Amed_II_VM_Attachment_B_THE_SCHEDULE_SECTION_B.xlsx

XLSX spreadsheet 158 KB Posted

Attached to
Vehicle Maintenance, Inspections, & Repairs Federal contract opportunity
Solicitation number
HSFE70-17-R-0018
Issued by
Federal Emergency Management Agency Recovery Section

About this file

Amendment II_VM Attachment B THE SCHEDULE SECTION B

View the file

Other files for this federal contract opportunity

Other files attached to Vehicle Maintenance, Inspections, & Repairs, newest first.
File Type Posted
VM_Service Contract Wage Determination PDF
VM_Service Contract Wage Determination PDF
Amend_I_VM_Attachment_A_Performance_Work_Statement.pdf PDF
VM_Service Contract Wage Determination PDF
Attachment_K_-_Amend_I_EQUIPMENT_LIST.pdf PDF
VM_Service Contract Wage Determination PDF
VM_Service Contract Wage Determination PDF
Amend_I_VM_Solicitation_HSFE70-17-R-0018.pdf PDF
VM_Service Contract Wage Determination PDF
Amed_I_VM_Attachment_B_THE_SCHEDULE_SECTION_B.xlsx XLSX spreadsheet
QA_Vehicle_Maintenance_Requirement_1.2.pdf PDF
Attachment E Motor Vehicle Accident Repor_SF-91.pdf PDF
VM_Equipment List —
Attachment F Personal Identification and Verification Guidance_FD121-1.pdf PDF
Attachment D IT Security Directive_FD 140-1.pdf PDF
VM__Solicitation_HSFE70-17-R-0018.pdf PDF
Attachment I Customer Complaint Investigation Form.pdf PDF
PWS_Attachment_A_Performance_Work_Statement.pdf PDF
VM_Equipment List —
VM_Equipment List —
Attachment_B_THE_SCHEDULE_SECTION_B.xlsx XLSX spreadsheet
VM_Equipment List —
VM_Equipment List —
Attachment H Contractor Fitness Security Screening_Form 121-3-1-6_.pdf PDF
VM_Equipment List —
Attachment G Quality Assurance Monitoring Form.pdf PDF
Attachment C Facility Access Directive_FD 121-3.pdf PDF
DRAFT_PWS_Attachment_A_Performance_Work_Statement.pdf PDF
DRAFT_Vehicle_Maintenance_Performance_Work_Statement.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Period Attachment B - Price/Cost Schedule

Base Period CLINSBase Period 5/16/2018 - 11/15/2018
CLIN 0001 - Labor - FFPLabor CategorySiteFTEs*HoursRateTotal Labor
Project ManagerAll11,040$0.00$0.00
Motor Vehicle Mechanic (Sr.)Atlanta11,040$0.00$0.00
Motor Vehicle Mechanic (Jr.)Atlanta31,040$0.00$0.00
Heavy Equipment Mechanic (Sr.)Ft. Worth11,040$0.00$0.00
Heavy Equipment Mechanic (Jr.)Ft. Worth41,040$0.00$0.00
Motor Vehicle Mechanic (Sr.)Frederick11,040$0.00$0.00
Motor Vehicle Mechanic (Jr.)Frederick21,040$0.00$0.00
Motor Vehicle Mechanic (Sr.)Moffett11,040$0.00$0.00
Motor Vehicle Mechanic (Jr.)Moffett11,040$0.00$0.00
Motor Vehicle Mechanic (Sr.)Cumberland11,040$0.00$0.00
Motor Vehicle Mechanic (Jr.)Cumberland21,040$0.00$0.00
Motor Vehicle Mechanic (Sr.)Selma11,040$0.00$0.00
Motor Vehicle Mechanic (Jr.)Selma21,040$0.00$0.00

TOTALs 13,520 $0.00 0.00

Other Direct Costs (ODCs)ODCsQtyRatePeriodsTotal Price
CLIN 0002 - Repairs - ODC*Repairs1$97,900.006$587,400.00
CLIN 0003 - DOT Inspections - ODCDOT Inspections710$150.001$106,500.00
Total$693,900.00
*The contractor shall notify the CO and COR when 25%, 50%, and 75% of funding for Repairs CLIN has been expended. After the 75% threshold has been reached, all additional requests for repairs, parts, and tools will be routed through the Program Office for approval.

Option YR 1

Option Year 1 CLINSOption YR I 11/16/2018 - 11/15/2019
CLIN 1001 - Labor FFPLabor CategorySiteFTEsHoursRateTotal Labor
Project ManagerAll12,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Atlanta12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Atlanta32,080$0.00$0.00
Heavy Equipment Mechanic (Sr.)Ft. Worth12,080$0.00$0.00
Heavy Equipment Mechanic (Jr.)Ft. Worth42,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Frederick12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Frederick22,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Moffett12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Moffett12,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Cumberland12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Cumberland22,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Selma12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Selma22,080$0.00$0.00

27,040 $0.00 0.00

Other Direct Costs (ODCs)QtyRatePeriodsTotal Price
CLIN 1002 - Repairs ODCRepairs1$97,900.0012$1,174,800.00
CLIN 1003 - DOT Inspections ODCDOT Inspections710$150.001$106,500.00
Total$1,281,300.00
*The contractor shall notify the CO and COR when 25%, 50%, and 75% of funding for Repairs CLIN has been expended. After the 75% threshold has been reached, all additional requests for repairs, parts, and tools will be routed through the Program Office for approval.

Option YR 2

Option Year II CLINSOption YR II 11/16/2019 - 11/15/2020
CLIN 2001 - Labor FFPLabor CategorySiteFTEsHoursRateTotal Labor
Project ManagerAll12,080$9,000.00$0.00
Motor Vehicle Mechanic (Sr.)Atlanta12,080$9,000.00$0.00
Motor Vehicle Mechanic (Jr.)Atlanta32,080$9,000.00$0.00
Heavy Equipment Mechanic (Sr.)Ft. Worth12,080$9,000.00$0.00
Heavy Equipment Mechanic (Jr.)Ft. Worth42,080$9,000.00$0.00
Motor Vehicle Mechanic (Sr.)Frederick12,080$9,000.00$0.00
Motor Vehicle Mechanic (Jr.)Frederick22,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Moffett12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Moffett12,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Cumberland12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Cumberland22,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Selma12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Selma22,080$0.00$0.00

27,040 $4,153.85 0.00

Other Direct Costs (ODCs)QtyRatePeriodsTotal Price
CLIN 2002 - Repairs ODCRepairs1$97,900.0012$1,174,800.00
CLIN 2003 - DOT Inspections ODCDOT Inspections710$150.001$106,500.00
Total$1,281,300.00
*The contractor shall notify the CO and COR when 25%, 50%, and 75% of funding for Repairs CLIN has been expended. After the 75% threshold has been reached, all additional requests for repairs, parts, and tools will be routed through the Program Office for approval.

Option YR 3

Option Year III CLINSOption YR III 11/16/2020 - 11/15/2021
CLIN 3001 - Labor FFPLabor CategorySiteFTEsHoursRateTotal Labor
Project ManagerAll12,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Atlanta12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Atlanta32,080$0.00$0.00
Heavy Equipment Mechanic (Sr.)Ft. Worth12,080$0.00$0.00
Heavy Equipment Mechanic (Jr.)Ft. Worth42,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Frederick12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Frederick22,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Moffett12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Moffett12,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Cumberland12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Cumberland22,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Selma12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Selma22,080$0.00$0.00

27,040 $0.00 0.00

Other Direct Costs (ODCs)QtyRatePeriodsTotal Price
CLIN 3002 - Repairs ODCRepairs1$97,900.0012$1,174,800.00
CLIN 3003 - DOT Inspections ODCDOT Inspections710$150.001$106,500.00
Total$1,281,300.00
*The contractor shall notify the CO and COR when 25%, 50%, and 75% of funding for Repairs CLIN has been expended. After the 75% threshold has been reached, all additional requests for repairs, parts, and tools will be routed through the Program Office for approval.

Option YR 4

Option Year IV CLINSOption YR IV 11/16/2021 - 11/15/2022
CLIN 4001 - Labor FFPLabor CategorySiteFTEsHoursRateTotal Labor
Project ManagerAll12,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Atlanta12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Atlanta32,080$0.00$0.00
Heavy Equipment Mechanic (Sr.)Ft. Worth12,080$0.00$0.00
Heavy Equipment Mechanic (Jr.)Ft. Worth42,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Frederick12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Frederick22,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Moffett12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Moffett12,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Cumberland12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Cumberland22,080$0.00$0.00
Motor Vehicle Mechanic (Sr.)Selma12,080$0.00$0.00
Motor Vehicle Mechanic (Jr.)Selma22,080$0.00$0.00

27,040 $0.00 0.00

Other Direct Costs (ODCs)QtyRatePeriodsTotal Price
CLIN 4002 - Repairs ODCRepairs1$97,900.0012$1,174,800.00
CLIN 4003 - DOT Inspections ODCDOT Inspections710$150.001$106,500.00
Total$1,281,300.00
*The contractor shall notify the CO and COR when 25%, 50%, and 75% of funding for Repairs CLIN has been expended. After the 75% threshold has been reached, all additional requests for repairs, parts, and tools will be routed through the Program Office for approval.

Summary

SUMMARY

Title: Vehicle Maintenance Contract (Single Award)
FEMA Component: Logistics Management Directorate
Contract Type: IDIQ/FFP
Date: March 28, 2018
POP: May 16, 2018 - November 15, 2022
Annual Labor Rate Escalation: 2%
Labor (FFP)Repairs (ODC)DOT Inspections (ODC)Total
Base Year Subtotals$ - 0$587,400.00$106,500.00$693,900.00
Option Year I Subtotals$ - 0$1,174,800.00$106,500.00$1,281,300.00
Option Year II Subtotals$ - 0$1,174,800.00$106,500.00$1,281,300.00
Option Year III Subtotals$ - 0$1,174,800.00$106,500.00$1,281,300.00
Option Year IV Subtotals$ - 0$1,174,800.00$106,500.00$1,281,300.00
Total Contract Value (Grand Total)$ - 0$5,286,600.00$532,500.00$5,819,100.00

WDOL Burden Rates Summary

Occupation CodeLabor CategorySiteBaseOption 1Option 2Option 3Option 4
23430Heavy Equipment Mechanic (Sr.)Atlanta$42.76$43.51$44.26$45.01$45.75
05190Motor Vehicle Mechanic (Jr.)Atlanta$40.23$40.93$41.62$42.32$43.02
23430Heavy Equipment Mechanic (Sr.)Ft. Worth$42.17$42.90$43.64$44.38$45.11
05190Motor Vehicle Mechanic (Jr.)Ft. Worth$40.07$40.76$41.46$42.15$42.85
23430Heavy Equipment Mechanic (Sr.)Frederick$45.04$45.83$46.62$47.42$48.21
05190Motor Vehicle Mechanic (Jr.)Frederick$42.04$42.77$43.51$44.24$44.98
23430Heavy Equipment Mechanic (Jr.)Moffett$45.00$45.80$46.59$47.38$48.18
05190Motor Vehicle Mechanic (Sr.)Moffett$53.13$54.08$55.04$55.99$56.95
23430Heavy Equipment Mechanic (Jr.)Cumberland$39.00$39.67$40.34$41.02$41.69
05190Motor Vehicle Mechanic (Sr.)Cumberland$40.79$41.50$42.21$42.92$43.63
23430Heavy Equipment Mechanic (Jr.)Selma$32.19$32.72$33.26$33.80$34.33
05190Motor Vehicle Mechanic (Sr.)Selma$37.23$37.87$38.51$39.15$39.78
0% CPI2% CPI of Base4% CPI of Base6% CPI of Base8% CPI of Base

Summary- WDOL Based

INDEPENDENT GOVERNMENT COST ESTIMATE (IGCE)
Title:Vehicle Maintenance Contract
FEMA Component:Logistics Management Directorate
Contract Type:Hybrid: FFP and Cost Reimbursable
Date:April 12, 2017
POP:2017 - 2022
Annual Escalation:2%
Total Contract Value:$14,825,917.94
BASE PERIOD
Service Dates:8/31/17to8/30/18
DAYS/YRXHRS/DAY=TOTAL POSSIBLE HRS/YR
September 17, 1900January 8, 1900September 18, 1905
Labor CategorySiteQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 1, 1900Project ManagerAllJanuary 1, 1900X=December 31, 1899X=$0.00
January 2, 1900Heavy Equipment Mechanic (Sr.)AtlantaJanuary 3, 1900XSeptember 18, 1905=February 23, 1917X$40.23=$251,994.83
January 3, 1900Motor Vehicle Mechanic (Jr.)AtlantaJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$42.76=$89,283.34
January 4, 1900Heavy Equipment Mechanic (Sr.)Ft. WorthJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$42.17=$88,045.70
January 5, 1900Motor Vehicle Mechanic (Jr.)Ft. WorthJanuary 4, 1900XSeptember 18, 1905=November 12, 1922X$40.07=$334,655.12
January 6, 1900Heavy Equipment Mechanic (Sr.)FrederickJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$45.04=$94,033.21
January 7, 1900Motor Vehicle Mechanic (Jr.)FrederickJanuary 2, 1900XSeptember 18, 1905=June 7, 1911X$42.04=$175,556.20
January 8, 1900Heavy Equipment Mechanic (Jr.)MoffettJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$45.00=$93,966.31
January 9, 1900Motor Vehicle Mechanic (Sr.)MoffettJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$53.13=$110,925.33
January 10, 1900Heavy Equipment Mechanic (Jr.)CumberlandJanuary 2, 1900XSeptember 18, 1905=June 7, 1911X$39.00=$162,845.29
January 11, 1900Motor Vehicle Mechanic (Sr.)CumberlandJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$40.79=$85,169.02
January 12, 1900Heavy Equipment Mechanic (Jr.)SelmaJanuary 2, 1900XSeptember 18, 1905=June 7, 1911X$32.19=$134,413.00
January 13, 1900Motor Vehicle Mechanic (Sr.)SelmaJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$37.23=$77,743.17
January 14, 1900Total Labor Costs(Sum of Lines 1 through 13)$1,698,630.51
SECTION 2: OTHER DIRECT COSTSQTYRATE# OF PERIODS
January 16, 1900RepairsJanuary 1, 1900X$70,000.00XJanuary 12, 1900=$840,000.00
January 17, 1900DOT InspectionsMarch 10, 1902X$150.00XJanuary 1, 1900=$120,000.00
January 18, 1900Total Other Direct Costs(Sum of Lines 16 and 17)$960,000.00
SECTION 3: INDIRECT COSTS
January 8, 1900General Administrative10.00%of Line 18$96,000.00
January 9, 1900Profit15.00%of Line 18$144,000.00
January 10, 1900Total Indirect Costs(Sum of Lines 11 and 12)$240,000.00
SECTION 4: GOVERNMENT'S ESTIMATE
January 11, 1900Government's estimate of a reasonable contract price(Sum of lines 4, 7, and 10)$2,898,630.51
OPTION 1 PERIOD
Service Dates:8/31/18to8/30/19
DAYS/YRXHRS/DAY=TOTAL POSSIBLE HRS/YR
September 17, 1900January 8, 1900September 18, 1905
Labor CategorySiteQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 1, 1900Project ManagerAllJanuary 1, 1900X=December 31, 1899X=$0.00
January 2, 1900Heavy Equipment Mechanic (Sr.)AtlantaJanuary 3, 1900XSeptember 18, 1905=February 23, 1917X$43.51=$272,538.34
January 3, 1900Motor Vehicle Mechanic (Jr.)AtlantaJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$40.93=$85,455.35
January 4, 1900Heavy Equipment Mechanic (Sr.)Ft. WorthJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$42.90=$89,583.72
January 5, 1900Motor Vehicle Mechanic (Jr.)Ft. WorthJanuary 4, 1900XSeptember 18, 1905=November 12, 1922X$40.76=$340,456.65
January 6, 1900Heavy Equipment Mechanic (Sr.)FrederickJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$45.83=$95,690.98
January 7, 1900Motor Vehicle Mechanic (Jr.)FrederickJanuary 2, 1900XSeptember 18, 1905=June 7, 1911X$42.77=$178,621.54
January 8, 1900Heavy Equipment Mechanic (Jr.)MoffettJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$45.80=$95,622.74
January 9, 1900Motor Vehicle Mechanic (Sr.)MoffettJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$54.08=$112,920.95
January 10, 1900Heavy Equipment Mechanic (Jr.)CumberlandJanuary 2, 1900XSeptember 18, 1905=June 7, 1911X$39.67=$165,656.41
January 11, 1900Motor Vehicle Mechanic (Sr.)CumberlandJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$41.50=$86,649.51
January 12, 1900Heavy Equipment Mechanic (Jr.)SelmaJanuary 2, 1900XSeptember 18, 1905=June 7, 1911X$32.72=$136,655.47
January 13, 1900Motor Vehicle Mechanic (Sr.)SelmaJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$37.87=$79,075.14
January 14, 1900Total Labor Costs(Sum of Lines 1 through 13)$1,738,926.77
SECTION 2: OTHER DIRECT COSTSQTYRATE# OF PERIODS
January 16, 1900RepairsJanuary 1, 1900X$70,000.00XJanuary 12, 1900=$840,000.00
January 17, 1900DOT InspectionsMarch 10, 1902X$150.00XJanuary 1, 1900=$120,000.00
January 18, 1900Total Other Direct Costs(Sum of Lines 16 and 17)$960,000.00
SECTION 3: INDIRECT COSTS
January 8, 1900General Administrative10.00%of Line 18$96,000.00
January 9, 1900Profit15.00%of Line 18$144,000.00
January 10, 1900Total Indirect Costs(Sum of Lines 11 and 12)$240,000.00
SECTION 4: GOVERNMENT'S ESTIMATE
January 11, 1900Government's estimate of a reasonable contract price(Sum of lines 4, 7, and 10)$2,938,926.77
OPTION 2 PERIOD
Service Dates:8/31/19to8/30/20
DAYS/YRXHRS/DAY=TOTAL POSSIBLE HRS/YR
September 16, 1900January 8, 1900September 10, 1905
Labor CategorySiteQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 1, 1900Project ManagerAllJanuary 1, 1900X=December 31, 1899X=$0.00
January 2, 1900Heavy Equipment Mechanic (Sr.)AtlantaJanuary 3, 1900XSeptember 10, 1905=January 30, 1917X$44.26=$276,164.48
January 3, 1900Motor Vehicle Mechanic (Jr.)AtlantaJanuary 1, 1900XSeptember 10, 1905=September 10, 1905X$41.62=$86,579.42
January 4, 1900Heavy Equipment Mechanic (Sr.)Ft. WorthJanuary 1, 1900XSeptember 10, 1905=September 10, 1905X$43.64=$90,772.61
January 5, 1900Motor Vehicle Mechanic (Jr.)Ft. WorthJanuary 4, 1900XSeptember 10, 1905=October 11, 1922X$41.46=$344,931.51
January 6, 1900Heavy Equipment Mechanic (Sr.)FrederickJanuary 1, 1900XSeptember 10, 1905=September 10, 1905X$46.62=$96,975.76
January 7, 1900Motor Vehicle Mechanic (Jr.)FrederickJanuary 2, 1900XSeptember 10, 1905=May 22, 1911X$43.51=$180,990.75
January 8, 1900Heavy Equipment Mechanic (Jr.)MoffettJanuary 1, 1900XSeptember 10, 1905=September 10, 1905X$46.59=$96,906.45
January 9, 1900Motor Vehicle Mechanic (Sr.)MoffettJanuary 1, 1900XSeptember 10, 1905=September 10, 1905X$55.04=$114,476.27
January 10, 1900Heavy Equipment Mechanic (Jr.)CumberlandJanuary 2, 1900XSeptember 10, 1905=May 22, 1911X$40.34=$167,822.06
January 11, 1900Motor Vehicle Mechanic (Sr.)CumberlandJanuary 1, 1900XSeptember 10, 1905=September 10, 1905X$42.21=$87,792.33
January 12, 1900Heavy Equipment Mechanic (Jr.)SelmaJanuary 2, 1900XSeptember 10, 1905=May 22, 1911X$33.26=$138,365.76
January 13, 1900Motor Vehicle Mechanic (Sr.)SelmaJanuary 1, 1900XSeptember 10, 1905=September 10, 1905X$38.51=$80,099.04
January 14, 1900Total Labor Costs(Sum of Lines 1 through 13)$1,761,876.45
SECTION 2: OTHER DIRECT COSTSQTYRATE# OF PERIODS
January 16, 1900RepairsJanuary 1, 1900X$70,000.00XJanuary 12, 1900=$840,000.00
January 17, 1900DOT InspectionsMarch 10, 1902X$150.00XJanuary 1, 1900=$120,000.00
January 18, 1900Total Other Direct Costs(Sum of Lines 16 and 17)$960,000.00
SECTION 3: INDIRECT COSTS
January 8, 1900General Administrative10.00%of Line 18$96,000.00
January 9, 1900Profit15.00%of Line 18$144,000.00
January 10, 1900Total Indirect Costs(Sum of Lines 11 and 12)$240,000.00
SECTION 4: GOVERNMENT'S ESTIMATE
January 11, 1900Government's estimate of a reasonable contract price(Sum of lines 4, 7, and 10)$2,961,876.45
OPTION 3 PERIOD
Service Dates:8/31/20to8/30/21
DAYS/YRXHRS/DAY=TOTAL POSSIBLE HRS/YR
September 17, 1900January 8, 1900September 18, 1905
Labor CategorySiteQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 1, 1900Project ManagerAllJanuary 1, 1900X=December 31, 1899X=$0.00
January 2, 1900Heavy Equipment Mechanic (Sr.)AtlantaJanuary 3, 1900XSeptember 18, 1905=February 23, 1917X$45.01=$281,914.97
January 3, 1900Motor Vehicle Mechanic (Jr.)AtlantaJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$42.32=$88,369.49
January 4, 1900Heavy Equipment Mechanic (Sr.)Ft. WorthJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$44.38=$92,659.76
January 5, 1900Motor Vehicle Mechanic (Jr.)Ft. WorthJanuary 4, 1900XSeptember 18, 1905=November 12, 1922X$42.15=$352,059.70
January 6, 1900Heavy Equipment Mechanic (Sr.)FrederickJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$47.42=$99,006.52
January 7, 1900Motor Vehicle Mechanic (Jr.)FrederickJanuary 2, 1900XSeptember 18, 1905=June 7, 1911X$44.24=$184,752.21
January 8, 1900Heavy Equipment Mechanic (Jr.)MoffettJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$47.38=$98,935.60
January 9, 1900Motor Vehicle Mechanic (Sr.)MoffettJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$55.99=$116,912.17
January 10, 1900Heavy Equipment Mechanic (Jr.)CumberlandJanuary 2, 1900XSeptember 18, 1905=June 7, 1911X$41.02=$171,278.65
January 11, 1900Motor Vehicle Mechanic (Sr.)CumberlandJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$42.92=$89,610.48
January 12, 1900Heavy Equipment Mechanic (Jr.)SelmaJanuary 2, 1900XSeptember 18, 1905=June 7, 1911X$33.80=$141,140.41
January 13, 1900Motor Vehicle Mechanic (Sr.)SelmaJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$39.15=$81,739.08
January 14, 1900Total Labor Costs(Sum of Lines 1 through 13)$1,798,379.03
SECTION 2: OTHER DIRECT COSTSQTYRATE# OF PERIODS
January 16, 1900RepairsJanuary 1, 1900X$70,000.00XJanuary 12, 1900=$840,000.00
January 17, 1900DOT InspectionsMarch 10, 1902X$150.00XJanuary 1, 1900=$120,000.00
January 18, 1900Total Other Direct Costs(Sum of Lines 16 and 17)$960,000.00
SECTION 3: INDIRECT COSTS
January 8, 1900General Administrative10.00%of Line 18$96,000.00
January 9, 1900Profit15.00%of Line 18$144,000.00
January 10, 1900Total Indirect Costs(Sum of Lines 11 and 12)$240,000.00
SECTION 4: GOVERNMENT'S ESTIMATE
January 11, 1900Government's estimate of a reasonable contract price(Sum of lines 4, 7, and 10)$2,998,379.03
OPTION 4 PERIOD
Service Dates:8/31/21to8/30/22
DAYS/YRXHRS/DAY=TOTAL POSSIBLE HRS/YR
September 17, 1900January 8, 1900September 18, 1905
Labor CategorySiteQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 1, 1900Project ManagerAllJanuary 1, 1900X=December 31, 1899X=$0.00
January 2, 1900Heavy Equipment Mechanic (Sr.)AtlantaJanuary 3, 1900XSeptember 18, 1905=February 23, 1917X$45.75=$286,603.29
January 3, 1900Motor Vehicle Mechanic (Jr.)AtlantaJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$43.02=$89,826.56
January 4, 1900Heavy Equipment Mechanic (Sr.)Ft. WorthJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$45.11=$94,197.78
January 5, 1900Motor Vehicle Mechanic (Jr.)Ft. WorthJanuary 4, 1900XSeptember 18, 1905=November 12, 1922X$42.85=$357,861.22
January 6, 1900Heavy Equipment Mechanic (Sr.)FrederickJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$48.21=$100,664.29
January 7, 1900Motor Vehicle Mechanic (Jr.)FrederickJanuary 2, 1900XSeptember 18, 1905=June 7, 1911X$44.98=$187,817.54
January 8, 1900Heavy Equipment Mechanic (Jr.)MoffettJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$48.18=$100,592.03
January 9, 1900Motor Vehicle Mechanic (Sr.)MoffettJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$56.95=$118,907.78
January 10, 1900Heavy Equipment Mechanic (Jr.)CumberlandJanuary 2, 1900XSeptember 18, 1905=June 7, 1911X$41.69=$174,089.76
January 11, 1900Motor Vehicle Mechanic (Sr.)CumberlandJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$43.63=$91,090.96
January 12, 1900Heavy Equipment Mechanic (Jr.)SelmaJanuary 2, 1900XSeptember 18, 1905=June 7, 1911X$34.33=$143,382.88
January 13, 1900Motor Vehicle Mechanic (Sr.)SelmaJanuary 1, 1900XSeptember 18, 1905=September 18, 1905X$39.78=$83,071.05
January 14, 1900Total Labor Costs(Sum of Lines 1 through 13)$1,828,105.17
SECTION 2: OTHER DIRECT COSTSQTYRATE# OF PERIODS
January 16, 1900RepairsJanuary 1, 1900X$70,000.00XJanuary 12, 1900=$840,000.00
January 17, 1900DOT InspectionsMarch 10, 1902X$150.00XJanuary 1, 1900=$120,000.00
January 18, 1900Total Other Direct Costs(Sum of Lines 16 and 17)$960,000.00
SECTION 3: INDIRECT COSTS
January 8, 1900General Administrative10.00%of Line 18$96,000.00
January 9, 1900Profit15.00%of Line 18$144,000.00
January 10, 1900Total Indirect Costs(Sum of Lines 11 and 12)$240,000.00
SECTION 4: GOVERNMENT'S ESTIMATE
January 11, 1900Government's estimate of a reasonable contract price(Sum of lines 4, 7, and 10)$3,028,105.17

WDOL Rates

Occupation CodeTitleDC AtlantaDC Fort WorthDC FrederickDC MoffettMHU CumberlandMHU Selma
01051Data Entry Operator I13.8413.2014.3815.3814.7411.70
01052Data Entry Operator II15.7014.4115.6916.7816.0812.77
01111General Clerk I13.4312.4514.8815.8714.8810.33
01112General Clerk II14.8414.0716.2417.3116.2411.52
01113General Clerk III16.4516.1618.7419.3718.2312.65
01300Scheduler, Maintenance16.1317.3218.0723.1218.0713.73
01311Secretary I16.1317.3218.0723.1218.0713.73
01312Secretary II18.0519.3820.1825.8620.1815.36
01313Secretary III20.1321.6025.2928.8325.2917.13
05005Automobile Body Repairer, Fiberglass23.2622.3125.2624.2520.9820.66
05070Automotive Worker20.1821.9322.1522.3319.3414.94
05190Motor Vehicle Mechanic23.3622.9924.7824.7621.0116.76
23430Heavy Equipment Mechanic21.7821.6822.9129.8322.1319.91
23910Small Engine Mechanic16.9318.0820.4920.5821.0316.61
23960Welder, Combination, Maintenance16.3817.7522.9123.2022.9116.63
99050Desk Clerk10.059.7511.5811.8111.169.36
N/AHealth & Welfare4.27January 4, 1900January 4, 1900January 4, 1900January 4, 1900January 4, 1900
*The labor rates for Atlanta (Fulton County, GA) were pulled from the wage determinations under the SCA date of revision 12/30/2016.
*The labor rates for Cumberland (Allegany County, MD) were pulled from the wage determinations under the SCA date of revision 12/30/2016.
*The labor rates for Fort Worth (Tarrant County, TX) were pulled from the wage determinations under the SCA date of revision 12/30/2016.
*The labor rates for Frederick (Frederick County, MD) were pulled from the wage determinations under the SCA date of revision 12/30/2016.
*The labor rates for Moffett (Santa Clara County, CA) were pulled from the wage determinations under the SCA date of revision 12/30/2016.
*The labor rates for Selma (Dallas County, AL) were pulled from the wage determinations under the SCA date of revision 12/30/2016.

Base Burden

Title of Work:DC Atlanta Maintenance ContractService Dates:8/31/17to8/30/18
DAYS/YRXHRS/DAY=TOTAL POSSIBLE HRS/YR-HOLIDAY HRS/YR-VACATION HRS/YRACTUAL HRS/YR
September 17, 1900January 8, 1900September 18, 1905December 31, 1899December 31, 1899September 18, 1905
DIRECT LABOR COSTSQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 1, 1900Motor Vehicle MechanicJanuary 1, 1900XSeptember 18, 1905September 18, 1905X$23.36

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.=$48,775.68
January 2, 1900Base CPI0.00%$48,775.68
January 3, 1900Total Labor Costs(Sum of Lines 1 and 2)$48,775.68
FRINGE BENEFITS COSTS
January 4, 1900Workmen's Compensation9.38%of Line 3$4,575.16
January 5, 1900Payroll Taxes8.65%of Line 3$4,219.10
January 6, 1900Other Fringe Benefits10.13%of Line 3$4,940.98
January 7, 1900Health & WelfareSeptember 18, 1905HoursX$4.27

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.=$8,915.76
January 8, 1900Total Fringe Benefits Cost(Sum of Lines 4 through 7)$22,650.99
INDIRECT COSTS
January 10, 1900General Administrative10.00%of Lines 3 and 8$7,142.67
January 11, 1900Profit15.00%of Lines 3 and 8$10,714.00
January 12, 1900Total Indirect Costs(Sum of Lines 10 through 11)$17,856.67
BURDENED RATE PER LABOR CATEGORY
January 13, 1900Total Labor, Fringe Benefits and Indirect Cost for Motor Vehicle Mechanic$89,283.34
January 14, 1900Total Possible Hours per YearSeptember 18, 1905
January 15, 1900Burdened Labor Rate(Divide Line 13 by Line 14)$42.76
DIRECT LABOR COSTSQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 16, 1900Heavy Equipment MechanicJanuary 1, 1900XSeptember 18, 1905September 18, 1905X$21.78

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.=$45,476.64
January 17, 1900Base CPI0.00%$45,476.64
January 18, 1900Total Labor Costs(Sum of Lines 16 and 17)$45,476.64
FRINGE BENEFITS COSTS
January 19, 1900Workmen's Compensation9.38%of Line 3$4,265.71
January 20, 1900Payroll Taxes8.65%of Line 3$3,933.73
January 21, 1900Other Fringe Benefits10.13%of Line 3$4,606.78
January 22, 1900Health & WelfareSeptember 18, 1905HoursX$4.27

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.=$8,915.76
January 23, 1900Total Fringe Benefits Cost(Sum of Lines 19 through 22)$21,721.98
INDIRECT COSTS
January 24, 1900General Administrative10.00%of Lines 3 and 8$6,719.86
January 25, 1900Profit15.00%of Lines 3 and 8$10,079.79
January 26, 1900Total Indirect Costs(Sum of Lines 24 and 25)$16,799.66
BURDENED RATE PER LABOR CATEGORY
January 27, 1900Total Labor, Fringe Benefits and Indirect Cost for Motor Vehicle Mechanic$83,998.28
January 28, 1900Total Possible Hours per YearSeptember 18, 1905
January 29, 1900Burdened Labor Rate(Divide Line 27 by Line 28)$40.23
Title of Work:DC Fort Worth Maintenance ContractService Dates:8/31/17to8/30/18
DAYS/YRXHRS/DAY=TOTAL POSSIBLE HRS/YR-HOLIDAY HRS/YR-VACATION HRS/YRACTUAL HRS/YR
September 17, 1900January 8, 1900September 18, 1905December 31, 1899December 31, 1899September 18, 1905
DIRECT LABOR COSTSQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 1, 1900Motor Vehicle MechanicJanuary 1, 1900XSeptember 18, 1905September 18, 1905X$22.99

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.=$48,003.12
January 2, 1900Base CPI0.00%$48,003.12
January 3, 1900Total Labor Costs(Sum of Lines 1 and 2)$48,003.12
FRINGE BENEFITS COSTS
January 4, 1900Workmen's Compensation9.38%of Line 3$4,502.69
January 5, 1900Payroll Taxes8.65%of Line 3$4,152.27
January 6, 1900Other Fringe Benefits10.13%of Line 3$4,862.72
January 7, 1900Health & WelfareSeptember 18, 1905HoursX$4.27

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.=$8,915.76
January 8, 1900Total Fringe Benefits Cost(Sum of Lines 4 through 7)$22,433.44
INDIRECT COSTS
January 10, 1900General Administrative10.00%of Lines 3 and 8$7,043.66
January 11, 1900Profit15.00%of Lines 3 and 8$10,565.48
January 12, 1900Total Indirect Costs(Sum of Lines 10 through 11)$17,609.14
BURDENED RATE PER LABOR CATEGORY
January 13, 1900Total Labor, Fringe Benefits and Indirect Cost for Motor Vehicle Mechanic$88,045.70
January 14, 1900Total Possible Hours per YearSeptember 18, 1905
January 15, 1900Burdened Labor Rate(Divide Line 13 by Line 14)$42.17
DIRECT LABOR COSTSQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 16, 1900Heavy Equipment MechanicJanuary 1, 1900XSeptember 18, 1905September 18, 1905X$21.68

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.=$45,267.84
January 17, 1900Base CPI0.00%$45,267.84
January 18, 1900Total Labor Costs(Sum of Lines 16 and 17)$45,267.84
FRINGE BENEFITS COSTS
January 19, 1900Workmen's Compensation9.38%of Line 3$4,246.12
January 20, 1900Payroll Taxes8.65%of Line 3$3,915.67
January 21, 1900Other Fringe Benefits10.13%of Line 3$4,585.63
January 22, 1900Health & WelfareSeptember 18, 1905HoursX$4.27

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.=$8,915.76
January 23, 1900Total Fringe Benefits Cost(Sum of Lines 19 through 22)$21,663.18
INDIRECT COSTS
January 24, 1900General Administrative10.00%of Lines 3 and 8$6,693.10
January 25, 1900Profit15.00%of Lines 3 and 8$10,039.65
January 26, 1900Total Indirect Costs(Sum of Lines 24 and 25)$16,732.76
BURDENED RATE PER LABOR CATEGORY
January 27, 1900Total Labor, Fringe Benefits and Indirect Cost for Motor Vehicle Mechanic$83,663.78
January 28, 1900Total Possible Hours per YearSeptember 18, 1905
January 29, 1900Burdened Labor Rate(Divide Line 27 by Line 28)$40.07
Title of Work:DC Frederick Maintenance ContractService Dates:8/31/17to8/30/18
DAYS/YRXHRS/DAY=TOTAL POSSIBLE HRS/YR-HOLIDAY HRS/YR-VACATION HRS/YRACTUAL HRS/YR
September 17, 1900January 8, 1900September 18, 1905December 31, 1899December 31, 1899September 18, 1905
DIRECT LABOR COSTSQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 1, 1900Motor Vehicle MechanicJanuary 1, 1900XSeptember 18, 1905September 18, 1905X$24.78

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.=$51,740.64
January 2, 1900Base CPI0.00%$51,740.64
January 3, 1900Total Labor Costs(Sum of Lines 1 and 2)$51,740.64
FRINGE BENEFITS COSTS
January 4, 1900Workmen's Compensation9.38%of Line 3$4,853.27
January 5, 1900Payroll Taxes8.65%of Line 3$4,475.57
January 6, 1900Other Fringe Benefits10.13%of Line 3$5,241.33
January 7, 1900Health & WelfareSeptember 18, 1905HoursX$4.27

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.=$8,915.76
January 8, 1900Total Fringe Benefits Cost(Sum of Lines 4 through 7)$23,485.92
INDIRECT COSTS
January 10, 1900General Administrative10.00%of Lines 3 and 8$7,522.66
January 11, 1900Profit15.00%of Lines 3 and 8$11,283.98
January 12, 1900Total Indirect Costs(Sum of Lines 10 through 11)$18,806.64
BURDENED RATE PER LABOR CATEGORY
January 13, 1900Total Labor, Fringe Benefits and Indirect Cost for Motor Vehicle Mechanic$94,033.21
January 14, 1900Total Possible Hours per YearSeptember 18, 1905
January 15, 1900Burdened Labor Rate(Divide Line 13 by Line 14)$45.04
DIRECT LABOR COSTSQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 16, 1900Heavy Equipment MechanicJanuary 1, 1900XSeptember 18, 1905September 18, 1905X$22.91

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.=$47,836.08
January 17, 1900Base CPI0.00%$47,836.08
January 18, 1900Total Labor Costs(Sum of Lines 16 and 17)$47,836.08
FRINGE BENEFITS COSTS
January 19, 1900Workmen's Compensation9.38%of Line 3$4,487.02
January 20, 1900Payroll Taxes8.65%of Line 3$4,137.82
January 21, 1900Other Fringe Benefits10.13%of Line 3$4,845.79
January 22, 1900Health & WelfareSeptember 18, 1905HoursX$4.27

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.=$8,915.76
January 23, 1900Total Fringe Benefits Cost(Sum of Lines 19 through 22)$22,386.40
INDIRECT COSTS
January 24, 1900General Administrative10.00%of Lines 3 and 8$7,022.25
January 25, 1900Profit15.00%of Lines 3 and 8$10,533.37
January 26, 1900Total Indirect Costs(Sum of Lines 24 and 25)$17,555.62
BURDENED RATE PER LABOR CATEGORY
January 27, 1900Total Labor, Fringe Benefits and Indirect Cost for Motor Vehicle Mechanic$87,778.10
January 28, 1900Total Possible Hours per YearSeptember 18, 1905
January 29, 1900Burdened Labor Rate(Divide Line 27 by Line 28)$42.04
Title of Work:DC Moffett Maintenance ContractService Dates:8/31/17to8/30/18
DAYS/YRXHRS/DAY=TOTAL POSSIBLE HRS/YR-HOLIDAY HRS/YR-VACATION HRS/YRACTUAL HRS/YR
September 17, 1900January 8, 1900September 18, 1905December 31, 1899December 31, 1899September 18, 1905
DIRECT LABOR COSTSQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 1, 1900Motor Vehicle MechanicJanuary 1, 1900XSeptember 18, 1905September 18, 1905X$24.76

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.=$51,698.88
January 2, 1900Base CPI0.00%$51,698.88
January 3, 1900Total Labor Costs(Sum of Lines 1 and 2)$51,698.88
FRINGE BENEFITS COSTS
January 4, 1900Workmen's Compensation9.38%of Line 3$4,849.35
January 5, 1900Payroll Taxes8.65%of Line 3$4,471.95
January 6, 1900Other Fringe Benefits10.13%of Line 3$5,237.10
January 7, 1900Health & WelfareSeptember 18, 1905HoursX$4.27

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.=$8,915.76
January 8, 1900Total Fringe Benefits Cost(Sum of Lines 4 through 7)$23,474.16
INDIRECT COSTS
January 10, 1900General Administrative10.00%of Lines 3 and 8$7,517.30
January 11, 1900Profit15.00%of Lines 3 and 8$11,275.96
January 12, 1900Total Indirect Costs(Sum of Lines 10 through 11)$18,793.26
BURDENED RATE PER LABOR CATEGORY
January 13, 1900Total Labor, Fringe Benefits and Indirect Cost for Motor Vehicle Mechanic$93,966.31
January 14, 1900Total Possible Hours per YearSeptember 18, 1905
January 15, 1900Burdened Labor Rate(Divide Line 13 by Line 14)$45.00
DIRECT LABOR COSTSQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 16, 1900Heavy Equipment MechanicJanuary 1, 1900XSeptember 18, 1905September 18, 1905X$29.83

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.=$62,285.04
January 17, 1900Base CPI0.00%$62,285.04
January 18, 1900Total Labor Costs(Sum of Lines 16 and 17)$62,285.04
FRINGE BENEFITS COSTS
January 19, 1900Workmen's Compensation9.38%of Line 3$5,842.34
January 20, 1900Payroll Taxes8.65%of Line 3$5,387.66
January 21, 1900Other Fringe Benefits10.13%of Line 3$6,309.47
January 22, 1900Health & WelfareSeptember 18, 1905HoursX$4.27

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.=$8,915.76
January 23, 1900Total Fringe Benefits Cost(Sum of Lines 19 through 22)$26,455.23
INDIRECT COSTS
January 24, 1900General Administrative10.00%of Lines 3 and 8$8,874.03
January 25, 1900Profit15.00%of Lines 3 and 8$13,311.04
January 26, 1900Total Indirect Costs(Sum of Lines 24 and 25)$22,185.07
SECTION 3: BURDENED RATE PER LABOR CATEGORY
January 27, 1900Total Labor, Fringe Benefits and Indirect Cost for Motor Vehicle Mechanic$110,925.33
January 28, 1900Total Possible Hours per YearSeptember 18, 1905
January 29, 1900Burdened Labor Rate(Divide Line 27 by Line 28)$53.13
Title of Work:MHU Cumberland Maintenance ContractService Dates:8/31/17to8/30/18
DAYS/YRXHRS/DAY=TOTAL POSSIBLE HRS/YR-HOLIDAY HRS/YR-VACATION HRS/YRACTUAL HRS/YR
September 17, 1900January 8, 1900September 18, 1905December 31, 1899December 31, 1899September 18, 1905
DIRECT LABOR COSTSQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 1, 1900Motor Vehicle MechanicJanuary 1, 1900XSeptember 18, 1905September 18, 1905X$21.01

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.=$43,868.88
January 2, 1900Base CPI0.00%$43,868.88
January 3, 1900Total Labor Costs(Sum of Lines 1 and 2)$43,868.88
FRINGE BENEFITS COSTS
January 4, 1900Workmen's Compensation9.38%of Line 3$4,114.90
January 5, 1900Payroll Taxes8.65%of Line 3$3,794.66
January 6, 1900Other Fringe Benefits10.13%of Line 3$4,443.92
January 7, 1900Health & WelfareSeptember 18, 1905HoursX$4.27

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.=$8,915.76
January 8, 1900Total Fringe Benefits Cost(Sum of Lines 4 through 7)$21,269.24
INDIRECT COSTS
January 10, 1900General Administrative10.00%of Lines 3 and 8$6,513.81
January 11, 1900Profit15.00%of Lines 3 and 8$9,770.72
January 12, 1900Total Indirect Costs(Sum of Lines 10 through 11)$16,284.53
BURDENED RATE PER LABOR CATEGORY
January 13, 1900Total Labor, Fringe Benefits and Indirect Cost for Motor Vehicle Mechanic$81,422.65
January 14, 1900Total Possible Hours per YearSeptember 18, 1905
January 15, 1900Burdened Labor Rate(Divide Line 13 by Line 14)$39.00
DIRECT LABOR COSTSQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 16, 1900Heavy Equipment MechanicJanuary 1, 1900XSeptember 18, 1905September 18, 1905X$22.13

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.=$46,207.44
January 17, 1900Base CPI0.00%$46,207.44
January 18, 1900Total Labor Costs(Sum of Lines 16 and 17)$46,207.44
FRINGE BENEFITS COSTS
January 19, 1900Workmen's Compensation9.38%of Line 3$4,334.26
January 20, 1900Payroll Taxes8.65%of Line 3$3,996.94
January 21, 1900Other Fringe Benefits10.13%of Line 3$4,680.81
January 22, 1900Health & WelfareSeptember 18, 1905HoursX$4.27

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.=$8,915.76
January 23, 1900Total Fringe Benefits Cost(Sum of Lines 19 through 22)$21,927.78
INDIRECT COSTS
January 24, 1900General Administrative10.00%of Lines 3 and 8$6,813.52
January 25, 1900Profit15.00%of Lines 3 and 8$10,220.28
January 26, 1900Total Indirect Costs(Sum of Lines 24 and 25)$17,033.80
BURDENED RATE PER LABOR CATEGORY
January 27, 1900Total Labor, Fringe Benefits and Indirect Cost for Motor Vehicle Mechanic$85,169.02
January 28, 1900Total Possible Hours per YearSeptember 18, 1905
January 29, 1900Burdened Labor Rate(Divide Line 27 by Line 28)$40.79
Title of Work:MHU Selma Maintenance ContractService Dates:8/31/17to8/30/18
DAYS/YRXHRS/DAY=TOTAL POSSIBLE HRS/YR-HOLIDAY HRS/YR-VACATION HRS/YRACTUAL HRS/YR
September 17, 1900January 8, 1900September 18, 1905December 31, 1899December 31, 1899September 18, 1905
DIRECT LABOR COSTSQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 1, 1900Motor Vehicle MechanicJanuary 1, 1900XSeptember 18, 1905September 18, 1905X$16.76

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.=$34,994.88
January 2, 1900Base CPI0.00%$34,994.88
January 3, 1900Total Labor Costs(Sum of Lines 1 and 2)$34,994.88
FRINGE BENEFITS COSTS
January 4, 1900Workmen's Compensation9.38%of Line 3$3,282.52
January 5, 1900Payroll Taxes8.65%of Line 3$3,027.06
January 6, 1900Other Fringe Benefits10.13%of Line 3$3,544.98
January 7, 1900Health & WelfareSeptember 18, 1905HoursX$4.27

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.=$8,915.76
January 8, 1900Total Fringe Benefits Cost(Sum of Lines 4 through 7)$18,770.32
INDIRECT COSTS
January 10, 1900General Administrative10.00%of Lines 3 and 8$5,376.52
January 11, 1900Profit15.00%of Lines 3 and 8$8,064.78
January 12, 1900Total Indirect Costs(Sum of Lines 10 through 11)$13,441.30
BURDENED RATE PER LABOR CATEGORY
January 13, 1900Total Labor, Fringe Benefits and Indirect Cost for Motor Vehicle Mechanic$67,206.50
January 14, 1900Total Possible Hours per YearSeptember 18, 1905
January 15, 1900Burdened Labor Rate(Divide Line 13 by Line 14)$32.19
DIRECT LABOR COSTSQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 16, 1900Heavy Equipment MechanicJanuary 1, 1900XSeptember 18, 1905September 18, 1905X$19.91

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.=$41,572.08
January 17, 1900Base CPI0.00%$41,572.08
January 18, 1900Total Labor Costs(Sum of Lines 16 and 17)$41,572.08
FRINGE BENEFITS COSTS
January 19, 1900Workmen's Compensation9.38%of Line 3$3,899.46
January 20, 1900Payroll Taxes8.65%of Line 3$3,595.98
January 21, 1900Other Fringe Benefits10.13%of Line 3$4,211.25
January 22, 1900Health & WelfareSeptember 18, 1905HoursX$4.27

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.=$8,915.76
January 23, 1900Total Fringe Benefits Cost(Sum of Lines 19 through 22)$20,622.46
INDIRECT COSTS
January 24, 1900General Administrative10.00%of Lines 3 and 8$6,219.45
January 25, 1900Profit15.00%of Lines 3 and 8$9,329.18
January 26, 1900Total Indirect Costs(Sum of Lines 24 and 25)$15,548.63
SECTION 3: BURDENED RATE PER LABOR CATEGORY
January 27, 1900Total Labor, Fringe Benefits and Indirect Cost for Motor Vehicle Mechanic$77,743.17
January 28, 1900Total Possible Hours per YearSeptember 18, 1905
January 29, 1900Burdened Labor Rate(Divide Line 27 by Line 28)$37.23

Option 1 Burden

Title of Work:DC Atlanta Maintenance ContractService Dates:8/31/18to8/30/19
DAYS/YRXHRS/DAY=TOTAL POSSIBLE HRS/YR-HOLIDAY HRS/YR-VACATION HRS/YRACTUAL HRS/YR
September 17, 1900January 8, 1900September 18, 1905December 31, 1899December 31, 1899September 18, 1905
DIRECT LABOR COSTSQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 1, 1900Motor Vehicle MechanicJanuary 1, 1900XSeptember 18, 1905September 18, 1905X$23.36

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.=$48,775.68
January 2, 1900Option 1 CPI2.00%$49,751.19
January 3, 1900Total Labor Costs(Sum of Lines 1 and 2)$49,751.19
FRINGE BENEFITS COSTS
January 4, 1900Workmen's Compensation9.38%of Line 3$4,666.66
January 5, 1900Payroll Taxes8.65%of Line 3$4,303.48
January 6, 1900Other Fringe Benefits10.13%of Line 3$5,039.80
January 7, 1900Health & WelfareSeptember 18, 1905HoursX$4.27

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.=$8,915.76
January 8, 1900Total Fringe Benefits Cost(Sum of Lines 4 through 7)$22,925.70
INDIRECT COSTS
January 10, 1900General Administrative10.00%of Lines 3 and 8$7,267.69
January 11, 1900Profit15.00%of Lines 3 and 8$10,901.53
January 12, 1900Total Indirect Costs(Sum of Lines 10 through 11)$18,169.22
BURDENED RATE PER LABOR CATEGORY
January 13, 1900Total Labor, Fringe Benefits and Indirect Cost for Motor Vehicle Mechanic$90,846.11
January 14, 1900Total Possible Hours per YearSeptember 18, 1905
January 15, 1900Burdened Labor Rate(Divide Line 13 by Line 14)$43.51
DIRECT LABOR COSTSQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 16, 1900Heavy Equipment MechanicJanuary 1, 1900XSeptember 18, 1905September 18, 1905X$21.78

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.=$45,476.64
January 17, 1900Option 1 CPI2.00%$46,386.17
January 18, 1900Total Labor Costs(Sum of Lines 16 and 17)$46,386.17
FRINGE BENEFITS COSTS
January 19, 1900Workmen's Compensation9.38%of Line 3$4,351.02
January 20, 1900Payroll Taxes8.65%of Line 3$4,012.40
January 21, 1900Other Fringe Benefits10.13%of Line 3$4,698.92
January 22, 1900Health & WelfareSeptember 18, 1905HoursX$4.27

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.=$8,915.76
January 23, 1900Total Fringe Benefits Cost(Sum of Lines 19 through 22)$21,978.11
INDIRECT COSTS
January 24, 1900General Administrative10.00%of Lines 3 and 8$6,836.43
January 25, 1900Profit15.00%of Lines 3 and 8$10,254.64
January 26, 1900Total Indirect Costs(Sum of Lines 24 and 25)$17,091.07
BURDENED RATE PER LABOR CATEGORY
January 27, 1900Total Labor, Fringe Benefits and Indirect Cost for Motor Vehicle Mechanic$85,455.35
January 28, 1900Total Possible Hours per YearSeptember 18, 1905
January 29, 1900Burdened Labor Rate(Divide Line 27 by Line 28)$40.93
Title of Work:DC Fort Worth Maintenance ContractService Dates:8/31/18to8/30/19
DAYS/YRXHRS/DAY=TOTAL POSSIBLE HRS/YR-HOLIDAY HRS/YR-VACATION HRS/YRACTUAL HRS/YR
September 17, 1900January 8, 1900September 18, 1905December 31, 1899December 31, 1899September 18, 1905
DIRECT LABOR COSTSQTYHOURS/YRTOTAL HRSRATE/HRTOTAL
January 1, 1900Motor Vehicle MechanicJanuary 1, 1900XSeptember 18, 1905September 18, 1905X$22.99

Reid Jr, David: Reid Jr, David:

Rate based off Department of Labor wage determination for 01051 - Data Entry Operator I.=$48,003.12
January 2, 1900Option 1 CPI2.00%$48,963.18
January 3, 1900Total Labor Costs(Sum of Lines 1 and 2)$48,963.18
FRINGE BENEFITS COSTS
January 4, 1900Workmen's Compensation9.38%of Line 3$4,592.75
January 5, 1900Payroll Taxes8.65%of Line 3$4,235.32
January 6, 1900Other Fringe Benefits10.13%of Line 3$4,959.97
January 7, 1900Health & WelfareSeptember 18, 1905HoursX$4.27

Reid Jr, David: Reid Jr, David:

Enter dollar figure per hour based on DOL Wage Determination or CBA info.=$8,915.76
January 8, 1900Total Fringe Benefits Cost(Sum of Lines 4 through 7)$22,703.79
INDIRECT COSTS
January 10, 1900General Administrative10.00%of Lines 3 and 8$7,166.70
January 11, 1900Profit15.00%of Lines 3 and 8$10,750.05
January 12, 1900Total Indirect Costs(Sum of Lines 10 through 11)$17,916.74

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.