HSFEEM-12-R-0008 00003.docx
DOCX document 23 KB Posted
- Attached to
- Curriculum Development and Revision Services and Products Federal contract opportunity
- Solicitation number
- HSFEEM-12-R-0008
About this file
Amendment 00003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment J NFA Sample-Boilerplate Instructor Guide | — | |
| Attachment K NFA Sample-Boilerplate Student Manual | — | |
| QA 6-22-20112 Kim - Edits by Chuck and Kim 6-27-2012v3.docx | DOCX document | |
| Attachment I 121-3.pdf | ||
| Attachment G NFA attachment 3.docx | DOCX document | |
| Attachment B WD 05-2103 06132012.txt | TXT text file | |
| Attachment L Version_1 1 | — | |
| HSFEEM-12-R-0008 Final 4-12-2012 edits by Chuck as result of Q and As 6-27-2012v1.docx | DOCX document | |
| Attachment H 121-1.pdf | ||
| HSFEEM-12-R-0008 0002.docx | DOCX document | |
| HSFEEM-12-R-0008 0001.docx | DOCX document | |
| instruction1440_3.docx | DOCX document | |
| wages as of 6-30.txt | TXT text file | |
| Past Performance Questionnaire.docx | DOCX document | |
| netc1100-1_8-21-07.pdf | ||
| RFP ATTACHMENT E PRICING WORKSHEETS.docx | DOCX document | |
| HSFEEM-12-R-0008 Final 4-25-2012.docx | DOCX document | |
| NFA Consolidated IDIQ PWS 021712_combined(EMI_NFA merged document) | — |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE
OF PAGES
NOTICE:
Offerors must acknowledge receipt of this amendment in writing, by the date and time specified for proposal submissions or the date and time specified in Block 6, whichever is later. IF YOUR ACKNOWLEDGE IS NOT RECEIVED AT THE DESIGNATED LOCATION BY THE SPECIFIED DATE AND TIME, YOUR OFFER MAY BE REJECTED. If, by virtue of this amendment, you wish to change your offer, such change must make reference to the solicitation and this amendment and be received prior to the date and time specified in Block 6.
1. SOLICITATION NUMBER
2. SOLICITATION DATE
3. AMENDMENT NUMBER
4. AMENDMENT DATE
5. ISSUED BY
6. DUE DATE
THIS AMENDMENT DOES NOT CHANGE THE DATE BY WHICH OFFERS ARE DUE UNLESS A DATE AND
TIME IS INSERTED BELOW.
A. DATE
B. TIME
7. FOR INFORMATION CALL
A. NAME
C. E-MAIL ADDRESS
B. TELEPHONE
AREA CODE
PHONE NUMBER
8. DESCRIPTION OF AMENDMENT
Except as provided herein, all terms and conditions of the solicitation remain unchanged and in full force and effect.
In lieu of other written methods of acknowlegdment , the offeror may complete Blocks 9 and 10 and retur n this amendment to the address in Block 5.
9. NAME AND ADDRESS OF OFFEROR
10A. OFFEROR
10B. NAME OF SIGNER
10C. TITLE OF SIGNER
10D. DATE
AUTHORIZED FOR LOCAL REPRODUCTION
OPTIONAL FORM 309 (9-97)
Prescribed by GSA - FAR (48 CFR) 53.215-1(g) (No collect calls) (Signature of person authorized to sign)
I. AMENDMENT
II. ACKNOWLEDGMENT OF AMENDMENT
AMENDMENT OF SOLICITATION
(Negotiated Procurements)
HSFEEM-12-R-0008
05-16-2012 06-27-2012 Department of Homeland Security/FEMA Acquisition Preparedness Branch Building D - Acquisition 16825 South Seton Avenue Emmitsburg MD 21727 07-13-2012 11:00
AM
EASTERN
Chance Caione 301-447-7281 chance.caione@dhs.gov The purpose of this amendment is as follows:
1) Revise specified sections of the RFP # HSFEEM-12-R-0008.
2) Provide Vendor posed Questions and Answers.
The proposal submission date has been extended to 11:00 am E astern, July 13, 2012.
See CONTINUATION PAGE To all Offerors /Bidders
Continuation Page
SUMMARY OF CHANGES
TO
SOLICITATION HSFEEM-R-12-0008, 27 June 2012
NOTE: Yellow highlight indicates significant change.
1. SF Form 33, Block 9: Closing date revised to 11:00 AM EST, 13 July 2012.
2. Changed H.2.2.4.
FROM: Quality of the SMEs proposed under the Task Order. General ranking factors of SMEs will be detailed in each Task Order Proposal Request (TOPR).
TO: H.2.2.4. Quality of the SMEs proposed under the Task Order. The government will provide a list of minimum qualifications and credentials for SMEs for the specific course development(s). General ranking factors of SMEs will be detailed in each Task Order Proposal Request (TOPR).
3. Changed H.8 ON-CAMPUS HOUSING
FROM: Dormitory rooms may be available to the Contractor for Contractor Staff and Subcontractors for overnight housing when such personnel are required to be on campus at the NETC for meetings or the conduct of training activities and meet the security requirements cited in clause I.27 Contractor Employee Access Alt I (JUN 2006). The room(s) is provided at no cost to the Contractor. The Contractor shall notify the COR of housing requirements as soon as they are known to allow a reasonable time for arrangements to be made. DHS policy states that all persons staying on campus for more than one night are required to purchase a meal ticket from the campus cafeteria for each day they are on campus. If a meal ticket is not purchased, the individual will be asked to leave campus and acquire housing at his/her own expense. In the event that government on-campus housing is not available, it is the contractor's responsibility to provide housing at their own expense.
TO: Dormitory rooms may be available to the Contractor for Contractor Staff and Subcontractors for overnight housing when such personnel are required to be on campus at the NETC for meetings or the conduct of training activities and meet the security requirements cited in clause I.25 Contractor Employee Access Alt I (JUN 2006). The room(s) is provided at no cost to the Contractor. The Contractor shall notify the COR of housing requirements as soon as they are known to allow a reasonable time for arrangements to be made. DHS policy states that all persons staying on campus for more than one night are required to purchase a meal ticket from the campus cafeteria for each day they are on campus. If a meal ticket is not purchased, the individual will be asked to leave campus and acquire housing at his/her own expense. In the event that government on-campus housing is not available, it is the contractor's responsibility to provide housing at their own expense.
4. Revised I.24 (b) (1)
FROM: (1) Within days after contract award, the contractor shall submit for approval its IT Security Plan, which shall be consistent with and further detail the approach contained in the offeror's proposal. The plan, as approved by the Contracting Officer, shall be incorporated into the contract as a compliance document.
TO: (1) Within 30 days after contract award, the contractor shall submit for approval its IT Security Plan, which shall be consistent with and further detail the approach contained in the offeror's proposal. The plan, as approved by the Contracting Officer, shall be incorporated into the contract as a compliance document.
5. Revised ADR address in L.5 A.
FROM: Alternative Dispute Resolution Center
FEMA
400 Virginia Ave Washington, D.C. 20472 Web Address: http://www.fema.gov/help/adr
| TO: | FEMA ADR Office |
| 500 C Street, SW | |
| Suite 840 | |
| Washington DC, 20472 | |
| ATTN: Cindy Mazur | |
| WEB ADDRESS: http://www.fema.gov/help/adr/ |
6. Revised L.6 A.3., paragraph 3
FROM: Offerors must use 8 1/2 inch by 11 inch white paper for its proposal pages. Each page shall have not less than one-inch margins on each side of the page. The font color shall be black.
TO: Offerors must use 8 1/2 inch by 11 inch white paper for its proposal pages. Each page shall have not less than one-inch margins on each side of the page. The font color shall be black and the content shall be single spaced.
7. Revised L.6.B., Volume 1, Section 1, Technical Approach
FROM: Technical Approach: Provide a clear and concise narrative description that addresses your proposed approach, capabilities and experience to meet the technical requirements in the Performance Work Statement (PWS). The approach shall be specific, detailed and complete enough to demonstrate the offeror has a thorough understanding of the requirements in the PWS. At a minimum, the offeror shall address the functions and disciplines involved for each objective, skill levels, quantity of resources and methods of operation required on an annual basis. Describe allocation of resources (i.e., distribution of staff, types of labor, categories, subcontractors, proposed contractor owned equipment/vehicles, etc.)
TO: Technical Approach: Provide a clear and concise narrative description that addresses your proposed approach, capabilities and experience to meet the technical requirements in the Performance Work Statement (PWS). The approach shall be specific, detailed and complete enough to demonstrate the offeror has a thorough understanding of the requirements in the PWS.
8. Revised L.6.B., Volume 1, Section 2, TECHNICAL CAPABILITY, Company Experience, NOTE
FROM: NOTE: If the offeror is proposing any type of partnering arrangement (i.e., joint venture, teaming arrangement/agreement, sub-contracting arrangement; etc.), the offeror must include in their proposal a copy of the partnering document which includes arrangement details (roles of both parties with regard to this solicitation and any contract that may result from this solicitation), the period of time the arrangement is effective and signature of authorized individual(s) for both parties.
TO: NOTE: If the offeror is proposing any type of partnering arrangement (i.e., joint venture, teaming arrangement/agreement, sub-contracting arrangement; etc.), the offeror must include in their proposal a copy of the partnering document which includes arrangement details (roles of both parties with regard to this solicitation and any contract that may result from this solicitation), the period of time the arrangement is effective and signature of authorized individual(s) for both parties. If the partnering arrangement is a teaming arrangement/agreement which expires at the time of contract award and is then superseded by a formal subcontract, the successful offeror must provide an executed copy of the sub-contract which matches the end point of the contract period of performance within 3 business days of award.
9. Revised L.6.B., Volume 1, Section 1, Staffing Plan, paragraph 2
FROM: The staffing plan shall include a description of how the offeror will recruit, train, retain and otherwise maintain a qualified work force for this requirement as well as the proposed plan to supervise and coordinate its staff. The plan shall include the number, skill mix, levels of expertise and qualification for the proposed positions. Include the duties and responsibilities for each position proposed. In the description of the proposed labor mix demonstrate that the proposed staff will have the necessary skills and expertise necessary for successful contract performance. The offeror should include a record of recruiting and retention success for similar contracts.
TO: The staffing plan shall include a description of how the offeror will recruit, train, retain and otherwise maintain a qualified work force for this requirement as well as the proposed plan to supervise and coordinate its staff. The plan shall include the number, skill mix, levels of expertise and qualification for the proposed positions. Include the duties and responsibilities for each position proposed. In the description of the proposed labor mix demonstrate that the proposed staff will have the necessary skills and expertise necessary for successful contract performance and describe how the offeror proposes to find the required SMEs, and what they propose to do to ensure SME retention throughout the course development effort(s). The offeror should include a record of recruiting and retention success for similar contracts.
10. Revised L.6.C, Volume 2, 2.b.
FROM: b. Subcontractor Labor - If proposed, cost information for each subcontractor shall be furnished in the same format and level of detail as prescribed for the prime offeror. Additionally, the offeror shall submit the following information:
(1) a description of the items to be furnished by the subcontractor;
(2) identification of the proposed subcontractor and an explanation of why and how the proposed subcontractor was selected including the extent of how competition was obtained;
(3) the proposed subcontract price, together with the offeror's cost or price analysis thereof, and performance and delivery schedule; and
(4) Identification of the type of subcontract to be used.
c. Subject Matter Experts - If proposed, detailed data concerning proposed Subject Matter Expert costs shall include the following:
(1) Purpose;
(2) Names of Subject Matter Expert(s) to be engaged;
(3) Daily fees to be paid to each Subject Matter Expert(s);
(4) Rationale for acceptance of costs.
TO: b. Subcontractor Labor - If proposed, cost information for each subcontractor shall be furnished in the same format and level of detail as prescribed for the prime offeror.
Subsequent paragraphs d and e re-lettered as c and d.
11. Section J, is changed
FROM: B. Wage Determination No. 05-2103 6/13/11, (Rev. 11)
TO: B. Wage Determination No. 2005-2103, Revision No.: 12, Date Of Revision: 06/13/2012 and the following attachments were added:
ATTACHMENT NO.
NUMBER TITLE DATE PAGES
G. NFA-3 1
H. FEMA DIRECTIVE 121-1 6/24/11 4
I. FEMA DIRECTIVE 121-3 5
J. NFA Sample-Boilerplate Instructor Guide 33
K. NFA Sample-Boilerplate Student Manual 7
L. Curriculum Management System Guidebook 7
File details come from the government source that posted it. Updated .