Attachment_6_Price_Element_Breakdown_Instructions.doc

DOC document 37 KB Posted

Attached to
Protective Security Officer (PSO) Services at the Center for Medicaid, Woodlawn, MD
Solicitation number
HSHQE3-13-R-00003
Issued by

About this file

Attachment 6

View the file

Other files

File Type Posted
Attachment_-_Sample_Schedule_of_Supplies_Services_and_Prices.xls XLS spreadsheet
Part_2_CBA_-_PSOs_at_CMS_-.pdf PDF
Exhibit_8B.pdf PDF
Part_1__-_PSOs_at_CMS_-.pdf PDF
Copy_of_Contractor_PSO_Data_Template.xlsx XLSX spreadsheet
AMENDMENT_2.pdf PDF
CBA_-_Supervisors_at_CMS_-_3_documents 1 .pdf PDF
Copy_of_EXHIBIT_for_CMS_PreSolicitationREV7-24-2013.xls XLS spreadsheet
Questions_July_25.pdf PDF
Revised_Exhibit_8E.pdf PDF
Amendment_1.pdf PDF
CLAUSES.pdf PDF
Attachment_4_-_Past_Performance_Questionaire.doc DOC document
Attachment_8_-_Field_Level_Supervision_Exhibit.xls XLS spreadsheet
Attachment_7_Award_Approval_Request.doc DOC document
Attachment_11_Post_Exhibit.xls XLS spreadsheet
1449.pdf PDF
Pre-Proposal_Conference_Presentation_Final.ppt PPT presentation
TABLE_OF_CONTENTS.pdf PDF
Attachment_10_CMS_Anniversary_dates_as_of_08-10-12.xls XLS spreadsheet
Attachment_6_Price_Element_Breakdown.xls XLS spreadsheet
Attachment_1_CMS_SOW.pdf PDF
Attachment_3_-_Past_Project_Form_-_Jan_2013_Version.doc DOC document
Attachment_5_CBA.pdf PDF
Attachment_2__Exhibits_(2013).pdf PDF
Attachment_9_-_Proposal_Submission_Checklist_-_March_2013_Version__JUNE_7.doc DOC document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 6 - Supplement

Instructions for the Price Element Breakdown Template

Introduction This Price Element template is a Microsoft Excel based pricing tool that provides a standardized format for costing a PSO labor hour rate. The template was designed to assist contractors in pricing their proposal. Contractors choosing to use the template should only complete those cost elements, which apply to their proposal. The cost data provided in these worksheets are considered other than certified cost pricing data as discussed under FAR 15.403-5(b)(2).

Instructions for Completion

1. Please provide the name of your company and the solicitation number for your submission in the header section of the “Model for Price Realism” worksheet.

2. Note that the Price Breakdown file contains three worksheet tabs entitled, “Model for Price Realism”, “Relief”, and “Non-PSO Position”. The offeror shall input the cost amounts for those elements listed on the template that apply except for the Non-PSO Positions.

3. Cost data for the Non-PSO Positions shall be entered under the “Non-PSO Position” worksheet tab as instructed by the notes found on the worksheet. Total costs for the Non-PSO positions identified under the “Non-PSO Position” worksheet tab will automatically populate the “Model for Price Realism” worksheet tab under the Non-PSO Position line item.

4. The “Relief” worksheet tab does not self-populate to the “Model for Price Realism” worksheet tab. The purpose of the “Relief” worksheet is to provide specific cost data regarding relief and breaks that was included in the offeror’s proposal. The “Relief” worksheet tab provides detailed instructions on completing the worksheet and required narrative on the basis of estimate. Note that the narrative requires that the offeror identify which cost elements from the "Model for Price Realism" worksheet contain the break and relief costs included in each identified element. For example, if the Relief line item from the “Model for Price Realism” includes $1,000 for paid break costs and $200 for Relief Officer travel, the offeror would identify as such in their narrative. If the wages, taxes, and fringe cost elements include $1,200 for the PSO relief costs, such amounts shall be identified in the narrative. The narrative also requires that the offeror detail the basis of estimate for determining the paid break and/or lunch hours priced into the proposal.

5. Rows 6, 15, 31, 39, 80, 86, and 90 automatically calculate applicable totals, therefore data should not be inputted into these rows. Row 92 automatically calculates the labor hour rate applicable to the inputted data; therefore data should not be inputted into this row.

6. Rows 76-78 provide for the option to insert “Other” price elements, which are not included in the standardized listed elements. If including “Other” price elements, list a descriptor of each element in the applicable worksheet cell. If additional “other” price elements are needed for the breakdown, please insert rows under 79 and list the additional elements.

7. Additional worksheets may be provided to explain any subsidiary calculations used to determine the pricing amounts in the template.

8. The worksheet is not locked and may be adjusted by the offeror as appropriate.

File details come from the government source that posted it. Updated .