SOLICITATION_AMENDMENT_0001_HSCGG117BPFA002_WAESCHE_HALL_REPLACE_ROOF_USCG_ACADEMY _PROJECT__5753515.pdf

PDF 98 KB Posted

Attached to
REPLACE ROOFS, WAESCHE HALL, USCG ACADEMY, NEW LONDON, CT PROJECT #5753515
Solicitation number
HSCGG1-17-B-PFA002
Issued by

About this file

SOLICITATION AMENDMENT 0001 HSCGG1-17-B-PFA002 WAESCHE HALL ROOF REPLACEMENT USCG ACADEMY NEW LONDON CT PROJECT 5753515

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO.

3. DATE

28 OCT 2016

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE

7. ADMINISTERED BY (If other than Item 6) CODE

Contracting Officer USCG Civil Engineering Unit 475 Kilvert St. Suite 100 Warwick, RI 02886

Same as block #6

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

THIS AMENDMENT MUST BE

ACKNOWLEDGED WITH YOUR BID

9A. AMENDMENT OF SOLICITATION NO.

HSCGG1-17-B-PFA002

9B. DATED (SEE ITEM 11)

10/04/2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

THE BID OPENING DATE REMAINS 2:00 P.M. TUESDAY 08 NOVEMBER 2016

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or

(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET

FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

1. The solicitation referenced in Block #9A is hereby amended as follows:

a. Funds are not presently available for this contract. FAR 52.232-18 Availability of Funds (APR 1984) is hereby incorporated by reference.

b. Solicitation Page 10 – FAR 52.204-18 – change date to read JUL 2016

c. Solicitation Page 10 – FAR 52.222-26 – change date to read SEP 2016

d. Solicitation Page 10 – FAR 52.223-12 – delete in its entirety

e. Solicitation Page 11 – FAR 52.244-6 – change date to read SEP 2016

f. Solicitation Page 24 – FAR 52.204-16 – change date to read JUL 2016

g. Page 2 of this amendment provides questions and answers in response to requests for information received to date.

2. The bid opening date remains 2:00 p.m. eastern time on Tuesday, 8 November 2016.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TERESA LAMPHERE

15B. CONTRACTOR/OFFEROR

15C. DATE SIGNED

16B UNITED STATES OF AMERICA

BY

16C. DATE SIGNED

10/28/2016

NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83)

Amendment 0001 10/28/2016

Question 1:

We want to verify if there is an existing pitch in the roof deck. When you refer to plan page A-100 the roof plan, the main roof area (Library Roof Area) says "Structural Concrete Slab 1/8" in 12", with a 1/4" in 12 Roof Slope note above this. Does this mean we are adding an 1/8" Per ft tapered system to achieve 1/4" per ft slope? The same question applies to the Lobby Roof & Museum Roof areas, if there is existing 1/8" slope at all areas and we are adding tapered to achieve 1/4" per ft slope after the re-roof.

Answer 1:

Based on the existing building drawings (bid reference drawings) and as noted on contract drawing A-100, the existing structural deck at the Library roof area and the Museum roof area slope at about 1/8” in 12”, and the existing structural deck at the Lobby roof area is flat. Per contract drawing A-100, final roof slope shall be ¼” in 12”. This will include tapered insulation plus any existing scope on the structural deck.

Question 2:

On page 5 of 29 on the Solicitation Package, Section F. Mentions start date of May 2017. I want to confirm that this is the intended start date, and if so are we to price it with today's pricing or try to forecast pricing for next May.

Answer 2:

Yes, the “May 2017 after graduation” in the Solicitation Package is the on-site start date and is correct.

The contractor’s bid shall include cost for completing the work per the solicitation package including on-site construction schedule. The date for R-day, Monday June 28, 2017 is incorrect. The date for R-day is Monday, July 3, 2017.

Questions 3:

Can we get clarification on any test cuts that may have been done? (Thickness of existing material, composition etc.)

Answer 3:

The roof assemblies base on previous test cuts are as follows:

Silver coating on black modified bituminous membrane.

Polyisocyanurate insulation board – about 4” thick, thickness varies at crickets and edges.

Concrete deck.

Question 4:

There are several details that show at the edge & parapet wall "Continuous 2X Pressure Treated wood blocking mechanically attached to concrete deck." We assume that there is some existing blocking, are we to add on to existing blocking as needed? Or is all blocking to be new?

Answer 4:

Remove all existing wood blocking and replace with new pressure treated wood per bid drawing details.

Amendment 0001 10/28/2016

Question 5:

I have looked in the SOW and did not see anything that mention the size of the ISO board can you please clarify the size you are looking for and an R-Value?

Answer 5:

Per drawing A-100 the elevations of the existing roof deck and the elevations of the new roof are giving.

Based on these elevations, the minimum total thickness of the insulation plus cover board is 4" at the low point and increases in thickness to maximum at the high points, (8" to 13.5" see A-100 for elevations and locations).

Question 6:

Why are you asking for a vapor barrier on the deck?

Answer 6:

Vapor barrier is required on this project per the bid documents.