Attachment B - SECTION B CLIN Tables final 1-30-09 .xls

XLS spreadsheet 78 KB Posted

Attached to
Maintenance and Deactivation, Haul & Install
Solicitation number
HSFELA-09-R-0010
Issued by

About this file

Attachment B- Section B CLIN Tables

View the file

Other files

File Type Posted
scan0001.pdf PDF
Attachment E WD-2233 rev 7.txt TXT text file
Attachment E WD-2231 rev 6.txt TXT text file
Attachment E WD-2229 rev 6.txt TXT text file
MDC Sol 2 Mar 2009.doc DOC document
Attachment D 49 Field Report.xls XLS spreadsheet
Attachment C Formosan Termite Form LDAF-Q1.pdf PDF
Attachment E WD-2235 rev 6.txt TXT text file
Attachment F DHS Form 11000-6 Non-Disclosure Agreement.pdf PDF
Attachment A Definitions.pdf PDF
MDC_QA_year 4 FEB17(2) —
HSFELA-09-R-0010 MDHIC.rtf RTF text file
SECTION J - Attachment C 49 Field Report.xls XLS spreadsheet
SECTION B CLIN Tables final 1-30-09 .xls XLS spreadsheet
SECTION J - Attachments.doc DOC document
SECTION J - Attachment E WD-2231 rev 6.txt TXT text file
MDC PWS 1-30-09.doc DOC document
SECTION J - Attachment E WD-2229 rev 6.txt TXT text file
Attachment A Definitions.pdf PDF
QASP HSFELA-09-R-0010.pdf PDF
SECTION J - Attachment D Formosan Termite Form LDAF-Q1.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

SECTION B – SUPPLIES OR SERVICES AND PRICES (SUMMARY)
B.1 ITEMS TO BE ACQUIRED
The Contractor shall furnish all personnel, facilities, equipment, materials, supplies, and services (exceptly set forth in the contract as furnished by the Government) and otherwise do all things necessary to, or incident to, performing and providing the services in accordance with Performance Work Statement.
B.2 MAXIMUM AND MINIMUM FUNDING LIMITATION
The maximum funding limitation for this contract (inclusive of the aggregate price of all task orders issued) is $50,000,000.00. The guaranteed minimum under this contract is $50,000.00.
B.3 CONSIDERATION -- FIXED PRICE
The total fixed price will be established for each task order using thefully burdened fixed unit rates (except for, CLIN 0004 - Health & Safety, and CLIN 0010 - Miscellaneous) established under this contract.
B.4 CLIN PRICING SUMMARY
ItemDescriptionTotal Price
TRANSITION PERIODApril 1, 2009 - April 30, 20091 month$0.00
BASE PERIODMay 1, 2009 - April 30, 201012 Months$40,000.00
OPTION PERIOD 1May 1, 2010 - April 30, 201112 months$40,000.00
OPTION PERIOD 2May 1, 2011 - April 30, 201212 months$40,000.00
TOTAL PRICE ALL PERIODS$120,000.00

&LSolicitation HSFELA-09-R-0010 Page &P

Base Period

SECTION B – SUPPLIES OR SERVICES AND PRICES
NOTE 1Offer must price each Contract Line Item Number (CLIN) below, no consideration will be given to an offer that does not make an offer on all line items except CLIN 0004 & CLIN 0010.
NOTE 2There ia a projected total of 4500 total units located throughout the state of Louisiana.
TRANSITION PERIOD (APRIL 1, 2009 - APRIL 30, 2009)
ItemDescriptionQtyUnitUnit PriceTotal Price
0001TRANSITION PERIOD - All parts, equipment, supplies, and labor to posture each THU in order to meet the Habilability Government Contract Standard. (Firm Fixed Price)4500EA$0.00$0.00
Total CLIN 00014500EA$0.00
BASE PERIOD (MAY 1, 2009 - APRIL 30, 2010)
ItemsDescriptionQtyUnitUnit PriceTotal Price
0002MAINTENANCE - All parts, equipment, supplies, and labor to maintain the assigned THUs.3075EA$0.00$0.00
Total CLIN 0002 (Maintenance)3075EA$0.00
BASE PERIOD (MAY 1, 2009 - APRIL 30, 2010)
ItemsDescriptionQtyUnitUnit PriceTotal Price
0003ADEACTIVATION - All parts, equipment, supplies, and labor to deactivate the assigned THUs.660EA$0.00$0.00
Total CLIN 0003A (MH/PM)660EA$0.00
BASE PERIOD (MAY 1, 2009 - APRIL 30, 2010)
ItemsDescriptionQtyUnitUnit PriceTotal Price
0003BDEACTIVATION - All parts, equipment, supplies, and labor to deactivate the assigned THUs.2400EA$0.00$0.00
Total CLIN 0003B (TT)2400EA$0.00$0.00
Total CLIN 0003 - Deactivation3060EA$0.00
BASE PERIOD (MAY 1, 2009 - APRIL 30, 2010)
ItemsDescriptionQtyUnitUnit PriceTotal Price
0004Miscellaneous - NTE1Cost only$20,000.00$20,000.00
Contractor shall not price the CLIN 0010. This is a cost reimbursable only CLIN with a Not to Exceed.
BASE PERIOD (MAY 1, 2009 - APRIL 30, 2010)
ItemsDescriptionQtyUnitUnit PriceTotal Price
0005AHAULING & INSTALLATION - All parts, equipment, supplies, and labor to haul and install the assigned THUs.30EA$0.00$0.00
Total CLIN 0005A (MH/PM)30EA$0.00
BASE PERIOD (FEBRUARY 1, 2009 - JULY 31, 2009)BASE PERIOD (MAY 1, 2009 - APRIL 30, 2010)
ItemsDescriptionQtyUnitUnit PriceTotal Price
0005BHAULING & INSTALLATION - All parts, equipment, supplies, and labor to haul and install the assigned THUs.0EA$0.00$0.00
Total CLIN 0005B (TT)0EA$0.00
Total CLIN 0005 - Hauling & Installation30EA$0.00
BASE PERIOD (MAY 1, 2009 - APRIL 30, 2010)
ItemsDescriptionQtyUnitUnit PriceTotal Price
0006AMILEAGE OVER 150 MILES4800EA$0.00$0.00
Total CLIN 0006A (MH/PM)4800EA$0.00
BASE PERIOD (MAY 1, 2009 - APRIL 30, 2010)
ItemsDescriptionQtyUnitUnit PriceTotal Price
0006BMILEAGE OVER 150 MILES9000EA$0.00$0.00
Total CLIN 0006B (TT)9000EA$0.00
Total CLIN 0006 - Mileage over 15013800EA$0.00
The Contractor will be paid mileage over 150 miles from point of Origin to point of destination as designated by the COTR or PWS for Deactivations (CLIN 0003) and Hauling & Installation (CLIN 0005).
BASE PERIOD (MAY 1, 2009 - APRIL 30, 2010)
ItemsDescriptionQtyUnitUnit PriceTotal Price
0007AREPOSITION - All parts, equipment, supplies, and labor to reposition the assigned THUs.18EA$0.00$0.00
Total CLIN 0007A (MH/PM)18EA$0.00
BASE PERIOD (MAY 1, 2009 - APRIL 30, 2010)
ItemsDescriptionQtyUnitUnit PriceTotal Price
0007BREPOSITION - All parts, equipment, supplies, and labor to reposition the assigned THUs.6EA$0.00$0.00
Total CLIN 0007B (TT)6EA$0.00
Total CLIN 0007 - Reposition24EA$0.00
This is not normal occurrence but may be required for CLIN 0007.
BASE PERIOD (MAY 1, 2009 - APRIL 30, 2010)
ItemsDescriptionQtyUnitUnit PriceTotal Price
0008ARELOCATION - All parts, equipment, supplies, and labor to relocate the assigned THUs.7EA$0.00$0.00
Total CLIN 0008A (MH/PM)7EA$0.00
BASE PERIOD (MAY 1, 2009 - APRIL 30, 2010)
ItemsDescriptionQtyUnitUnit PriceTotal Price
0008BRELOCATION - All parts, equipment, supplies, and labor to relocate the assigned THUs.0EA$0.00$0.00
Total CLIN 0008B (TT)0EA$0.00
Total CLIN 0008 - Relocation7EA$0.00
BASE PERIOD (MAY 1, 2009 - APRIL 30, 2010)
ItemsDescriptionQtyUnitUnit PriceTotal Price
0009REINSTALLATION - All parts, equipment, supplies, and labor to reinstall the assigned THUs.12EA$0.00$0.00
Total CLIN 0009 - Reinstallation12EA$0.00
FEMA is not installing Travel Trailers under CLIN 0009 at this time.
BASE PERIOD (MAY 1, 2009 - APRIL 30, 2010)
ItemsDescriptionQtyUnitUnit PriceTotal Price
0010Miscellaneous Other - NTE1LOT$20,000.00$20,000.00
Contractor shall not price the CLIN 0010. This is a cost reimbursable only CLIN with a Not to Exceed.
TOTAL BASE PERIOD PRICE$40,000.00

&LSolicitation HSFELA-09-R-0010 Page &P

Option Period 1

SECTION B – SUPPLIES OR SERVICES AND PRICES
OPTION PERIOD 1 (MAY 1, 2010 - APRIL 30, 2011)
ItemsDescriptionQtyUnitUnit PriceTotal Price
1002MAINTENANCE - All parts, equipment, supplies, and labor to maintain the assigned THUs.1525EA$0.00$0.00
Total CLIN 0002 (Maintenance)1525EA$0.00
OPTION PERIOD 1 (MAY 1, 2010 - APRIL 30, 2011)
ItemsDescriptionQtyUnitUnit PriceTotal Price
1003ADEACTIVATION - All parts, equipment, supplies, and labor to deactivate the assigned THUs.480EA$0.00$0.00
Total CLIN 0003A (MH/PM)480EA$0.00
OPTION PERIOD 1 (MAY 1, 2010 - APRIL 30, 2011)
ItemsDescriptionQtyUnitUnit PriceTotal Price
1003BDEACTIVATION - All parts, equipment, supplies, and labor to deactivate the assigned THUs.960EA$0.00$0.00
Total CLIN 0003B (TT)960EA$0.00$0.00
Total CLIN 0003 - Deactivation1440EA$0.00
OPTION PERIOD 1 (MAY 1, 2010 - APRIL 30, 2011)
ItemsDescriptionQtyUnitUnit PriceTotal Price
1004Miscellaneous - NTE1Cost only$20,000.00$20,000.00
Contractor shall not price the CLIN 0010. This is a cost reimbursable only CLIN with a Not to Exceed.
OPTION PERIOD 1 (MAY 1, 2010 - APRIL 30, 2011)
ItemsDescriptionQtyUnitUnit PriceTotal Price
1005AHAULING & INSTALLATION - All parts, equipment, supplies, and labor to haul and install the assigned THUs.7EA$0.00$0.00
Total CLIN 0005A (MH/PM)7EA$0.00
OPTION PERIOD 1 (MAY 1, 2010 - APRIL 30, 2011)
ItemsDescriptionQtyUnitUnit PriceTotal Price
1005BHAULING & INSTALLATION - All parts, equipment, supplies, and labor to haul and install the assigned THUs.0EA$0.00$0.00
Total CLIN 0005B (TT)0EA$0.00
Total CLIN 0005 - Hauling & Installation7EA$0.00
OPTION PERIOD 1 (MAY 1, 2010 - APRIL 30, 2011)
ItemsDescriptionQtyUnitUnit PriceTotal Price
1006AMILEAGE OVER 150 MILES2400EA$0.00$0.00
Total CLIN 0006A (MH/PM)2400EA$0.00
OPTION PERIOD 1 (MAY 1, 2010 - APRIL 30, 2011)
ItemsDescriptionQtyUnitUnit PriceTotal Price
1006BMILEAGE OVER 150 MILES12000EA$0.00$0.00
Total CLIN 0006B (TT)12000EA$0.00
Total CLIN 0006 - Mileage over 15014400EA$0.00
The Contractor will be paid mileage over 150 miles from point of Origin to point of destination as designated by the COTR or PWS for Deactivations (CLIN 0003) and Hauling & Installation (CLIN 0005).
OPTION PERIOD 1 (MAY 1, 2010 - APRIL 30, 2011)
ItemsDescriptionQtyUnitUnit PriceTotal Price
1007AREPOSITION - All parts, equipment, supplies, and labor to reposition the assigned THUs.4EA$0.00$0.00
Total CLIN 0007A (MH/PM)4EA$0.00
OPTION PERIOD 1 (MAY 1, 2010 - APRIL 30, 2011)
ItemsDescriptionQtyUnitUnit PriceTotal Price
1007BREPOSITION - All parts, equipment, supplies, and labor to reposition the assigned THUs.0EA$0.00$0.00
Total CLIN 0007B (TT)0EA$0.00
Total CLIN 0007 - Reposition4EA$0.00
This is not normal occurrence but may be required for CLIN 0007.
OPTION PERIOD 1 (MAY 1, 2010 - APRIL 30, 2011)
ItemsDescriptionQtyUnitUnit PriceTotal Price
1008ARELOCATION - All parts, equipment, supplies, and labor to relocate the assigned THUs.4EA$0.00$0.00
Total CLIN 0008A (MH/PM)4EA$0.00
OPTION PERIOD 1 (MAY 1, 2010 - APRIL 30, 2011)
ItemsDescriptionQtyUnitUnit PriceTotal Price
1008BRELOCATION - All parts, equipment, supplies, and labor to relocate the assigned THUs.0EA$0.00$0.00
Total CLIN 0008B (TT)0EA$0.00
Total CLIN 0008 - Relocation4EA$0.00
OPTION PERIOD 1 (MAY 1, 2010 - APRIL 30, 2011)
ItemsDescriptionQtyUnitUnit PriceTotal Price
1009REINSTALLATION - All parts, equipment, supplies, and labor to reinstall the assigned THUs.1EA$0.00$0.00
Total CLIN 0009 - Reinstallation1EA$0.00
FEMA is not installing Travel Trailers under CLIN 0009 at this time.
OPTION PERIOD 1 (MAY 1, 2010 - APRIL 30, 2011)
ItemsDescriptionQtyUnitUnit PriceTotal Price
1010Miscellaneous Other - NTE1LOT$20,000.00$20,000.00
Contractor shall not price the CLIN 0010. This is a cost reimbursable only CLIN with a Not to Exceed.
TOTAL OPTION PERIOD 1 PRICE$40,000.00

&LSolicitation HSFELA-09-R-0010 Page &P

Option Period 2

SECTION B – SUPPLIES OR SERVICES AND PRICES
OPTION PERIOD 2 (MAY 1, 2011 - APRIL 30, 2012)
ItemsDescriptionQtyUnitUnit PriceTotal Price
2002MAINTENANCE - All parts, equipment, supplies, and labor to maintain the assigned THUs.150EA$0.00$0.00
Total CLIN 0002 (Maintenance)150EA$0.00
OPTION PERIOD 2 (MAY 1, 2011 - APRIL 30, 2012)
ItemsDescriptionQtyUnitUnit PriceTotal Price
2003ADEACTIVATION - All parts, equipment, supplies, and labor to deactivate the assigned THUs.50EA$0.00$0.00
Total CLIN 0003A (MH/PM)50EA$0.00
OPTION PERIOD 2 (MAY 1, 2011 - APRIL 30, 2012)
ItemsDescriptionQtyUnitUnit PriceTotal Price
2003BDEACTIVATION - All parts, equipment, supplies, and labor to deactivate the assigned THUs.50EA$0.00$0.00
Total CLIN 0003B (TT)50EA$0.00$0.00
Total CLIN 0003 - Deactivation100EA$0.00
OPTION PERIOD 2 (MAY 1, 2011 - APRIL 30, 2012)
ItemsDescriptionQtyUnitUnit PriceTotal Price
2004Miscellaneous - NTE1Cost only$20,000.00$20,000.00
Contractor shall not price the CLIN 0010. This is a cost reimbursable only CLIN with a Not to Exceed.
OPTION PERIOD 2 (MAY 1, 2011 - APRIL 30, 2012)
ItemsDescriptionQtyUnitUnit PriceTotal Price
2005AHAULING & INSTALLATION - All parts, equipment, supplies, and labor to haul and install the assigned THUs.0EA$0.00$0.00
Total CLIN 0005A (MH/PM)0EA$0.00
OPTION PERIOD 2 (MAY 1, 2011 - APRIL 30, 2012)
ItemsDescriptionQtyUnitUnit PriceTotal Price
2005BHAULING & INSTALLATION - All parts, equipment, supplies, and labor to haul and install the assigned THUs.0EA$0.00$0.00
Total CLIN 0005B (TT)0EA$0.00
Total CLIN 0005 - Hauling & Installation0EA$0.00
OPTION PERIOD 2 (MAY 1, 2011 - APRIL 30, 2012)
ItemsDescriptionQtyUnitUnit PriceTotal Price
2006AMILEAGE OVER 150 MILES250EA$0.00$0.00
Total CLIN 0006A (MH/PM)250EA$0.00
OPTION PERIOD 2 (MAY 1, 2011 - APRIL 30, 2012)
ItemsDescriptionQtyUnitUnit PriceTotal Price
2006BMILEAGE OVER 150 MILES250EA$0.00$0.00
Total CLIN 0006B (TT)250EA$0.00
Total CLIN 0006 - Mileage over 150500EA$0.00
The Contractor will be paid mileage over 150 miles from point of Origin to point of destination as designated by the COTR or PWS for Deactivations (CLIN 0003) and Hauling & Installation (CLIN 0005).
OPTION PERIOD 2 (MAY 1, 2011 - APRIL 30, 2012)
ItemsDescriptionQtyUnitUnit PriceTotal Price
2007AREPOSITION - All parts, equipment, supplies, and labor to reposition the assigned THUs.0EA$0.00$0.00
Total CLIN 0007A (MH/PM)0EA$0.00
OPTION PERIOD 2 (MAY 1, 2011 - APRIL 30, 2012)
ItemsDescriptionQtyUnitUnit PriceTotal Price
2007BREPOSITION - All parts, equipment, supplies, and labor to reposition the assigned THUs.0EA$0.00$0.00
Total CLIN 0007B (TT)0EA$0.00
Total CLIN 0007 - Reposition0EA$0.00
This is not normal occurrence but may be required for CLIN 0007.
OPTION PERIOD 2 (MAY 1, 2011 - APRIL 30, 2012)
ItemsDescriptionQtyUnitUnit PriceTotal Price
2008ARELOCATION - All parts, equipment, supplies, and labor to relocate the assigned THUs.0EA$0.00$0.00
Total CLIN 0008A (MH/PM)0EA$0.00
OPTION PERIOD 2 (MAY 1, 2011 - APRIL 30, 2012)
ItemsDescriptionQtyUnitUnit PriceTotal Price
2008BRELOCATION - All parts, equipment, supplies, and labor to relocate the assigned THUs.0EA$0.00$0.00
Total CLIN 0008B (TT)0EA$0.00
Total CLIN 0008 - Relocation0EA$0.00
OPTION PERIOD 2 (MAY 1, 2011 - APRIL 30, 2012)
ItemsDescriptionQtyUnitUnit PriceTotal Price
2009REINSTALLATION - All parts, equipment, supplies, and labor to reinstall the assigned THUs.0EA$0.00$0.00
Total CLIN 0009 - Reinstallation0EA$0.00
FEMA is not installing Travel Trailers under CLIN 0009 at this time.
OPTION PERIOD 2 (MAY 1, 2011 - APRIL 30, 2012)
ItemsDescriptionQtyUnitUnit PriceTotal Price
2010Miscellaneous Other - NTE1LOT$20,000.00$20,000.00
Contractor shall not price the CLIN 0010. This is a cost reimbursable only CLIN with a Not to Exceed.
TOTAL OPTION PERIOD 2 PRICE$40,000.00