Summary of HSR26-81 Attachment D - Merced to Madera PG&E Electric Design

This file is a technical design document and exhibit prepared by Stantec Consulting Services, Inc., for the California High-Speed Rail Authority (CAHSR) and PG&E, detailing the scope of work for the Merced to Madera (M2M) PG&E Electric Design project (ED-02, PM 35607104). The project involves the relocation and construction of PG&E distribution and service lines along Avenue 20 to ensure proper clearance and compliance with PG&E standards (GO-95, GO-176). Key work components include mobilization and pre-construction activities, existing line removal and preparation, foundation and structure installation, pole and conductor installation, line transition and splicing, structural and circuit testing, site restoration and demobilization, and final documentation and closeout. The document specifies critical safety protocols, coordination requirements with PG&E and other stakeholders, and comprehensive submittals including project schedules, safety plans, environmental permits, and quality assurance procedures. The virtual site visit for M2M PG&E Electrical ED-02/03 is scheduled for Tuesday, November 10, 2026, at 10:00 a.m. Pacific Time, with sign-up deadline on November 9, 2026, at 5:00 p.m. Pacific Time. Proposals for the broader HSR26-81 MATOC on-ramp solicitation are due Wednesday, December 16, 2026, at 5:00 p.m. Pacific Time, with Notice of Proposed Award(s) expected in January 2027.

The work will be performed within the counties of Merced, Madera, Fresno, Tulare, Kings, and Kern as part of the Authority's MATOC contracting vehicle. The RFP seeks responses from large businesses as well as qualified Small Business (SB), Small Business for the Purpose of Public Works (SB-PW), Disadvantaged Business Enterprise (DBE), and Disabled Veteran Business Enterprise (DVBE) entities. The document includes a Report of Investigation (ROI) exhibit showing existing and proposed PG&E property rights, easements, and utility coordination requirements. All work must comply with PG&E requirements and HSR standards, with particular emphasis on safety near at-grade HSR tracks and proper subsurface utility identification before excavation activities commence.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Merced To Madera PG&E Electric Design ED-02 (PM 35607104)

Overview:

This project involves the relocation and construction of PG&E distribution and service lines along Avenue 20 to ensure proper clearance and compliance with PG&E standards (GO-95, GO-176). The work encompasses the installation of new distribution and service structures, undergrounding existing overhead lines, removal and re-stranding of existing lines and pole work, and coordination with existing utilities and roadway modifications. The scope covers all necessary civil, electrical, and structural work to facilitate the safe and compliant realignment of PG&E facilities within the designated corridor.

1. Mobilization and Pre-Construction Activities

• Conduct a pre-construction meeting with PG&E and other stakeholders to review safety protocols, staging, utility coordination, and traffic management.

• Submit all required pre-construction submittals including project schedule, safety plan, environmental permits, material data sheets, and QA/QC procedures.

• Review existing utility and structural data, verify field conditions, and confirm excavation, foundation, and pole requirements.

• Mobilize equipment, personnel, and materials to the project site, including cranes, drilling rigs, and safety barriers.

• Provide all required Traffic Control, Closures and Flagging as required including plan preparations and approval by local jurisdictions

• Procure required encroachment permits/ license.

2. Existing Line Removal and Preparation

• Identify and isolate existing distribution and service lines for safe removal, including disconnecting and grounding conductors.

• Remove existing poles, insulators, hardware, and associated equipment in accordance with safety standards.

• Demolish existing wood poles at designated locations.

• Remove and dispose of debris and old infrastructure in compliance with environmental regulations.

• All work shall be performed in accordance with the Contract Specifications and PG&E requirements

• Track removed PG&E poles and send Hazmat documentation to PG&E according to PG&E standards.

• Maintain and protect all existing utilities.

3. Foundation and Structure Installation

• Excavate and install required conduit and casings per PG&E and HSR DCM standards.

• Ensure all underground infrastructure is at sufficient depth so all future work and final grades meet PG&E requirements.

4. Pole and Conductor Installation

• Erect new overhead distribution poles

• Install conductors

• String conductors on new structures, re-strand existing lines where applicable, and transition lines as specified.

• Transition existing circuits onto new structures, including re-stranding and splicing as needed.

5. Line Transition and Splicing

• Perform conductor splicing, tensioning, and testing to ensure line integrity.

• Remove and re-strand circuits on existing poles where necessary, and secure all hardware.

• Transition circuits from old to new structures, verifying clearances and proper tension.

6. Structural and Circuit Testing

• Conduct line clearances, insulation testing, and operational checks in accordance with PG&E procedures.

• Verify clearances to PG&E standards, HSR standards, and safety protocols, including clearance over the HSR and roadway.

7. Site Restoration and Demobilization

• Restore disturbed areas, including pavement, landscaping, and access roads.

• Remove construction equipment, temporary facilities, and debris from the site.

• Conduct final inspections, documentation, and obtain approvals from PG&E and project stakeholders.

8. Final Documentation and Closeout

• Submit as-built drawings, test reports, warranties, and certifications for all installed structures and conductors.

• Provide operation and maintenance manuals for new equipment.

• Ensure all project documentation complies with PG&E and regulatory requirements.

Note: All work shall be performed in accordance with PG&E standards (GO-95, GO-176), safety protocols, and project-specific drawings and specifications.

NOTE: HSR TRACKS ARE "AT GRADE"

Kn ow w ha t's b elo w.

Ca ll b efo re yo u d ig.

See Sheet 7

See if you move the guy down if it will give you more clearance from the cutout.

Use Pole Brkt only

Loc 15

Loc 15

Update WIP Post beings you are no longer doing anything with this pole.

Note to Mapping:

TX is mapped being shown 2 spans west from the actual location.

Are you going transfer this TX?

ow w ha t's b elo w.

Ca ll b efo re yo u d ig.

ow w ha t's b elo w.

Ca ll b efo re yo u d ig.

See Sht 6

See Sht 5

See Sht 4 ow w ha t's b elo w.

Ca ll b efo re yo ow w ha t's b elo w.

Ca ll b efo re yo u d ig.

Downguy needs to be directly behind the conductors on a deadend

OMITTED

See Sht 1

See Sht 3 ow w ha t's b elo w.

Ca ll b efo re yo u d ig.See Sht 3 ow w ha t's b elo w.

Ca ll b efo re yo u d ig.

See Sht 1 ow w ha t's b elo w.

Ca ll b efo re yo

CALIFORNIA HIGH-SPEED RAIL AUTHORITY

TRANSMITTAL SHEET

CONTRACT NO: HSR22-02

Date: April 24, 2026 TO: California High-Speed Rail Authority

FROM: Snipes, Britton, CM Mgr On behalf of Martinez, Jose DBM Contractor Stantec Consulting Services, Inc.

CATEGORY: Other

REVISION NO: 0

REMARKS

Please see attached M2M_ROI Exhibit_ED-01_PG&E Concurrence received on 4/23/2026.

MF-20-2146

029-140-032

E X

P R

O P

E R

T Y

L I

N E

H S R

R

O W

H S R

R

O W

P R

O P

E

A S E

(E

A S E

N O T

F

O R

C

O N F L

IC

M

M E

P R

O P

E

A S E

M E

N T

(E

A S E

M E

O T

F

O R

C

O N F L

IC

M E

EASEMENT DOC. 2210-17-0140

PG&E EXISTING RIGHTS - EXISTING

- PRESCRIPTIVE RIGHT

PG&E EXISTING RIGHTS

REMAINS INTACT2

ACCESS FROM AVENUE 20

MF-20-2144 EXTENDS TO AVENUE 20 1/2

MF-20-2144

029-140-039

MF-20-2146

029-140-021

MF-20-2144

029-140-039

MF-20-2146

029-140-032

REMAINS INTACT

ACCESS FROM AVENUE 20

SEE DETAIL A

EX DIRT ROAD

R

SEE DETAIL B

ADETAIL

SHEET NO. -

SCALE: NTS

R

BDETAIL

SHEET NO. -

SCALE: NTS

R 3

120°06'06.15"WLONG:

37°02'37.19"NLAT:

EX PROPERTY LINE

S

S

S

S

DATE

DRAWING NO.

SCALE

SHEET NO.

DATE CHK APPBYREV DESCRIPTION

DRAWN BY

DESIGNED BY

CHECKED BY

IN CHARGE

CONTRACT NO.

C A

H S

R P t b l i p l o t d r v n p l t

CALIFORNIA HIGH-SPEED RAIL PROJECT

s t a n p w i c s $ 4

P s t a n p w i c s i C

S p d f w o r k d i r

M

M

E

E D d g n

CONSTRUCTION

NOT FOR

USE ONLY

FOR INTERNAL

SUBMITTAL

DRAFT 60%

EM EM

7 7

R R

EM

THROUGH THE REVIEW PROCESS.

THE CALIFORNIA HIGH-SPEED RAIL AUTHORITY AND PG&E

AND ROI EXHIBIT ARE REVIEWED AND APPROVED BY BOTH

ARE DRAFT ONLY UNTIL THE REPORT OF INVESTIGATION (ROI)

NOTE: ALL EXISTING AND PROPOSED PG&E PROPERTY RIGHTS

03/27/2026

J. MARTINEZ

J. SUTTON

J. JOHNSON

B.WELDON

MERCED TO MADERA

SIERRA SUBDIVISION

ROI EXHIBIT - PG&E (HSR24-30)

M2M-E1-003 (ED-03)

S9601+50

1" = 50'

UT-ROI-ED03-001

HSR-022

03/27/2026

J. MARTINEZ

J. SUTTON

J. JOHNSON

B.WELDON

MERCED TO MADERA

SIERRA SUBDIVISION

ROI EXHIBIT - PG&E (HSR24-30)

M2M-E1-003 (ED-03)

S9601+50

1" = 50'

UT-ROI-ED03-001

HSR-022

MF-20-2146

029-140-032

029-140-021, PRIVATE OWNERUNRECORDED EASEMENTEASEMENT173

MF-20-2146

MF-20-2144,

029-140-021

029-140-039, PRIVATE OWNERPRESCRIPTIVE/UNRECORDED EASEMENTJUA102

MF-20-2144029-140-039PRIVATE OWNERPRESCRIPTIVEEASEMENT141

HST #APNOWNER

RIGHTS

EXISTING/PRIOR

RIGHTS

REPLACEMENT

NUMBERS

RIGHT MATRIX

PG&E REPLACEMENT

OUTGRANT

OUTGRANT TABLE

050 50 100

1"=50'

SCALE APPLICABLE FOR FULL SIZE ONLY

AUTHORITY

JUA

Jeremy Sutton Text Box

EXHIBIT CONCURRED TO: 4/23/26

File details come from the government source that posted it. Updated .