Attch_3__PBSOW_Appendix_A_-_SASS_Historical_Data.pdf
PDF 520 KB Posted
- Attached to
- Support Enterprise Student Administration and Scheduling System (SASS) Federal contract opportunity
- Solicitation number
- HSFLGL-16-R-00026
About this file
PBSOW Appendix A - SASS Historical Data
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HSFLGL-16-R-00026-000004.pdf | ||
| HSFLGL-16-R-00026-000003.pdf | ||
| AMENDMENT_00002A.pdf | ||
| AMENDMENT_00002.pdf | ||
| scannedDoc.pdf | ||
| HSFLGL-16-R-00026.pdf | ||
| Attch_11__PBSOW_Appendix_I_-_DHS_4300A_Sensitive_Systems_Policy.pdf | ||
| Attch_1__PBSOW.pdf | ||
| Attch_13__NONDISCLOSURE_AGREEMENT.pdf | ||
| Attch_8__PBSOW_Appendix_F_-_Sample_Travel_Authorization_Form.pdf | ||
| Attch_5__PBSOW_Appendix_C_-_Sample_Monthly_Report.pdf | ||
| Attch_7__PBSOW_Appendix_E_-_Sample_Quarterly_Report.pdf | ||
| Attch_2__SASS_Bill_of_Materials.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL LAW ENFORCEMENT TRAINING CENTERS (FLETC) RFP HSFLGL-16-R-00026
STUDENT ADMINISTRATION AND SCHEDULING SYSTEM (SASS)
PBSOW Appendix A: SASS Historical Data
The purpose of the document is to provide the potential vendors with a sample of some of the tasking concerning software engineering changes made in a given month and year.
Figure 1: Example of Software Engineering Work Performed for SASS in a Given Month
Ticket Description Priority Type Hours
Unit-testing hours place-holder Low Task 3.0
Upgrade Plateau(SuccessFactors) from
6.2.13 to b1302.9
Medium Task 82.0
Refactor EPO management and scenario criteria pages
High Task 13.0
Can't edit scenario in quick notes tab High Refactoring 8.0
Update users with roles report to show account status
Low Sub-task 2.5
States drop-down is not in alpha order Medium Bug 0.6
Resources: Deactivating a resource sends out different emails
High Bug 6.0
Reports with Start Year instead of Fiscal
Year
Low Bug 3.0
Student PE Transcript 1.2 and 1.3 BETA change to Fiscal Year
Low Sub-task 6.0
Need to add functionality to allow admin.admin to add NTE categories
Medium Improvement 36.0
Scenario UI updates High Improvement 8.0
Add three columns to Role Player Order report v1.7: report time, start time and end time for role-players, number of males and females
High Sub-task 24.5
REPORT: Add a program column to the
End of Year Student Summary Report
[v1.1]
High Sub-task 9.5
Changes to Housing Scheduler Activities
Page - Viewing results
High Bug 2.0
Remove merge cells for Site and Date from Role Player Order v1.7
High Sub-task 1.0
Move Lodging and Assign Lodging Plan from P&F/Allocations to Housing
High Bug 8.0
Remove merge cells for Site and Date from Role Player by Class v1.1
High Sub-task 7.0
Informational message for updated housing assignments
High Improvement 3.0
Need linked classes on PROD for FY16 High Task 3.0
Need to log who is removing students from the SASS Portal
High Bug 7.5
Change to Bulk Student Upload –
Remove student download link
High Bug 0.4
Add screen to find existing students and add them to a class
Low New Feature 61.0
Invalid emails within Plateau and causing issue with uploading of students
High Bug 6.0
FAILOVER projection packets set to
Requal do not show quarterly cutoff dates
High Bug 0.5
Students cannot be removed from class on PROD prior to arrival
High Bug 2.6
Artesia Operational Schedule will not schedule any classes
High Bug 15.0
Refresh issue on student detail page after save is made
High Bug 8.0
Cannot upload Exams to G_UPTP-518
Exam 2
Urgent Bug 28.0
Update Non-Standard Estimate Area High New Feature 12.0
Set and group columns are blank Low Sub-task 9.3
Status shows null after student is checked as depart early twice
High Bug 4.0
Running the bill in the background produced an error
High Bug 6.0
Facility characteristics are not being saved
High Bug 1.0
Facility updates are not being saved High Bug 0.5
Create new SLRTT Registration Report Medium Sub-task 9.0
Create a Driver and Marine Division PE report
High Task 22.5
JBoss errors creating/updating models High Bug 4.5
Issue with saving extended data from
Student records in Plateau
High Bug 1.0
Scheduler needs to copy new role player fields
High Sub-task 1.0
Create a Initial Cost Summary report High Sub-task 6.0
Need listing of badly created records in
Plateau
High Task 16.8
Cannot upload existing international students into classes
High Bug 6.0
Create a Projected Fiscal Year Resource
Cost report
High Sub-task 22.0
Attach features of quick Note functionalities with criteria
High Improvements 31.0
Agency dropdown in student upload not refreshing correctly for PO user
High Bug 6.5
Charleston users Jim Ferry & Ray Philyaw getting JBOSS working on models
High Bug 6.0
JBoss error when loading a FAST student on Failover
High Bug 1.0
Agency list in Student Upload page is not in order
Medium Bug 0.8
Student middle initial shown as null in student registration search by student
Medium Bug 0.5
Scenarios with missing organizations Low Task 1.0
Refresh issue with new existing student upload feature
High Bug 9.5
Add clear button to student upload page High Improvement 4.0
Add choice of "In past 60,180 days" to arrival filter on Bulk Student Upload page
High Bug 4.0
Error clicking on "View Class" button before class is selected
Medium Bug 0.5
Create new report - Instructor Daily
Schedule report
Low Sub-task 11.0
Remove button in Student Detail page doesn't do anything when clicked
High Bug 1.0
Cannot delete app guide with First or
Last in Model rule
Medium Bug 6.0
Need linking of classes added to copy function for housing segments
High Bug 5.5
Error changing app guide to not be draft Medium Bug 2.0
New report - Tactical Tablet Report High Sub-task 5.0
Remove "Schedule Rooms" menu item High Task 0.3
Facility audit history has some Ids instead of values
Low Bug 0.3
Figures 2-4 are pie charts that show breakouts of software engineering work completed over a one and two year period (Fiscal Year 2015, 01 October 2014 – 30 September 2015. Fiscal Year
2014, 01 October 2013- 30 September 2014)
Figure 2: Software Engineering Work Completed by SASS Component
One Year Trend (FY15)
Two Year Trend (FY14-15)
Figure 3: Software Engineering Work Completed by Issue Type
Figure 4: Software Engineering Work Completed by Priority
File details come from the government source that posted it. Updated .