Amendment 000004 Document

View the file

Other files for this federal contract opportunity

Other files attached to NBACC FFRDC, newest first.
File Type Posted
A9_SF30.pdf PDF
Amendment_000009_v1.docx DOCX document
Amendment_000008_v1.docx DOCX document
Revised_Section_M_v2.docx DOCX document
Revised_Final_RFP_Executive_Summary_v1.docx DOCX document
A7_SF30.pdf PDF
Revised_Final_RFP_A14_PPQ.docx DOCX document
Revised_Final_RFP_Section_J_v1.docx DOCX document
Revised_Attachment_1_to_CDRL_Package_v2.docx DOCX document
Amendment_000007_v1.docx DOCX document
A6_SF30.pdf PDF
Revised_Section_L_v2.docx DOCX document
Updated_A3_AT_Plan_v1.docx DOCX document
Updated_A2_AF_Plan_v1.docx DOCX document
Award_Fee_Evaluation_Process_for_NBACC_v1.vsd VSD drawing
Updated_A12_Draft_QASP_v1.docx DOCX document
Award_Term_Evaluation_Process_for_NBACC_v1.vsd VSD drawing
Revised_Final_RFP_A1_CDRL_Package_v2.xlsx XLSX spreadsheet
Updated_Final_RFP_Section_C_v1.docx DOCX document
Updated_Final_RFP_Section_D_v1.docx DOCX document
Revised_Final_RFP_A13_v1.docx DOCX document
Updated_Final_RFP_Section_E_v1.docx DOCX document
Updated_Attachment_16_for_Final_NBACC_RFP.txt TXT text file
Updated_Final_RFP_A4_Cost_Charts.xlsx XLSX spreadsheet
Amendment_000001.docx DOCX document
Final_RFP_A4_Cost_Charts.xlsx XLSX spreadsheet
Final_A6_Draft_SA.docx DOCX document
Final_RFP_A20_BQSF.docx DOCX document
Final_RFP_Section_H.docx DOCX document
Final_RFP_Section_L.docx DOCX document
Attachment_1_to_CDRL_Package.docx DOCX document
Section_A_Cover_Page.docx DOCX document
Final_RFP_Section_A.pdf PDF
Final_RFP_A7_NBACC_Photo.docx DOCX document
Final_RFP_A21_Table_T1.xlsx XLSX spreadsheet
Award_Term_Evaluation_Process_for_NBACC.vsd VSD drawing
Final_RFP_A16_SCA_WD.pdf PDF
Final_RFP_Section_C.docx DOCX document
Final_RFP_Section_M.docx DOCX document
Final_RFP_A1_CDRL_Package.xlsx XLSX spreadsheet
Final_RFP_A8_GFP_List.xlsx XLSX spreadsheet
Final_RFP_A2_AF_Plan.docx DOCX document
Final_RFP_Section_D.docx DOCX document
Final_RFP_A5_Draft_Mgmt_Plan.docx DOCX document
Final_RFP_Section_E.docx DOCX document
Final_RFP_A15_WEE.docx DOCX document
Final_RFP_A13_Contract_Directives_List.docx DOCX document
Final_RFP_Executive_Summary.docx DOCX document
Final_RFP_A11_OSHA_Form_300A.xls XLS spreadsheet
Final_RFP_A12_Draft_QASP.docx DOCX document
Show all 50

NBACC FFRDC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary of Changes to Solicitation HSHQDC-15-R-00050 through Amendment 000004

A. The purpose of Amendment 000004 to DHS Solicitation HSHQDC-15-R-00050 is to make changes to Sections C, D, E, H, and update/revise Attachments 1 and 13. Accordingly, the amendment provides the following information:

1. In Section C of the solicitation, the Table of Contents located on page C-1 has been updated to reflect the changes identified in this amendment.

2. In Section C of the solicitation, Item c.3 located on pages C-9 and C-10 is hereby deleted in its entirety and is replaced with the following text:

3. Manage, operate, sustain, and enhance the NBACC as a safe, secure, and efficient facility. The NBACC facility has an estimated 160,000 gross square feet to include estimated Laboratory space of 20% BSL-4, 53% BSL-3, and 27% BSL-2. Total estimated staff is approximately 168. A photograph of the NBACC facility is provided as an attachment to the Request for Proposals (See Attachment 7 in Section J of this contract/solicitation)

The efficiency will be measured through Government approved performance measures such as Condition Index, Annual Operating Costs, Mission Dependency, Repair Needs, Utilization, and Sustainability. The repair needs will be identified for the NBACC yearly using an industry standard methodology. For the first year, perform a baseline property condition assessment in accordance with ASTM E2018-08 Standard Guide for Property Condition Assessments: Baseline Property Condition Assessment Process. Thereafter, every four years, conduct a detailed Facility Condition Assessments (FCA). The deliverable for the FCAs will be an updated list of performance measures stated above and an Asset Management Plan (AMP), highlighting short (1-year) and long term (2-3 years) repair needs. Also, the Contractor shall develop a Capital Projects Plan that indicates out years funding requirements. Note the reference for this requirement is S&T’s Official RP Guidance in S&T RP Manual dated September 24, 2013 and as amended. The deliverables shall be provided to the COR, PCO, and ASD/CAO as identified in the Contract Data Requirements List (CDRLs), Attachment 1 to this solicitation/contract.

The above statement is marked in Item C.3 on pages C-9 and C-10 through the use of bold green font.

3. In Section C of the solicitation, Item K.1 on page C-20 is hereby deleted in its entirety and is replaced with the following text:

1. Perform overall integrated planning, acquisition, maintenance, operation, management and disposition of Government-owned, Contractor-operated facilities and infrastructure. The NBACC Contractor will manage the maintenance operations through the use of Industry recognized Computer Aided Facility Management (CAFM) software to plan, schedule, and implement maintenance. The Contractor will submit quarterly reports of maintenance efficiency highlighting agreed upon performance measures.” Note that for this requirement, there is no reference. It is a Facilities Management Industry’s Best Business Practice.

The above statement is marked in Item K.1 on page C-20 through the use of bold green font.

4. In Section C of the solicitation, Item K.2 on pages C-20 and C-21 is hereby deleted in its entirety and is replaced with the following text:

2. Incorporate Life Cycle Plan & Costing for all systems contained within NBACC operations scope to include systems implemented to manage Government property under the control of the Contractor. Due to recent Executive Order 13693, energy efficiency of DHS buildings is extremely important. The Contractor will manage building energy in such a manner so that the energy consumption per gross square foot of the NBACC in fiscal years 2016 through 2025 is reduced, by the following percentages:

Fiscal

Year
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Goal
2%
4%
6%
8%
10%
12%
14%
16%
18%
20%

Performance will be assessed in terms of site-delivered energy or in terms of primary energy from fossil sources based on the initial 2014 baseline and meet the goals cited above. Energy Conservation Measures (ECM) identified during FY13 Energy Assessment through the DHS Mission Sustainable Energy Program is available for reference.

The above statement is marked in Item K.2 on pages C-20 and C-21 through the use of bold green font.

5. In Section C of the solicitation, the following statement is hereby added to Item K.4 located on page C-21:

“The management system shall include environmental and safety management and conform to the latest editions of ISO 14001 and ANSI/AIHA/ASSE Z10, respectively.”

The above statement is marked in Item K.4 on page C-21 through the use of bold green font.

6. In Section C of the solicitation, the following statement is hereby added to Item K.5 located on page C-22:

“The safety management program shall include environmental and safety management and conform to the latest editions of ISO 14001 and ANSI/AIHA/ASSE Z10, respectively.”

The above statement is marked in Item K.5 on page C-21 through the use of bold green font.

7. In Section C of the solicitation, the following statement is hereby added at page C-38 before the header “For Work-For-Others (WFO) Program (Applicable to Item 0006 and if Option Line Items 1005, 1105, 2005, 3005, and Award-Term Incentive Periods 4005, 5005, 6005, 7005, and 8005 are exercised/awarded by the Government in accordance with the applicable regulations/guidance)” located on page C-39 of the section:

The Sunflower Asset Management System (SAMS) must be used as the system of records for asset management. The reference for this requirement is DHS Management Directive 119-02 entitled Real Property Management Program and DHS Management Directive 119-03 entitled Personal Property Asset Management Program.

The above statement is marked on page C-38 through the use of bold green font.

8. In Section C of the solicitation, the table entitled “Deliverable Requirements for the NBACC FFRDC Project” located on pages C-39-C41 of the section has been reformatted in order to improve overall readability.

9. In Section C of the solicitation, Item 9 of the table entitled “Deliverable Requirements for the NBACC” located on page C-40 of the section has been deleted in its entirety and is replaced with the following:

Item

Item Description

CDRL Number*
Date Due:
9
Real Property Management Systems
A009
90 DAC

Plan Status Report (including FCAs and Maintenance Management)

This change is marked in the section by the use of bold green font.

10. In Section C of the solicitation, Item 12 of the table entitled “Deliverable Requirements for the NBACC” located on page C-40 of the section has been deleted in its entirety and is replaced with the following:

Item

Item Description

CDRL Number*
Date Due:
Environmental, Safety, and
A012
90 DAC
12
Health (ESH) Program Status Report

This change is marked in the section by the use of bold green font.

11. In Section C of the solicitation, the following Items are hereby added to the table entitled “Deliverable Requirements for the NBACC” located on page C-41 of the section:

Item
Item Description
Number
Date Due:
37
Facility Condition Assessments (FCAs)
A037
Initial—due 180 DAC

Final—due 210 DAC

SUBSEQUENTLY (Every 4 Years):

Initial—due 180 DAOE/DATE*

Final—due 210 DAOE/DATE

38
Asset Management Plan (AMP)
A038
Initial—due 180 DAC

Final—due 225 DAC

SUBSEQUENTLY (Every Year): Initial—due 180 DAOE/DATE

Final—due 225 DAOE/DATE

39
Capital Projects Plan (CPP)
A039
Initial—due 180 DAC

Final—due 210 DAC

SUBSEQUENTLY (Every Year):

Initial—due 180 DAOE/DATE

Final—due 210 DAOE/DATE

This change is marked in the table through the use of bold green font.

12. In Section C of the solicitation, the following text is added to under the heading entitled “Deliverables Table Notes” located on page C-42 of the section:

*--Key Terms for Table:

Term
Description
DAC
Days After Contract Award
DAOE
Days After Option Exercise
DATE
Days After Award-Term Exercise
MAC
Months After Contract Award
MAOE
Months after Option Exercise

This change is marked in the section through the use of bold green font.

13. In Section D of the solicitation, paragraph (d) of Clause D-2 entitled “Hazardous Material” is hereby deleted in its entirety and is replaced with the following text:

d. To ascertain which Department of Defense, Department of Homeland Security, and/or local installation regulations concerning hazardous materials may impact on this contract, the Contractor should contact the DHS/S&T Environmental Safety & Health (ESH) Branch Chief.

This change is marked in Section D through the use of bold green font.

14. In Section E of the solicitation, the following text is hereby added after the first sentence of paragraph in Section E.9 entitled “Quality Management System Requirements” located at page E-7 of the section:

“In addition, the Contractor shall provide and maintain a Safety, Health, and Environmental Management System (SHEMS). The SHEMS shall include environmental and safety management and conform to the latest editions of ISO 14001 and ANSI/AIHA/Z10 respectively.”

This change is marked in Section E through the use of bold green font.

15. As a result of the addition of new text in Section E identified in item 14 above, Section E’s formatting was refreshed and the Table of Contents located on page E-1 was updated accordingly.

16. In Section H of the solicitation, the text for Clause H.31 entitled “External Regulation” located on page H-43 is hereby deleted in its entirety and is replaced with the following:

The Parties commit to full cooperation with regard to complying with any statutory mandate regarding external regulation of NBACC facilities, whether by the Nuclear Regulatory Commission (NRC), the Occupational Safety and Health Administration (OSHA), Environmental Protection Agency (EPA), and/or State and local entities with regulatory oversight authority, and including, but not limited to the conduct of pilot programs simulating external regulation, and the application for materials, facilities, and/or other licenses by or behalf of the DHS.

This change is marked in Section H through the usage of bold green font.

17. In Section H of the solicitation, the address for the DHS Office of Inspector General in Clause H.32 entitled “Agency Office of Inspector General” located on page H-43 is hereby deleted in its entirety and is replaced with the following table:

Name:
DHS Office of Inspector General
Address:
MAIL STOP 0305

245 Murray Lane, SW

Washington, DC 20528-0305

Telephone:
(202) 254-4100
Fax:
(202) 254-4285
World-Wide Web (WWW):
http://www.oig.dhs.gov

18. As a result of the addition of new text in Section H identified in items 16 and 17 above, Section H’s formatting was refreshed and the Table of Contents located on page H-1 was updated accordingly.

19. As a result of the above additions/changes in the deliverables section of the solicitations Statement of Work found in Section C, Attachment 1 to the solicitation entitled “Contract Data Requirements List” has been updated through the addition of CDRLs A037 (Facility Condition Assessments (FCAs), A038 (Asset Management Plan (AMP), and A039 (Capital Projects Plan (CPP). Attachment 1 to the solicitation is hereby deleted in its entirety and is replaced with the updated Attachment 1 that is attached to this amendment.

20. Also, as a result of the above changes/additions to the deliverables section of the solicitation’s Statement of Work found in Section C, Attachment 1 to the CDRL for this solicitation has been updated to incorporate the addition of CDRLs A037 through A039. Those changes are identified in the document through bold green font on pages 4, 14. In addition, the updated Attachment 1 to the CDRL now has pages that are numbered and an updated Table of Contents. Attachment 1 to the CDRL is hereby deleted in its entirety and is replaced with the updated Attachment 1 to the CDRL that is attached to this amendment.

21. The number and title of the regulation for Item (g) found under Number 27(d) entitled “Chemical Safety” located on page 10 of Attachment 13 entitled “Listing of Applicable Directives” has been deleted in its entirety and has been replaced with the following:

g. American Society of Heating, Refrigerating, and Air Conditioning Engineers, Inc.: ASHRAE 62.1-2013-Ventilation for Acceptable Indoor Air Quality https://www.ashrae.org/standards-research--technology/standards--guidelines

This change is marked in Attachment 13 using bold red font.

22. On page 19 of Attachment 13 entitled “Listing of Applicable Directives,” the following DHS Management Directives have been added as follows:

#
Number and Title of Regulation
Date
Coded:
67
DHS Management Directive 023-01, Environmental Planning

http://www.dhs.gov/publication/management-directives-volume-0000-general-management-and-administration

4/19/06
M
68
DHS Management Directive 025-01, Sustainable Practices for Environmental, Energy, and Transportation Management http://www.dhs.gov/publication/management-directives-volume-0000-general-management-and-administration
9/29/08
M
69
DHS Management Directive 119-02, Real Property Management System
12/10/12
M
70
DHS Management Directive 119-03, Personal Property Asset Management Program
6/21/12
M
71
DHS Management Directive 066-05 Drug-Free Workplace Program
8/11/14
M
72
DHS Management Directive 066-01, Safety and Health Programs http://www.dhs.gov/publication/management-directives-volume-0000-general-management-and-administration
7/25/08
M

These additions are marked in Attachment 13 using bold red font.

B. Except as identified herein, all other terms and conditions of this solicitation remain in full force and effect.