HSHQWA-17-Q-00006_0001.pdf

PDF 720 KB Posted

Attached to
IDS & CCV Installation
Solicitation number
HSHQWA-17-Q-00006
Issued by

About this file

Amendment 0001 provides replacement pages to Attachment A-Statement of Work Questions and Answers will be posted separately.

View the file

Other files

File Type Posted
Question_and_Answer_63017.docx DOCX document
HSHQWA-17-Q-00006_RFQ_PKG.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7.4 Conduit: All wire in exposed areas shall be in either Electrical Metallic Tubing (EMT) conduit or panduit. If existing conduit is not available, new conduit shall be installed in the exposed areas of the facility.

7.5 Programming and final instructions: The Contractor shall configure the IDS panel and devices.

The DMC will do the actual programming of the account. When the contractor is ready for the panel to be programmed by the DMC the contractor shall submit the MAR packet 24 hours in advance to the FPS TPOC for review and to establish monitoring services. Once the account is programmed by the DMC the FPS TPOC will notify the contractor the system is ready for final testing. The FPS TPOC will schedule with the contractor a date and time to conduct the final test of the system with the DMC. The contractor shall be on site with the FPS TPOC present for the final test.

7.6 Video Surveillance System (VSS)

7.6.1 The Contractor shall ensure that all programming is per manufacturer specifications.

7.6.2 The Contractor shall ensure that all provide a baseline backup of the system settings for the NVR and cameras to the FPS TPOC.

7.6.3 The Contractor shall adhere to the Cybersecurity requirements in Section 23.0.

7.6.4 The Contractor shall ensure that the power backup is appropriate to support the VSS equipment.

7.6.5 The VSS equipment shall be mounted neatly inside a rack. Panduit shall be used to conceal any exposed cabling.

8.0 PERIOD OF PERFORMANCE

8.1 The project shall be completed within 30 business days after receipt of Notice to Proceed (NTP) issued by the FPS CO.

9.0 EQUIPMENT SPECIFICATIONS and SALIENT CHARACTERISTICS: IDS

9.1 The contractor shall provide and install all equipment necessary for a 100% functional intrusion detection system, as outlined in this Statement of Work (SOW). The door contacts shall be Sonitrol or equivalent. The control panel shall be DMP XR550 or similar.

9.2 Door Contact(s)

a) Wired

b) Recessed mounted according to manufacturers specifications

c) Magnetic field tamper

d) Shallow installation depth (2” or less)

HSHQWA-17-Q-00006

June 2017

Amendment 0001

9.3 IDS Control Panel

a) UL 1610 Listed

b) Sufficient zones for all required devices (zone expanders may be used)

c) Brand of panel shall be acceptable to FPS Denver Mega Center (DMC) for monitoring (reference

Section 7.0, Sub-Section 7.2.1)

d) The panel shall have a key locked enclosure with two (2) keys that shall be provided to the FPS

TPOC.

e) A panel tamper switch shall be installed and connected to the IDS panel.

f) 60 VA AC/DC Power Transformer, 120 VA input.

g) Shall accommodate two (2) 12v, 7ah sealed lead-acid batteries.

h) Encryption Embedded; FIPS 140-2 Compliant, 256 bit

9.4 Battery Backup Power for IDS

a) Sealed Lead Acid Battery(s) rated at 12 volts and 7 Amp shall be mounted securely inside of the panel enclosure.

b) The battery shall be labeled with the install date and voltage reading at the time of the install.

c) The UPS shall be securely mounted in an appropriate size equipment rack. So that it is not lying on the floor.

9.5 Keypad

a) Wired

b) Supervised

c) LCD (Green)

d) White color

e) Backlit keyboard

f) 8.5-15VDC

g) Two (2) button panic

h) Alert sounder

i) Proximity Card arming and disarming capable.

9.6 Motion Sensor

a) Wired

b) Passive Infrared

c) Tamper

d) Walk Test Mode

e) Panel Programmable

f) Sensitivity adjustable

g) 180° and 360° Coverage

h) White color

HSHQWA-17-Q-00006

June 2017

9.7 Miscellaneous: The vendor shall furnish all incidental materials (listed herein or not) such as conduit, wire mold, mounting hardware, brackets and connectors that are necessary to complete this task as specified within this SOW.

10.0 EQUIPMENT SPECIFICATIONS and SALIENT CHARACTERISTICS: VSS

10.1 The contractor shall provide and install all equipment necessary for a 100% functional video surveillance system, as outlined in this Statement of Work (SOW). The NVR shall be Bosch DIVAR network 2000 or similar.

10.2 Digital Video Recorder (DVR)

At a minimum the recording equipment shall be capable of recording standard analog cameras. The system/s shall have a minimum of 1 TB of total hard drive space for video recording.

a) Minimum 8 analog Channel Real-time Recording capability

b) 960H high-resolution video recording

c) HDMI and VGA outputs

d) H.264 Compression

e) Simultaneous recording and playback

e) Manual or sequential switching

f) Up to 30 IPS per channel (NTSC)

g) Minimum of 1 TB hard drive video storage

i) Built-in motion detection configurable for area and sensitivity for each camera

j) Easy search by date and time or alarm event

k) Pre-alarm event recording

l) Multi-level password protection

m) Local archiving via USB connection and R/W DVD

n) Proof of authentication to prevent video alteration

10.3. Fixed Dome Camera

a) 960H Resolution

b) 700 TVL Resolution

c) Vandal-resistant Proof Dome

d) Varifocal Lens

e) Day/Night cameras with high resolution (No IR)

10.4. Equipment Rack

a) 12 Rack Units (12RU)

b) 19 inch width

c) Shelf for DVR

HSHQWA-17-Q-00006

June 2017

HSHQWA-17-Q-00006 0001
Amendment 0001
HSHQWA-17-Q-00006 SOW 8
HSHQWA-17-Q-00006 SOW 9
HSHQWA-17-Q-00006 SOW 10

File details come from the government source that posted it. Updated .