RFP HSHQDC-08-R-00070 Amendment 000003.pdf
PDF 36 KB Posted
- Solicitation number
- HSHQDC-08-R-00070
About this file
RFP HSHQDC-08-R-00070 Amendment 000003
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
HSHQDC-08-R-00070
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Washington DC 20528
245 Murray Lane, SW, Bldg 410
DHS/OPO/DEPT.OPS
Room 3051-65, Attn: Paula Nusbaum
Departmental Operations Division
Office of Procurement Operations
Department of Homeland Security
Washington DC 20528
245 Murray Lane, SW, Bldg 410
DHS/OPO/DEPT.OPS
Room 3051-65, Attn: Paula Nusbaum
Departmental Operations Division
Office of Procurement Operations
Department of Homeland Security
AREA A POWER
08/18/2008000003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/08/2008
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT:
Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Tax ID Number: Not Available
DUNS Number: Not Available
Revisions to the solicitation begin on Page 2.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Johnnie Lewis-Banks
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
SOLICITATION AMENDMENTS
This amendment replaces Attachment B – Drawings in its entirety.
Most of the Part II drawings are incorrectly numbered when printed out, but the drawing file name and the table of content labels are correct.
QUESTIONS AND RESPONSES
Question Response 1 How are volume one (Technical proposal) and volume two (Business Proposal) weighted regarding evaluation importance, in terms of percentage for this RFP? Is either the Tech Prop. or Bus Prop. given more importance than the other in evaluating the best value of the bid, or are they equally as important?
There are no weight differences between the technical and business proposals. This is a lowest price technically acceptable source selection process not a tradeoff source selection process.
Please see FAR 15.101-1 and 15.101-2 for further explanation of the differences between these two techniques.
In accordance with M-4 Basis of Award in the RFP, “award will be made to the Offeror that is determined to be the lowest price technically acceptable.” This means that the Government will evaluate the technical proposals to determine whether or not they are acceptable. Award will then be made to the Offeror who proposes an acceptable technical proposal and the lowest price. Definitions for acceptable and unacceptable are listed in Section M of the RFP.
2 Also, is the site visit on 8/26/08 mandatory attendance in order to bid or highly recommended?
The site visit is not mandatory but it is recommended that Offerors attend. See FAR provision 52.236-27 Site Visit (Construction) – Alternative I (Feb 1995) in Section L for further information.
HSHQDC-08-R-00070/000003 Page 2 of 2