNWATERING

PUMPS

MA-102

D-4 D-5 U-3

D-5

6" PUMP

COLUMN

" P

U M

P C

O

LU

M N

M A-

4-20mA PRESSURE TRANSMITTER MOUNTED AT EL. 584.0

EL. 578.5

EL. 576.0

4-20mA UNWATERING SUMP PRESSURE TRANSDUCER MOUNTED AT EL. 576.5

12" OVERFLOW TO UNWATERING SUMP CL EL. 592.5

STATION DRAINAGE EMERGENCY HIGH LEVEL ALARM EL. 592.0

STATION DRAINAGE HIGH LEVEL ALARM EL. 591.0

STATION DRAINAGE LAG PUMP START EL. 590.0

STATION DRAINAGE PUMP STOP EL. 586.5

EL. 582.0

4-20mA STATION SUMP PRESSURE TRANSDUCERS MOUNTED EL. 583.5

T.W. GAGE

WELL

BLOWOUT

A

A

A A

A A

A

A

6" 8"

6"

10" 14"

12" 16"

AA

A

P-1 P-2

P-3

6" PUMP

COLUMN

6" PUMP

COLUMN

P-4 P-5

START PUMP #3 AUXILIARY UNWATERING EL. 591.0

STATION DRAINAGE LEAD PUMP START EL. 589.0

STOP PUMPS 3, 4 & 5 EL. 588.0

EL. 582.0

12" OVERFLOW TO UNWATERING SUMP CL EL. 592.5

START PUMP #4 UNWATERING EL. 595.0

START PUMP #5 UNWATERING EL. 595.1

UNWATERING HIGH LEVEL ALARM EL. 595.5

12" INTAKE DRAIN HEADER EL. 601.5

UNWATERING EMERGENCY HIGH LEVEL ALARM 600

1 2

4 5

TRANSDUCERS AND PLC'S SHOWN

FOR REPRESENTATION ONLY.

GENERAL SHEET NOTES

1. SEE E-601 FOR ELECTRICAL ONE-LINE DIAGRAM FOR

ADDITIONAL INFORMATION.

2. THE DRAWING DOES NOT SHOW ALL REQUIRED EQUIPMENT

FOR A COMPLETE SYSTEM. REFER TO ALL PLANS AND

SPECIFICATIONS FOR ALL REQUIREMENTS.

3. SIMULATE PUMP CONTROL LOGIC WITH COR PRESENT AND

FOLLOW ADDITIONAL TESTING REQUIREMENTS IN

SPECIFICATIONS.

4. REFER TO MECHANICAL SHEET DRAWINGS FOR ALL

MECHANICAL RELATED WORK.

SHEET KEYNOTES

1. SUBMERSIBLE STATION DRAINAGE PUMP AND MOTOR P-1 TO BE

CONTROLLED FROM PUMP CONTROL PANEL #1.

2. SUBMERSIBLE STATION DRAINAGE PUMP AND MOTOR P-2 TO BE

CONTROLLED FROM CONTROL PANEL #2.

3. SUBMERSIBLE AUXILIARY PUMP AND MOTOR P-3 TO BE

CONTROLLED FROM CONTROL PANEL #1.

4. SUBMERSIBLE UNWATERING PUMP AND MOTOR P-4 TO BE

CONTROLLED FROM CONTROL PANEL #2.

5. SUBMERSIBLE UNWATERING PUMP AND MOTOR P-5 TO BE

CONTROLLED FROM CONTROL PANEL #1.

6. PUMP CONTROL LOGIC FOR STATION DRAINAGE SUMP PUMP

CONTROLS

7. PUMP CONTROL LOGIC FOR UNWATERING SUMP PUMP CONTROLS

8. SEE SPECIFICATION 40 60 00 PARAGRAPH 2.3.2 FOR MORE

INFORMATION ON THE UNWATERING PRESSURE TRANDUCERS AND

NEW BALL VALVE REQUIREMENT.

SHEET LEGEND SHEET LEGEND (CONT.)

WATER

GATE VALVE (NORMALLY OPEN)

GATE VALVE (NORMALLY CLOSED)

CHECK VALVE

MOTOR OPERATED VALVE (FLOOR STAND)

GEARED VALVE (FLOOR STAND)

M

G

FLOOR STAND MOUNTED VALVE (HAND WHEEL)

VALVE EXTENSION STEM

STATION COMPRESSED AIR LINE

PIPE IMBEDDED IN CONCRETE

A

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

File Path:

Plot Date:

R:\d0272376\486909_DrainPump_Replacement_MM_RVT20_E.rvt

7/20/2022 12:11:57 PM

E-101

PO

W

ER

H

O U

SE

S

TA

TI

O N

D R

AI

N

AG

E

AN

D

U N

W

AT

ER

IN

G S

YS

TE

M

H

AR

R Y

S

TR

U M

AN

D

AM

A

N D

R

ES

ER

VO

IR

KA

N

SA

S C

IT

Y

D

IS

TR

IC

T B.

B R

AC

K

J.

L

O C

KW

O

O D

T.

S

W

AN

SO

N

J.

J

ES

TI

LA

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

PRODUCTION DATA 4PRODUCTION DATA 3

AU

G

U

ST

-R

TA

S

U

BM

IT

TA

L

E.

2T

H S

TR

EE

T

KA

N

SA

S C

IT

Y, M O

AN

SI

D

SCALE: NTSA1

POWERHOUSE STATION DRAINAGE AND

UNWATERING SYSTEM

EL. 658.0

MOTOR CONTROL CENTER 7P

1A 1B

8A 7B

7A 7B

A 16A 16B

17A 17B

18A 18B

MOTOR CONTROL CENTER 7P

1A 1B

8A 7B

7A 7B

A 16A 16B

17A 17B

18A 18B

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

File Path:

Plot Date:

R:\d0272376\486909_DrainPump_Replacement_MM_RVT20_E.rvt

7/20/2022 12:12:08 PM

E-400

M C

C 7P

E

LE

VA

TI

O N

N

EW

P

U M

P C

O N

TR

O

L

PA

N

EL

L

AY

O U

T

H

AR

R Y

S

TR

U M

AN

D

AM

A

N D

R

ES

ER

VO

IR

KA

N

SA

S C

IT

Y

D

IS

TR

IC

T B.

B R

AC

K

J.

L

O C

KW

O

O D

T.

S

W

AN

SO

N

J.

J

ES

TI

LA

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

PRODUCTION DATA 4PRODUCTION DATA 3

AU

G

U

ST

-R

TA

S

U

BM

IT

TA

L

E.

2T

H S

TR

EE

T

KA

N

SA

S C

IT

Y, M O

AN

SI

D

NTSC1

MOTOR CONTROL CENTER 7P ELEVATION

DEMOLITION

GENERAL SHEET NOTES

1. LIGHTER GRAY COLOR INDICATES EXISTING TO REMAIN AS IS.

2. ANY PROPOSED BUCKET LABELED AS NOT USED WITH AN ASTERISK (*) NEXT

TO IT MAY BE CONSIDERED BY CONTRACTOR AS AN ALTERNATIVE LOCATION

FOR CIRCUIT BREAKERS FEEDING CONTROL PANELS #1 AND #2. REQUEST

APPROVAL THROUGH COR. SEE E-601 FOR ADDITIONAL INFORMATION.

3. TURN OVER ALL MCC7P DEMOLISHED PARTS TO USACE THROUGH COR FOR

SPARE PARTS.

4. PROVIDE BLANKS FOR ALL EMPTY BUCKETS PER SPECIFICATIONS.

NTSC6

MOTOR CONTROL CENTER 7P ELEVATION

PROPOSED

2. NOT LABELED. VERIFY IF ANY COMPONENTS ARE IN CABINET

AND REMOVE AS NECESSARY TO MAKE READY FOR NEW WORK.

3. REMOVE & DEMOLISH STATION DRAINAGE PUMP #1 BREAKER,

CONTROLS, AND ALL ASSOCIATED EQUIPMENT & WIRING.

MAKE READY FOR NEW WORK.

4. REMOVE & DEMOLISH STATION DRAINAGE PUMP #2 BREAKER,

CONTROLS, AND ALL ASSOCIATED EQUIPMENT & WIRING.

MAKE READY FOR NEW WORK.

5. REMOVE AND DEMOLISH AUTOMATIC ALTERNATOR PUMP #1 & #2

COMPONENTS AND ALL ASSOCIATED EQUIPMENT & WIRING.

MAKE READY FOR NEW WORK.

10. REMOVE & DEMOLISH AUXILIARY UNWATERING PUMP #3 BREAKER,

CONTROLS, AND ALL ASSOCIATED EQUIPMENT & WIRING.

15. REMOVE & DEMOLISH UNWATERING PUMP #4 BREAKER,

CONTROLS, AND ALL ASSOCIATED EQUIPMENT & WIRING.

MAKE READY FOR NEW WORK.

20. REMOVE & DEMOLISH UNWATERING PUMP #5 BREAKER,

CONTROLS, AND ALL ASSOCIATED EQUIPMENT & WIRING.

MAKE READY FOR NEW WORK.

1A. INCOMING FEEDER #1

1B. INCOMING FEEDER #2

6. WASTE OIL PUMP

7A. SERVICE ELEVATOR

7B. VISITORS ELEVATOR

8A. HEADER DRAIN VALVE U-1

8B. UPSTREAM DRAIN VALVE U-1

9. DOWNSTREAM DRAIN VALVE U-1

MAKE READY FOR NEW WORK.

11. GALLERY DRAINAGE PUMP #1

12. GALLERY DRAINAGE PUMP #2

13. AUTOMATIC ALTERNATOR

14. GALLERY DRAINAGE PUMP #3

16A. DRAFT TUBE UNWATERING VALVE #1

16B. DRAFT TUBE UNWATERING VALVE #2

17A. DRAFT TUBE UNWATERING VALVE #3

17B. DRAFT TUBE UNWATERING VALVE #4

18A. DRAFT TUBE UNWATERING VALVE #5

18B. DRAFT TUBE UNWATERING VALVE #6

19. GALLERY DRAIN PUMP #5

1A. INCOMING FEEDER #1

1B. INCOMING FEEDER #2

6. WASTE OIL PUMP

7A. SERVICE ELEVATOR

7B. VISITORS ELEVATOR

8A. HEADER DRAIN VALVE U-1

8B. UPSTREAM DRAIN VALVE U-1

9. DOWNSTREAM DRAIN VALVE U-1

11. GALLERY DRAINAGE PUMP #1

12. GALLERY DRAINAGE PUMP #2

13. AUTOMATIC ALTERNATOR

14. GALLERY DRAINAGE PUMP #3

16A. DRAFT TUBE UNWATERING VALVE #1

16B. DRAFT TUBE UNWATERING VALVE #2

17A. DRAFT TUBE UNWATERING VALVE #3

17B. DRAFT TUBE UNWATERING VALVE #4

18A. DRAFT TUBE UNWATERING VALVE #5

18B. DRAFT TUBE UNWATERING VALVE #6

19. GALLERY DRAIN PUMP #5

2. PUMP CONTORL PANEL #1

3. PUMP CONTROL PANEL #2

4. NOT USED*

5. NOT USED*

10. NOT USED*

15. NOT USED*

20. NOT USED*

KEYED NOTES DEMOLITION:

KEYED NOTES PROPOSED:

2016A

111111

7.5

CR1

CR2

CR3

63D3X

12111097B7A

63 4 5

111157.5

1A

WASTE

OIL

PUMP

SERVICE

ELEVATOR

VISITORS

ELEVATOR

HEADER

DRAIN

VALVE

U-1

UPSTREAM

DRAIN

VALVE U-2

DOWNSTREAM

DRAIN U-3

GALLERY

DRAINAGE

PUMP #1

GALLERY

DRAINAGE

PUMP #2

AUTOMATIC

ALTERNATOR

PUMPS #1

AND #2

GALLERY

DRAINAGE

PUMP #3

DRAFT TUBE

UNWATERING

VALVE #1

(DTU-1)

DTU-2 DTU-3 DTU-4 DTU-5 DTU-6

STATION DRAINAGE AND UNWATERING MOTOR CONTROL CENTER (7P), 3W, 480V

H O A

H O A

H O A

PUMP

MOTOR

#1

STATION

DRAINAGE

PUMP

MOTOR

#3

AUXILIARY

UNWATERING

PUMP

MOTOR

#5

UNWATERING

PUMP

MOTOR

#2

STATION

DRAINAGE

PUMP

MOTOR

#4

UNWATERING

PUMP CONTROL PANEL #1

ASD

1B

INCOMING

FEEDER #1

INCOMING

FEEDER #2

2 8B8A 16B 17A 17B 18A 18B

200A

STATION

DRAINAGE

PUMP #1

STATION

DRAINAGE

PUMP #2

200A

600A 600A

ASD

ASD

PUMP CONTROL PANEL #2

ASD

ASD ASD

SPARE

200A 200A

50A 50A 125A

50A 125A

FEEDERS NOT

IN CONDUIT

INSIDE PANELS

2 3 2 3

50A

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

US Army Corps of Engineers

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

File Path:

Plot Date:

R:\d0272376\486909_DrainPump_Replacement_MM_RVT20_E.rvt

7/20/2022 12:12:27 PM

E-601

TR

U

M

AN

P P

ST

AT

IO

N

D R

AI

N

AG

E

AN

D

U N

W

AT

ER

IN

G P

U M

PS

O

N E-

LI

N

E D

IA

G

R

AM

H

AR

R Y

S

TR

U M

AN

D

AM

A

N D

R

ES

ER

VO

IR

KA

N

SA

S C

IT

Y

D

IS

TR

IC

T B.

B R

AC

K

J.

L

O C

KW

O

O D

T.

S

W

AN

SO

N

J.

J

ES

TI

LA

AU

G

U

ST

SE

E

C O

VE

R

P

AG

E

SE

E

C O

VE

R

P

AG

E

FI

LE

RTA

PO

W

ER

H

O U

SE

U

N W

AT

ER

IN

G

A N

D S

TA

TI

O N

D R

AI

N

AG

E

PU

M

PS

PRODUCTION DATA 4PRODUCTION DATA 3

AU

G

U

ST

-R

TA

S

U

BM

IT

TA

L

E.

2T

H S

TR

EE

T

KA

N

SA

S C

IT

Y, M O

AN

SI

D

GENERAL SHEET NOTES

SHEET KEYED NOTES

1. PROVIDE MINIMUM #14 CLASS 1 CIRCUIT IN SAME MOTOR FEEDER CONDUIT FOR

AUXILIARY BREAK BEFORE BREAK CONTACT TO ASD, TYPICAL.

1. LIGHTER GRAY COLOR INDICATES EXISTING TO REMAIN AS IS.

2. NUMBERS NEXT TO MCC7P BUS CORRESPOND WITH E-400 DETAIL E6.

3. CONTRACTOR RESPONSIBLE FOR SIZING AND PROVIDING MOTOR OVERLOADS

ACCORDING TO THE NAMEPLATE DATA PER NFPA 70.

1/8" = 1'-0"A1 ONE LINE DIAGRAM OF PUMP SYSTEM

FEEDER SCHEDULE

1. 3 - #3/0, 1 - #6G IN 2" CONDUIT

2. 3 - #6, 1 - #10G IN 1" CONDUIT

3. 3 - #1/0, 1 - #6G IN 1-1/2" CONDUIT

4. 3 - #6, 1 - #10G IN SUBMERSIBLE CABLING PER SPECIFICATIONS

5. 3 - #1/0, 1 - #6G IN SUBMERSIBLE CABLING PER SPECIFICATIONS

GENERAL
G-001 - COVER SHEET AND INDEX
MECHANICAL
MD100 - MECHANICAL PLAN EL- 658-0 DEMOLITION
MD101 - MECHANICAL PLAN EL- 640-0 DEMOLITION
MD102 - MECHANICAL PLAN EL- 592-0 DEMOLITION
MD103 - POWERHOUSE UNWATERING SYSTEM DEMOLITION PLAN
M-100 - MECHANICAL PLAN EL- 658-0
M-101 - MECHANICAL PLAN EL- 640-0
M-102 - MECHANICAL PLAN EL- 592-0
M-103 - POWERHOUSE UNWATERING SYSTEM & PUMP SCHEDULE
M-500 - HST STA DRAIN SUMP DIVING - DWG 1
M-501 - HST STA DRAIN SUMP DIVING - DWG 2
M-502 - HST STA DRAIN SUMP DIVING - DWG 3
M-503 - HST STA DRAIN SUMP DIVING - DWG 4
M-504 - HST STA DRAIN SUMP DIVING - DWG 5
M-505 - HST STA DRAIN SUMP DIVING - DWG 6
M-506 - HST STA DRAIN SUMP DIVING - PHOTOS
ELECTRICAL
E-001 - ELECTRICAL LEGEND
ED100 - ELECTRICAL DEMOLITION PLAN EL- 658
ED101 - POWERHOUSE UNWATERING SYSTEM DEMOLITION PLAN
ED900 - REFERENCE PHOTOS EXISTING EQUIPMENT
ED901 - REFERENCE PHOTOS EXISTING EQUIPMENT
E-100 - POWER PLAN EL- 658-0
E-101 - POWERHOUSE STATION DRAINAGE AND UNWATERING SYSTEM
E-400 - MCC7P ELEVATION & NEW PUMP CONTROL PANEL LAYOUT
E-601 - TRUMAN PP STATION DRAINAGE AND UNWATERING PUMPS ONE-LINE DIAGRAM