Amendment 0002 to solicitation HSCGG1-12-B-PFA027

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

6/26/2012

4. REQUISITION/PURCHASE REQ.

2412G12PFA027

5. PROJECT NO. (If applicable)

4685061 / 3580433

6. ISSUED BY CODE 51283 7. ADMINISTERED BY (If other than Item 6) CODE 51283

Contracting Officer USCG Civil Engineering Unit Providence 300 Metro Center Blvd.

Warwick, RI 02886-1747

Contracting Officer USCG Civil Engineering Unit Providence 300 Metro Center Blvd.

Warwick, RI 02886-1747

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

TO ALL BIDDERS

THIS AMENDMENT MUST BE ACKNOWLEDGED

SEE BLOCK 11 BELOW

9A. AMENDMENT OF SOLICITATION NO.

HSCGG1-12-B-PFA027

9B. DATED (SEE ITEM 11)

6 JUN 2012

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Bid Opening Remains 10 July 2012, at 2:00 p.m.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET

FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The solicitation referenced on block 9, for Waterfront Repairs at the USCG Academy, is amended as follows:

a) FAR clause 53.232-27, referenced on page 12 of the solicitation is amended to include the following: Paragraph (a)(i)(A) is changed to read 30 days.

b) Section J. 5 -- The wage rate decision no. CT12007 (04/06/2012) is deleted and is hereby replaced with the attached Wage Rate Decision No.

CT12007 (06/01/2012)

c) In response to a Request for Information (RFI) submitted by an interested party regarding the configuration/components of the South Float, please see the attached (1 page).

All other terms and conditions remain unchanged. Due date for receipt of proposals remains 10 July 2012, 2:00 p.m.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Jean Bretz

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.243

The floating dock system depicted on Sheet S-11 is diagrammatical in nature and does not necessarily match existing floating dock system construction or configuration. Existing floating dock system is approximately 30’ wide x 100’ long and constructed of one solid float with two rows of concrete float modules similar to the floating dock substructure depicted in the image below (of a similar float taken during disassembly). See photo on sheet G-04 (“South Float Looking West”) for existing condition of the timber floating dock.

The replacement floating dock shall be in-accordance with the plans and specifications with the following modifications.

1. Floating dock system may be of a single unit or articulated as depicted on drawings. Articulated docks must have an approved aluminum transition plate between units to alleviate tripping hazards.

2. The floating dock system shall have total dimensions of 30 feet by 100 feet regardless of construction type.

3. The specified live load shall be modified from 50 psf to 30psf

4. The maximum freeboard measured from the end of the sloped/wing section shall be 12-inches under dead load only. Minimum freeboard including live load is depicted on the drawings.

5. Float module coverage and depth shall be adjusted to maximize the distribution and meet the specified requirements and may not correspond to the diagrammatic figures in the contract set.

General Decision Number: CT120017 06/01/2012 CT17

Superseded General Decision Number: CT20100019 State: Connecticut Construction Type: Heavy County: New London County in Connecticut.

HEAVY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 01/06/2012 1 01/20/2012 2 03/23/2012 3 04/06/2012 4 06/01/2012

* CARP0024-007 05/07/2012

Rates Fringes

CARPENTER, Includes Form Work....$ 29.65 21.00

ELEC0035-011 06/01/2011

Bozrah, Colchester, Franklin, Griswold, Lebanon, Ledyard, Lisbon, Montville, North Stonington, Norwich, Preston, Salem, Sprague, Stonington and Voluntown

Rates Fringes

ELECTRICIAN......................$ 36.40 21.31

ELEC0090-003 06/01/2010

East Lyme, Groton, New London, Old Lyme, Waterford, plus the part of Ledyard wherein the property of the Submarine Base is located

Rates Fringes

ELECTRICIAN......................$ 35.20 20.51

ENGI0478-008 04/01/2012

Rates Fringes

POWER EQUIPMENT OPERATOR:

Asphalt Paver...............$ 33.46 20.50+a Asphalt Roller..............$ 32.81 20.50+a Asphalt Spreader............$ 33.46 20.50+a Backhoe/Excavator 2 cubic yards and over..............$ 35.18 20.50+a Backhoe/Excavator under 2 cubic yards.................$ 34.44 20.50+a Bulldozer (Rough Grade Dozer)......................$ 33.15 20.50+a Bulldozer Fine Grade(includes slopes, shaping, laser or gps)......$ 34.44 20.50+a Crane handling or erecting structural steel or stone...$ 35.50 20.50+a Cranes (100 ton capacity & over).......................$ 35.18 20.50+a Cranes (under 100 ton rated capacity).............$ 34.44 20.50+a Drills with self contained power units; Directional driller.....................$ 33.46 20.50+a

Earth Roller................$ 29.94 20.50+a Forklift....................$ 31.98 20.50+a Front End Loader (3 cubic yards up to 7 cubic yards)..$ 33.15 20.50+a Front End Loader (7 cubic yards or over)..............$ 35.50 20.50+a Front End Loader (under 3 cubic yards)................$ 31.98 20.50+a Grader/Blade................$ 34.44 20.50+a Maintenance Engineer/Oiler..$ 27.10 20.50+a Mechanic....................$ 32.41 20.50+a Rubber Tire Backhoe/Excavator...........$ 34.44 20.50+a

a. PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday.

b. Crane with boom, including jib, 150 feet - $1.50 extra .

Crane with boom, including jib, 200 feet- $2.50 extra.

Crane with boom, including jib, 250 feet - $5.00 extra.

Crane with boom, including jib, 300 feet - $7.00 extra.

Crane with boom, including jib, 400 feet - $10.00 extra.

IRON0015-008 01/02/2012

Rates Fringes

IRONWORKER, REINFORCING AND

STRUCTURAL.......................$ 33.50 27.03+a

a. PAID HOLIDAY: Labor Day provided employee has been on the payroll for the 5 consecutive work days prior to Labor Day.

LABO0056-007 04/01/2012

Rates Fringes

LABORERS

GROUP 1.....................$ 25.80 16.45

GROUP 2.....................$ 26.05 16.45

GROUP 3.....................$ 26.30 16.45

GROUP 4.....................$ 26.80 16.45

GROUP 5.....................$ 27.55 16.45

GROUP 6.....................$ 27.80 16.45

GROUP 7.....................$ 16.00 16.45

LABORERS CLASSIFICATIONS

GROUP 1: Laborers (Unskilled), acetylene burner, concrete specialist GROUP 2: Chain saw operators, fence and guard rail erectors, pneumatic tool operators and powdermen.

GROUP 3: Pipelayers, Jackhammer/Pavement breaker (handheld), mason tenders/catch basin builders, asphalt rakers, air track operators, block paver and curb setter GROUP 4: Asbestos/lead removal GROUP 5: Blasters GROUP 6: Toxic waste remover GROUP 7: Traffic control signalman

PAIN0011-013 06/01/2010

Rates Fringes

PAINTER

Brush and Roller............$ 28.47 15.40 Spray Only..................$ 31.47 15.40 Steel Only..................$ 30.47 15.40

SUCT2002-012 12/16/2008

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 25.52 8.49

TRUCK DRIVER: 3 Axle & Semi

- Truck..........................$ 19.93 7.01

TEAM0064-006 04/01/2012

Rates Fringes

TRUCK DRIVER: 4 Axle Truck......$ 28.08 17.22+a

Hazardous waste removal work receives additional $1.25 per hour.

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day and Good Friday, provided the employee has at least 31 calendar days of service and works the last scheduled day before and the first scheduled day after the holiday, unless excused.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification.

Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.)

that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION